Q A 56 - 60.doc
DOC document 21 KB Posted
- Solicitation number
- GS-03P-10-AZC-0004
About this file
Q A 56-60 and revision to Q 52
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A 164-166.doc | DOC document | |
| Q A 148-163.doc | DOC document | |
| Sign In Sheets 01-13.pdf | ||
| Q A 143-147.doc | DOC document | |
| Clarification Answers.doc | DOC document | |
| Q A 130-142.doc | DOC document | |
| Q A 108-117.doc | DOC document | |
| Pre-Proposal Site Visit Notification 12-23-09.doc | DOC document | |
| Pre-Proposal Site Visit Notification 12-23-09.doc | DOC document | |
| Amendment 0002 12-22-2009.pdf | ||
| Sign In Sheets 12-21.pdf | ||
| 0001.pdf | ||
| Pre-Proposal Site Visit Notification 12-18.doc | DOC document | |
| Sign In Sheets 12-14.pdf | ||
| Sign In Sheets 12-08.pdf | ||
| Q A 38 - 50.doc | DOC document | |
| Q A 1 - 37.doc | DOC document | |
| Pre-Proposal Site Visit Notification.doc | DOC document | |
| Sign In Sheets.pdf | ||
| Pre-Proposal Conference Minutes.pdf | ||
| Pre-Proposal Conference Camera Notice.doc | DOC document | |
| Pre-Proposal Conference Invitation.doc | DOC document | |
| VOLUME III CONTRACT CLAUSES.pdf | ||
| VOLUME I BIDDER INSTRUCTIONS SECTION.pdf | ||
| VOLUME II SPECIFICATIONS SECTION.pdf |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
*** CORRECTION TO QUESTION 52:
Q 52. Are there any restrictions around using wireless technology within the Green Building or the Byrne Courthouse? Any restricted wavelengths, poor coverage areas, not allowed at all, etc.?
R 52. No, contractors cannot use wireless technology in the building
Q 56. A contractor is requesting that several ceiling tiles be removed in the corridors on a couple of floors and that a ladder be made available so that they may examine the above ceiling space where ductwork is to be removed and replaced. This will allow them to determine the level of congestion in the above ceiling spaces.
R 56. GSA Field Office personnel will remove the referenced ceiling tiles and take photos of the above ceiling space where ductwork is to be removed and replaced. The photos will be securely posted to the FBO website.
Q 57. The specifications state; “Increase the roofing insulation value from existing conditions, striving toward R50”. Is this correct? If so, are they looking for a total roof composition of R50, including existing lightweight concrete?
R 57. Yes; Yes Q 58. Have the building’s main chilled water and/or heating hot water pumps been equipped with VFD’s?
R 58. The main heating hot water pumps have been equipped with VFDs. The main chilled water pumps are constant volume.
Q 59. The air handling unit configuration for the “Remaining Units” does not list a hot water preheat coil. Is one required?
R 59. Yes, the units that fall into the “Remaining Units” category all require hot water preheat coils.
Q 60. AH-77 is not listed as being Constant Volume. Is this AHU to be VAV?
R 60. Yes.