09 06 30 Answers to Questions Final 17-25.pdf

PDF 30 KB Posted

Attached to
System Techical Support Services for FOSOV Ground Mobility Vehicles in accordance with attached Performance Work Statement (PWS)
Solicitation number
H92222-09-R-0027
Issued by

About this file

This document provides the answers to questions 17 through 25 submitted by offerors.

View the file

Other files

File Type Posted
Answers to Questions 56 57 09 07 15.pdf PDF
Amendment 0004 Final 09 07 10.pdf PDF
Amendment 0004 Conformed Final 09 07 10.pdf PDF
09 07 08 Answers to Questions 26 27 29-32.pdf PDF
Amendment 0003 Final.pdf PDF
Amendment 0003 Conformed.pdf PDF
09 06 22 Answers to Questions 1-16 .doc DOC document
Amendment 0002 Conformed Final.pdf PDF
Amendment 0002 Final.pdf PDF
CDRL A014 TIR _2_x.pdf PDF
CDRL A019 SAR.pdf PDF
CDRL A013 Conceptual Design.pdf PDF
CDRL A007 ERR.pdf PDF
09 06 09 PWS Final.pdf PDF
CDRL A011 Critical Safety.pdf PDF
CDRL A009 Transp Report.pdf PDF
Amendment 0001 Conformed Final.pdf PDF
CDRL A005 ECP _2_.pdf PDF
CDRL A018 Engineering Services Report.pdf PDF
CDRL A010 Agenda.pdf PDF
CDRL A004 Parts Mgt Plan _2_.pdf PDF
CDRL A006 NOR.pdf PDF
CDRL A016 Meeting Minutesx.pdf PDF
Amendment 0001 Final.pdf PDF
CDRL A008 CSAR.pdf PDF
Atch 03 - SOO Sample 2 GMV —
CDRL A003 Product Dwgs.pdf PDF
CDRL A012 FIR.pdf PDF
CDRL A001 Cost Report.pdf PDF
CDRL A002 Tech Rpt Study.pdf PDF
CDRL A015 RFD _2_.pdf PDF
CDRL A017 ESM _2_.pdf PDF
CDRL A011 Critical Safety.doc DOC document
H9222-09-R-0027 Solicitation.doc DOC document
CDRL A007 ERR.doc DOC document
Atch 03 - SOO Sample 2 GMV Mod.doc DOC document
CDRL A006 NOR.doc DOC document
CDRL A004 Parts Mgt Plan.doc DOC document
CDRL A003 Product Dwgs.doc DOC document
CDRL A008 CSAR.doc DOC document
CDRL A005 ECP.doc DOC document
Atch 02 - SOO Sample Task 1 Armor Coupon Testing.docx DOCX document
CDRL A030 Meeting Minutes.doc DOC document
CDRL A012 FIR.doc DOC document
Atch 01 - STS PWS 09 05 29.docx DOCX document
CDRL A001 Cost Report.docx DOCX document
CDRL A009 Transp Report.doc DOC document
CDRL A002 Tech Rpt Study.docx DOCX document
090204 STS PWS.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP H92222-09-R-0025

Questions and Answers

17. Are any of the Sample Tasks going to be awarded, or are they simply for evaluation? The Government anticipates awarding three (3) of the Sample Tasks. However, the Government still reserves the right to award one (1) or all five (5) tasks.

18. In the H92222-09-R-0027 solicitation Page 52 of 56, the question of whether DD Form1547 and supporting documentation requirement is not defined. Will the Government please clarify if the DD Form 1547 and supporting documentation are or are not required? Offerors are not required to submit a DD Form 1547 with supportive documentation. Amendment 0003 to the Solicitation deletes all language in Section L pertaining to DD Form 1547 requirements.

19. Amendment 0001, Factor 2 – Sample Tasks, Page 17-18 of 27, lists “All of the products described below are required for each of the sample tasks.” Following this statement, six (6) items are listed with item number six being Resumes of Key Personnel. The sample task requirement listed in L-3.1.2.1 Subfactor 2.1 and L-3.1.2.2 Subfactor 2.2, require the “Offeror shall provide (1) a PWS, (2) a Work Breakdown Structure (WBS), (3) a Resource Estimate, (4) a Project Milestone Schedule, and (5) a Management Plan. These five products are explained in detail above.”

As the subfactor descriptions are silent on the Resume of Key Personnel requirement, will the Government please specify where in the Offeror’s response the Resumes are to be included and if they are included in the page count of the identified section? Offerors are required to provide resumes of key personnel. Amendment 0003 revises Section L, paragraphs L-3.1.2.1 and L-3.1.2.2 to require resumes.

To comply with the maximum page count specified in paragraph L-2.3, Offerors may include the resumes in the page count for either the Technical/Management section (Amendment 0003 changed maximum to 60 pages) or the page count for each Sample Task.

20. Should the minimum panel requirements mentioned in Sample Task 1 be revised to account for the two (2) obliquity angles required (increase minimum panel number to 144)? Yes, the minimum quantity needs to be revised to include both obliquity angles. Therefore, the coupon quantity would increase by 72 for a new minimum total of 144 armor coupons. The reason for this is that one of the obliquity angles was accounted for in the SOO and the other angle was not.

21. If so, and the minimum number of panels increases to 144, will the time for test performance completion increase to 60 days from receipt of Gov’t approval of contractor submitted test plan since the number of tests is effectively doubled? Yes, the time will be increased to 45 days in lieu of the 30 day requirement stated in Section 6; Timeliness Standards but not to 60 days. Typical coupon testing is four (4) coupons per day and therefore 45 days would allow the necessary time for the additional 72 panels that will need to be tested at the second obliquity angle.

23. What are the elements of NATO STANAG 4569 that will be applied to the testing performed during this task? NATO STANAG 4569 should be replaced with NATO AEP-55 Volumes 1 and 2.

24. Will the shot spacing requirements of NATO STANAG 4569 be used as part of the definition of ballistic limit testing requirements in addition to those in MIL-STD-610F? I believe this question is referring to MIL-STD-662 in lieu of MIL-STD-610. If so, then NATO AEP-55

Volumes 1, Annex B specifies multiple hit testing and shot spacing.

25. Will you post a copy of the M1165A1 Characteristic sheet? Yes, this will be posted with Amendment 0003.

File details come from the government source that posted it. Updated .