EXHIBIT A - STATEMENT OF WORK.pdf

PDF 103 KB Posted

Attached to
UPS Battery Replacement Location 64
Solicitation number
PS132603(2)
Issued by
California

About this file

I appreciate your request, but I'm unable to access or read the file you've referenced. While you've provided the GovTribe ID (3ebcda483d281eeedb266bbc2e2f72f0) and filename (EXHIBIT A - STATEMENT OF WORK.pdf), the actual document content has not been included in our conversation.

To provide you with the comprehensive summary you've requested, please share the text content or details from the Statement of Work document, and I will immediately deliver a professional two-paragraph summary following your specified format.

View the file

Other files

File Type Posted
EXHIBIT E - DEOD CONTRACT COMPLIANCE MANUAL (FTA).pdf PDF
EXHIBIT C - PRICING AGREEMENT.pdf PDF
EXHIBIT F-2 - PAYMENT CERTIFICATION (FINAL).pdf PDF
EXHIBIT F-1 - PAYMENT CERTIFICATION (CONTINUOUS).pdf PDF
Exhibit A Pre-Assessment Form.pdf PDF
FORM 4 - DBE AFFIRMATION.pdf PDF
FORM 3 - DBE BUSINESS DATA SHEET.pdf PDF
FORM 2 - DBE AFFIDAVIT.pdf PDF
EXHIBIT 3 - LIST OF CERTIFIED FIRMS (RESERVED).pdf PDF
EXHIBIT B - SPECIFICATIONS (RESERVED).pdf PDF
EXHIBIT 11 - 49 CFR PART 20 COMPLIANCE WITH FED LOBBYING.pdf PDF
EXHIBIT 8 - ETHICS DECLARATION.pdf PDF
EXHIBIT 10 - CERTIFICATE OF COMPLIANCE WITH 49 CFR PART 655.pdf PDF
EXHIBIT 5 - BID LETTER.pdf PDF
EXHIBIT 9 - GENERAL CERTIFICATIONS.pdf PDF
FORM G - WRITTEN SOLICITATION SUBMITTAL FORM.pdf PDF
FORM E - SOLICITATION FOLLOW-UP LOG.pdf PDF
EXHIBIT 4 - BIDDERS LIST FORM.pdf PDF
EXHIBIT 13 - NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER.pdf PDF
EXHIBIT 7 - LIST OF COMPLETED CONTRACTS - LAST FIVE (5) YEARS.pdf PDF
EXHIBIT 6 - LIST OF CURRENT CONTRACTS - BACKLOG.pdf PDF
FORM 5 - BIDDERS LIST FORM.pdf PDF
FORM C - SELECTED WORK CATEGORIES.pdf PDF
SUBCONTRACTOR LISTING FORM.pdf PDF
FORM 1 - DBE SUBS AND SUPPLIERS.pdf PDF
FORM H -CERTIFICATION OF GOOD FAITH EFFORTS.pdf PDF
Exhibit B Post-Assessment Form.pdf PDF
PS132603(2) - UPS Battery Replacement Location 64.pdf PDF
EXHIBIT G - APPROVED SUBCONTRACTORS AND SUPPLIERS.pdf PDF
EXHIBIT D - WORK-COMPLETION_DELIVERABLE SCHEDULE (RESERVED).pdf PDF
EXHIBIT H - MISCELLANEOUS (RESERVED).pdf PDF
EXHIBIT I - (RESERVED) 49 CFR PART 20 COMPLIANCE WITH FED LOBBYING.pdf PDF
EXHIBIT J - 29 CFR 5.5.pdf PDF
EXHIBIT 12 - CERT OF PROSPECTIVE CONTRACTOR AND LOWER TIER PARTICIPANT.pdf PDF
EXHIBIT 2 - SCHEDULE OF QUANTITIES AND PRICES (BID PRICING SHEET).pdf PDF
FORM B - NEWSPAPER ADVERTISEMENT LOG.pdf PDF
FORM A - SAMPLE ADVERTISEMENT.pdf PDF
FORM 6 - DBE REGULAR DEALER DIST AFFIRMATION.pdf PDF
FORM F - ALL FIRMS-SOLICITATION RESPONSES RECEIVED.pdf PDF
FORM D - SAMPLE LETTER OF SOLICITATION.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A – STATEMENT OF WORK

UPS BATTERY REPLACEMENT LOCATION 64

I. BACKGROUND AND PROJECT SUMMARY

Metro needs to purchase 144 High rated batteries 12 volt 550 W (1st UPS) and 72 High rated batteries 12 volt 475(2nd UPS), to be installed at Location 64.

The batteries described are specified by manufacturer of the UPS equipment.

Battery description is identified on the equipment label installed on the cabinet and is designed for use with this specified UPS. The Organizational impact affects operational emergency lighting and power required to maintain building lighting during any power outage. Lighting supports emergency egress for any maintenance personnel occupying the building. Battery service life expectancy is estimated to be around five years, the current batteries have reached their useful life. Monthly inspections have supported the battery decline. Rail Facilities Maintenance has the responsibility to maintain this emergency system and must respond to rectifying such failures.

All work, including installation and acceptance, needs to be completed within 45 days of contract execution.

II. CONTRACTOR RESPONSIBILITIES

The Contractor shall fulfill the following requirements:

A. Provide (144) Deka Unigy Battery-HR5500 Valve Regulated Lead Acid batteries (or an approved equal).

B. Provide (72) Deka Unigy Battery-31H5000 Valve Regulated Lead Acid batteries (or an approved equal).

C. Contractor is to remove all 216 batteries and install new batteries.

D. Contractor is to remove all 216 items from Metro property and dispose of them in accordance with all applicable environmental and state laws.

E. Contractor is to deliver batteries to Location 64, 590 S. Santa Fe Ave. Los

Angeles, CA 90013.

F. Contractor is to arrange for delivery by contracting Mr. Angel Alba 323-826-1048 or Albaan@metro.net for delivery.

G. Contractor shall be delivered all batteries in a protective wrapping/box and free from any defects or damage.

H. All work, including installation and acceptance, needs to be completed within 45 days of contract execution.

I. WARRANTY – Batteries must include 1-year manufacturer warranty from date of receive and acceptance of product.

mailto:Albaan@metro.net

III. TECHNICAL SPECIFICATIONS

A. 1st UPS – Deka Unigy Battery-HR5500 Valve Regulated Lead Acid battery, 12volts, Capacity 550 Watts/Cell @ 15min Rate to 1.67 VPC, Float Voltage

13.50 +/- 0.06 VPB @25C. Weight 105.5lbs(48kg) (or approved equal)–144 total

B. 2nd UPS – Deka Unigy Battery -31H5000 Valve Regulated Lead Acid battery, 12Volts, Capacity 475watts/Cell @15min Rate to 1.67 VPC Float Voltage 13.50 +/- 0.06 VPB@25C, Weight 97lbs (44kg) (or approved equal)– 72 total

File details come from the government source that posted it. Updated .