01_57_19_Temporary_Environmental_Control-Rev21061103.pdf

PDF 11 KB Posted

Attached to
Environmental Remediation Services at the former Belle Mead Army Depot in Belle Mead, NJ
Solicitation number
GS-03-P-17-AZ-C-0001
Issued by

About this file

Temporary Environmental Control-Rev21061103

View the file

Other files

File Type Posted
GS-03-P-17-AZ-C-0001_Amendment_004.pdf PDF
BMAD_North_Parcel_RFI_Responses_Amendment_004.pdf PDF
2016-11-15_Belle_Mead_Rev._3_(1).pdf PDF
Solicitation_GS-03-P-17-AZ-C-0001_Amendment_003.pdf PDF
Schedule_A-20161102.xlsx XLSX spreadsheet
31_22_00_Backfill_and_Grading-Rev20161103.pdf PDF
31_05_19_Geosynthetics_for_Earthworks-Rev20161103.pdf PDF
32_92_00_Turf_and_Grasses-Rev20161103.pdf PDF
02_11_60_Demolition-Rev20161103.pdf PDF
Sitework.Planting.Gravel.Crushed.jpg JPG image
20161103-Bid_Addendum_summary.docx DOCX document
Sitework.Planting.Grass.Short.jpg JPG image
Exist_Conds.txt TXT text file
31_23_16_Excavation-rev20161102.pdf PDF
Sitework.Planting.Gravel.Mixed.jpg JPG image
DWG_To_PDF.pc3 —
Concrete.Cast-In-Place.Flat.Grey.1.jpg JPG image
02_82_00_Fencing.pdf PDF
Sitework.Planting.Grass.Thick.jpg JPG image
Solicitation_GS-03-P-17-AZ-C-0001_Amendment_002.pdf PDF
32_90_00_Planting-Rev20161103.pdf PDF
2016-11-03_Belle_Mead_Rev._3.pdf PDF
01_30_00_ePMS-rev20161103.pdf PDF
RFI_Responses_Amendment_0002.pdf PDF
_ACM-G-STANDARD.ctb —
01_22_00_Unit_Prices-Rev20161103.pdf PDF
Exist_Conds.dwg DWG drawing
02_51_00_Decontamination-rev20161103.pdf PDF
Sitework.Planting.Soil.jpg JPG image
PreProposal_Sign_In.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_A.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_D.pdf PDF
Pre-proposal_Agenda_BMAD_North_Parcel_Remediation_-_Construction.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_C.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Exhibit_A_-_Permit_Application.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_B.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Exhibit_A_-_Permit_Application_contd_III.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Exhibit_A_-_Permit_Application_contd_II.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_E.pdf PDF
Solicitation_GS-03-P-17-AZ-C-0001_Amendment_001.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Exhibit_A_-_Permit_Application_contd.pdf PDF
RAWP-NorthParcel-BMAD_20160811_FO.pdf PDF
Solicitation_GS-03-P-17-AZ-C-0001_SF1442.pdf PDF
C301.pdf PDF
C101-SB_BMAD_NP_Remediation.pdf PDF
20161017_TreeMitigation_NorthParcel.pdf PDF
C201-SB.pdf PDF
Schedule_A-20161019.xlsx XLSX spreadsheet
2016-10-19_Belle_Mead_Rev._2.pdf PDF
SESCP-Application.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. General Services Adminstration Mid-Atlantic Region

Public Buildings Service

SECTION 01 57 19

TEMPORARY ENVIRONMENTAL CONTROL

100% Design – Issue For Bid 01 57 19-1 October 19November 3, 2016 \\uspsw2pfpsw001\data\Data_USPSW2VFP001\Environment\Piscataway\Project\GSA\60436364 Belle Mead Design\500 Deliverables\503 North Parcel Issue for Bid Design\Specifications\01- General Requirments\01 57 19 Temporary Environmental Control.docx

PART 1 – GENERAL

1.01 SECTION INCLUDES:

A. Summary B. Laws and Regulations C. Safety D. Dust Control E. Noise Control F. Wetting Agents G. Noise Dampers

1.02 SUMMARY:

A. The Work under this Section includes the furnishing of all labor, equipment and materials, and performing all operations in connection with temporary environmental controls as specified herein.

B. Air, dust and noise monitoring procedures and action levels are provide in the Air Monitoring Plan. This plan will be implemented by the Contactor.

1.03 LAWS AND REGULATIONS:

A. All work under this Contract shall be accomplished in accordance with regulations of local, county, State and Federal agencies and utility authority standards as they apply.

1.04 SAFETY:

A. Methods of operation utilized in work related to these specifications shall be such as to provide maximum protection against injury or death to workmen or the public.

Requirements of the United States and New Jersey Occupational Safety and Health Acts as to safety regulations and procedures shall be adhered to for all work covered under these specifications.

1.05 DUST CONTROL:

A. The control and mitigation of dust on-site is a critical aspect of this project.

B. Dust particles generated from Work, and/or general site conditions (i.e., dry or wind conditions) shall be controlled during working and non-working hours.

1. Site-Wide Dust Suppression: The Contractor shall maintain stockpiles, haul roads, permanent and temporary access roads, staging areas, and other areas within or outside the Work Area free from particulates which would cause the air pollution standards to be exceeded or which would cause a hazard or nuisance.

The Contractor must have sufficient equipment and personnel available to accomplish these tasks. After work hours, Contractor must maintain dust free conditions by sweeping paved roadways and entrance gates to the site and through the use of dust suppression solutions, tarp or other means.

Public Buildings Service

SECTION 01 57 19

TEMPORARY ENVIRONMENTAL CONTROL

100% Design – Issue For Bid 01 57 19-2 October 19November 3, 2016 \\uspsw2pfpsw001\data\Data_USPSW2VFP001\Environment\Piscataway\Project\GSA\60436364 Belle Mead Design\500 Deliverables\503 North Parcel Issue for Bid Design\Specifications\01- General Requirments\01 57 19 Temporary Environmental Control.docx

2. Excavation Dust Suppression: The Contractor shall provide at least one mister continuously operated for each work area involving impacted soil (excavation, stockpiling, loading, etc.). At the end of every work day, the Contractor shall remove soil tracked on public streets, cover soil stockpiles with plastic/tarp and cover of excavated areas with Formula 480Soil Works Durasoil®, SoilTac® (or other Owner approved dust control agent) or plastic/tarp.

3. Other measures such as additional misters and a misting curtain may be required as directed by the Construction Manager.

C. Contractor shall provide dust control measures required by all applicable regulatory requirements and as specified in the current Air Monitoring Plan.

D. Contractor shall provide all labor, materials (on-site potable water service is not available on-site at no charge) and equipment, including water trucks and dust suppressant, needed to limit visible dust generation and meet measurable requirements of the Dust Control Plan during on-site transportation and other work activities.

E. Wetting agents (Formula 480 e.g., DuraSoil® and/or potable water) shall be used on an as needed basis.

F. Work shall be stopped if dust is visually observed migrating across site boundaries.

1.06 NOISE CONTROL:

A. Contractor shall be responsible for conducting all Work in accordance with Laws and Regulations concerning noise or sound levels as specified in local ordinance “.

B. The Construction Manager may enforce compliance with noise levels. If compliance is not met, the contruction manager may coordinate with GSA who shall have authority to direct Contractor to stop Work or modify Work methods or activities as necessary.

C. Contractor shall control the Work at all times, such that sound levels measured at the Project site property boundary comply with the local ordinances.

D. Contractor’s vehicles and equipment shall be outfitted with mufflers and other sound attenuating equipment so that sound levels comply with local ordinances.

PART 2 - PRODUCTS

2.01 WETTING AGENTS:

A. The Contractor shall provide wetting agent (water or Construction Manager approved wetting agent) for general site use.

B. The Contractor shall provide drip system if requested by Construction Manager.

Public Buildings Service

SECTION 01 57 19

TEMPORARY ENVIRONMENTAL CONTROL

100% Design – Issue For Bid 01 57 19-3 October 19November 3, 2016 \\uspsw2pfpsw001\data\Data_USPSW2VFP001\Environment\Piscataway\Project\GSA\60436364 Belle Mead Design\500 Deliverables\503 North Parcel Issue for Bid Design\Specifications\01- General Requirments\01 57 19 Temporary Environmental Control.docx

2.02 NOISE DAMPERS:

A. The Contractor is required to provide noise dampening materials / equipment necessary to achieve noise standards.

PART 3 – EXECUTION

Not Used

END OF SECTION