RFI_Responses_Amendment_0002.pdf

PDF 384 KB Posted

Attached to
Environmental Remediation Services at the former Belle Mead Army Depot in Belle Mead, NJ
Solicitation number
GS-03-P-17-AZ-C-0001
Issued by

About this file

RFI Responses

View the file

Other files

File Type Posted
GS-03-P-17-AZ-C-0001_Amendment_004.pdf PDF
BMAD_North_Parcel_RFI_Responses_Amendment_004.pdf PDF
2016-11-15_Belle_Mead_Rev._3_(1).pdf PDF
Solicitation_GS-03-P-17-AZ-C-0001_Amendment_003.pdf PDF
Schedule_A-20161102.xlsx XLSX spreadsheet
31_22_00_Backfill_and_Grading-Rev20161103.pdf PDF
31_05_19_Geosynthetics_for_Earthworks-Rev20161103.pdf PDF
32_92_00_Turf_and_Grasses-Rev20161103.pdf PDF
02_11_60_Demolition-Rev20161103.pdf PDF
Sitework.Planting.Gravel.Crushed.jpg JPG image
20161103-Bid_Addendum_summary.docx DOCX document
Sitework.Planting.Grass.Short.jpg JPG image
Exist_Conds.txt TXT text file
31_23_16_Excavation-rev20161102.pdf PDF
Sitework.Planting.Gravel.Mixed.jpg JPG image
DWG_To_PDF.pc3 —
Concrete.Cast-In-Place.Flat.Grey.1.jpg JPG image
02_82_00_Fencing.pdf PDF
Sitework.Planting.Grass.Thick.jpg JPG image
Solicitation_GS-03-P-17-AZ-C-0001_Amendment_002.pdf PDF
32_90_00_Planting-Rev20161103.pdf PDF
2016-11-03_Belle_Mead_Rev._3.pdf PDF
01_30_00_ePMS-rev20161103.pdf PDF
01_57_19_Temporary_Environmental_Control-Rev21061103.pdf PDF
_ACM-G-STANDARD.ctb —
01_22_00_Unit_Prices-Rev20161103.pdf PDF
Exist_Conds.dwg DWG drawing
02_51_00_Decontamination-rev20161103.pdf PDF
Sitework.Planting.Soil.jpg JPG image
PreProposal_Sign_In.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_A.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_D.pdf PDF
Pre-proposal_Agenda_BMAD_North_Parcel_Remediation_-_Construction.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_C.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Exhibit_A_-_Permit_Application.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_B.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Exhibit_A_-_Permit_Application_contd_III.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Exhibit_A_-_Permit_Application_contd_II.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Appendix_E.pdf PDF
Solicitation_GS-03-P-17-AZ-C-0001_Amendment_001.pdf PDF
2016_BelleMead_GP4-10_FHA_WQC_Exhibit_A_-_Permit_Application_contd.pdf PDF
RAWP-NorthParcel-BMAD_20160811_FO.pdf PDF
Solicitation_GS-03-P-17-AZ-C-0001_SF1442.pdf PDF
C301.pdf PDF
C101-SB_BMAD_NP_Remediation.pdf PDF
20161017_TreeMitigation_NorthParcel.pdf PDF
C201-SB.pdf PDF
Schedule_A-20161019.xlsx XLSX spreadsheet
2016-10-19_Belle_Mead_Rev._2.pdf PDF
SESCP-Application.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Response to October 25, 2016 RFIs

1. Please address discrepancies [regarding plantings].

The Upland Tree Mitigation Plan submitted to the Township referenced the incorrect number of additional trees and shrubs to be planted in the wetland and riparian zone areas. The following table details the numbers of plantings in each area of the site and under which bid item the plantings would be covered. Specification 32 90 00 is being updated to remove planting tables. Note that planting table on LP-1-16 is for the 50-foot landscape buffer which is part of the Eastern Area. This drawing will be updated to change “total project” to “50-foot landscape buffer”. Planting details have been prepared for Wetland Restoration, Wetland Transition Areas, Riparian Zones, and the DRCC Buffer Zones. Upland tree details are provided only for the 50-foot landscaped buffer on the eastern side of the site (see LP-1-11 through LP-1-16). Remaining upland tree plantings are discussed in the Tree Preservation/Mitigation Plan provided in the Bid Package. The trees/shrubs included in the Tree Preservation/Mitigation Plan are inclusive of the DRCC Buffer Zones and the 50-foot landscaped buffer.

Northwest Corridor

Western Area

Eastern Area

Railyard Consolidation Area

Construction Support Zone

TOTAL

Wetland Restoration Trees 1956 48 913 0 0 0 2917

(Bid Item #16) Shrubs 756 18 436 0 0 0 1210

Other 160 0 185 0 0 0 345

Wetland Transition Areas Trees 744 272 1477 0 0 0 2493

(Bid Item #16) Shrubs 468 76 614 0 0 0 1158

Other 0 0 0 0 0 0 0

Riparian Zone Trees 700 0 2968 0 0 0 3668

(Bid Item #16) Shrubs 476 0 412 0 0 0 888

Other 0 0 0 0 0 0 0

DRCC Buffer Zone Trees 125 1072 25 0 0 0 1222

(Bid Item #15) Shrubs 42 357 8 0 0 0 407 values are included within upland tree mitigation Other 0 0 0 0 0 0 0

Upland Tree Mitigation Plan

Trees 1000 1500 3000 1000 0 1500 8000

Shrubs 1000 300 700 700 0 300 3000

(Bid Item #15) Other 0 0 0 0 0 0 0

TOTAL Trees 4400 1820 8358 1000 0 1500 17078 DRCC Buffer Zone is included in

Upland Tree Mitigation Plan Shrubs 2700 394 2162 700 0 300 6256

Other 160 0 185 0 0 0 345

2. Please indicate where the limits of the 19.081 Acres of Wetland and Riparian Zone Restoration and Plantings are shown. Please provide a detailed scope of work for Bid Item 16.

The details for wetland and riparian zone restoration and plantings (paid under Bid Item 16) are provided on Drawings LP-0-01 and LP-1-01 through LP-1-10. These Drawings also show the additional DRCC restoration area, which will be paid within Bid item 15.

File details come from the government source that posted it. Updated .