Bid_Schedules_(1).pdf

PDF 26 KB Posted

Attached to
Environmental Remediation Services at the former Belle Mead Army Depot in Belle Mead, NJ
Solicitation number
GS-03-P-17-AZ-C-0001
Issued by

About this file

Bid Schedules

View the file

Other files

File Type Posted
GS-03-P-17-AZ-C-0001_Amendment_004.pdf PDF
BMAD_North_Parcel_RFI_Responses_Amendment_004.pdf PDF
2016-11-15_Belle_Mead_Rev._3_(1).pdf PDF
Solicitation_GS-03-P-17-AZ-C-0001_Amendment_003.pdf PDF
Schedule_A-20161102.xlsx XLSX spreadsheet
31_22_00_Backfill_and_Grading-Rev20161103.pdf PDF
31_05_19_Geosynthetics_for_Earthworks-Rev20161103.pdf PDF
32_92_00_Turf_and_Grasses-Rev20161103.pdf PDF
02_11_60_Demolition-Rev20161103.pdf PDF
Sitework.Planting.Gravel.Crushed.jpg JPG image
20161103-Bid_Addendum_summary.docx DOCX document
Sitework.Planting.Grass.Short.jpg JPG image
Exist_Conds.txt TXT text file
31_23_16_Excavation-rev20161102.pdf PDF
Sitework.Planting.Gravel.Mixed.jpg JPG image
DWG_To_PDF.pc3 —
Concrete.Cast-In-Place.Flat.Grey.1.jpg JPG image
02_82_00_Fencing.pdf PDF
Sitework.Planting.Grass.Thick.jpg JPG image
Solicitation_GS-03-P-17-AZ-C-0001_Amendment_002.pdf PDF
32_90_00_Planting-Rev20161103.pdf PDF
2016-11-03_Belle_Mead_Rev._3.pdf PDF
01_30_00_ePMS-rev20161103.pdf PDF
RFI_Responses_Amendment_0002.pdf PDF
01_57_19_Temporary_Environmental_Control-Rev21061103.pdf PDF
_ACM-G-STANDARD.ctb —
01_22_00_Unit_Prices-Rev20161103.pdf PDF
Exist_Conds.dwg DWG drawing
02_51_00_Decontamination-rev20161103.pdf PDF
Sitework.Planting.Soil.jpg JPG image
PreProposal_Sign_In.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_A.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_D.pdf PDF
Pre-proposal_Agenda_BMAD_North_Parcel_Remediation_-_Construction.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_C.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Exhibit_A_-_Permit_Application.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_B.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Exhibit_A_-_Permit_Application_contd_III.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Exhibit_A_-_Permit_Application_contd_II.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_E.pdf PDF
Solicitation_GS-03-P-17-AZ-C-0001_Amendment_001.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Exhibit_A_-_Permit_Application_contd.pdf PDF
RAWP-NorthParcel-BMAD_20160811_FO.pdf PDF
Solicitation_GS-03-P-17-AZ-C-0001_SF1442.pdf PDF
C301.pdf PDF
C101-SB_BMAD_NP_Remediation.pdf PDF
20161017_TreeMitigation_NorthParcel.pdf PDF
C201-SB.pdf PDF
Schedule_A-20161019.xlsx XLSX spreadsheet
2016-10-19_Belle_Mead_Rev._2.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE A - 01 FIXED PRICE BID SCHEDULE

SCHEDULE OF QUANTITIES AND PRICES

FIXED PRICE AMOUNTS

FORMER BELLE MEAD ARMY DEPOT

BELLE MEAD, NEW JERSEY

1 General Conditions Day 460 Unit Rate Item 1 2 Site Clearing Acre 235 Unit Rate Item 2 3 Site Preparation LS 1 No Unit Rate 4 Burn Pit Excavation and Disposal Ton 1750 Unit Rate Item 4 5 Pistol Range Excavation and Disposal Ton 150 Unit Rate Item 5 6 AOC 17, AOC 9, Selenium Area and Naphthalene Area Excavation and Disposal Ton 7000 Unit Rate Item 6 7 Excavation and Material Handling (Northwest Corridor) CY 40,000 Unit Rate Item 7 8 Excavation and Material Handling (Eastern Area, Rail Yard, and Western Area) CY 359,000 Unit Rate Item 8 9 Excavation and Material Handling (Royce Brook Tributary) CY 120 Unit Rate Item 9 10 Site Grading Acre 235 Unit Rate Item 10 11 Topsoil and Seed Acre 235 Unit Rate Item 11 12 AOC 15 Consolidation Area - Cover Soil CY 61,900 Unit Rate Item 12 13 AOC 15 Consolidation Area - Access Road, Downshoots and Culverts LS 1 No Unit Rate 14 AOC 15 Consolidation Area - Topsoil and Seed Acre 21 Unit Rate Item 14 15 Upland Tree Mitigation - - - Unit Rate Item 15 15 - 01 Trees each 8000 Unit Rate Item 15 - 01 15 - 02 Shrubs each 3000 Unit Rate Item 15 - 02 16 Wetland Riparian Zone Restoration and Plantings Acre 19.081 Unit Rate Item 16 17 Site Construction Access Roads LS 1 No Unit Rate 18 Air Noise and Dust Monitoring Day 420 Unit Rate Item 18 19 Confirmation Sampling & Analysis each sample 1926 Unit Rate Item 19 20 Surveying LS 1 No Unit Rate 21 Off-Site Disposal - Miscellaneous Debris - - - Unit Rate Item 21 21 - 01 Rail Ties LS 1 Unit Rate Item 21 - 01 21 - 02 Other miscellaneous debris Ton 1000 Unit Rate Item 21 - 02 22 Off-Site Disposal - Recyclable Metals Ton 1000 Unit Rate Item 22

$0

Notes:

SY denotes a square yard in two Dimensions Acre is 43,560 square feet in two Dimensions

Fixed Price Amount bid prices listed in this Schedule are based on performance of the Work as specified in these Specifications shall include all overhead, profit, handling, taxes and all other related charges. The Fixed Price Amount includes all costs for the measured quantitiesquantity up to the estimated quantity for each Bid Item. For measured quantities greater than the outside estimated quantity, the Fixed Price Amount will be increased by at the unit rate in the corresponding Unit Prices Allowance Item times the measured quantity measured above the estimated quantity up to a maximum of 15% beyond the estimated quantity as listed on the Unit Rate Allowance Bid Sheet.

Bid Item No. Bid Item Measurement Unit

Estimated Quantity

Fixed Price Amount $ Corresponding Unit Rate Item

TOTAL FIXED PRICE COST

L.S. denotes Lump Sum CY denotes in place cubic yard Ton denotes short ton (2,000 pounds)

SCHEDULE A - 02 UNIT RATE ALLOWANCE

SCHEDULE OF QUANTITIES AND PRICES

UNIT RATE ALLOWANCE

FORMER BELLE MEAD ARMY DEPOT

BELLE MEAD, NEW JERSEY

1 General Conditions Day 69 2 Site Clearing Acre 35 3 Site Preparation No Allowance 0 4 Burn Pit Excavation and Disposal Ton 263 5 Pistol Range Excavation and Disposal Ton 23 6 AOC 17, AOC 9, Selenium Area and Naphthalene Area Excavation and Disposal Ton 1,050 7 Excavation and Material Handling (Northwest Corridor) CY 6,000 8 Excavation and Material Handling (Eastern Area, Rail Yard, and Western Area) CY 53,850 9 Excavation and Material Handling (Royce Brook Tributary) CY 18 10 Site Grading Acre 35 11 Topsoil and Seed Acre 35 12 AOC 15 Consolidation Area - Cover Soil CY 9,285 13 AOC 15 Consolidation Area - Access Road, Downshoots and Culverts No Allowance 0 14 AOC 15 Consolidation Area - Topsoil and Seed Acre 3 15 Upland Tree Mitigation - - 15 - 01 Trees each tree 1,200 15 - 02 Shrubs each shrub 450 16 Wetland Riparian Zone Restoration and Plantings Acre 3 17 Site Construction Access Roads No Allowance 0 18 Air Noise and Dust Monitoring Day 63 19 Confirmation Sampling & Analysis each sample 289 20 Surveying No Allowance 0 21 Off-Site Disposal - Miscellaneous Debris - - 21 - 01 Rail Ties No Allowance 0 21 - 02 Other miscellaneous debris Ton 150 22 Off-Site Disposal - Recyclable Metals Ton 150

$0

Notes:

SY denotes a square yard in two Dimensions Acre is 43,560 square feet in two Dimensions

TOTAL ALLOWANCE ADJUSTMENTS

L.S. denotes Lump Sum CY denotes in place cubic yard Ton denotes short ton (2,000 pounds)

Unit Price Allowances are based on performance of the Work as specified in these Specifications shall include all overhead, profit, handling, taxes and all other related charges.

As may be needed during the performance of the Work, the Base Contract may be increased on a unit-rate basis for for quantities up to 15% of the base bid.

Measurement Unit

Quantity (15% of Base) Unit Rate

Total Unit Price Allowance

Bid Item No. Bid Item

U.S. General Services Adminstration Mid-Atlantic Region

Public Buildings Service

100% Design – Issue for Bid Schedule B August 12, 2016 \\uspsw2pfpsw001\data\Data_USPSW2VFP001\Environment\Piscataway\Project\GSA\60436364 Belle Mead Design\500 Deliverables\503 North Parcel Issue for Bid Design\Bid Schedules\SCHEDULE B to G.docx

SCHEDULE B

LIST OF ADDENDA

List all Addenda received

NO. TITLE DATE

Public Buildings Service

100% Design DRAFT Schedule C August 12, 2016 \\uspsw2pfpsw001\data\Data_USPSW2VFP001\Environment\Piscataway\Project\GSA\60436364 Belle Mead Design\500 Deliverables\503 North Parcel Issue for Bid Design\Bid Schedules\SCHEDULE B to G.docx

SCHEDULE C

SCHEDULE OF MATERIALS - (VARIATIONS AND SOURCES)

VARIATIONS (Bidder shall list any proposed variations from the specified materials, subject to approval by the Engineer):

MATERIALS SOURCES (Bidder shall list sources of the following specified materials)

Material Source Cement

Top Soil

AOC 15 Cover Soil

Open Graded Stone

Rock

Landscape Materials and Planting

Disposal Facilities for All Waste Streams

Any other materials required to complete the Work.

Public Buildings Service

100% Design DRAFT Schedule D August 12, 2016 \\uspsw2pfpsw001\data\Data_USPSW2VFP001\Environment\Piscataway\Project\GSA\60436364 Belle Mead Design\500 Deliverables\503 North Parcel Issue for Bid Design\Bid Schedules\SCHEDULE B to G.docx

SCHEDULE D

LIST OF SUBCONTRACTORS

Provide the name of each Subcontractor proposed for the Work, together with the amount payable to each Subcontractor. Work that will be carried out partly or entirely by Bidder’s own forces shall be indicated by “Own Forces”. Should Bidder wish to separate the Work into two parts or more to be awarded to two or more Subcontractors, without conflicting with the requirements of the Specifications, such separation shall be indicated below. Bidder shall not be allowed to change any Subcontractor except with the prior consent of GSA and/or the construction Manager.

TYPE OF WORK NAME AND ADDRESS APPROXIMATE VALUE

Public Buildings Service

100% Design DRAFT Schedule E August 12, 2016 \\uspsw2pfpsw001\data\Data_USPSW2VFP001\Environment\Piscataway\Project\GSA\60436364 Belle Mead Design\500 Deliverables\503 North Parcel Issue for Bid Design\Bid Schedules\SCHEDULE B to G.docx

SCHEDULE E

LIST OF EQUIPMENT

On this form or Bidder’s similar form, list all equipment that will be used in the performance of the Work.

Such list shall show for each unit, description of the unit, capacity, condition, age, present location, name of the owner of the equipment, and all-inclusive hourly rental rates including operator. Such equipment shall be subject to inspection by the Owner or Engineer to verify the stated information. The equipment rates provided will be used as the basis for payment of any Time and Materials Work that is deemed necessary by the Engineer for completion of the Work.

HR. WKLY

RENTAL

DESCRIPTION CAPACITY CONDITION AGE LOCATION OWNER RATE

Public Buildings Service

100% Design DRAFT Schedule F August 12, 2016 \\uspsw2pfpsw001\data\Data_USPSW2VFP001\Environment\Piscataway\Project\GSA\60436364 Belle Mead Design\500 Deliverables\503 North Parcel Issue for Bid Design\Bid Schedules\SCHEDULE B to G.docx

SCHEDULE F

CONSTRUCTION MILESTONES

Bidder shall prepare an initial Progress Schedule showing all activities and dependent operations such as equipment mobilization and taking into account the Milestones listed below. The Bidder’s initial Progress Schedule shall be provided with the Bid proposal. Mobilization shall begin in January 2017 and Substantial Completion shall be before February 2019.

Major Schedule Milestones

Mobilization

Start of Tree Clearing

Tree Clearing 50 Eastern Area

Tree Clearing Rail Yard Area

End of Tree Clearing

Contractor’s Baseline Survey Submittal

Install Temporary Royce Brook Crossing

Remove Temporary Royce Brook Crossing

Begin Soil Placement in Consolidation Area

End Soil Placement in Consolidation Area

Begin Eastern Boundary Excavation

End Eastern Boundary Excavation

Begin Burn Pit Excavation

End Burn Pit Excavation

Begin Pistol Range (AOC10-2) Excavation

End pistol Range (AOC10-2) Excavation

Begin Rail Yard Excavation

End Rail Yard Excavation

Begin Northwest Corridor Excavation

End Northwest Corridor Excavation

Public Buildings Service

100% Design DRAFT Schedule F August 12, 2016 \\uspsw2pfpsw001\data\Data_USPSW2VFP001\Environment\Piscataway\Project\GSA\60436364 Belle Mead Design\500 Deliverables\503 North Parcel Issue for Bid Design\Bid Schedules\SCHEDULE B to G.docx

Begin Western Area Excavation

End Western Area Excavation

Begin Royce Brook Tributary Excavation

End Royce Brook Tributary Excavation

Begin Backfill

End Backfill

Final Restoration

Demobilization

Public Buildings Service

DRAFT 100% Design Schedule G August 12, 2016 \\uspsw2pfpsw001\data\Data_USPSW2VFP001\Environment\Piscataway\Project\GSA\60436364 Belle Mead Design\500 Deliverables\503 North Parcel Issue for Bid Design\Bid Schedules\SCHEDULE B to G.docx

SCHEDULE G

LIST OF PERSONNEL

List the names of the principal personnel who will be assigned to the Work, including the superintendent, and their experience and hourly billing rate (not pay rate). List all categories of personnel and hourly rates for non-principal personnel. The labor rates provided will be used as the basis for payment of any Time and Materials Work that is deemed necessary by the Engineer for completion of the Work.

NAME POSITION EXPERIENCE HOURLY RATE

File details come from the government source that posted it. Updated .