Amendment 0002 12-22-2009.pdf

PDF 205 KB Posted

Attached to
Recovery Design Build AHU / PV Roof / Green Roof in Philadelphia, PA
Solicitation number
GS-03P-10-AZC-0004
Issued by

View the file

Other files

File Type Posted
Q A 164-166.doc DOC document
Q A 148-163.doc DOC document
Sign In Sheets 01-13.pdf PDF
Q A 143-147.doc DOC document
Clarification Answers.doc DOC document
Q A 130-142.doc DOC document
Q A 108-117.doc DOC document
Pre-Proposal Site Visit Notification 12-23-09.doc DOC document
Pre-Proposal Site Visit Notification 12-23-09.doc DOC document
Sign In Sheets 12-21.pdf PDF
0001.pdf PDF
Pre-Proposal Site Visit Notification 12-18.doc DOC document
Sign In Sheets 12-14.pdf PDF
Sign In Sheets 12-08.pdf PDF
Q A 56 - 60.doc DOC document
Q A 38 - 50.doc DOC document
Q A 1 - 37.doc DOC document
Pre-Proposal Site Visit Notification.doc DOC document
Sign In Sheets.pdf PDF
Pre-Proposal Conference Minutes.pdf PDF
Pre-Proposal Conference Camera Notice.doc DOC document
Pre-Proposal Conference Invitation.doc DOC document
VOLUME III CONTRACT CLAUSES.pdf PDF
VOLUME I BIDDER INSTRUCTIONS SECTION.pdf PDF
VOLUME II SPECIFICATIONS SECTION.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATiON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED

(SEE

ITEM

11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

KatelynAMcCullough TextBox

KatelynAMcCullough TextBox

Solicitation GS-03P-10-AZC-0004 Amendment 0002 (cont.)

Solicitation GS-03P-10-AZC-0004 is amended to read as follows:

5. Volume I Appendix A Technical Evaluation Factors/Minimum Standards shall be revised as follows:

- Factor # 1 Past Performance (Page 8) Vegetative Roof: Each offeror must provide a list of two projects representing full roof replacement and vegetative roof installation, both on a minimum roof area of 20,000 square feet on an existing structure. One of projects must demonstrate an IRMA roof type. One of the projects must demonstrate experience with a non-unitized green roofing system. Offerors providing projects that exceed the stated requirement may receive a higher rating.

- Factor # 2 Key Personnel of the Design Team (Page 10) Vegetative Roof: Resume and qualifications of the lead designer of the vegetative roof shall be submitted demonstrating experience of two past full roof replacement projects including vegetative roof systems fully designed, one of which utilizing an IRMA roof type. Both projects must be on a minimum roof area of 20,000 square feet on an existing structure, one of which shall demonstrate experience with a non-unitized system.

- Factor # 3 Project Management Plan (Page 11): The Project Management Plan shall now include that the offerors shall submit a Phasing Plan to demonstrate how they will phase the Air Handler Unit (AHU) piece of the project and the roofing work.

6. All other terms and conditions of the original solicitation, as modified, apply.

Roof Replacement Amendment Scope of Work

Design Build Criteria

1. Summary

1.1. GSA has opted to amend a full roof replacement into the vegetative roof installation at the Green Federal Building. All prior requirements of the vegetative roof remain intact, with the exception of roof coating requirements for these roof areas. The new roof installation shall supercede the roof coating requirements to provide the same required 20 year waterproof warranty. The existing Green building roof and penthouse level consists of approximately 62,660 square feet of a Built-Up-Roof system with lightweight insulating concrete and the remaining 6,140 square feet consists of a BUR system on concrete deck. The roof is divided in to two areas, the penthouse/mechanical yard and the outer ring of the roof. The penthouse/mechanical yard area consists of over 50% of the area at this level. It is heavily occupied by operating mechanical equipment. The surface of this portion of the roof is worn due to maintenance traffic. The outer ring is just under 50% of the overall roof area and is a relatively open roof plan. This entire roof area shall be demolished, including all abandoned curbs, dunnage and other stub-up mounts for equipment that is no longer there. There are a few select active pieces of equipment that will remain located on this roof. A new inverted roofing membrane assembly (IRMA) shall be installed on these roof areas beneath the vegetative roof already specified for this project.

2. Project Description

2.1. Project Goals

Increase the insulation value of the roof.

Provide a new, waterproof IRMA roof as the base for the vegetative roofing system previously specified.

2.2. Reference Materials

2.2.1. Roofing design and installation must follow the recommendations of the

National Roofing Contractors Association (NRCA) as contained in the NRCA Roofing and Waterproofing Manual.

2.2.2. ASTM E2400-06 Standard Guide for Selection, Installation, and Maintenance of Plants for Green Roof Systems.

2.2.3. ASTM E2397-05 Standard Practice for Determination of Dead Loads and Live Loads associated with Green Roof Systems

2.2.4. EPA Technical Guidance on Implementing Section 438 of the Energy Independence and Security Act, when available.

2.2.5. GSA P100

3. General Requirements

3.1. Performance Objectives

3.1.1. Thermal Performance

Roofing replacement designs should target a composite insulation value goal of R- 50 including insulation and a calculated value of the soils and vegetative overburden. (It is recognized that the insulating qualities of the soils is subject to change based on moisture content etc.) A minimum requirement of R-30 must be achieved on this project. Existing closed cell insulation in good condition without excessive moisture or structural degradation may be reused. The design shall included consideration for existing penetrations and parapets.

3.1.2. Drainage

All drains shall be tri-level design with primary drainage at the membrane to prevent ponding, secondary drainage via through the insulation and vegetative media and tertiary overflow above the level of the vegetation. Access to the drain for maintenance and cleanout must be provided

3.1.3. Water Test

The new roof shall be water tested prior to the installation of the vegetative roof system for a minimum of 24 hours. This shall be witness by GSA and signed off on prior to installation of the vegetation.

4. Scope of Services

4.1. Design Stage

4.1.1. Survey

4.1.1.1. The A/E is to visit the site, consult with the Building Manager concerning the nature of the roof problems, examine the roof, taking non-destructive samples as necessary, and examine any existing record construction documents and/or shop drawings.

4.1.1.2. The structural capacity of the existing deck for the vegetative roof must be assessed in order that the roof will support the extra dead load of the designed planting media, other components, and detained water. All of these loads are exclusive of applicable snow loads. Refer to Vegetative Roof portion of the scope of work (Volume 2 Page 3.3-2) for other loading requirements.

4.1.1.3. Upon accessing and analyzing the data compiled via the above-described process, the A/E is to produce a narrative that validates the type of roof and installation that the A/E has selected to meet the project objectives and maximize the roof membrane warranty.

4.1.2. Design

4.1.2.1. The following requirements must be included in the new IRMA roof.

4.1.2.1.1. Minimum of R-30, with a goal of R-50.

4.1.2.1.2. Use Waterproof Extruded Polystyrene Insulation with a flame spread rating of 15 or better.

4.1.2.1.3. Phasing plan which includes but is not limited to

4.1.2.1.3.1. demolition,

4.1.2.1.3.2. drying of existing lightweight concrete deck if reused,

4.1.2.1.3.3. new installation

4.1.2.1.4. Leak Detection system for vegetative roof (see scope of work for Vegetative portion (Volume 2 Page 3.3-2).

4.2. Construction

4.2.1. Remove existing roof material to arrive at a suitable base for installation of the new vegetative roof. The contractor shall be responsible for the suitability of the substrate surface to accept the vegetative roof.

4.2.2. Provide a new roof installation including but not limited to roof waterproofing and closed-cell waterproof insulation material. The roof waterproofing must be able to withstand ponding water, survive expected deflection or expansion, resist chemical action of acid rain and fertilizers, and be resistant to root penetration. The design shall utilize an engineered soil medium and plants as ballast. Compatibility between the engineered soil medium, plants, and the roofing system below must be demonstrated to avoid negation of any manufacturer warranties. The roof warranty must include the planted roof system and all components.

4.2.3. Any excess water that is not contained by the engineered soil medium shall drain positively to the existing roof drains. Utilize composite drainage mats to assist with drainage. The selection of the roof waterproofing system must support the ease of leak detection and not allow water to travel under the waterproofing.

4.3. Warranty

4.3.1. A planted roof is a complete system and the waterproofing warranty shall include all components of the waterproofing and planted roof. The waterproofing system shall be warranted for a minimum of 20 years covering wind damage for up to 60 mph.

4.3.2. A plant warranty against disease and death shall extend for 2 years from date of planting. Replant areas that fail to provide a uniform cover of plants, with specified materials, until the Owner accepts all affected areas.

4.3.3. Provide for all new roofs a single source responsibility warranty, including removal and replacement of the overburden and the growing media.

4.3.4. The Design Builder shall provide for a period of two years, maintenance of the vegetative roof including but not limited to the insulation, membrane, soil medium and the planting.

ePM Scope of Work Language for A/E/C Service Contracts

0.0 PURPOSE

GSA will require the Contractor to utilize an Enterprise electronic Project Management (e-PM) system on this project. GSA’s goal is to implement this state-of-the art technology to reduce administrative and overhead costs, eliminate redundancies, and institute a collaboration tool to ensure better accountability among all project team members. This technology will provide up-to-date information, encourage disciplined methods for monitoring progress, ensure better communication regarding changes, provide improved documentation, and enable PBS executives to have real-time access to status of projects.

1.0 DEFINITION

e-PM is defined as an internet-based information and project communication system that allows the entire project team to collaborate in a centralized and secured repository. All project-specific correspondence, workflow processes, and documentation will be stored and routed within the ePM system.

2.0 PROJECT DOCUMENTATION

The Contractor is required to timely and accurately post, review, respond, and collaborate with other team members using the following features and/or workflow processes within the ePM system:

Project Team Directory – Contractor shall provide an updated directory of contact information for all companies, subcontractors and project team members who are engaged on this project.

Schedules – Contractor shall post, review, and/or respond to CPM schedule updates within the ePM system.

Meeting Minutes – Contractor shall enter meeting agendas, records and minutes in the system for all applicable meetings as designated by the GSA PM.

Project Correspondence – Contractor shall manage and maintain all incoming and outgoing correspondence and associated logs for all correspondence related to the project.

Budget and Cost Management – Contractor to provide estimates and work breakdown structure (WBS) to provide GSA with accurate budget/cost analysis.

Contract Management – Contractor to provide administration of all contract tasks related to the project.

Pay Applications Requests (Invoices) – The Contractor shall create invoices for review by GSA.

Once the invoices are agreed to by GSA then the invoices should be submitted to GSA per the instructions given by the Contracting Officer.

Progress Photos – Contractor shall upload all progress photos into the system.

Permits & Approvals – Contractor shall upload and maintain current copies of all permits and agency approvals that relate to the project.

Design Drawings/Design Packages – Contractor shall submit design drawings and design packages into the system.

Design Review Comments – Contractor shall post and/or respond to design comments related to his/her role in the project team

Daily/Progress Reports – The Contractor identified in e-PM shall maintain construction progress reports, daily reports/logs, and documentation of inspections.

Inspection Reports – Maintain inspection reports on materials and/or workmanship to assure compliance with all construction requirements.

Page 6 September 2009 ePM Scope of Work Language for A/E/C Service Contracts

Safety/Injury Reports – Maintain reports on construction contractors' compliance with current safety regulations and standards.

Punchlists – Maintain list(s) of observed defects and omissions.

Request For Information (RFI) – The system shall manage the RFI process and all Request for Information shall be entered and responded to by the Contractor within the e-PM system.

Issue Tracking – Contractor to log and respond to issues that are related and affect other stakeholders within the project team.

Submittals – The system shall manage the submittals and the Contractor is responsible for uploading submittal documentation and using the system to track the submittal process.

Change Management – Cost Events and Change Orders will be managed by the e-PM system and the Contractor shall be responsible for reporting potential changes and logging Requests for Change Orders in the system. The Contractor shall also upload and manage all documentation supporting Requested Change Orders.

Shop Drawings – The Contractor shall submit all shop drawings in the system for review by GSA (and the CM where applicable).

As-built Drawings and Specifications – The Contractor shall use the system to record all approved specifications as well as all as-built construction documents.

GSA reserves the right to require the Contractor to upload other documentation not mentioned above that is needed to support the project.

3.0 EQUIPMENT AND TRAINING

The e-PM system is based on the Proliance software that was developed by Meridian Systems. Users will be provided a username and password after they have completed the HSPD-12 process. The Contractor shall log into the e-PM system to enter the Project Documentation listed in section 2.0. All correspondence should be communicated through the e-PM system.

GSA will hold several training sessions to familiarize team members with the system, and all Contractor staff are expected to attend one of these sessions or otherwise receive proper training on the system’s use. Furthermore, all Contractor team members who are actively participating on the project must have access to the proper computer equipment and software to access and utilize the e-PM system and be trained in the proper usage of said equipment and software. All workstations require a high-bandwidth Internet connection.

4.0 PERSONNEL REQUIREMENTS

The Contractor shall be required to have an adequate number of people who can complete the HSPD-12 background check process to have rights to log into the e-PM system.

5.0 DATA OWNERSHIP

GSA shall retain ownership of all data entered into the system and shall administrate and distribute all information contained therein.

6.0 REFERENCES

PBS SECURITY ORDER 3490.1 (March 8, 2002)

Page 7 September 2009

Insert from: "EPM_SOW_FOR_CONTRACTORS_091809.pdf"
0.0 PURPOSE
1.0 DEFINITION
2.0 PROJECT DOCUMENTATION
3.0 EQUIPMENT AND TRAINING
4.0 PERSONNEL REQUIREMENTS
5.0 DATA OWNERSHIP
6.0 REFERENCES
Insert from: "EPM_SOW_FOR_CONTRACTORS_091809.pdf"
0.0 PURPOSE
1.0 DEFINITION
2.0 PROJECT DOCUMENTATION
3.0 EQUIPMENT AND TRAINING
4.0 PERSONNEL REQUIREMENTS
5.0 DATA OWNERSHIP
6.0 REFERENCES
IDCode:
EffDate: DEC 22, 2009
ReqNo: 3PQCP-10-5001
ProjNo:
IssuedBy: GSA CONTRACTS OPERATIONS BRANCH - PA NJ & DE SECTION

THE STRAWBRIDGE BLDG -3PQCP

20 NORTH 8TH ST

PHILADELPHIA PA 19107-3191

AdminBy: See Block 6
NoCopies: 1
Amended: Yes
ChgeOrder:
Modify: Off
SuppAuth:
OthrSpec:
Require: Off
Copies:
Descript: Solicitation GS-03P-10-AZC-0004 is amended to read as follows:

1. The above solicitation is hereby extended until January 15, 2010.

2. Include the attached Scope of Work for a full roof replacement into the vegetative roof installation at the Green Federal Building as part of the Request for Proposal (RFP) package. This shall include a new inverted roofing membrane assembly (IRMA).

3. Remove all reference to roof coating requirements associated with the Vegetative Roof Scope of Work.

4. Include the attached ePM Scope of Work in the Request for Proposal (RFP) package.

(Continued on page 2)

SignName:
SignTitl:
ContDate:
CODate:
OffrExt: Yes
OffrNoEx: Off
ChgeOrd: Off
SuppAgre: Off
ModOthr: Off
NoReq: Off
ContractorCode:
FacCode:
ContractorPOC:
AwdChg: Off
SolChg: Yes
SolNo: GS-03P-10-AZ-C-0004
SolDate: NOV 20, 2009
AwdNo:
IssuedByCode: 3PQCP
AdminByCode:
ContrOfficerInfo:
DocNo: 0002
AwdDate:
text1: 10B. DATED (SEE ITEM 13)
block 14: 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
pageblock: PAGE OF PAGES
block13: 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Contractor:
ContratorInfo:
ModAmount:
block12: 12. ACCOUNTING AND APPROPIATION DATA (If required)
ApprData: See Schedule
Pages: 1
Page: 1

File details come from the government source that posted it. Updated .