01_30_00_ePMS-rev20161103.pdf
PDF 14 KB Posted
- Attached to
- Environmental Remediation Services at the former Belle Mead Army Depot in Belle Mead, NJ
- Solicitation number
- GS-03-P-17-AZ-C-0001
About this file
Electronic Project Management System ev20161103
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. General Services Adminstration Mid-Atlantic Region
Public Buildings Service
SECTION 01 30 00
ELECTRONIC PROJECT MANAGEMENT (ePM) SYSTEM
100% Design – Issue For Bid 01 30 00-1 October November 319, 2016 \\uspsw2pfpsw001\data\Data_USPSW2VFP001\Environment\Piscataway\Project\GSA\60436364 Belle Mead Design\500 Deliverables\503 North Parcel Issue for Bid Design\Specifications\01- General Requirments\01 30 00 ePMS.docx
PART 1 - GENERAL
1.01 SECTION INCLUDES:
A. Purpose B. Definition C. Project Collaboration and Documentation D. Scheduling Requirements E. Equipment and Training F. Personnel Requirements G. Data Ownership H. Document Security
1.02 PURPOSE:
A. The Contractor shall use GSA’s web-based electronic Project Management (ePM) system, which is a fully configured version of Meridian SystemTrimble’s’ Proliance Construction Management Software. Click on this link for the ePM minimum requirements: https://insite.gsa.gov/portal/category/517870
1.03 DEFINITION:
A. ePM is a web-based project management tool which provides GSA’s Public Buildings Service with an automated workflow, collaboration, document management and project management solution to help manage GSA design and construction projects. ePM is integrated with GSA’s gBUILD (Green Building Upgrade Information Lifecycle Database ) to share project creation and data storage information.
1.04 PROJECT COLLABORATION AND DOCUMENTATION:
A. General
1. The Contractor shall effectively manage the ePM database including maintaining adequate staffing levels and ensuring that personnel attend the mandatory GSA-provided training sessions.
2. The Contractor shall use ePM to upload, store, capture, preserve, record, maintain, update, and route all project-related documentation to comply with GSA's Document Security Requirements. Classified material is not permitted to be stored in this system.
3. The Contractor shall use the workflow processes contained within ePM to submit and receive approval for all project deliverables.
4. The Contractor shall continuously monitor and review ePM to ensure the Contractor data is current through completion of the Close-out Phase of Construction.
5. The Contractor is required to store documents from their subcontractors and vendors in ePM. If a subcontractor or vendor does not obtain an ePM license, the
Public Buildings Service
SECTION 01 30 00
ELECTRONIC PROJECT MANAGEMENT (ePM) SYSTEM
100% Design – Issue For Bid 01 30 00-2 October November 319, 2016 \\uspsw2pfpsw001\data\Data_USPSW2VFP001\Environment\Piscataway\Project\GSA\60436364 Belle Mead Design\500 Deliverables\503 North Parcel Issue for Bid Design\Specifications\01- General Requirments\01 30 00 ePMS.docx contractor will be responsible for uploading and processing documents in ePM on their behalf.
B. Contents of ePM
1. The Contractor shall use ePM as the electronic filing cabinet for all project-related correspondence and submittals. The Contract Documents specify certain documentation that the Contractor shall provide during performance of the Contract. For the avoidance of doubt, and unless specifically stated otherwise in the Contract Documents, in addition to any documentation that the Contractor submits to GSA as set forth in the Contract Documents. The current ePM Minimum Requirements can be found at: http://www.gsa.gov/epm.
2. Contractor shall upload all Project Schedules and updates as specified in Specification Section 01 31 10 – Critical Path Method Scheduling.
3. Contractor shall upload Daily Construction Reports and any other construction progress documentation as specified in Specification Section 01 32 00 – Construction Progress Documentation.
4. Contractor shall upload all digital photographs, construction videos, and any other photographic documentation as specified in Specification Section 01 32 20
– Photographic Documentation.
5. Contractor shall upload all required submittals with performance of construction activities as described in other Sections of the Specifications and with the Submittal Schedule specified in Section 013200 – Construction Progress Documentation described. Submittals shall be in accordance with Specification Section 01 33 00 – Submittal Procedures.
6. Contractor shall upload all quality control reports, inspections and data as specified in Specification Section 01 40 00 – Quality Assurance & Control and as specified in other Sections of the Specifications.
7. Contractor shall upload all health and safety plans and reports as specified in Specification Section 01 41 50 – Safety & Health.
8. Contractor shall upload any other submittal, schedule, report, plan, or data as specified in other Sections of the Specifications.
1.05 SCHEDULING REQUIREMENTS:
A. The Project Schedule shall be produced using widely used, commercially available computer software that is capable of generating and monitoring a CPM schedule and is compatible with Meridian Trimble Proliance®.
1.06 EQUIPMENT AND TRAINING:
A. Equipment
Public Buildings Service
SECTION 01 30 00
ELECTRONIC PROJECT MANAGEMENT (ePM) SYSTEM
100% Design – Issue For Bid 01 30 00-3 October November 319, 2016 \\uspsw2pfpsw001\data\Data_USPSW2VFP001\Environment\Piscataway\Project\GSA\60436364 Belle Mead Design\500 Deliverables\503 North Parcel Issue for Bid Design\Specifications\01- General Requirments\01 30 00 ePMS.docx
1. GSA will not furnish any equipment related to accessing ePM. ePM is web-accessible, and can therefore be accessed via any computer with an Internet connection. For up to date ePM desktop requirements: http://www.gsa.gov/epm.
B. ePM Training
1. GSA will provide no cost training to familiarize team members with the ePM system. The GSA Project Manager will ensure that appropriate personnel should attend training and what roles they will be set up within the system based on their project responsibilities.
C. ePM Support
1. GSA will provide ePM system administration and end user support, for the duration of the project.
1.07 PERSONNEL REQUIREMENTS:
A. An HSPD-12 security clearance is required to access ePM. Project Team members without an HSPD-12 clearance will need to work with the GSA Project Manager to initiate the clearance process, and request a temporary waiver for ePM access until clearance can be confirmed. A waiver means that once the individual’s HSPD-12 clearance is confirmed, an ePM username and password will be provided. For up to date GSA HSPD- 12 information: www.gsa.gov/hspd12. Obtaining clearances vary in length and may take time to receive them.
1.08 DATA OWNERSHIP:
A. GSA shall retain ownership of all data entered into the system and shall administer all information contained therein. And distribution of any system data shall be made upon request.
1.09 DOCUMENT SECURITY:
A. ePM security access levels ensure that sensitive documents can only be accessed by the appropriate personnel. It is the contractor’s responsibility to ensure their employees, subcontractors and vendors have the appropriate level of security to ensure document security.
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
END OF SECTION
Public Buildings Service
SECTION 01 30 00
ELECTRONIC PROJECT MANAGEMENT (ePM) SYSTEM
100% Design – Issue For Bid 01 30 00-4 October November 319, 2016 \\uspsw2pfpsw001\data\Data_USPSW2VFP001\Environment\Piscataway\Project\GSA\60436364 Belle Mead Design\500 Deliverables\503 North Parcel Issue for Bid Design\Specifications\01- General Requirments\01 30 00 ePMS.docx