Revised Schedule A - Bid Sheet included in Amendment 002.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01-Fixed Price Bid Schedule
| SCHEDULE A - 01 FIXED PRICE BID SCHEDULE |
| SCHEDULE OF QUANTITIES AND PRICES |
| FIXED PRICE AMOUNTS |
| FORMER BELLE MEAD ARMY DEPOT |
| BELLE MEAD, NEW JERSEY |
Fixed Price Amount bid prices listed in this Schedule are based on performance of the Work as specified in these Specifications shall include all overhead, profit, handling, taxes and all other related charges. The Fixed Price Amount includes all costs for the measured quantitiesquantity up to the estimated quantity for each Bid Item. For measured quantities greater than the outside estimated quantity, the Fixed Price Amount will be increased by at the unit rate in the corresponding Unit Prices Allowance Item times the measured quantity measured above the estimated quantity up to a maximum of 15% beyond the estimated quantity as listed on the Unit Rate Allowance Bid Sheet.
Bid Item No. Bid Item Measurement Unit Estimated Quantity Micalizio, Gregg: Micalizio, Gregg:
| Consider removal of this column. | Fixed Price Amount |
| $ | Corresponding Unit Rate Item |
| 1 | General Conditions | Day | 460 | Unit Rate Item 1 | |
| 2 | Site Clearing | Acre | 235 | Unit Rate Item 2 | |
| 3 | Site Preparation | LS | 1 | No Unit Rate | |
| 4 | Burn Pit Excavation and Disposal | Ton | 1750 | Unit Rate Item 4 | |
| 5 | Pistol Range Excavation and Disposal | Ton | 150 | Unit Rate Item 5 | |
| 6 | AOC 17, AOC 9, Selenium Area and Naphthalene Area Excavation and Disposal | Ton | 7000 | Unit Rate Item 6 | |
| 7 | Excavation and Material Handling (Northwest Corridor) | CY | 40,000 | Unit Rate Item 7 | |
| 8 | Excavation and Material Handling (Eastern Area, Rail Yard, and Western Area) | CY | 359,000 | Unit Rate Item 8 | |
| 9 | Excavation and Material Handling (Royce Brook Tributary) | CY | 120 | Unit Rate Item 9 | |
| 10 | Site Grading | Acre | 210 | Unit Rate Item 10 | |
| 11 | Topsoil and Seed | Acre | 191 | Unit Rate Item 11 | |
| 12 | AOC 15 Consolidation Area - Cover Soil | CY | 61,900 | Unit Rate Item 12 | |
| 13 | AOC 15 Consolidation Area - Access Road, Downshoots and Culverts | LS | 1 | No Unit Rate | |
| 14 | AOC 15 Consolidation Area - Topsoil and Seed | Acre | 21 | Unit Rate Item 14 | |
| 15 | Upland Tree Mitigation | - | - | - | Unit Rate Item 15 |
| 15 - 01 | Trees | each | 8000 | Unit Rate Item 15 - 01 | |
| 15 - 02 | Shrubs | each | 3000 | Unit Rate Item 15 - 02 | |
| 16 | Wetland Riparian Zone Restoration and Plantings | Acre | 19 | Unit Rate Item 16 | |
| 17 | Site Construction Access Roads | LS | 1 | No Unit Rate | |
| 18 | Air Noise and Dust Monitoring | Day | 420 | Unit Rate Item 18 | |
| 19 | Confirmation Sampling & Analysis | each sample | 1926 | Unit Rate Item 19 | |
| 20 | Surveying | LS | 1 | No Unit Rate | |
| 21 | Off-Site Disposal - Miscellaneous Debris | - | - | - | Unit Rate Item 21 |
| 21 - 01 | Rail Ties | Ton | 3020 | Unit Rate Item 21 - 01 | |
| 21 - 02 | Other miscellaneous debris | Ton | 1000 | Unit Rate Item 21 - 02 | |
| 22 | Off-Site Disposal - Recyclable Metals | Ton | 1000 | Unit Rate Item 22 | |
| TOTAL FIXED PRICE COST | $0 | ||||
| Notes: | |||||
| L.S. denotes Lump Sum | |||||
| CY denotes in place cubic yard | |||||
| Ton denotes short ton (2,000 pounds) | |||||
| SY denotes a square yard in two Dimensions | |||||
| Acre is 43,560 square feet in two Dimensions |
02-Unit Rate Allowance
| SCHEDULE A - 02 UNIT RATE ALLOWANCE |
| SCHEDULE OF QUANTITIES AND PRICES |
| UNIT RATE ALLOWANCE |
| FORMER BELLE MEAD ARMY DEPOT |
| BELLE MEAD, NEW JERSEY |
Unit Price Allowances are based on performance of the Work as specified in these Specifications shall include all overhead, profit, handling, taxes and all other related charges. As may be needed during the performance of the Work, the Base Contract may be increased on a unit-rate basis for for quantities up to 15% of the base bid.
Bid Item No. Bid Item Measurement Unit Quantity (15% of Base) Unit Rate Total Unit Price Allowance
| 1 | General Conditions | Day | 69 | |
| 2 | Site Clearing | Acre | 35 | |
| 3 | Site Preparation | No Allowance | - | |
| 4 | Burn Pit Excavation and Disposal | Ton | 263 | |
| 5 | Pistol Range Excavation and Disposal | Ton | 23 | |
| 6 | AOC 17, AOC 9, Selenium Area and Naphthalene Area Excavation and Disposal | Ton | 1,050 | |
| 7 | Excavation and Material Handling (Northwest Corridor) | CY | 6,000 | |
| 8 | Excavation and Material Handling (Eastern Area, Rail Yard, and Western Area) | CY | 53,850 | |
| 9 | Excavation and Material Handling (Royce Brook Tributary) | CY | 18 | |
| 10 | Site Grading | Acre | 32 | |
| 11 | Topsoil and Seed | Acre | 29 | |
| 12 | AOC 15 Consolidation Area - Cover Soil | CY | 9,285 | |
| 13 | AOC 15 Consolidation Area - Access Road, Downshoots and Culverts | No Allowance | 0 | |
| 14 | AOC 15 Consolidation Area - Topsoil and Seed | Acre | 3 | |
| 15 | Upland Tree Mitigation | - | - | |
| 15 - 01 | Trees | each tree | 1,200 | |
| 15 - 02 | Shrubs | each shrub | 450 | |
| 16 | Wetland Riparian Zone Restoration and Plantings | Acre | 3 | |
| 17 | Site Construction Access Roads | No Allowance | 0 | |
| 18 | Air Noise and Dust Monitoring | Day | 63 | |
| 19 | Confirmation Sampling & Analysis | each sample | 289 | |
| 20 | Surveying | No Allowance | - | |
| 21 | Off-Site Disposal - Miscellaneous Debris | - | - | |
| 21 - 01 | Rail Ties | Ton | 453 | |
| 21 - 02 | Other miscellaneous debris | Ton | 150 | |
| 22 | Off-Site Disposal - Recyclable Metals | Ton | 150 | |
| TOTAL ALLOWANCE ADJUSTMENTS | $0 | |||
| Notes: | ||||
| L.S. denotes Lump Sum | ||||
| CY denotes in place cubic yard | ||||
| Ton denotes short ton (2,000 pounds) | ||||
| SY denotes a square yard in two Dimensions | ||||
| Acre is 43,560 square feet in two Dimensions |
File details come from the government source that posted it. Updated .