FORM 1 - DBE SUBS AND SUPPLIERS.pdf
PDF 235 KB Posted
- Attached to
- UPS Battery Replacement Location 64
- Solicitation number
- PS132603(2)
- Issued by
- California
About this file
This is a Disadvantaged Business Enterprise (DBE) subcontractor and supplier documentation form issued by Los Angeles County Metropolitan Transportation Authority (LACMTA). The document establishes the requirements and procedures for prime contractors to identify and report all DBE businesses of any tier that will be utilized on projects and for which the prime is seeking DBE credit. The forms must be completed and submitted with bids to ensure responsiveness, with all information consistent across Forms 1 through 5 and the DBE Affidavit. Each DBE business listed on Form 1 must complete Attachment A, providing supporting information that validates the DBE credit claimed and the overall DBE commitment. The document includes separate guidance for construction projects (Form 1) and non-construction professional services and IFBs/RFPs (Form 1B), along with corresponding attachments for lower-tier subcontractor reporting.
The forms establish specific credit calculation methodologies based on business classification: suppliers receive 60 percent credit of contract costs, distributors receive 40 percent credit, and brokers receive credit only for fees and commissions. Work that a DBE subcontracts to non-DBE firms does not count toward DBE goals. The prime contractor is responsible for verifying consistency between all submitted forms, attachments, and the stated DBE commitment, and must meet the DBE commitment listed in the DBE Affidavit as enforced by LACMTA under the contract. LACMTA may issue clarification requests if discrepancies are identified among Forms 1 to 5 or related attachments. Termination and substitution requirements apply to all DBE firms listed on Form 1, and all compliance is reviewed according to 49 CFR Part 26.55.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FORM 1 - DBE SUBCONTRACTORS & SUPPLIERS
TO BE COMPLETED BY PRIME ONLY
The Prime (Offeror) is required to list ALL DBE businesses, of any tier, to be utilized on this project for whom Prime is seeking DBE Credit. For a bid to be responsive, the Prime (Offeror) must complete this form and submit the completed form with its bid. The form should be complete in accordance with the instructions on this form and in the solicitation, using care so that the information provided in this form is consistent with the information provided in Forms 2 to 5 and the DBE commitment in the DBE Affidavit. If there is any discrepancy or conflict between the information listed on any of Forms 2 to 5 and the information in this Form 1, LACMTA may issue requests for clarification seeking information or clarification from the Prime (Offeror) in accordance with this solicitation. In all events, Prime shall be required to meet the DBE commitment listed in the DBE Affidavit, which will be enforced by LACMTA under the Contract. Each DBE business listed on Form 1 shall complete Attachment A to this Form.
Solicitation Number: Total Prime Bid Price:
Project Name: Authorized Signature / Date:
Bid Due Date: Printed Name and Title:
A1 B C D E E F G2 H I
NAME OF BUSINESS Manufacturer?
(Y/N)
Supplier?3 (Y/N)
Distributor4
(Y/N) Broker5 (Y/N)
Tier (First/ Second/
Third, etc.)
% work intended to be self-performed
If not first-tier, name of business with whom listed business is contracted
Dollar value of listed business’ contract
DBE Credit $6 (Suppliers take 60% of price;
Distributors take 40% of price;
Brokers, fees & commission only) Your Firm
D
BE
S ub co nt ra ct or s
1.
2.
3.
4.
5.
6.
7.
Total:
1For any DBE firm listed on this Project, the Prime is subject to the Termination/Substitution requirements in the solicitation.
2Prime may be required to list businesses not listed on the Subcontractor Listing Form (e.g., a low dollar value non-DBE subcontractor who contracts with a DBE business).
3If a DBE business is a supplier providing materials/supplies, only sixty-percent (60%) of the cost will be credited toward the DBE goal. LACMTA will take 60% of the cost for materials/supplies listed in Column H to credit for DBE participation. If a DBE supplier, list 60% of the Bid Price breakdown in Column I. Appropriate credit will be reviewed by LACMTA according to 49 CFR Part 26.55.
4If a DBE business is Distributor, only forty percent (40%) of the cost will be credited toward the DBE goal. LACMTA will take 40% of the cost for materials/supplies listed in Column H to credit for DBE participation. If a DBE distributor, list 40% of the Bid Price breakdown in Column I. Appropriate credit will be reviewed by LACMTA according to 49 CFR Part 26.55.
5If a DBE business is providing brokering services, only the broker/commission (mark-up) fees will be credited toward the DBE goal. If a broker, only list broker/commission (mark-up) fees in Column H.
6The Prime is reminded that work that a DBE subcontracts to a non-DBE firm does not count toward the DBE goal. See Section 300 (Commercial Useful Function and Counting DBE Participation) of the DBE Instructions to Proposers (Federal). All lower-tier Subcontractors for each DBE firm listed on this form must be identified on Attachment A.
ATTACHMENT A TO FORM 1: SUPPORTING INFORMATION FROM DBE SUBCONTRACTOR
INSTRUCTIONS FOR PRIME (Offeror):
The purpose of this Attachment A is to validate the DBE credit on Form 1 and the DBE commitment in the DBE Affidavit.
1. Send this Attachment A to each DBE business listed on Form 1 and ask each such DBE business to complete Attachment A and return to the Prime.
2. Obtain all Attachment A forms and verify that the information provided in the Attachments is consistent with the aggregated numbers in Form 1 and the DBE commitment listed in the DBE Affidavit. Verify that the information provided in the Attachment A forms is consistent with the information provided in Forms 2 to 5.
3. The Attachment A forms obtained from the DBE businesses listed on Form 1 may include businesses not listed on the Subcontractor Listing Form (e.g., a low dollar value non-DBE subcontractor who contracts with the DBE business).
4. Attach all Attachment A forms received to Form 1 as Attachment A. For a bid to be responsive, you must submit with your bid a completed Attachment A for each DBE business listed on Form 1.
5. If there is any discrepancy or conflict between the information listed on any of Forms 1 to 5 and the information in the Attachments, LACMTA may issue requests for clarification seeking information or clarification from the Prime (Offeror) and the DBE in accordance with this IFB. In all events, Prime shall be required to meet the DBE commitment listed in the DBE Affidavit, which will be enforced by LACMTA under the Contract.
INSTRUCTIONS FOR EACH DBE SUBCONTRACTOR LISTED ON FORM 1 THAT IS SUBCONTRACTING WORK:
1. Complete this Attachment A to Form 1 to the best of your knowledge and information.
2. Complete the row titled "Your Firm" with name in column A and complete the information in columns B to E and G to I for your contract.
3. List each lower-tier Subcontractor (DBE or non-DBE) that you will be sub-contracting Work to in column A and complete the information in columns B through I for each of the Subcontractors listed in column A.
ATTACHMENT A TO FORM 1: SUPPORTING INFORMATION FROM DBE SUBCONTRACTOR
Project Name:
Your Prime Name:
Your Business Name:
Subcontractor Bid Price:
Printed Name and Title: Authorized Signature1 / Date:
A B C D E F G H I
NAME OF BUSINESS DBE?
(Y/N)
Manufacturer (Y/N)
Supplier2 (Y/N)
Distributor3 (Y/N)
Broker4 (Y/N)
Directly contracting through your firm or at a lower tier?
(Direct/lower)
If not first-tier, name of business with whom listed business is contracted
Dollar value of listed business contract5
DBE Credit $6 (Suppliers take 60% of price;
Distributors take 40% of price;
Brokers, fees & commission only)
Your Firm
Lo w er -T ie r
Su bc on tra ct or s
1.
2.
3.
4.
5.
1To be signed by the authorized signatory of the applicable DBE business listed in Form 1.
2If a DBE business is a Supplier providing materials/equipment/supplies, only sixty percent (60%) of the cost will be credited toward the DBE goal. LACMTA will take 60% of the cost for materials/equipment/supplies listed in Column H to credit for DBE participation. If a DBE supplier, please list 60% of the sub-bid price breakdown in Column I. Appropriate credit will be reviewed by LACMTA according to 49 CFR Part 26.55.
3If a DBE business is Distributor, only forty-percent (40%) of the cost will be credited toward the DBE goal. LACMTA will take 40% of the cost for materials/supplies listed in Column H to credit for DBE participation. If a DBE distributor, list 40% of the Bid Price breakdown in Column I. Appropriate credit will be reviewed by LACMTA according to 49 CFR Part 26.55.
4If a DBE business is providing brokering services, only the broker/commission (mark-up) fees will be credited toward the DBE goal. If a broker, only list broker/commission (mark-up) fees in Column I.
6The Subcontractor is reminded that work that a DBE subcontracts to a non-DBE firm does not count toward the DBE goal. See Section 300 (Commercial Useful Function and Counting DBE Participation) of the DBE Instructions to Proposers (Federal).
For any DBE firm listed on Form 1 for this Project, the Prime is subject to the Termination/Substitution requirements in the DEOD Contract Compliance Manual.
FORM 1B - PROPOSED SUBCONTRACTORS & SUPPLIERS FOR NON-CONSTRUCTION IFBs AND RFPs ONLY
TO BE COMPLETED BY PRIME ONLY
The Prime is requested to list ALL first-tier businesses, which include DBEs & non-DBEs, to be utilized on this project to perform work, labor, and/or render service to the Prime for this professional services and/or non-construction procurement. For a bid (IFB)/proposal (RFP) to be responsive, the Prime (Offeror) must complete this form and submit it with the bid/proposal.
IFB/RFP/RFIQ Number: Total Proposal/Bid Price:
Project Name: Authorized Signature / Date:
Proposal/Bid Due Date: Printed Name and Title:
A B C D E F G H
NAME OF BUSINESS DBE?
(Y/N)
Manufacturer (Y/N)
Supplier1 (Y/N)
Distributor2
(Y/N) Broker3 (Y/N) Proposal/Bid Price Breakdown $
DBE Credit $ (If supplier take 60% of price; if Distributor take 40% of price;
if broker, fees and commission only)
Your Firm
Su bc on tra ct or s
1.
2.
3.
4.
5.
6.
7.
8.
9.
Total:
(Should match Total Proposal/Bid Price listed on top of page) (Total DBE Commitment) 1If a DBE business is a Supplier providing materials/supplies, only sixty percent (60%) of the cost will be credited toward the DBE goal. Metro will take 60% of the cost for materials/supplies listed in Column G to credit for DBE participation. If a DBE supplier, please list 60% of the Proposal/Bid Price in Column H. Appropriate credit will be reviewed by LACMTA according to 49 CFR Part 26.55.
2If a DBE business is Distributor, only forty percent (40%) of the cost will be credited toward the DBE goal. LACMTA will take 40% of the cost for materials/supplies listed in Column G to credit for DBE participation. If a DBE distributor, list 40% of the Bid Price breakdown in Column H. Appropriate credit will be reviewed by LACMTA according to 49 CFR Part 26.55.
3If a DBE business is providing brokering services, only the broker/commission (mark-up) fees will be credited toward the DBE goal. If a broker, please only list broker/commission (mark-up) fees in Column H. Appropriate credit will be reviewed by Metro according to 49 CFR Part 26.55.
ATTACHMENT B TO FORM 1B: SUPPORTING INFORMATION FROM DBE SUBCONTRACTOR
FOR NON-CONSTRUCTION IFBs AND RFPs ONLY INSTRUCTIONS FOR PRIME (Offeror):
The purpose of this Attachment B is to validate the DBE credit on Form 1B and the DBE commitment in the DBE Affidavit.
1. Send this Attachment B to each DBE business listed on Form 1B and ask each such DBE business to complete Attachment B and return to the Prime.
2. Obtain all Attachment B forms and verify that the information provided in the Attachments is consistent with the aggregated numbers in Form 1B and the DBE commitment listed in the DBE Affidavit. Verify that the information provided in the Attachment B forms is consistent with the information provided in Forms 2 to 6.
3. Attach all Attachment B forms received to Form 1B as Attachment B. For a bid/proposal to be responsive, you must submit with your bid/proposal a completed Attachment B for each DBE business listed on Form 1B.
4. If there is any discrepancy or conflict between the information listed on any of Forms 1B to 6 and the information in the Attachments, LACMTA may issue requests for clarification seeking information or clarification from the Prime (Offeror) and the DBE in accordance with this IFB. In all events, Prime shall be required to meet the DBE commitment listed in the DBE Affidavit, which will be enforced by LACMTA under the Contract.
INSTRUCTIONS FOR EACH DBE SUBCONTRACTOR LISTED ON FORM 1 THAT IS SUBCONTRACTING WORK:
1. Complete this Attachment B to Form 1B to the best of your knowledge and information.
2. Complete the row titled "Your Firm" with name in column A and complete the information in columns B to E and G to I for your contract.
3. List each lower-tier Subcontractor (DBE or non-DBE) that you will be sub-contracting Work to in column A and complete the information in columns B through I for each of the Subcontractors listed in column A.
ATTACHMENT B TO FORM 1B - PROPOSED LOWER TIER SUBCONTRACTORS & SUPPLIERS
FOR NON-CONSTRUCTION IFBs AND RFPs ONLY
TO BE COMPLETED BY ALL SUBCONTRACTORS LISTED ON FORM 1
All subcontractors listed on Form 1B that are subcontracting work are requested to list ALL lower-tier businesses, which include DBEs & non-DBEs to be utilized on this project.
Your Business Name: Project Name:
Total Proposal/Bid Price: Your Prime Name:
Printed Name and Title: Authorized Signature / Date:
A B C D E F G H
NAME OF BUSINESS DBE
(Y/N)
Manufacturer (Y/N)
Supplier1 (Y/N)
Distributor2
(Y/N) Broker2 (Y/N) Proposal/Bid Price Breakdown $
DBE Credit $ (If Supplier, take 60% of price; if Distributor, take 40% of price; and if broker, fees and commission only)
Your Firm
Su bc on tra ct or s
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Total: (Should match Total Proposal/Bid Price listed on top of page) (Total DBE Commitment)
1If a DBE business is a supplier providing materials/supplies, only sixty percent (60%) of the cost will be credited toward the DBE goal. Metro will take 60% of the cost for materials/supplies listed in Column G to credit for DBE participation. If a DBE supplier, please list 60% of the Proposal Price in Column H.
2If a DBE business is Distributor, only forty percent (40%) of the cost will be credited toward the DBE goal. LACMTA will take 40% of the cost for materials/supplies listed in Column G to credit for DBE participation. If a DBE distributor, list 40% of the Bid Price breakdown in Column H. Appropriate credit will be reviewed by LACMTA according to 49 CFR Part 26.55.
3If a DBE business is providing brokering services, only the broker/commission (mark-up) fees will be credited toward the DBE goal. If a broker, please only list broker/commission (mark-up) fees in Column H. Appropriate credit will be reviewed by Metro according to 49 CFR Part 26.55
| Total Prime Bid Price: |
| Solicitation Number 1: |
| Solicitation Number 2: |
| Solicitation Number 3: |
| Printed Name and Title: |
| Your Firm: |
| Manufacturer YNYour Firm: |
| Supplier3 YNYour Firm: |
| Distributor4 YNYour Firm: |
| Broker5 YNYour Firm: |
| Tier First Second Third etcYour Firm: |
| work intended to be selfperformedYour Firm: |
| If not firsttier name of business with whom listed business is contractedYour Firm: |
| Dollar value of listed business contractYour Firm: |
| DBE Credit 6 Suppliers take 60 of price Distributors take 40 of price Brokers fees commission onlyYour Firm: |
| 1: |
| Manufacturer YN1: |
| Supplier3 YN1: |
| Distributor4 YN1: |
| Broker5 YN1: |
| Tier First Second Third etc1: |
| work intended to be selfperformed1: |
| If not firsttier name of business with whom listed business is contracted1: |
| Dollar value of listed business contract1: |
| DBE Credit 6 Suppliers take 60 of price Distributors take 40 of price Brokers fees commission only1: |
| 2: |
| Manufacturer YN2: |
| Supplier3 YN2: |
| Distributor4 YN2: |
| Broker5 YN2: |
| Tier First Second Third etc2: |
| work intended to be selfperformed2: |
| If not firsttier name of business with whom listed business is contracted2: |
| Dollar value of listed business contract2: |
| DBE Credit 6 Suppliers take 60 of price Distributors take 40 of price Brokers fees commission only2: |
| 3: |
| Manufacturer YN3: |
| Supplier3 YN3: |
| Distributor4 YN3: |
| Broker5 YN3: |
| Tier First Second Third etc3: |
| work intended to be selfperformed3: |
| If not firsttier name of business with whom listed business is contracted3: |
| Dollar value of listed business contract3: |
| DBE Credit 6 Suppliers take 60 of price Distributors take 40 of price Brokers fees commission only3: |
| 4: |
| Manufacturer YN4: |
| Supplier3 YN4: |
| Distributor4 YN4: |
| Broker5 YN4: |
| Tier First Second Third etc4: |
| work intended to be selfperformed4: |
| If not firsttier name of business with whom listed business is contracted4: |
| Dollar value of listed business contract4: |
| DBE Credit 6 Suppliers take 60 of price Distributors take 40 of price Brokers fees commission only4: |
| 5: |
| Manufacturer YN5: |
| Supplier3 YN5: |
| Distributor4 YN5: |
| Broker5 YN5: |
| Tier First Second Third etc5: |
| work intended to be selfperformed5: |
| If not firsttier name of business with whom listed business is contracted5: |
| Dollar value of listed business contract5: |
| DBE Credit 6 Suppliers take 60 of price Distributors take 40 of price Brokers fees commission only5: |
| 6: |
| Manufacturer YN6: |
| Supplier3 YN6: |
| Distributor4 YN6: |
| Broker5 YN6: |
| Tier First Second Third etc6: |
| work intended to be selfperformed6: |
| If not firsttier name of business with whom listed business is contracted6: |
| Dollar value of listed business contract6: |
| DBE Credit 6 Suppliers take 60 of price Distributors take 40 of price Brokers fees commission only6: |
| 7: |
| Manufacturer YN7: |
| Supplier3 YN7: |
| Distributor4 YN7: |
| Broker5 YN7: |
| Tier First Second Third etc7: |
| work intended to be selfperformed7: |
| If not firsttier name of business with whom listed business is contracted7: |
| Dollar value of listed business contract7: |
| DBE Credit 6 Suppliers take 60 of price Distributors take 40 of price Brokers fees commission only7: |
| Dollar value of listed business contractTotal: |
| DBE Credit 6 Suppliers take 60 of price Distributors take 40 of price Brokers fees commission onlyTotal: |
| ATTACHMENT A TO FORM 1 SUPPORTING INFORMATION FROM DBE SUBCONTRACTOR: |
| Subcontractor Bid Price: |
| undefined: |
| Printed Name and Title_2: |
| Manufacturer YNY: |
| Supplier2 YNY: |
| Distributor3 YNY: |
| Broker4 YNY: |
| Directly contracting through your firm or at a lower tier DirectlowerY: |
| If not firsttier name of business with whom listed business is contractedY: |
| Dollar value of listed business contract5Y: |
| DBE Credit 6 Suppliers take 60 of price Distributors take 40 of price Brokers fees commission onlyY: |
| NAME OF DBE FROM FORM 11: |
| Y1: |
| Manufacturer YN1_2: |
| Supplier2 YN1: |
| Distributor3 YN1: |
| Broker4 YN1: |
| Directly contracting through your firm or at a lower tier Directlower1: |
| If not firsttier name of business with whom listed business is contracted1_2: |
| Dollar value of listed business contract51: |
| DBE Credit 6 Suppliers take 60 of price Distributors take 40 of price Brokers fees commission only1_2: |
| NAME OF DBE FROM FORM 12: |
| Y2: |
| Manufacturer YN2_2: |
| Supplier2 YN2: |
| Distributor3 YN2: |
| Broker4 YN2: |
| Directly contracting through your firm or at a lower tier Directlower2: |
| If not firsttier name of business with whom listed business is contracted2_2: |
| Dollar value of listed business contract52: |
| DBE Credit 6 Suppliers take 60 of price Distributors take 40 of price Brokers fees commission only2_2: |
| NAME OF DBE FROM FORM 13: |
| Y3: |
| Manufacturer YN3_2: |
| Supplier2 YN3: |
| Distributor3 YN3: |
| Broker4 YN3: |
| Directly contracting through your firm or at a lower tier Directlower3: |
| If not firsttier name of business with whom listed business is contracted3_2: |
| Dollar value of listed business contract53: |
| DBE Credit 6 Suppliers take 60 of price Distributors take 40 of price Brokers fees commission only3_2: |
| NAME OF DBE FROM FORM 14: |
| Y4: |
| Manufacturer YN4_2: |
| Supplier2 YN4: |
| Distributor3 YN4: |
| Broker4 YN4: |
| Directly contracting through your firm or at a lower tier Directlower4: |
| If not firsttier name of business with whom listed business is contracted4_2: |
| Dollar value of listed business contract54: |
| DBE Credit 6 Suppliers take 60 of price Distributors take 40 of price Brokers fees commission only4_2: |
| NAME OF DBE FROM FORM 15: |
| Y5: |
| Manufacturer YN5_2: |
| Supplier2 YN5: |
| Distributor3 YN5: |
| Broker4 YN5: |
| Directly contracting through your firm or at a lower tier Directlower5: |
| If not firsttier name of business with whom listed business is contracted5_2: |
| Dollar value of listed business contract55: |
| DBE Credit 6 Suppliers take 60 of price Distributors take 40 of price Brokers fees commission only5_2: |
| Business Name 1: |
| Text1: |
| Y0: |
| Total ProposalBid Price: |
| IFBRFPRFIQ Number 1: |
| IFBRFPRFIQ Number 2: |
| ProposalBid Due Date: |
| Printed Name and Title_3: |
| Your Firm_2: |
| DBE YNYour Firm: |
| Manufacturer YNYour Firm_2: |
| Supplier1 YNYour Firm: |
| Distributor2 YNYour Firm: |
| Broker3 YNYour Firm: |
| ProposalBid Price Breakdown Your Firm: |
| DBE Credit If supplier take 60 of price if Distributor take 40 of price if broker fees and commission onlyYour Firm: |
| 1_2: |
| DBE YN1: |
| Manufacturer YN1_3: |
| Supplier1 YN1: |
| Distributor2 YN1: |
| Broker3 YN1: |
| ProposalBid Price Breakdown 1: |
| DBE Credit If supplier take 60 of price if Distributor take 40 of price if broker fees and commission only1: |
| 2_2: |
| DBE YN2: |
| Manufacturer YN2_3: |
| Supplier1 YN2: |
| Distributor2 YN2: |
| Broker3 YN2: |
| ProposalBid Price Breakdown 2: |
| DBE Credit If supplier take 60 of price if Distributor take 40 of price if broker fees and commission only2: |
| 3_2: |
| DBE YN3: |
| Manufacturer YN3_3: |
| Supplier1 YN3: |
| Distributor2 YN3: |
| Broker3 YN3: |
| ProposalBid Price Breakdown 3: |
| DBE Credit If supplier take 60 of price if Distributor take 40 of price if broker fees and commission only3: |
| 4_2: |
| DBE YN4: |
| Manufacturer YN4_3: |
| Supplier1 YN4: |
| Distributor2 YN4: |
| Broker3 YN4: |
| ProposalBid Price Breakdown 4: |
| DBE Credit If supplier take 60 of price if Distributor take 40 of price if broker fees and commission only4: |
| 5_2: |
| DBE YN5: |
| Manufacturer YN5_3: |
| Supplier1 YN5: |
| Distributor2 YN5: |
| Broker3 YN5: |
| ProposalBid Price Breakdown 5: |
| DBE Credit If supplier take 60 of price if Distributor take 40 of price if broker fees and commission only5: |
| 6_2: |
| DBE YN6: |
| Manufacturer YN6_2: |
| Supplier1 YN6: |
| Distributor2 YN6: |
| Broker3 YN6: |
| ProposalBid Price Breakdown 6: |
| DBE Credit If supplier take 60 of price if Distributor take 40 of price if broker fees and commission only6: |
| 7_2: |
| DBE YN7: |
| Manufacturer YN7_2: |
| Supplier1 YN7: |
| Distributor2 YN7: |
| Broker3 YN7: |
| ProposalBid Price Breakdown 7: |
| DBE Credit If supplier take 60 of price if Distributor take 40 of price if broker fees and commission only7: |
| 8: |
| DBE YN8: |
| Manufacturer YN8: |
| Supplier1 YN8: |
| Distributor2 YN8: |
| Broker3 YN8: |
| ProposalBid Price Breakdown 8: |
| DBE Credit If supplier take 60 of price if Distributor take 40 of price if broker fees and commission only8: |
| 9: |
| DBE YN9: |
| Manufacturer YN9: |
| Supplier1 YN9: |
| Distributor2 YN9: |
| Broker3 YN9: |
| ProposalBid Price Breakdown 9: |
| DBE Credit If supplier take 60 of price if Distributor take 40 of price if broker fees and commission only9: |
| Your Business Name: |
| Total ProposalBid Price_2: |
| 1_3: |
| 2_3: |
| Printed Name and Title_4: |
| Your Firm_3: |
| DBE YNYour Firm_2: |
| Manufacturer YNYour Firm_3: |
| Supplier1 YNYour Firm_2: |
| Distributor2 YNYour Firm_2: |
| Broker2 YNYour Firm: |
| ProposalBid Price Breakdown Your Firm_2: |
| DBE Credit If Supplier take 60 of price if Distributor take 40 of price and if broker fees and commission onlyYour Firm: |
| 1_4: |
| DBE YN1_2: |
| Manufacturer YN1_4: |
| Supplier1 YN1_2: |
| Distributor2 YN1_2: |
| Broker2 YN1: |
| ProposalBid Price Breakdown 1_2: |
| DBE Credit If Supplier take 60 of price if Distributor take 40 of price and if broker fees and commission only1: |
| 2_4: |
| DBE YN2_2: |
| Manufacturer YN2_4: |
| Supplier1 YN2_2: |
| Distributor2 YN2_2: |
| Broker2 YN2: |
| ProposalBid Price Breakdown 2_2: |
| DBE Credit If Supplier take 60 of price if Distributor take 40 of price and if broker fees and commission only2: |
| 3_3: |
| DBE YN3_2: |
| Manufacturer YN3_4: |
| Supplier1 YN3_2: |
| Distributor2 YN3_2: |
| Broker2 YN3: |
| ProposalBid Price Breakdown 3_2: |
| DBE Credit If Supplier take 60 of price if Distributor take 40 of price and if broker fees and commission only3: |
| 4_3: |
| DBE YN4_2: |
| Manufacturer YN4_4: |
| Supplier1 YN4_2: |
| Distributor2 YN4_2: |
| Broker2 YN4: |
| ProposalBid Price Breakdown 4_2: |
| DBE Credit If Supplier take 60 of price if Distributor take 40 of price and if broker fees and commission only4: |
| 5_3: |
| DBE YN5_2: |
| Manufacturer YN5_4: |
| Supplier1 YN5_2: |
| Distributor2 YN5_2: |
| Broker2 YN5: |
| ProposalBid Price Breakdown 5_2: |
| DBE Credit If Supplier take 60 of price if Distributor take 40 of price and if broker fees and commission only5: |
| 6_3: |
| DBE YN6_2: |
| Manufacturer YN6_3: |
| Supplier1 YN6_2: |
| Distributor2 YN6_2: |
| Broker2 YN6: |
| ProposalBid Price Breakdown 6_2: |
| DBE Credit If Supplier take 60 of price if Distributor take 40 of price and if broker fees and commission only6: |
| 7_3: |
| DBE YN7_2: |
| Manufacturer YN7_3: |
| Supplier1 YN7_2: |
| Distributor2 YN7_2: |
| Broker2 YN7: |
| ProposalBid Price Breakdown 7_2: |
| DBE Credit If Supplier take 60 of price if Distributor take 40 of price and if broker fees and commission only7: |
| 8_2: |
| DBE YN8_2: |
| Manufacturer YN8_2: |
| Supplier1 YN8_2: |
| Distributor2 YN8_2: |
| Broker2 YN8: |
| ProposalBid Price Breakdown 8_2: |
| DBE Credit If Supplier take 60 of price if Distributor take 40 of price and if broker fees and commission only8: |
| 9_2: |
| DBE YN9_2: |
| Manufacturer YN9_2: |
| Supplier1 YN9_2: |
| Distributor2 YN9_2: |
| Broker2 YN9: |
| ProposalBid Price Breakdown 9_2: |
| DBE Credit If Supplier take 60 of price if Distributor take 40 of price and if broker fees and commission only9: |
| 10: |
| DBE YN10: |
| Manufacturer YN10: |
| Supplier1 YN10: |
| Distributor2 YN10: |
| Broker2 YN10: |
| ProposalBid Price Breakdown 10: |
| DBE Credit If Supplier take 60 of price if Distributor take 40 of price and if broker fees and commission only10: |
| Text3: |
| Text2: |
| Text6: |
| Text8: |
File details come from the government source that posted it. Updated .