CDRL A003 Product Dwgs.pdf
PDF 16 KB Posted
- Solicitation number
- H92222-09-R-0027
- Issued by
-
United States Special Operations Command
About this file
Attachment 6
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
TDP _X_ TM OTHER
D. SYSTEM/ITEM.
FOSOV System Technical Support (STS)
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
PRODUCT DRAWINGS / MODELS AND ASSOCIATED LISTS
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81000C
5. CONTRACT REFERENCE
C.2.11.1, C.2.11.4.1
6. REQUIRING OFFICE
SOAL-SW, PM-FOSOV
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
AS REQUIRED
12. DATE OF FIRST
SUBMISSION
SEE BLK 16 14. DISTRIBUTION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLKS 10 & 16 a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16 REMARKS
BLK 8 - Government approval/disapproval turn-around time is 30 days after receipt. Contractor correction response and resubmit time is 30 days after Government notification. Technical Inspection and Acceptance shall be IAW MIL-DTL-31000C, Section 4. Verification.
BLK 9 – Required markings: Technical Distribution Statement D, Export Control Warning, Government Part Number and CAGE, and Government approved Contractor Rights-in-Data (if applicable) shall be applied to engineering drawings, models, and associated documentation IAW ASME Y14.100, Y14.24, Y14.35, Y14.41, DoDD 5230.24 and 5230.25. The Contractor’s name and the contract number shall be identified on all documents. Apply on all delivered models, sheets of drawings, associated documents, packaging instructions, lists, and other technical data:
DISTRIBUTION STATEMENT D: DISTRIBUTION IS AUTHORIZED TO THE DEPARTMENT OF
DEFENSE AND U.S. DOD CONTRACTORS ONLY. REASON: (ADMINISTRATIVE OR
OPERATIONAL USE). DATE OF DETERMINATION: (31 JUL 08). OTHER REQUESTS SHALL BE
REFERRED TO THE SPECIAL OPERATIONS COMMAND, PROGRAM MANAGER, FAMILY OF
SPECIAL OPERATIONS VEHICLES, PM-FOSOV, PROJECT OFFICE, ATTN: SOAL-SW, PM-
FOSOV, TAMPA, FLORIDA, 33621-5223.
EXPORT CONTROL WARNING. WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA
WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C.,
SEC 2751, ET. SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE
50, U.S.C., APP. 2401 ET. SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO
SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD
DIRECTIVE 5230.25.
BLK 12/13/14 – Submit for drawing/model product data set approval 7 days after receipt of Government approval of associated ECP (engineering change proposal). Submit approved product data IAW ERR CDRL A007.
BLK 13 – Transfer master files at end of contract IAW CDRL A008.
BLK 14b – Email Addresses:
SOFSA Mike.doroha.ctr@SOFSA.mil
SOAL-SW, PM-FOSOV Michael.ellis1@socom.mil
AMSRD-TAR-E mark.fox1@us.army.mil
Distribution shall also include any others specified in the Task Order.
SOFSA 1
PM-FOSOV 1
AMSRD-TAR-E 1
15. TOTAL 3
G. PREPARED BY
Mark Fox
H. DATE
08 Jun 09
I. APPROVED BY
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS ARE OBSOLETE Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
DATA ITEM NO. A003 (Cont’d)
B. EXHIBIT
C. CATEGORY
TDP X TM OTHER
D. SYSTEM/ITEM.
FOSOV System Technical Support (STS)
E. CONTRACT/PR NO.
F. CONTRACTOR
16 REMARKS (Continued)
PWS Para C.2.12.1: Email data to Product Data Management (PDM) Team (SOAL-SW, PM-FOSOV; AMSRD-TAR-E) within 7 days of request.
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS ARE OBSOLETE Page of Pages
File details come from the government source that posted it. Updated .