MACC IDIQ RFP Questions and Answers_14July2025.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- FY25MACC
About this file
The file is a Questions and Answers (Q&A) document for a Multiple Award Construction Contract (MACC) Indefinite Delivery Indefinite Quantity (IDIQ) Request for Proposal. The document contains technical clarification questions from potential bidders regarding the Building 1106 Conference Center HVAC Task Order at Hanscom Air Force Base, primarily focused on scope of work details, equipment inventory, operational sequences, and technical specifications.
Key questions addressed include requests for complete inventory lists of HVAC equipment, operational sequences for equipment, steam and water flow rates for sizing control valves, and clarification on fiber optic cabling installation requirements. The document also includes a confirmation about consent requirements for teaming partners and guidance on submitting key personnel resumes. These questions suggest potential bidders needed additional technical information to accurately prepare their proposals for the competitive small business set-aside contract, which has an anticipated contract ceiling of $71.8 million and a 5-year ordering period starting September 2025.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP Questions
| 166 | Per discussion with Johnson Controls, the scope of work and or drawings are not complete enough to provide quote. For bidding purposes, please provide total inventory list and locations of HVAC equipment to be inspected, tested, and upgraded. |
| All existing and new are shown on the drawings. See Attachment 13: MXRD150009_IFC_SPECIFICATIONS 30JAN2025_SEED PROJECT, sections 23 09 00, 23 09 13, and section 23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS for BACnet systems , Facility DDC control system shall implement COIN requirements, see drawings. | |
| 167 | In addition to above, please provide operational sequences for equipment above for bidding purposes. |
| See Attachment 11: 20250130_MXRD150009_DRAWINGS_IFC_SEED PROJECT, sections M-701 and M-702. | |
| 168 | For bidding purposes, please provide steam & water flow rates for existing coils to size and price new valves for controls upgrade. |
| See Attachment 11: 20250130_MXRD150009_DRAWINGS_IFC_SEED PROJECT, section M-601. | |
| 169 | Spec 25 10 10, para 3.4.1. requires fiber optical cabling to be installed but there are no further directions on drawings nor specifications for the fiber. Please include for bidding purposes |
| See Attachment 13: MXRD150009_IFC_SPECIFICATIONS 30JAN2025_SEED PROJECT, sections 23 09 00, 23 09 23.02, 23 30 00, fiber is used for Controllers and devices depending on the manufacturers allowed distances. Splices of communication wiring for controllers and devices are prohibited. | |
| 170 | Please confirm that L.7.1.3-consent letter is only applicable for companies utilizing teaming Partner. |
| Confirmed, Per L-7.1.3: PPI concerning teaming partners cannot be disclosed to a private party without the teaming partner’s consent. Because a Prime Contractor is a private party, the Government will need that consent before disclosing teaming partner PPI to the Prime during exchanges. Completed consent forms shall be submitted as part of the Past Performance Volume. | |
| 171 | Are we required to provide details for all company key site personnel for MACC contract, or only those assigned to Project B-1106? |
| Per L-6.4.1.1.4., Key Personnel IAW Statement of Work (SOW) paragraph 1.4 CONTRACTOR PERSONNEL. Résumés should be provided for all Key Personnel, including name, employee’s position description, education, and qualifying academic, design,construction, Professional Registration and experience. |