Attachment 14 MXRD150009_IFC_SUB REGISTER 30JAN2025_SEED PROJECT.pdf
PDF 393 KB Posted
- Solicitation number
- FY25MACC
About this file
This Submittal Register document is a comprehensive 38-page form for the B1106 HAVAC Repair/Replacement project (Contract No. MXRD-15-0009), detailing the required submittals across multiple construction specification sections. The register systematically tracks preconstruction submittals, product data, shop drawings, samples, test reports, certificates, and other documentation that must be prepared and submitted by the contractor throughout the project lifecycle.
The submittal register covers extensive technical areas including project management, deconstruction, hazardous waste handling, concrete work, masonry, metals, roofing, doors, finishes, HVAC systems, electrical systems, communications infrastructure, and site improvements. Each entry specifies the specific document required, the relevant specification section, paragraph number, submittal classification (G for government review, S for record), and provides columns for tracking submission, approval, and review dates. The comprehensive nature of the document suggests a complex federal construction project with rigorous documentation and quality control requirements.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 38 PAGES
MXRD-15-0009
B1106 HAVAC REPAIR/REPLACEMENT
01 11 00 SD-01 Preconstruction Submittals
1.7 GSalvage Plan
3.1 GAF 103
01 14 00 SD-01 Preconstruction Submittals
1.3.5 GRequest for Utility Shutdown or
Building Interruption
1.3.5Schedule Of Anticipated Utility
And Building Interruptions
1.3.5.1 GSchedule of Anticipated Road
Closures or Traffic Impacts
1.3.5.1 GRequest for Road Closure or
Traffic Impact
1.3.1.1 GList of Contact Personnel
1.4.1.1 GRequests for DBIDS
1.3.5.1Traffic Control Plan
01 20 00 SD-01 Preconstruction Submittals
1.3 GEarned Value Report
SD-07 Certificates
1.3.3 GInterim DD Form 1354
01 30 00 SD-01 Preconstruction Submittals
1.4View Location Map
1.5Progress and Completion
Pictures
SD-04 Samples
1.3 GColor Boards
01 32 16 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
01 32 16 1.2 GBaseline Construction Schedule
1.63-Week Look Ahead Schedule
SD-07 Certificates
1.4Monthly Updates
1.3.1.6.2.1Tracking Gantt Schedule With
Cost Table
1.3.1.6.2.2Earned Value Over Time Report
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.2 GPreliminary High Performance
and Sustainable Building Checklist
1.4.1 GSustainability Action Plan
1.5.3.2 GPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
1.5.3.2 GFinal High Performance and
Sustainable Building Checklist
1.5.3.2 GFinal Sustainability eNotebook
1.5.3.2 GAmended Final Sustainability
eNotebook
1.5.3.2 GAmended Final High
Performance and Sustainable
Building Checklist
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
01 35 26 1.7.1 GAPP - Construction
1.16 GIndoor Air Quality (IAQ)
Management Plan
1.16 SFinal IAQ Management Plan
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.3.2 GStandard Lift Plan
1.7.3.3 GCritical Lift Plan
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
1.14License Certificates
1.14.1 GRadiography Operation Planning
Work Sheet
1.14.1 GPortable Gauge Operations
Planning Worksheet
01 45 00 SD-01 Preconstruction Submittals
1.5.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
01 45 00 1.11.2Verification Statement
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
1.6.1.4 GContractor Computer
Cybersecurity Compliance
Statements
1.6.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
SD-03 Product Data
1.4 GBackflow Preventers
SD-06 Test Reports
3.5Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.6.1Preconstruction Survey
1.6.2 GRegulatory Notifications
1.6.4 GEnvironmental Manager
Qualifications
1.6.5 GEmployee Training Records
1.7 GEnvironmental Protection Plan
1.7.9.1 GDirt and Dust Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
01 57 19 3.2.2.1 GStormwater Pollution Prevention
Plan
3.2.2.2 GStormwater Notice of Intent
3.15.2 GSpill Prevention Control And
Countermeasure (SPCC) Plan
1.6.3 GEnvironmental Management
System Focus Area Awareness form
1.12.1 GWetlands Notice of Intent
1.12.2 GWetlands Protection Act
Certificate of Compliance
1.6.5Environmental Records Binder
SD-02 Shop Drawings
1.10 GSolid Waste Management And
Disposal Plan
SD-06 Test Reports
1.10.1 GMonthly Solid Waste Disposal
Report
3.2.2.3Inspection Reports
3.7.1.1.2Laboratory Analysis
SD-07 Certificates
1.6.5 GEmployee Training Records
1.6.5Erosion and Sediment Control
Inspector
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
01 57 19 1.6.3 GEnvironmental Management
System Focus Area Awareness
Form
SD-11 Closeout Submittals
1.6.2 GRegulatory Notifications
1.6.5 GAssembled Employee Training
Records
3.2.2.4 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.2.5 GStormwater Notice of Termination
3.2.2.5As-Built Topographic Survey
3.7.1 GWaste Determination
Documentation
3.7.2.1 GSales Documentation
3.7.2.1Contractor Certification
3.7.3.1 GHazardous Waste/Debris
Management
3.7.3.5 GDisposal Documentation for
Hazardous and Regulated Waste
3.7.2.1 GProject Solid Waste Disposal
Documentation Report
01 74 19 SD-01 Preconstruction Submittals
1.7 GConstruction Waste Management
Plan
SD-06 Test Reports
1.9.2Quarterly Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
01 74 19 1.9.3Annual Report
SD-11 Closeout Submittals
1.10 SFinal Construction Waste
Diversion Report
01 78 00 SD-01 Preconstruction Submittals
3.6Indoor Air Quality (Iaq)
Management Plan
SD-03 Product Data
1.7.1Warranty Management Plan
1.7.4Warranty Tags
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.7.1Instructions
SD-10 Operation and Maintenance
Data
3.5 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.2 GRecord Drawings
1.7.1Warranted Equipment and
Materials
3.3 GFinal Approved Shop Drawings
3.4 GConstruction Contract
Specifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
01 78 00 2.1 GCertification of EPA Designated
Items
2.2 GCertification Of USDA Designated
Items
3.7.1 GInterim DD FORM 1354
3.7.2 GHigh Performance and
Sustainable Building (HPSB)
Checklist
3.7.2List Of Installed Building
Equipment Items For DD Form
01 78 23 SD-10 Operation and Maintenance
Data
1.4 GFacility Data Workbook
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
3.2.1 GOperation And Maintenance
Manual, Progress Submittal
3.2.2 GOperation And Maintenance
Manual, Prefinal Submittal
3.2.3 GOperation And Maintenance
Manual, Final Submittal
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
01 78 23 3.1.1 GTraining Plan
1.6.6.7 GRecord Drawings And Utility
Systems
01 78 24.00 10 SD-01 Preconstruction Submittals
1.7.1Facility Data Project Execution
Plan
SD-10 Operation and Maintenance
Data
3.2 GFacility Data Workbook, Construction Progress
3.2 GFacility Document Set, Construction Progress
SD-11 Closeout Submittals
1.6.1 GFacility Data Workbook (FDW), Progress Submittal
1.6.2 GFacility Data Workbook (FDW), Prefinal Submittal
1.6.3 GFacility Data Workbook (FDW), Final Submittal
1.7.2 GFacility Document Set, Construction Final
3.3 GFacility Data Workbook, Construction Final
01 91 00 SD-06 Test Reports
3.6 GCompleted Construction
Observation Checklists
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
01 91 00 3.1 GDesign Review Report
3.5 GInterim Construction Phase
Commissioning Plan
3.5 GFinal Construction Phase
Commissioning Plan
3.11 GInitial Commissioning Report
1.11 GIssues Log
SD-07 Certificates
1.9 GCommissioning Firm
SD-10 Operation and Maintenance
Data
3.10 GMaintenance and Service Life
Plan
3.9 GSystems Manual
SD-11 Closeout Submittals
3.11 GFinal Commissioning Report
3.12 GUpdated Final Commissioning
Report
3.11 SFinal Commissioning Report
(eNotebook)
3.12 SUpdated Final Commissioning
Report (eNotebook)
01 99 00 SD-11 Closeout Submittals
3.2.1 GFACILITY ASSET - REMOVED
3.2.2 GFACILITY ASSET - REPAIRED
3.2.3 GFACILITY ASSET - INSTALLED
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
01 99 00 3.3.3 GREAL PROPERTY INSTALLED
EQUIPMENT - INSTALLED
3.3.2 GREAL PROPERTY INSTALLED
EQUIPMENT - REPAIRED
3.3.1 GREAL PROPERTY INSTALLED
EQUIPMENT - REMOVED
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDeconstruction Plan
1.11Existing Conditions
SD-07 Certificates
1.7 GNotification
SD-11 Closeout Submittals
3.3.4Receipts
02 81 00 SD-03 Product Data
2.1.1Packaging Notifications
3.1 GHazardous Waste Management
Plan
3.2 GOnsite Hazardous Waste
Management
3.3Notices of Non-Compliance and
Notices of Violation
SD-06 Test Reports
3.6 GRecordkeeping
3.6 GException Report
3.7Spill Response
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
02 81 00 1.4.1 GTransportation and Disposal
Coordinator
1.4.2 GTraining
1.4.3Certification
3.3.3 GShipping Documents and
Packagings Certification
3.3.4Security Plan
3.3.5Certificates of Disposal
3.5Waste Minimization
02 82 00 SD-03 Product Data
1.2.2 GAmended Water
1.3.9 GSafety Data Sheets (SDS) for All
Materials
2.1 GEncapsulants
3.1.2.1 GRespirators
3.1.7 GLocal Exhaust Equipment
3.1.7 GPressure Differential Automatic
Recording Instrument
3.1.8 GVacuums
3.1.10 GGlovebags
SD-06 Test Reports
1.5.5 GAir Sampling Results
1.5.6 GPressure Differential Recordings
for Local Exhaust System
3.2.12.2 GEncapsulation Test Patches
3.2.13.5 GClearance Sampling
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
02 82 00 3.3.3.2 GAsbestos Disposal Quantity
Report
SD-07 Certificates
1.3.4 GEmployee Training
1.3.5 GNotifications
1.3.7 GRespiratory Protection Program
1.3.10 GAsbestos Hazard Abatement Plan
1.3.11 GTesting Laboratory
1.3.12 GLandfill Approval
1.3.12 GDelivery Tickets
1.3.12 GWaste Shipment Records
1.3.13 GTransporter Certification
1.3.14 GMedical Certification
1.5.1 GPrivate Qualified Person
Documentation
1.5.2 GDesignated Competent Person
1.5.3 GWorker's License
1.5.4 GContractor's License
1.5.7 GFederal, State or Local Citations
on Previous Projects
2.1 GEncapsulants
3.1 GEquipment Used to Contain
Airborne Asbestos Fibers
3.1.3.3 GWater Filtration Equipment
3.1.8 GVacuums
3.1.8 GVentilation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
02 82 00 SD-11 Closeout Submittals
1.3.5 GPermits and Licenses
1.3.5 GNotifications
1.3.7.1 GRespirator Program Records
1.7.1 GRental Equipment
03 30 53 SD-02 Shop Drawings
1.4 GInstallation Drawings
SD-03 Product Data
2.2.3.1Air-Entraining Admixture
2.2.3.2Water-Reducing or Retarding
Admixture
3.2Conveying and Placing Concrete
2.3 GMix Design Data
2.3Ready-Mix Concrete
2.2.5Mechanical Reinforcing Bar
Connectors
2.2.7Curing Materials
SD-06 Test Reports
2.2.2Aggregates
2.1.3 GConcrete Mixture Proportions
3.7.3 GCompressive Strength Testing
3.7.3 GSlump
3.7.3Air Content
2.2.4Water
SD-07 Certificates
2.2.1Cementitious Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
03 30 53 2.2.2Aggregates
2.3Delivery Tickets
SD-08 Manufacturer’s Instructions
2.4.1Chemical Floor Hardener
04 20 00 SD-02 Shop Drawings
3.3.5.1Cut CMU
3.4.1.1Detail Drawings
SD-03 Product Data
1.4.1Hot Weather Procedures
1.4.2Cold Weather Procedures
2.2.2Clay or Shale Brick
2.2.3.2.1Cement
2.4.1.1Cementitious Materials
2.6.8Insulation
SD-04 Samples
2.2.2Clay or Shale Brick
2.2.3.2 GConcrete Masonry Units (CMU)
2.4.1.4Admixtures for Masonry Mortar
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
2.6.6Clay Masonry Expansion-Joint
Materials
2.6.8Insulation
SD-05 Design Data
2.1.2Masonry Compressive Strength
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
04 20 00 3.2.5Bracing Calculations
SD-06 Test Reports
2.2.2.1.4Efflorescence Test
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
3.6.1.3Prism Tests
SD-07 Certificates
2.2.2Clay or Shale Brick
2.2.3.2Concrete Masonry Units (CMU)
2.4.1.1Cementitious Materials
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
2.6.8Insulation
SD-08 Manufacturer’s Instructions
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
SD-11 Closeout Submittals
2.2.2.1.3 SClay Units
2.2.3.2.2 SRecycled Content
05 05 20 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
05 05 20 1.5.1.1 GInstaller Qualifications
SD-03 Product Data
2.1.1.3 GMechanical Anchors in Concrete
2.1.1.4 GAdhesive Anchor System in
Concrete
3.1.3Non-Shrink, Non Metallic Grout
SD-06 Test Reports
3.3.4 GPost-Installed Anchor Special
Inspections Report
SD-07 Certificates
2.1.1.1 GPost-Installed Anchor
Certification
SD-08 Manufacturer’s Instructions
2.1.1.2 GManufacturer's Printed
Installation Instructions
1.5Manufacturer's Material Safety
Data Sheets
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1Erection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2Fabrication Drawings
SD-03 Product Data
2.4.2Shop Primer
2.3.1Welding Electrodes and Rods
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
05 12 00 2.2.1 SRecycled Content for Structural
Steel
SD-05 Design Data
1.4.3 GDesign Calculations for Steel
Connections
SD-07 Certificates
2.2Steel
1.3AISC Structural Steel Fabricator
Quality Certification
1.3AISC Structural Steel Erector
Quality Certification
1.4.4.1Welding Procedures and
Qualifications
2.3.1Welding Electrodes and Rods
3.5.1.1Certified Welding Inspector
3.3Welding Procedure Specifications
(WPS)
06 10 00 SD-02 Shop Drawings
2.2.1 GNailing Strips
SD-03 Product Data
2.3Oriented Strand Board
SD-05 Design Data
1.8.2 GModifications of Structural
Members
SD-06 Test Reports
1.7Preservative-Treated
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
06 10 00 SD-07 Certificates
1.9.1Certificates of Grade
1.7Preservative-Treated
07 27 19.01 SD-01 Preconstruction Submittals
1.5.1Qualifications of Manufacturer
1.5.2Qualifications of Installer
SD-02 Shop Drawings
1.3.1Self-adhering Air Barrier Shop
Drawings
SD-03 Product Data
2.1Self-adhering Air Barrier
2.2Primers, Adhesives, and Mastics
1.3.2Safety Data Sheets
SD-06 Test Reports
1.5.3 GField Peel Adhesion Test
3.4.1 GSite Inspections and Testing
SD-08 Manufacturer’s Instructions
1.3.2 GSelf-adhering Air Barrier
Manufacturer's Printed Instructions
2.2 GPrimers, Adhesives, and Mastics
07 54 19 SD-02 Shop Drawings
1.6 GDetail Drawings
1.6 GRoof Plan
SD-03 Product Data
3.2.2 GPVC Roofing Membrane
2.1.3Bonding Adhesive
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
07 54 19 1.5.3Flashing
3.2.2.2Flashing
2.1.6Membrane Fasteners and Plates
2.1.9Roof Insulation
2.1.7Protection Mat
2.1.8Pre-Manufactured Accessories
2.1.1Information Card
SD-05 Design Data
1.3.2 GWind Uplift Resistance
SD-07 Certificates
1.5.1Qualification of Manufacturer
1.5.2Qualifications of Applicator
1.3.1Fire Resistance
2.1.1Minimum Polymer Thickness
2.1.5Minimum Polymer Thickness
1.10 GSample
SD-08 Manufacturer’s Instructions
3.2 GApplication Method
2.1.5 GMembrane Flashing
3.3.2 GMembrane Flashing
2.1.6.2Auxiliary Fasteners
2.1.8Pre-Manufactured Accessories
1.8 GCold Weather
SD-11 Closeout Submittals
1.10 GWarranty
2.1.1 GInformation Card
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
07 54 19 3.9 GInstructions to Government
Personnel
07 60 00 SD-02 Shop Drawings
2.2.1Exposed Sheet Metal
3.1.9Base Flashing
3.1.10Counterflashing
3.1.16Flashing at Roof Penetrations and Equipment Supports
3.1.13Drip Edges
2.1Recycled Content
2.2.8 GReglets
SD-04 Samples
1.4.2Finish Samples
SD-07 Certificates
2.2.5.1 GWarranty on Finishes
SD-08 Manufacturer’s Instructions
1.4.3 GInstructions for Installation
3.5 GQuality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3 GCleaning and Maintenance
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
07 92 00 2.5 GCaulking
2.6 GCleaning Solvents
3.1 GField Adhesion
SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
2.5 SIndoor Air Quality For Interior
Caulking
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.3 GFrames
2.3 GFrames
2.2Accessories
SD-03 Product Data
2.1 GDoors
2.1 SRecycled Content for Steel Door
Product
2.3 GFrames
2.3 SRecycled Content for Steel Frame
Product
2.2Accessories
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
08 71 00 2.2.4 GKeying System
SD-03 Product Data
2.2 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
09 22 00 SD-02 Shop Drawings
2.1 GMetal Support Systems
SD-03 Product Data
2.1Metal Support Systems
2.1 SRecycled Content for Metal
Support Systems
09 29 00 SD-03 Product Data
2.1.6Accessories
2.1.1Gypsum Board
2.1.2 SVOC Content of Joint Compound
SD-07 Certificates
2.1 GAsbestos Free Materials
2.1.1Indoor Air Quality for Gypsum
Board
09 51 00 SD-02 Shop Drawings
2.1 GDrawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
09 51 00 SD-03 Product Data
2.2.1.1 SRecycled Content for Type III
Ceiling Tiles
2.1.1 GAcoustical Performance
SD-04 Samples
2.2 GAcoustical Units
2.2.1.1Acoustical Ceiling Tiles
SD-07 Certificates
2.2.1.1Indoor Air Quality for Type III
Ceiling Tiles
09 90 00 SD-02 Shop Drawings
3.11Piping Identification
SD-03 Product Data
2.1 GCoating
2.1Product Data Sheets
3.2.5Sealant
2.2Color
SD-07 Certificates
1.6.4Indoor Air Quality for Paints and
Primers
SD-08 Manufacturer’s Instructions
3.3.1Application Instructions
2.1Mixing
1.8.1Manufacturer's Safety Data
Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
09 90 00 SD-10 Operation and Maintenance
Data
2.1 GCoatings
23 01 30.41 SD-01 Preconstruction Submittals
3.1.1.1Record of Existing Conditions
3.1.1.2Coordination Plan
1.4.1NADCA Firm
1.4.1NADCA Team Assistants
1.4.1NADCA Air System Cleaning
Specialist (ASCS)
1.4.1NADCA Supervisor Qualifications
1.4.2Records of Experience in the
Field of HVAC System Cleaning
1.5.1NADCA Work Execution
Schedule
SD-03 Product Data
1.4.3Safety Data Sheets (SDS)
SD-06 Test Reports
3.3.2Testing Procedures Summary
3.3.2Post-Project Report
23 05 48.19 SD-02 Shop Drawings
3.1Coupling and Bracing
3.2Flexible Couplings or Joints
2.2Equipment Restraint
1.2.4 GContractor Designed Bracing
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
23 05 48.19 3.1 GCoupling and Bracing
3.2 GFlexible Couplings Or Joints
2.2 GEquipment Restraint
1.2.4 GContractor Designed Bracing
3.8Anchor Bolts
2.2.2Vibration Isolators
SD-05 Design Data
1.2.4Design Calculations
SD-06 Test Reports
3.8 GAnchor Bolts
23 05 93 SD-01 Preconstruction Submittals
1.3.2 GRecords of Existing Conditions
SD-02 Shop Drawings
1.3.2 GTAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3 GEquipment and Performance
Data
3.4.1.1 GTAB Related HVAC Submittals
3.4.1.1 GTAB Related HVAC Submittals
SD-06 Test Reports
3.3.5 GCompleted Pre-Final DALT
Report
3.3.8 GCertified Final DALT Report
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
23 05 93 1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.3.2 GDALT and TAB Submittal and
Work Schedule
1.3.2 GTAB Pre-Field Engineering
Report
23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
2.3.1 SRecycled content for insulation
materials
SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
SD-04 Samples
2.2.1.3 GThermal Insulation
3.1.1 GDisplay Samples
SD-07 Certificates
2.2.1 SIndoor air quality for adhesives
SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
23 08 00 SD-03 Product Data
2.1 GTest Equipment
SD-06 Test Reports
3.3 GCompleted Pre-Functional
Checklists
3.12 GSeasonal Test Report
3.13 GFull-Load Test Report
3.16 GPost-Construction Trend Log
Report
SD-07 Certificates
1.5 GCertificate Of Readiness
23 09 00 SD-02 Shop Drawings
3.3 GDDC Contractor Design Drawings
3.3 GDraft As-Built Drawings
1.7 GFinal As-Built Drawings
3.3 GFinal As-Built Drawings
SD-03 Product Data
1.8.3 GProgramming Software
1.8.4 GController Application Programs
1.8.1 GConfiguration Software
1.8.2 GController Configuration Settings
2.2 GManufacturer's Product Data
SD-06 Test Reports
3.1.1Existing Conditions Report
1.9.1 GPre-Construction Quality Control
(QC) Checklist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
23 09 00 1.9.2 GPost-Construction Quality Control
(QC) Checklist
3.5.2 GStart-Up Testing Report
3.6.1 GPVT Procedures
3.6.3 GPVT Report
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
(O&M) Instructions
3.9.1 GTraining Documentation
SD-11 Closeout Submittals
2.5 GEnclosure Keys
3.2.6.1 GPassword Summary Report
1.9.3 GCloseout Quality Control (QC)
Checklist
23 22 26.00 20 SD-03 Product Data
2.2Steam to Air Heating Coils
2.1.6Valves
2.1.9.1Traps
2.1.9.2Strainers
2.1.8Instrumentation
SD-06 Test Reports
3.2.2.1Steam Piping
2.1.6Valves
2.1.8Instrumentation
2.1Pipe and Pipe System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
23 22 26.00 20 2.2Steam to Air Heating Coils
SD-07 Certificates
1.4.1Welding Procedure
1.4.2Welder's Performance
Qualification Record
1.4.2List of Welders and Welder's
Symbols
23 23 00 SD-02 Shop Drawings
2.3 GRefrigerant Piping System
SD-03 Product Data
2.3Refrigerant Piping System
1.5.2Spare Parts
1.3.1Qualifications
3.5Refrigerant Piping Tests
3.1Verification of Dimensions
SD-06 Test Reports
3.5Refrigerant Piping Tests
SD-07 Certificates
2.1Service Organization
SD-10 Operation and Maintenance
Data
1.5 GMaintenance
3.4 GOperation and Maintenance
Manuals
3.4 GDemonstrations
23 30 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
23 30 00 1.4.4 GDetail Drawings
SD-03 Product Data
2.9.1.1Metallic Flexible Duct
2.9.1.2Insulated Nonmetallic Flexible
Duct Runouts
2.9.1.2Duct Connectors
2.9.2 GDuct Access Doors
2.9.3 GManual Balancing Dampers
2.9.6.1Acoustical Duct Liner
2.10.1.1Panel Type Power Wall
Ventilators
2.11 GAir Handling Units
2.12 GCondensing Units
2.13.1.1 GVariable Volume, Single Duct
Terminal Units
1.4.5Test Procedures
1.2.1.2 GDiagrams
2.9.1 SIndoor Air Quality for Duct
Sealants
SD-06 Test Reports
3.11 GPerformance Tests
SD-07 Certificates
1.4.1Bolts
1.4.3Ozone Depleting Substances
Technician Certification
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
23 30 00 3.2Manufacturer's Installation
Instructions
3.13.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
3.13.1 GOperation and Maintenance
Manuals
2.9.3 GManual Balancing Dampers
2.11 GAir Handling Units
2.12 GCondensing Units
2.13.1.1 GVariable Volume, Single Duct
Terminal Units
SD-11 Closeout Submittals
3.12 SIndoor Air Quality During
Construction
25 05 11 SD-01 Preconstruction Submittals
3.2.2.2 GWired Broadcast Communication
Request
3.3.2 GDevice Account Lock Exception
Request
3.2.4.2 GMultiple Ethernet Connection
Device Request
1.11.1.6 GContractor Computer
Cybersecurity Compliance
Statements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
25 05 11 1.9.2 GCybersecurity Interconnection
Schedule
3.6.4 GProtection of Information At Rest
Proposal
1.9.1 GProposed STIG and SRG
Applicability Report
1.9.4 GPre-Construction Control System
Inventory Report
SD-02 Shop Drawings
1.9.3 GNetwork Communication, Ports, Protocols and Services Report
1.9.6 GCybersecurity Network (Riser)
Diagram
SD-03 Product Data
1.9.8 GControl System Cybersecurity
Documentation
SD-06 Test Reports
3.13.1 GControl System Cybersecurity
Testing Procedures
3.13.3 GControl System Cybersecurity
Testing Report
SD-07 Certificates
1.10 GSoftware Licenses
SD-11 Closeout Submittals
3.4.4.5 GConfidential Password Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
25 05 11 3.4.4.5 GPassword Change Summary
Report
3.3.7 GEnclosure Keys
1.9.5 GSoftware and Configuration
Backups
3.8 GSystem Maintenance Tool
Software
3.10.2 GControl System Scanning Tools
1.9.7 GSTIG, SRG and Vendor Guide
Compliance Result Report
1.9.4 GFinal Control System Inventory
Report
3.12.2 GIntegrity Verification Software
25 08 10 SD-06 Test Reports
3.1.1 GPVT Plan
3.1.2.1 GPVT Phase I Report
3.1.2.2 GPVT Phase II Report
SD-07 Certificates
1.4 GTest Instrumentation Calibration
Certificates
25 10 10 SD-02 Shop Drawings
3.3.2 GUMCS Contractor Design
Drawings
3.3.3 GDraft As-Built Drawings
3.3.3 GFinal As-Built Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
25 10 10 2.1.5 GProduct Data Sheets
2.4 GComputer Software
2.6.1 GEnclosure Keys
SD-05 Design Data
3.3.1 GUMCS IP Network Bandwidth
Usage Estimate
SD-06 Test Reports
1.7 GPre-Construction QC Checklist
1.7 GPost-Construction QC Checklist
3.1 GFactory Test Procedures
3.1 GFactory Test Report
3.2 GExisting Conditions Report
3.7 GStart-Up and Start-Up Testing
Report
3.8.1 GPVT Phase I Procedures
3.8.2 GPVT Phase I Report
3.8.3 GPVT Phase II Report
SD-10 Operation and Maintenance
Data
1.8 GOperation and Maintenance
(O&M) Instructions
3.9.8.1 GPreventive Maintenance Work
Plan
3.10.1 GBasic Training Documentation
3.10.1 GAdvanced Training
Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
25 10 10 3.10.1 GRefresher Training
Documentation
SD-11 Closeout Submittals
1.7 GCloseout QC Checklist
26 20 00 SD-02 Shop Drawings
2.16 GWireways
SD-03 Product Data
2.9 GReceptacles
GCircuit Breakers
2.7 GSwitches
GMotor Controllers
2.10 GManual Motor Starters
SD-06 Test Reports
3.5.2 G600-volt Wiring Test
3.5.4 GGround-fault Receptacle Test
SD-07 Certificates
2.8 GFuses
SD-10 Operation and Maintenance
Data
1.6.1 GElectrical Systems
26 29 23 SD-02 Shop Drawings
1.5.1 GSchematic Diagrams
1.5.2 GInterconnecting Diagrams
1.5.3 GInstallation Drawings
1.5.3 GAs-Built Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
26 29 23 2.1 GAdjustable Speed Drives
2.3Wires and Cables
1.5.4Equipment Schedule
SD-06 Test Reports
3.3.1ASD Test
3.3.2Performance Verification Tests
3.3.3Endurance Test
SD-08 Manufacturer’s Instructions
1.5.5Installation instructions
SD-09 Manufacturer’s Field
Reports
2.5.1 GASD Test Plan
1.5.6Standard Products
SD-10 Operation and Maintenance
Data
2.1Adjustable Speed Drives
32 31 13 SD-02 Shop Drawings
2.1 GFence Assembly
3.2.2.1 GLocation of Gate, Corner, End, and Pull Posts
2.1 GGate Assembly
2.3.6 GGate Hardware and Accessories
Part 3 GErection/Installation Drawings
SD-03 Product Data
2.1 GFence Assembly
2.2.2.1.1Line Posts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 38 PAGES
B1106 HAVAC REPAIR/REPLACEMENT
32 31 13 2.1 GGate Assembly
2.3.6 GGate Hardware and Accessories
2.1 GPVC Coating
2.2.1 GFabric
2.2.6 GStretcher Bars
2.2.5Sleeves
2.4.2 GConcrete
SD-04 Samples
2.2.1 GFabric
2.3.5Padlocks
1.3.1Zinc Coating
2.4.1Zinc Coating
1.3.1Certificates of Compliance
SD-08 Manufacturer’s Instructions
2.1Fence Assembly
2.1Gate Assembly
2.1Hardware Assembly
2.1Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .