02_82_00_Fencing.pdf
PDF 9 KB Posted
- Attached to
- Environmental Remediation Services at the former Belle Mead Army Depot in Belle Mead, NJ
- Solicitation number
- GS-03-P-17-AZ-C-0001
About this file
Fencing
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSA Belle Mead Army Depot Belle Mead, New Jersey PCN #
January 2016 FENCING 028200 - 1
SECTION 028200 - FENCING
PART 1 - GENERAL
1.01 DESCRIPTION:
A. Furnish all labor, materials, tools and equipment for the installation of chain link fencing as shown in the Drawings.
1.04 REFERENCES:
A. American Society for Testing and Materials (ASTM):
ASTM A 392 Revision A, Standard Specification for Zinc-Coated Steel Chain Link Fence Fabric
1. ASTM C 33, Standard Specification for Concrete Aggregates
2. ASTM C 150, Standard Specification for Portland Cement
3. ASTM F 567, Standard Practice for Installation of Chain-Link Fence
4. ASTM F 626, Standard Specifications for Fence Fittings
5. ASTM F 1043 Standard Specification for Strength and Protective Coatings on
Steel Industrial Fence Framework
1.02 SUBMITTALS:
A. Prior to installation Contractor shall provide manufacturer specifications, cut sheets, drawings, details, installation instructions, and maintenance recommendations for chain link fencing.
B. Following installation, Contractor shall provide written certification that Contractor has installed the fencing system in accordance with manufacturer’s recommendations and that the fencing system has been inspected by Contractor and found free and clear of any defects.
C. Contractor shall submit the initial and continuously updated New Jersey One Call report numbers as soon as they are obtained, along with the subsequent reports after they are completed.
1.03 PROJECT CONDITIONS:
A. The approximate locations and dimensions of structures to be removed are indicated in the Contract Documents. The Contractor may encounter foundations, utilities, wooden or other pilings, surface slabs, and other debris during fence installation. If the Contractor encounters a structure not shown in the Contract Documents, the Contractor shall notify the Engineer immediately.
B. Surface and subsurface structure work shall be performed in a manner that does not disturb or damage existing utilities, structures, or other items found within the work area. Contractor is responsible for repairing and/or replacing damaged items at no cost to Owner.
1.04 COORDINATION AND SCHEDULING
GSA Belle Mead Army Depot Belle Mead, New Jersey PCN #
January 2016 FENCING 028200 - 2
A. Work shall be coordinated maintenance of temporary security fencing such that temporary security fencing shall remain in place until installation and final acceptance of permanent fencing, unless otherwise directed by the Engineer
PART 2 - PRODUCTS
2.01 FENCE HEIGHT:
A. Fence height shall be as indicated in the Drawings or as otherwise directed by the Engineer.
B. Product details for fencing and fencing appurtenances may change based on fence height.
Contractor shall provide materials and installation of fencing system based upon manufacturer’s recommendations for the appropriate fence height.
2.02 FENCE TYPE:
A. Chain link fence type shall be zinc coated steel woven fabric conforming to ASTM A 392 REV A.
2.03 FENCING SYSTEM:
A. A complete fencing system shall include all posts, braces, wires, concrete, rails, connections, and other appurtenances as recommended by the manufacturer.
2.04 CONCRETE FOR POST FOOTINGS:
A. Concrete shall consist of Type I Portland cement complying with ASTM C 150, aggregates complying with ASTM C 33, and clean water. Concrete mix shall be proportioned such that the 28-day compressive strength of moist-cured laboratory samples achieves not less than 3,000 pounds per square inch (psi).
PART 3 - EXECUTION
3.01 INSTALLATION:
A. Contractor shall inspect the work area prior to beginning work and identify to Engineer, in writing, any and all site conditions that may interfere with the work to be completed by Contractor.
B. Contractor shall locate and protect nearby utilities, structures, fences, vegetation, and other items shown in the Contract Drawings.
C. Contractor shall install a complete fencing system as determined through manufacturer recommendations, the Drawings, and the Engineer.
D. Subcontractor shall not install fence fabric until concrete has cured for a minimum of two days.
END OF SECTION
028200 Fencing