Schedule_A-20161102.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Environmental Remediation Services at the former Belle Mead Army Depot in Belle Mead, NJ
Solicitation number
GS-03-P-17-AZ-C-0001
Issued by

About this file

Revised Schedule A - Bid Sheet included in Amendment 002.

View the file

Other files

File Type Posted
GS-03-P-17-AZ-C-0001_Amendment_004.pdf PDF
BMAD_North_Parcel_RFI_Responses_Amendment_004.pdf PDF
2016-11-15_Belle_Mead_Rev._3_(1).pdf PDF
Solicitation_GS-03-P-17-AZ-C-0001_Amendment_003.pdf PDF
31_22_00_Backfill_and_Grading-Rev20161103.pdf PDF
31_05_19_Geosynthetics_for_Earthworks-Rev20161103.pdf PDF
32_92_00_Turf_and_Grasses-Rev20161103.pdf PDF
02_11_60_Demolition-Rev20161103.pdf PDF
Sitework.Planting.Gravel.Crushed.jpg JPG image
20161103-Bid_Addendum_summary.docx DOCX document
Sitework.Planting.Grass.Short.jpg JPG image
Exist_Conds.txt TXT text file
31_23_16_Excavation-rev20161102.pdf PDF
Sitework.Planting.Gravel.Mixed.jpg JPG image
DWG_To_PDF.pc3 —
Concrete.Cast-In-Place.Flat.Grey.1.jpg JPG image
02_82_00_Fencing.pdf PDF
Sitework.Planting.Grass.Thick.jpg JPG image
Solicitation_GS-03-P-17-AZ-C-0001_Amendment_002.pdf PDF
32_90_00_Planting-Rev20161103.pdf PDF
2016-11-03_Belle_Mead_Rev._3.pdf PDF
01_30_00_ePMS-rev20161103.pdf PDF
RFI_Responses_Amendment_0002.pdf PDF
01_57_19_Temporary_Environmental_Control-Rev21061103.pdf PDF
_ACM-G-STANDARD.ctb —
01_22_00_Unit_Prices-Rev20161103.pdf PDF
Exist_Conds.dwg DWG drawing
02_51_00_Decontamination-rev20161103.pdf PDF
Sitework.Planting.Soil.jpg JPG image
PreProposal_Sign_In.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_A.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_D.pdf PDF
Pre-proposal_Agenda_BMAD_North_Parcel_Remediation_-_Construction.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_C.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Exhibit_A_-_Permit_Application.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_B.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Exhibit_A_-_Permit_Application_contd_III.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Exhibit_A_-_Permit_Application_contd_II.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_E.pdf PDF
Solicitation_GS-03-P-17-AZ-C-0001_Amendment_001.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Exhibit_A_-_Permit_Application_contd.pdf PDF
RAWP-NorthParcel-BMAD_20160811_FO.pdf PDF
Solicitation_GS-03-P-17-AZ-C-0001_SF1442.pdf PDF
C301.pdf PDF
C101-SB_BMAD_NP_Remediation.pdf PDF
20161017_TreeMitigation_NorthParcel.pdf PDF
C201-SB.pdf PDF
Schedule_A-20161019.xlsx XLSX spreadsheet
2016-10-19_Belle_Mead_Rev._2.pdf PDF
SESCP-Application.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01-Fixed Price Bid Schedule

SCHEDULE A - 01 FIXED PRICE BID SCHEDULE
SCHEDULE OF QUANTITIES AND PRICES
FIXED PRICE AMOUNTS
FORMER BELLE MEAD ARMY DEPOT
BELLE MEAD, NEW JERSEY

Fixed Price Amount bid prices listed in this Schedule are based on performance of the Work as specified in these Specifications shall include all overhead, profit, handling, taxes and all other related charges. The Fixed Price Amount includes all costs for the measured quantitiesquantity up to the estimated quantity for each Bid Item. For measured quantities greater than the outside estimated quantity, the Fixed Price Amount will be increased by at the unit rate in the corresponding Unit Prices Allowance Item times the measured quantity measured above the estimated quantity up to a maximum of 15% beyond the estimated quantity as listed on the Unit Rate Allowance Bid Sheet.

Bid Item No. Bid Item Measurement Unit Estimated Quantity Micalizio, Gregg: Micalizio, Gregg:

Consider removal of this column.Fixed Price Amount
$Corresponding Unit Rate Item
1General ConditionsDay460Unit Rate Item 1
2Site ClearingAcre235Unit Rate Item 2
3Site PreparationLS1No Unit Rate
4Burn Pit Excavation and DisposalTon1750Unit Rate Item 4
5Pistol Range Excavation and DisposalTon150Unit Rate Item 5
6AOC 17, AOC 9, Selenium Area and Naphthalene Area Excavation and DisposalTon7000Unit Rate Item 6
7Excavation and Material Handling (Northwest Corridor)CY40,000Unit Rate Item 7
8Excavation and Material Handling (Eastern Area, Rail Yard, and Western Area)CY359,000Unit Rate Item 8
9Excavation and Material Handling (Royce Brook Tributary)CY120Unit Rate Item 9
10Site GradingAcre210Unit Rate Item 10
11Topsoil and SeedAcre191Unit Rate Item 11
12AOC 15 Consolidation Area - Cover SoilCY61,900Unit Rate Item 12
13AOC 15 Consolidation Area - Access Road, Downshoots and CulvertsLS1No Unit Rate
14AOC 15 Consolidation Area - Topsoil and SeedAcre21Unit Rate Item 14
15Upland Tree Mitigation---Unit Rate Item 15
15 - 01Treeseach8000Unit Rate Item 15 - 01
15 - 02Shrubseach3000Unit Rate Item 15 - 02
16Wetland Riparian Zone Restoration and PlantingsAcre19Unit Rate Item 16
17Site Construction Access RoadsLS1No Unit Rate
18Air Noise and Dust MonitoringDay420Unit Rate Item 18
19Confirmation Sampling & Analysiseach sample1926Unit Rate Item 19
20SurveyingLS1No Unit Rate
21Off-Site Disposal - Miscellaneous Debris---Unit Rate Item 21
21 - 01Rail TiesTon3020Unit Rate Item 21 - 01
21 - 02Other miscellaneous debrisTon1000Unit Rate Item 21 - 02
22Off-Site Disposal - Recyclable MetalsTon1000Unit Rate Item 22
TOTAL FIXED PRICE COST$0
Notes:
L.S. denotes Lump Sum
CY denotes in place cubic yard
Ton denotes short ton (2,000 pounds)
SY denotes a square yard in two Dimensions
Acre is 43,560 square feet in two Dimensions

02-Unit Rate Allowance

SCHEDULE A - 02 UNIT RATE ALLOWANCE
SCHEDULE OF QUANTITIES AND PRICES
UNIT RATE ALLOWANCE
FORMER BELLE MEAD ARMY DEPOT
BELLE MEAD, NEW JERSEY

Unit Price Allowances are based on performance of the Work as specified in these Specifications shall include all overhead, profit, handling, taxes and all other related charges. As may be needed during the performance of the Work, the Base Contract may be increased on a unit-rate basis for for quantities up to 15% of the base bid.

Bid Item No. Bid Item Measurement Unit Quantity (15% of Base) Unit Rate Total Unit Price Allowance

1General ConditionsDay69
2Site ClearingAcre35
3Site PreparationNo Allowance-
4Burn Pit Excavation and DisposalTon263
5Pistol Range Excavation and DisposalTon23
6AOC 17, AOC 9, Selenium Area and Naphthalene Area Excavation and DisposalTon1,050
7Excavation and Material Handling (Northwest Corridor)CY6,000
8Excavation and Material Handling (Eastern Area, Rail Yard, and Western Area)CY53,850
9Excavation and Material Handling (Royce Brook Tributary)CY18
10Site GradingAcre32
11Topsoil and SeedAcre29
12AOC 15 Consolidation Area - Cover SoilCY9,285
13AOC 15 Consolidation Area - Access Road, Downshoots and CulvertsNo Allowance0
14AOC 15 Consolidation Area - Topsoil and SeedAcre3
15Upland Tree Mitigation--
15 - 01Treeseach tree1,200
15 - 02Shrubseach shrub450
16Wetland Riparian Zone Restoration and PlantingsAcre3
17Site Construction Access RoadsNo Allowance0
18Air Noise and Dust MonitoringDay63
19Confirmation Sampling & Analysiseach sample289
20SurveyingNo Allowance-
21Off-Site Disposal - Miscellaneous Debris--
21 - 01Rail TiesTon453
21 - 02Other miscellaneous debrisTon150
22Off-Site Disposal - Recyclable MetalsTon150
TOTAL ALLOWANCE ADJUSTMENTS$0
Notes:
L.S. denotes Lump Sum
CY denotes in place cubic yard
Ton denotes short ton (2,000 pounds)
SY denotes a square yard in two Dimensions
Acre is 43,560 square feet in two Dimensions