This file is a Facility Maintenance Plan (FMP) for the Kimhae Storage Annex Site #1 in Korea, associated with a U.S. Army Corps of Engineers contract (W912DY-21-F-0076) managed by APTIM Federal Services, LLC. The document details maintenance requirements for multiple fuel storage and dispensing facilities, including a 21,236-barrel JP-8 cut and cover tank, a service station with 5,000-gallon Mogas and diesel aboveground storage tanks, dispensers, and associated infrastructure.
The maintenance plan provides a comprehensive task matrix with detailed maintenance schedules for various components, including valves, pumps, electronic equipment, containment systems, and safety features. Each asset is assigned a unique identifier, maintenance frequency (quarterly, semi-annual, or annual), and specific UFC (Unified Facilities Criteria) section references. The plan covers multiple facilities within the site, such as facility 2017 (bulk storage), 2034 (diesel/mogas dual tank), 2033 (unload stand), and 2026 (vehicle fueling station), with specific maintenance requirements for each component like flow switches, pressure gauges, emergency vents, and ground systems.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative
| ADMINISTRATIVE | ||
| Location | Installation Name | Kimhae Storage Annex Site #1 |
| DLA Site Code | KIM | |
| RPSUID | 2437 | |
| Hours of Operation | 0800-1630 | |
| Address | Kimhae, Korea | |
| Contract | Contractor | |
| Contract # | ||
| Local POCs | Primary QAE | |
| QAE Phone | ||
| QAE Email | ||
| Alternate QAE | ||
| Alt QAE Phone | ||
| Alt QAE Email | ||
| Contractor POCs | Contractor PM | |
| Contractor PM Phone | ||
| Contractor PM Email | ||
| Contractor QC Manager | ||
| Contractor QC Phone | ||
| Contractor QC Email | ||
| Contractor SOE | ||
| Contractor SOE Phone | ||
| Contractor SOE Email | ||
| Contractor RM | ||
| Contractor RM Phone | ||
| Contractor RM Email | ||
| Contractor SM | ||
| Contractor SM Phone | ||
| Contractor SM Email | ||
| USACE POCs | USACE PM/COR | |
| USACE PM/COR Phone | ||
| USACE PM/COR Email | ||
| USACE PE | ||
| USACE PE Phone | ||
| USACE PE Email | ||
| USACE KO | ||
| USACE KO Phone | ||
| USACE KO Email | ||
| USACE Monthly Report Inbox |
Pacific Ocean Division, POD-AF
| W912DY-21-F-0076 | &"-,Bold"&16Kimhae Storage Annex Site #1 |
| KIM | Facility Maintenance Plan |
OY3 Q1
&A &P of &N APTIM Federal Services, LLC
Instructions:
This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.
General Facility Description
| General Facility Description | |
| Installation Name | Kimhae Storage Annex Site #1 |
| DLA Site Code | KIM |
| Location | Kimhae, Korea |
| Service Station (2026): (1) 5,000-gallon Mogas AST and (1) 5,000-gallon diesel AST located in a (2)-compartment tank (2034), (1) diesel dispenser and (1) Mogas dispenser, each with (2) nozzles. |
Bulk Storage: (1) 21,236-barrel JP-8 cut and cover tank (2017).
ROKAF maintains the filter separators and receipt /issue stands.
PAE and GSI operate the system and perform routine maintenance, daily, weekly, quarterly and semi-annually.
Pacific Ocean Division, POD-AF
| W912DY-21-F-0076 | &"-,Bold"&16Kimhae Storage Annex Site #1 |
| KIM | Facility Maintenance Plan |
OY3 Q1
&A &P of &N APTIM Federal Services, LLC
Instructions:
Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.
Include Site Specific Conditions and Restrictions in this tab.
Communication Plan
Pacific Ocean Division, POD-AF
| W912DY-21-F-0076 | &"-,Bold"&16Kimhae Storage Annex Site #1 |
| KIM | Facility Maintenance Plan |
OY3 Q1
&A &P of &N APTIM Federal Services, LLC
Instructions:
Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.
Include Site Specific Conditions and Restrictions in this tab.
Site Specific Safety Plan
| W912DY-21-F-0076 | &"-,Bold"&16Kimhae Storage Annex Site #1 |
| KIM | Facility Maintenance Plan |
Instructions:
Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.
PM Schedule
Pacific Ocean Division, POD-AF
| W912DY-21-F-0076 | &"-,Bold"&16&K000000Kimhae Storage Annex Site #1 |
| KIM | Facility Maintenance Plan |
OY3 Q1
&A &P of &N APTIM Federal Services, LLC
Instructions:
Link PM schedule here
Task Matrix
| Applicable Facility Assets | UFC System Level Maintenance Frequency | Special Considerations | |||||||||||||||||||
| RPUID | Real Property Facility # | Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique ID (CUID) | APTIM Asset ID | Asset Description | Make | Model | Capacity/Size | Quarterly | |||||||||
| Semi Annual | Annual | UFC | |||||||||||||||||||
| Section Reference | Additional Manufacturer RM Requirements | Operator/ Equipment Requirements | System Availability | Other Contract | Comments | ||||||||||||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | EC-Electronic Equipment | KIM-2312-ELTREQ-169626 | 202102081551KIM | Flow switch on issue (Transfer) pipeline | X | Section 9-1.9 | Notify Facility | EAL required 4 days prior- | ||||||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | EC-Electronic Equipment | KIM-2312-ELTREQ-169490 | 202102081552KIM | Flow switch on receipt (Transfer) pipeline | X | Section 9-1.9 | Notify Facility | EAL required 4 days prior- | ||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | MV-Double Block and Bleed Valves | B-2 | KIM-2017-DBBVL-167095 | 31313KIM | DBB valve on Pump # 1 issue pipeline | ORBIT | 211 | X | X | X | Section 6-6.2.5 | Notify Facility | EAL required 4 days prior- | |||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | MV-Double Block and Bleed Valves | B-4 | KIM-2017-DBBVL-167096 | 31314KIM | DBB valve on Pump # 2 issue pipeline | ORBIT | 211 | X | X | X | Section 6-6.2.5 | Notify Facility | EAL required 4 days prior- | |||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | MV-Double Block and Bleed Valves | B-5 | KIM-2017-DBBVL-167097 | 31315KIM | DBB valve on issue pipeline | ORBIT | 211 | X | X | X | Section 6-6.2.5 | Notify Facility | EAL required 4 days prior- | |||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | MV-Double Block and Bleed Valves | B-6 | KIM-2017-DBBVL-167098 | 31316KIM | DBB valve on issue (return to tank) pipeline | ORBIT | 211 | X | X | X | Section 6-6.2.5 | Notify Facility | EAL required 4 days prior- | |||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | MV-Double Block and Bleed Valves | R-1 | KIM-2017-DBBVL-167099 | 31317KIM | DBB valve on receipt pipeline before HLSO control valve | ORBIT | 211 | X | X | X | Section 6-6.2.5 | Notify Facility | EAL required 4 days prior- | |||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | MV-Double Block and Bleed Valves | S-6 | KIM-2017-DBBVL-167100 | 31318KIM | DBB valve on PRT to receipt pipeline after HLSO Control Valve | ORBIT | 211 | X | X | X | Section 6-6.2.5 | Notify Facility | EAL required 4 days prior- | |||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | MV-Double Block and Bleed Valves | S-2 | KIM-2017-DBBVL-167101 | 31319KIM | DBB valve on sump pump to issue pipeline after control valve (S-1) | ORBIT | 211 | X | X | X | Section 6-6.2.5 | Notify Facility | EAL required 4 days prior- | |||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | TV-Thermal and Pressure Relief Valves | No.3 | KIM-2017-TPRVL-165241 | 31320KIM | Pressure relief valve on 8 in. receipt pipeline before DBB (R-1) | Taylor | X | X | Section 6-6.3 | Coordinate with Facility | EAL required 4 days prior- | |||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | PV-Pressure Gauges | KIM-2017-PVGA-169655 | 31321KIM | Pressure gauge on Pump # 1 pipeline | KONICS | X | X | X | Section 6-7.1 | EAL required 4 days prior- | ||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | PV-Pressure Gauges | KIM-2017-PVGA-176203 | 31322KIM | Pressure gauge on Pump # 2 pipeline | KONICS | X | X | X | Section 6-7.1 | EAL required 4 days prior- | ||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | PV-Pressure Gauges | KIM-2017-PVGA-169817 | 31323KIM | Pressure gauge on sump pump to PRT pipeline | KONICS | X | X | X | Section 6-7.1 | EAL required 4 days prior- | ||||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | MV-Double Block and Bleed Valves | B-6 | KIM-2312-DBBVL-167102 | 31324KIM | DBB valve on issue pipeline before basket strainer (outside building 34082) | ORBIT | 211 | X | X | X | Section 6-6.2.5 | Notify Facility | EAL required 4 days prior- | |||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | MV-Double Block and Bleed Valves | B-7 | KIM-2312-DBBVL-167103 | 31325KIM | DBB valve on issue pipeline after flow switch (outside building 34082) | ORBIT | 211 | X | X | X | Section 6-6.2.5 | Notify Facility | EAL required 4 days prior- | |||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | MV-Double Block and Bleed Valves | B-9 | KIM-2312-DBBVL-167104 | 31326KIM | DBB valve on issue pipeline after DBB B-7 (outside building 34082) | ORBIT | 211 | X | X | X | Section 6-6.2.5 | Notify Facility | EAL required 4 days prior- | |||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | MV-Double Block and Bleed Valves | R-2 | KIM-2312-DBBVL-167105 | 31327KIM | DBB valve on receipt pipeline after flow switch (outside building 34082) | ORBIT | 211 | X | X | X | Section 6-6.2.5 | Notify Facility | EAL required 4 days prior- | |||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | MV-Double Block and Bleed Valves | R-3 | KIM-2312-DBBVL-167106 | 31328KIM | DBB valve on receipt pipeline before basket strainer (outside building 34082) | ORBIT | 211 | X | X | X | Section 6-6.2.5 | Notify Facility | EAL required 4 days prior- | |||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | MV-Double Block and Bleed Valves | R-4 | KIM-2312-DBBVL-167107 | 31329KIM | DBB valve on receipt pipeline (outside building 34082) | ORBIT | 211 | X | X | X | Section 6-6.2.5 | Notify Facility | EAL required 4 days prior- | |||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | PV-Pressure Gauges | KIM-2312-PVGA-169818 | 31330KIM | Pressure gauge on issue pipeline after DBB B-9 (outside building 34082) | KONICS | X | X | X | Section 6-7.1 | Notify Facility | EAL required 4 days prior- | |||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | PV-Pressure and Pressure/Vacuum Gauges | KIM-2312-PVGA-176205 | 31331KIM | Pressure gauge on receipt pipeline before DBB R-4 (outside building 34082) | KONICS | X | X | X | Section 6-7.1 | Notify Facility | EAL required 4 days prior- | |||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | TV-Thermal and Pressure Relief Valves | KIM-2312-TPRVL-165242 | 31332KIM | Pressure relief valve on issue pipeline by DBB B-9 (outside building 34082) | Taylor | T-8200-1 | X | X | Section 6-6.3 | Coordinate with Facility | EAL required 4 days prior- | Set Pre. 150 PSI | ||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | TV-Thermal and Pressure Relief Valves | KIM-2312-TPRVL-165243 | 31333KIM | Pressure relief valve on receipt pipeline by DBB R-4 (outside building 34082) | Taylor | T-8200-1 | X | X | Section 6-6.3 | Coordinate with Facility | EAL required 4 days prior- | Set Pre. 150 PSI | ||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | MV-Double Block and Bleed Valves | B-8 | KIM-2312-DBBVL-167108 | 31334KIM | DBB valve on issue pipeline (ROKAF / DLA - inside building 34082) | ORBIT | 211 | X | X | X | Section 6-6.2.5 | Notify Facility | EAL required 4 days prior- | |||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | MV-Double Block and Bleed Valves | KIM-2312-DBBVL-167109 | 31335KIM | DBB valve on receipt pipeline (ROKAF / DLA - inside building 34082) | ORBIT | 211 | X | X | X | Section 6-6.2.5 | Notify Facility | EAL required 4 days prior- | ||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | MV-Ball Valves | KIM-2017-BLVL-148586 | KIM00001 | 1/2in ball valve for vent on 8in issue pipeline | Flo-Tite | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | FIT | ||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | MV-Ball Valves | KIM-2017-BLVL-148587 | KIM00002 | 1/2in ball valve for vent on 8in receipt pipeline | Flo-Tite | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | FIT | ||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | MV-Ball Valves | KIM-2017-BLVL-148588 | KIM00003 | 3/4in ball valve for PRV (inlet side) located on 8in receipt pipeline | Flo-Tite | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | FIT | ||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | MV-Ball Valves | KIM-2017-BLVL-148589 | KIM00004 | 3/4in ball valve for PRV (outlet side) located on 8in receipt pipeline | Flo-Tite | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | FIT | ||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | MV-Ball Valves | S-3 | KIM-2017-BLVL-148590 | KIM00005 | 2in ball valve on sump pump to PRT pipeline | Velan | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | ||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | MV-Ball Valves | S-4 | KIM-2017-BLVL-148591 | KIM00006 | 1-1/2in ball valve on sump pump to PRT (by PRT) pipeline | KPL VALVE IND. CO. LTD. | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | ||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | MV-Ball Valves | S-5 | KIM-2017-BLVL-157863 | KIM00007 | 2in ball valve on PRT to slop tank pipeline | Flo-Tite | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | FIT | |||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | CS-Dike/Berm with Walls and Floors | KIM-2017-DKBW-167917 | KIM00008 | Containment for PRT | X | Section 8-10.2 / 8-10.2.1 | EAL required 4 days prior- | |||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | CV-General System Control Valves | B-1 | KIM-2017-GSCVL-153094 | KIM00009 | Control valve on Pump # 1 pipeline | Cla-Val | X | X | Section 4-3.2.1 | Operate System to Test | EAL required 4 days prior- | |||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | CV-General System Control Valves | B-3 | KIM-2017-GSCVL-153095 | KIM00010 | Control valve on Pump # 2 pipeline | Cla-Val | X | X | Section 4-3.2.1 | Operate System to Test | EAL required 4 days prior- | |||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | CV-General System Control Valves | KIM-2017-GSCVL-153096 | KIM00011 | Control valve on issue (return to tank) pipeline after DBB (B-6) | Cla-Val | X | X | Section 4-3.2.1 | Operate System to Test | EAL required 4 days prior- | ||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | CV-General System Control Valves | KIM-2017-GSCVL-153097 | KIM00012 | Control valve for HLSO valve on 8 inch receipt pipeline | Cla-Val | X | X | Section 4-3.2.1 | Operate System to Test | EAL required 4 days prior- | ||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | CV-General System Control Valves | S-1 | KIM-2017-GSCVL-153098 | KIM00013 | Control valve on sump pump to PRT pipeline | Cla-Val | X | X | Section 4-3.2.1 | Operate System to Test | EAL required 4 days prior- | |||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | TA-Tank Pressure/Vacuum Vents | KIM-2017-TPVVT-176681 | KIM00023 | 6in pressure / vacuum vent (East next to PRT) | S&J | X | Section 8-9.3 | Notify Facility | EAL required 4 days prior- | |||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | TA-Tank Pressure/Vacuum Vents | KIM-2017-TPVVT-171070 | KIM00024 | 6in pressure / vacuum vent (West) | S&J | X | Section 8-9.3 | Notify Facility | EAL required 4 days prior- | |||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | PM-Vertical Turbine/Sub-merged Turbine Pumps | # 1 | KIM-2017-VTSP-171044 | KIM00026 | Issue Pump # 1 | Goulds Pumps | VIT-FF | X | X | X | Section 3-8.1.3 / 3-8.3 | Operate System to Test | EAL required 4 days prior- | |||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | PM-Vertical Turbine/Sub-merged Turbine Pumps | # 2 | KIM-2017-VTSP-171045 | KIM00027 | Issue Pump # 2 | Goulds Pumps | VIT-FF | X | X | X | Section 3-8.1.3 / 3-8.3 | Operate System to Test | EAL required 4 days prior- | |||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | PM-Vertical Turbine/Sub-merged Turbine Pumps | KIM-2017-VTSP-170881 | KIM00028 | Sump Pump | Goulds Pumps | VIT-FF | X | X | X | Section 3-8.1.3 / 3-8.3 | Operate System to Test | EAL required 4 days prior- | ||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | EQ-Real Property | KIM-2017-ASSET-153992 | KIM00029 | On/Off Switch for Pump # 1 | Appleton | EDSC150F2 | Non-Appx G Class | EAL required 4 days prior- | ||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | EQ-Real Property | KIM-2017-ASSET-153993 | KIM00030 | On/Off Switch for Pump # 2 | Appleton | EDSC150F2 | Non-Appx G Class | EAL required 4 days prior- | ||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | TK-Underground Field-Constructed Tanks | 2017 | KIM-2017-UGFET-171407 | KIM00031 | Field-constructed cut and cover tank | X | Section 8-6 | EAL required 4 days prior- | ||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | PS-Product Saver Tanks | KIM-2017-PRDST-176682 | KIM00032 | Product Recovery Tank | X | Section 8-9.10 | Notify Facility | EAL required 4 days prior- | ||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | TK-Underground Single-Walled Shop-Fabricated Tanks | KIM-2017-UGSSFT-170882 | KIM00033 | Slop Tank | X | Section 8-5.4.1 | EAL required 4 days prior- | |||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | EQ-Real Property | KIM-2017-ASSET-153994 | KIM00034 | 1/2in needle valve for pressure gauge (Pump # 1 pipeline) | Jeonil | JBF-6R | Non-Appx G Class | EAL required 4 days prior- | ||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | EQ-Real Property | KIM-2017-ASSET-153995 | KIM00035 | 1/2in needle valve for pressure gauge (Pump # 2 pipeline) | Jeonil | JBF-6R | Non-Appx G Class | EAL required 4 days prior- | ||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | EC-Electronic Equipment | KIM-2017-ELTREQ-171408 | KIM00036 | Flow Switch on issue pipeline | DELTA M Corporation | VS5100-N06-S6-00400-110-LE-00 | X | Section 9-1.9 | Notify Facility | EAL required 4 days prior- | ||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | EQ-Real Property | KIM-2017-ASSET-153996 | KIM00037 | 1/2in needle valve for pressure gauge (Sump Pump pipeline) | Jeonil | JBF-6R | Non-Appx G Class | EAL required 4 days prior- | ||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | MV-Check Valves | KIM-2017-CKVL-162827 | KIM00039 | 2in check valve on sump pump to PRT pipeline | X | Section 6-6.2.8 | Notify Facility | EAL required 4 days prior- | ||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | TG-Servo Gauge | KIM-2017-SRVGA-171047 | KIM00040 | Automatic Tank Gauge (ATG) | Honeywell | 854 ATG | X | X | X | Section 8-9.8.3 | EAL required 4 days prior- | Another Contract | Factory Mutual System - ENRAF | |||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | EQ-Real Property | KIM-2017-ASSET-153997 | KIM00041 | 10in manual gauge hatch cover | S&J | Non-Appx G Class | EAL required 4 days prior- | |||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | EC-Electronic Equipment | KIM-2017-ELTREQ-153998 | KIM00042 | EFSO located inside the tank vault | Appleton | EDSK-1JA | X | Section 9-1.9 | EAL required 4 days prior- | |||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | EQ-Real Property | KIM-2017-ASSET-153999 | KIM00043 | On/Off Switch for Sump Pump | Appleton | EDSC150F2 | Non-Appx G Class | EAL required 4 days prior- | ||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | EC-Electronic Equipment | KIM-2017-ELTREQ-154000 | KIM00044 | Exhaust fan located next to the vault entrance | X | Section 9-1.9 | EAL required 4 days prior- | |||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | EC-Electronic Equipment | KIM-2017-ELTREQ-154001 | KIM00045 | Exhaust fan located across from the vault entrance | X | Section 9-1.9 | EAL required 4 days prior- | |||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | MV-Ball Valves | S-6 | KIM-2017-BLVL-157914 | KIM00046 | 2in ball valve on PRT to Tank 2017 receipt pipeline | Flo-Tite | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | FIT | |||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | MV-Ball Valves | KIM-2312-BLVL-157935 | KIM00125 | 3/4in ball valve on issue (PRV inlet) pipeline (outside building 34082) | Kaneko Sangyo | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | |||||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | MV-Ball Valves | KIM-2312-BLVL-157936 | KIM00126 | 1in ball valve on issue (PRV outlet) pipeline (outside building 34082) | Kaneko Sangyo | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | |||||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | MV-Ball Valves | KIM-2312-BLVL-157937 | KIM00127 | 1in ball valve on issue (isolation valve for pressure gauge) pipeline (outside building 34082) | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | ||||||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | MV-Ball Valves | KIM-2312-BLVL-157938 | KIM00128 | 3/4in ball valve on receipt (PRV inlet) pipeline (outside building 34082) | Kaneko Sangyo | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | |||||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | FT-Basket Strainer | KIM-2312-BSTR-171418 | KIM00138 | Basket strainer on issue pipeline (outside building 34082) | Islip Flow Controls | B150FSBW1 | X | X | Section 3-6.4 | EAL required 4 days prior- | ||||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | FT-Basket Strainer | KIM-2312-BSTR-171419 | KIM00139 | Basket strainer on receipt pipeline (outside building 34082) | Islip Flow Controls | B150FSBW1 | X | X | Section 3-6.4 | EAL required 4 days prior- | ||||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | MV-Ball Valves | KIM-2312-BLVL-157939 | KIM00143 | 3/4in ball valve on receipt (PRV outlet) pipeline (outside building 34082) | Kaneko Sangyo | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | |||||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | MV-Ball Valves | KIM-2312-BLVL-157940 | KIM00144 | 15A ball valve on receipt (isolation valve for pressure gauge) pipeline (outside building 34082) | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | ||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | EC-Static Grounding Systems | KIM-2017-STGS-204176 | KIM1101245 | Static grounding system for tank 2017 | X | Section 9-1.6.2 | EAL required 4 days prior- | |||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | EC-Lighting | KIM-2017-LIGHT-204178 | KIM1101246 | Tank vault lighting | X | X | Section 9-1.8 | EAL required 4 days prior- | ||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | PL-Aboveground Piping | KIM-2017-AGPL-204170 | KIM1101247 | Piping for tank 2017 | X | X | Section 6-1.3 | EAL required 4 days prior- | ||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | CS-Containment Drain Valves | KIM-2017-CSGEN-204180 | KIM1101248 | Containment drain valve for the PRT containment | X | Section 8-10.1 | EAL required 4 days prior- | |||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | PM-Vertical Turbine/Sub-merged Turbine Pumps | KIM-2017-VTSP-204181 | KIM1101249 | Water pump located inside tank 2017 vault (Small Pump) | X | X | X | Section 3-8.1.3 / 3-8.3 | EAL required 4 days prior- | |||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | CS-Pipe Penetrations | KIM-2017-PPEN-204183 | KIM1101250 | Pipe penetrations for tank 2017 | X | X | Section 8-10.6 | EAL required 4 days prior- | ||||||||||
| 1161129 | KIM-2028 | 2028-PETROLEUM OPERATIONS FACILITY NEXT TO FAC #2017 | Bulk Storage | EC-Panelboards | P | KIM-2028-PNB-204185 | KIM1101251 | Panelboard P located inside facility 2028 | X | Section 9-1.5 | EAL required 4 days prior- | ||||||||||
| 1161129 | KIM-2028 | 2028-PETROLEUM OPERATIONS FACILITY NEXT TO FAC #2017 | Bulk Storage | EC-Control Panels - Elec Equip | KIM-2028-ELEQ-204187 | KIM1101252 | MCC control panel for tank 2017 located inside facility 2028 | Appleton | X | Section 9-1.2 | EAL required 4 days prior- | ||||||||||
| 1161129 | KIM-2028 | 2028-PETROLEUM OPERATIONS FACILITY NEXT TO FAC #2017 | Bulk Storage | EC-Control Panels - Elec Equip | KIM-2028-ELEQ-204188 | KIM1101253 | ATG control panel for tank 2017 located inside facility 2028 | Appleton | X | Section 9-1.2 | EAL required 4 days prior- | ||||||||||
| 1161129 | KIM-2028 | 2028-PETROLEUM OPERATIONS FACILITY NEXT TO FAC #2017 | Bulk Storage | EC-Control Panels - Elec Equip | KIM-2028-ELEQ-204189 | KIM1101254 | PLC control panel for tank 2017 located inside facility 2028 | Appleton | X | Section 9-1.2 | EAL required 4 days prior- | ||||||||||
| 1161129 | KIM-2028 | 2028-PETROLEUM OPERATIONS FACILITY NEXT TO FAC #2017 | Bulk Storage | EC-Control Panels - Elec Equip | KIM-2028-ELEQ-204190 | KIM1101255 | Remote alarm control panel for tank 2017 located inside facility 2028 | Appleton | X | Section 9-1.2 | EAL required 4 days prior- | ||||||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | EC-Lighting | KIM-2312-LIGHT-204192 | KIM1101256 | Tank vault lighting | X | X | Section 9-1.8 | EAL required 4 days prior- | ||||||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | PL-Aboveground Piping | KIM-2312-AGPL-204194 | KIM1101257 | Issue and receiving piping | X | X | Section 6-1.3 | EAL required 4 days prior- | ||||||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | CS-Containment Drain Valves | KIM-2312-CSGEN-204196 | KIM1101258 | Containment drain valve for the issue and receiving area containment | X | Section 8-10.1 | EAL required 4 days prior- | |||||||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | EC-Electronic Equipment | KIM-2312-ELTREQ-204197 | KIM1101259 | Flow switch located on the issue line inside the cabinet | X | Section 9-1.9 | EAL required 4 days prior- | |||||||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | EC-Electronic Equipment | KIM-2312-ELTREQ-204198 | KIM1101260 | Flow switch located on the receipt line inside the cabinet | X | Section 9-1.9 | EAL required 4 days prior- | |||||||||||
| 456584 | KIM-2312 | 2312-PIPELINE,LF | Bulk Storage | CS-Dike/Berm Floors (curbed) | KIM-2312-ETHDW-204200 | KIM1101261 | Containment for the emergency eyewash/shower station | X | Section 8-10.2.2 | EAL required 4 days prior- | |||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | EC-Lighting | KIM-2017-LIGHT-204207 | KIM1102231 | Tank pipe vault room lighting located on the side of tank 2017 | X | X | Section 9-1.8 | EAL required 4 days prior- | ||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | EC-Electronic Equipment | KIM-2017-ELTREQ-204208 | KIM1102232 | Exhaust fan for the tank pipe vault room lighting located on the side of tank 2017 | X | Section 9-1.9 | EAL required 4 days prior- | |||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | PL-Aboveground Piping | KIM-2017-AGPL-204209 | KIM1102233 | Piping located on the side of tank 2017 | X | X | Section 6-1.3 | EAL required 4 days prior- | ||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | PM-Vertical Turbine/Sub-merged Turbine Pumps | KIM-2017-VTSP-204210 | KIM1102234 | Water pump located inside the tank pipe vault room for tank 2017 (Small Pump) | X | X | X | Section 3-8.1.3 / 3-8.3 | EAL required 4 days prior- | |||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | CS-Containment Drain Valves | KIM-2017-CSGEN-204211 | KIM1102235 | Containment drain valve for the piping containment located on the side of tank 2017 | X | Section 8-10.1 | EAL required 4 days prior- | |||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | CS-Containment Drain Valves | KIM-2017-CSGEN-204212 | KIM1102236 | Containment drain valve for the piping (drain/issue/receive) containment located behind ROKAF facility 34047 | X | Section 8-10.1 | EAL required 4 days prior- | |||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | CS-Dike/Berm Floors (curbed) | KIM-2017-ETHDW-204214 | KIM1102237 | Containment for the piping located on the side of tank 2017 | X | Section 8-10.2.2 | EAL required 4 days prior- | |||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | CS-Dike/Berm Floors (curbed) | KIM-2017-ETHDW-204215 | KIM1102238 | Containment for the piping (drain/issue/receive) located behind ROKAF facility 34047 | X | Section 8-10.2.2 | EAL required 4 days prior- | |||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | PC-Aboveground Piping and Equipment Coating | KIM-2017-AGPCT-204217 | KIM1102239 | Piping (drain/issue/receive) located behind ROKAF facility 34047 | Section 6-10.1 | EAL required 4 days prior- | ||||||||||||
| 1161129 | KIM-2028 | 2028-PETROLEUM OPERATIONS FACILITY NEXT TO FAC #2017 | Bulk Storage | EC-Static Grounding Systems | KIM-2028-STGS-204202 | KIM1102242 | Static grounding system for facility 2028 | X | Section 9-1.6.2 | EAL required 4 days prior- | |||||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | TA-External High Level Shutoff Valves (HLSO) | KIM-2017-EHLSVL-176687 | KIM202202070939 | External HLSO valve on 8 inch receipt pipeline | X | X | Section 8-9.6.1 | Operate System to Test | EAL required 4 days prior- | |||||||||
| 455582 | KIM-2017 | 2017-BULK STOR, JET FL | Bulk Storage | EC-Ground Reels - Static Grounding Systems | KIM-2017-STGS-176688 | KIM202202090918 | Ground Reel next to the slop tank | X | X | Section 9-1.6.2 | EAL required 4 days prior- | ||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | TV-Thermal and Pressure Relief Valves | KIM-2034-TPRVL-165244 | 31336KIM | Pressure relief valve on issue pipeline (top of the Mogas tank) | Taylor | T-7700-1 | X | X | Section 6-6.3 | Coordinate with Facility | EAL required 4 days prior- | Set Pressure 65 PSIG | ||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | TV-Thermal and Pressure Relief Valves | KIM-2034-TPRVL-165245 | 31337KIM | Pressure relief valve on issue pipeline (top of the Diesel tank) | Taylor | T-7700-1 | X | X | Section 6-6.3 | Coordinate with Facility | EAL required 4 days prior- | Set Pressure 65 PSIG | ||||||
| 1196418 | KIM-2033 | 2033-UNLOAD STAND AT FACILITY 2026 | Gas Station | MV-Ball Valves | KIM-2033-BLVL-157915 | KIM00047 | 3in ball valve for diesel receipt pipeline (inside cabinet) | APOLLO | X | Section 6-6.2.4 | Notify Facility; KEY REQUIRED | EAL required 4 days prior- | |||||||||
| 1196418 | KIM-2033 | 2033-UNLOAD STAND AT FACILITY 2026 | Gas Station | MV-Ball Valves | KIM-2033-BLVL-157916 | KIM00048 | 1/2in ball valve for diesel receipt pipeline (inside cabinet) | APOLLO | X | Section 6-6.2.4 | Notify Facility; KEY REQUIRED | EAL required 4 days prior- | |||||||||
| 1196418 | KIM-2033 | 2033-UNLOAD STAND AT FACILITY 2026 | Gas Station | MV-Ball Valves | KIM-2033-BLVL-157917 | KIM00049 | 3in ball valve for mogas receipt pipeline (inside cabinet) | X | Section 6-6.2.4 | Notify Facility; KEY REQUIRED | EAL required 4 days prior- | Blinded and not being used | |||||||||
| 1196418 | KIM-2033 | 2033-UNLOAD STAND AT FACILITY 2026 | Gas Station | EC-Ground Reels - Static Grounding Systems | KIM-2033-STGS-170883 | KIM00050 | Ground Cables (Reels) | Appleton | SD11 | X | X | Section 9-1.6.2 | EAL required 4 days prior- | ||||||||
| 1196418 | KIM-2033 | 2033-UNLOAD STAND AT FACILITY 2026 | Gas Station | GF-Remote Dispenser Pumps | KIM-2033-RDSP-171409 | KIM00051 | Pump located below cabinent | Price Pump Company | RC30CPBF-402-21211RE-FM | X | X | X | Section 7-15.1 | Operate System to Test | EAL required 4 days prior- | ||||||
| 1196418 | KIM-2033 | 2033-UNLOAD STAND AT FACILITY 2026 | Gas Station | EC-EFSO-Elec Equip | KIM-2033-EFSO-166022 | KIM00052 | Emergency Shutoff Switch | X | Section 9-1.2 | Operate System to Test | EAL required 4 days prior- | ||||||||||
| 1196418 | KIM-2033 | 2033-UNLOAD STAND AT FACILITY 2026 | Gas Station | EQ-Real Property | KIM-2033-ASSET-154002 | KIM00053 | 3in female camlock fitting for diesel receipt pipeline (inside cabinet) | Non-Appx G Class | EAL required 4 days prior- | ||||||||||||
| 1196418 | KIM-2033 | 2033-UNLOAD STAND AT FACILITY 2026 | Gas Station | EQ-Real Property | KIM-2033-ASSET-154003 | KIM00054 | 3in female camlock fitting for mogas receipt pipeline (inside cabinet) | Non-Appx G Class | EAL required 4 days prior- | ||||||||||||
| 1196418 | KIM-2033 | 2033-UNLOAD STAND AT FACILITY 2026 | Gas Station | MV-Ball Valves | KIM-2033-BLVL-157918 | KIM00055 | 1/2in ball valve for mogas receipt pipeline (inside cabinet) | APOLLO | X | Section 6-6.2.4 | Notify Facility; KEY REQUIRED | EAL required 4 days prior- | |||||||||
| 1196418 | KIM-2033 | 2033-UNLOAD STAND AT FACILITY 2026 | Gas Station | MV-Ball Valves | KIM-2033-BLVL-157919 | KIM00056 | 1/2in ball valve for mogas receipt pipeline (inside cabinet) - bottom side | APOLLO | X | Section 6-6.2.4 | Notify Facility; KEY REQUIRED | EAL required 4 days prior- | |||||||||
| 1196418 | KIM-2033 | 2033-UNLOAD STAND AT FACILITY 2026 | Gas Station | MV-Ball Valves | MB-1 | KIM-2033-BLVL-157920 | KIM00057 | 3in ball valve on receipt pipeline before pump | APOLLO | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | Blinded and not being used | |||||||
| 1196418 | KIM-2033 | 2033-UNLOAD STAND AT FACILITY 2026 | Gas Station | MV-Ball Valves | MB-2 | KIM-2033-BLVL-157921 | KIM00058 | 3in ball valve on receipt pipeline (Mogas) after pump | APOLLO | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | Blinded and not being used | |||||||
| 1196418 | KIM-2033 | 2033-UNLOAD STAND AT FACILITY 2026 | Gas Station | MV-Check Valves | KIM-2033-CKVL-162828 | KIM00059 | 3in check valve on receipt pipeline (Mogas) after pump | X | Section 6-6.2.8 | Notify Facility | EAL required 4 days prior- | ||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | MV-Ball Valves | KIM-2034-BLVL-157922 | KIM00060 | 2in ball valve on issue pipeline on top of the Mogas tank | Flow-Tek | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | MV-Ball Valves | KIM-2034-BLVL-157923 | KIM00061 | 1in ball valve on PRV inlet on top of the Mogas tank | Flow-Tek | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | MV-Ball Valves | KIM-2034-BLVL-157924 | KIM00062 | 1/2in ball valve on issue pipeline (before tee) on top of the Mogas tank | Flow-Tek | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | MV-Ball Valves | KIM-2034-BLVL-157925 | KIM00063 | 1in ball valve on PRV outlet on top of the Mogas tank | Flow-Tek | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | MV-Ball Valves | KIM-2034-BLVL-157926 | KIM00064 | 1in ball valve on issue / vent pipeline on top of the Mogas tank | Flow-Tek | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | MV-Ball Valves | M-1 | KIM-2034-BLVL-157927 | KIM00065 | 1in ball valve on receipt pipeline on top of the Mogas tank | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | MV-Ball Valves | KIM-2034-BLVL-157928 | KIM00066 | 1in ball valve on receipt / vent pipeline on top of the Mogas tank | Flow-Tek | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | MV-Ball Valves | KIM-2034-BLVL-157929 | KIM00067 | 2in ball valve on issue pipeline on top of the Diesel tank | Flow-Tek | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | MV-Ball Valves | KIM-2034-BLVL-157930 | KIM00068 | 1in ball valve on PRV inlet on top of the Diesel tank | Flow-Tek | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | MV-Ball Valves | KIM-2034-BLVL-157931 | KIM00069 | 1/2in ball valve on issue pipeline (before tee) on top of the Diesel tank | Flow-Tek | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | MV-Ball Valves | KIM-2034-BLVL-157932 | KIM00070 | 1in ball valve on PRV outlet on top of the Diesel tank | Flow-Tek | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | MV-Ball Valves | KIM-2034-BLVL-157933 | KIM00071 | 2in ball valve on the bottom side diesel receipt pipeline (connected to Facility 2033) | Flow-Tek | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | MV-Ball Valves | KIM-2034-BLVL-157934 | KIM00072 | 2in ball valve on the bottom side mogas receipt pipeline (connected to Facility 2033) | Flow-Tek | X | Section 6-6.2.4 | Notify Facility | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | TK-Aboveground Shop-Fabricated Tanks | GH-2034-2-AST | KIM-2034-AGSFP-176683 | KIM00075 | 10,000 gallon compartment tank; Diesel Tank GH-2034-1 (5,000 gal) & MOGAS Tank GH-2034-2 (5,000 gal) | X | X | Section 8-5.1 | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | MV-Check Valves | KIM-2034-CKVL-162829 | KIM00076 | 2in check valve on issue pipeline (top of the Mogas tank) | X | Section 6-6.2.8 | Notify Facility | EAL required 4 days prior- | ||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | GF-Remote Dispenser Pumps | KIM-2034-RDSP-171048 | KIM00077 | Red Jacket Pump for Mogas tank | X | X | X | Section 7-15.1 | Operate System to Test | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | EQ-Real Property | KIM-2034-ASSET-154004 | KIM00078 | 4in manual gauge hatch cover for Mogas Tank | TankTech | Non-Appx G Class | EAL required 4 days prior- | |||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | TA-Emergency Vents | KIM-2034-EMGVT-170884 | KIM00080 | Emergency vent for Mogas tank | Morrison Bros. Co. | Fig. 244 | X | Section 8-9.4 | Notify Facility | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | SF-Emergency Eyewash/Showers | KIM-2034-EMEWSH-171410 | KIM00081 | Emergency Eyewash & Shower Station located next to the MOGAS dispenser | X | X | X | Section 11-3 | Notify Facility | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | GF-Remote Dispenser Pumps | KIM-2034-RDSP-176684 | KIM00082 | Red Jacket Pump for Diesel tank | X | X | X | Section 7-15.1 | Operate System to Test | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | MV-Check Valves | KIM-2034-CKVL-162830 | KIM00083 | 2in check valve on issue pipeline (top of the Diesel tank) | X | Section 6-6.2.8 | Notify Facility | EAL required 4 days prior- | ||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | EQ-Real Property | KIM-2034-ASSET-154005 | KIM00084 | 4in manual gauge hatch cover for Diesel Tank | TankTech | Non-Appx G Class | EAL required 4 days prior- | |||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | TA-Emergency Vents | KIM-2034-EMGVT-170885 | KIM00085 | Emergency vent for Diesel tank | Morrison Bros. Co. | Fig. 244 | X | Section 8-9.4 | Notify Facility | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | TA-Emergency Vents | KIM-2034-EMGVT-171411 | KIM00086 | Emergency vent located at the center of Diesel and Mogas tank | Morrison Bros. Co. | Fig. 244 | X | Section 8-9.4 | Notify Facility | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | EQ-Real Property | KIM-2034-ASSET-154006 | KIM00087 | 2in camlock fitting on the bottom side diesel receipt pipeline (connected to Facility 2033) | Dixon | Non-Appx G Class | EAL required 4 days prior- | |||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | EQ-Real Property | KIM-2034-ASSET-154007 | KIM00088 | 2in camlock fitting on the bottom side mogas receipt pipeline (connected to Facility 2033) | Dixon | Non-Appx G Class | EAL required 4 days prior- | |||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Cabinet | KIM-2034-DSCB-153309 | KIM00089 | Dispenser for Mogas dispenser # 3 and # 4 | Wayne | 3/G 7242D / 2GHJK | X | Section 7-7 | Key Required | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Meters | KIM-2034-DSMTR-171412 | KIM00090 | Dispenser Meter for Mogas dispenser # 3 | Wayne | DM2 | X | Section 7-8 | Key Required; OPERATE SYSTEM TO TEST | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Filters | KIM-2034-DSFLR-165720 | KIM00091 | Dispenser Filter for Mogas dispenser # 3 | Cim-Tek Filtration | 400 HS-30 | X | Section 7-9 | Key Required | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Emergency Shutoff Valves (Shear Valves) | KIM-2034-ESHVL-170886 | KIM00092 | Dispenser Shear Valve for Mogas dispenser # 3 and # 4 | X | Section 7-12 | Key Required; OPERATE SYSTEM TO TEST | EAL required 4 days prior- | ||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Nozzles | KIM-2034-DSNZ-153431 | KIM00093 | Nozzle for Mogas - dispenser # 3 | OPW | 11AP | X | Section 7-2 | Operate System to Test | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Nozzles | KIM-2034-DSNZ-153432 | KIM00094 | Nozzle for Mogas - dispenser # 4 | OPW | 11AP | X | Section 7-2 | Operate System to Test | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Swivels | KIM-2034-DSSW-171413 | KIM00095 | Swivel for Mogas - dispenser # 3 | OPW | 241TPS | X | Section 7-5 | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Swivels | KIM-2034-DSSW-176685 | KIM00096 | Swivel for Mogas - dispenser # 4 | OPW | 241TPS | X | Section 7-5 | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Breakaways | KIM-2034-DSBW-153240 | KIM00097 | Breakaway Valve for Mogas - dispenser # 3 | OPW | 66REC | X | Section 7-4 | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Breakaways | KIM-2034-DSBW-153241 | KIM00098 | Breakaway Valve for Mogas - dispenser # 4 | OPW | 66REC | X | Section 7-4 | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Hoses | KIM-2034-DSHS-165759 | KIM00101 | Dispener Hose (long) for Mogas - dispenser # 3 | Vapor Systems Technologie | X | Section 7-3 | EAL required 4 days prior- | ||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Hoses | KIM-2034-DSHS-165760 | KIM00102 | Dispener Hose (long) for Mogas - dispenser # 4 | Vapor Systems Technologie | X | Section 7-3 | EAL required 4 days prior- | ||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | EC-Electronic Equipment | KIM-2034-ELTREQ-171414 | KIM00103 | Flow Switch on Mogas receipt pipeline | Wayne | 3/G 7242D / 2GHJK | X | Section 9-1.9 | Notify Facility | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Meters | KIM-2034-DSMTR-171415 | KIM00104 | Dispenser Meter for Mogas dispenser # 4 | Wayne | DM2 | X | Section 7-8 | Key Required; OPERATE SYSTEM TO TEST | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Filters | KIM-2034-DSFLR-165722 | KIM00105 | Dispenser Filter for Mogas dispenser # 4 | Cim-Tek Filtration | 400 HS-30 | X | Section 7-9 | Key Required | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | TA-Tank Pressure/Vacuum Vents | KIM-2034-TPVVT-171416 | KIM00106 | Tank Pressure / Vacuum Vent for Diesel and Mogas AST (Diesel) | X | Section 8-9.3 | Notify Facility | EAL required 4 days prior- | ||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Cabinet | KIM-2034-DSCB-153310 | KIM00107 | Dispenser for Diesel dispenser # 1 and # 2 | Wayne | 3/G 7242D / 2GHJK | X | Section 7-7 | Key Required | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Meters | KIM-2034-DSMTR-176686 | KIM00108 | Dispenser Meter for Diesel dispenser # 1 | Wayne | DM2 | X | Section 7-8 | Key Required; OPERATE SYSTEM TO TEST | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Filters | KIM-2034-DSFLR-165724 | KIM00109 | Dispenser Filter for Diesel dispenser # 1 | Cim-Tek Filtration | 400 HS-30 | X | Section 7-9 | Key Required | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Emergency Shutoff Valves (Shear Valves) | KIM-2034-ESHVL-171051 | KIM00110 | Dispenser Shear Valve for Diesel dispenser # 1 and # 2 | X | Section 7-12 | Key Required; OPERATE SYSTEM TO TEST | EAL required 4 days prior- | ||||||||||
| 1196418 | KIM-2033 | 2033-UNLOAD STAND AT FACILITY 2026 | Gas Station | PM-Centrifugal Pumps | KIM-2033-CENP-170887 | KIM00111 | Self-priming centrifugal pump for Mogas | Pacer pump | 3/G 7242D / 2GHJK | X | X | X | Section 3-8.1 | Operate System to Test | EAL required 4 days prior- | ||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Meters | KIM-2034-DSMTR-171052 | KIM00112 | Dispenser Meter for Diesel dispenser # 2 | Wayne | DM2 | X | Section 7-8 | Key Required; OPERATE SYSTEM TO TEST | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Filters | KIM-2034-DSFLR-165726 | KIM00113 | Dispenser Filter for Diesel dispenser # 2 | Cim-Tek Filtration | 400 HS-30 | X | Section 7-9 | Key Required | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | TA-Tank Pressure/Vacuum Vents | KIM-2034-TPVVT-171054 | KIM00114 | Tank Pressure / Vacuum Vent for Diesel and Mogas AST (Mogas) | X | Section 8-9.3 | Notify Facility | EAL required 4 days prior- | ||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Nozzles | KIM-2034-DSNZ-171417 | KIM00115 | Nozzle for Diesel - dispenser # 1 | OPW | 11AP | X | Section 7-2 | Operate System to Test | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Hoses | KIM-2034-DSHS-165761 | KIM00117 | Dispener Hose (short) for Diesel - dispenser # 1 | X | Section 7-3 | EAL required 4 days prior- | |||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Hoses | KIM-2034-DSHS-165762 | KIM00118 | Dispener Hose (long) for Diesel - dispenser # 1 | Vapor Systems Technologie | X | Section 7-3 | EAL required 4 days prior- | ||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Breakaways | KIM-2034-DSBW-153242 | KIM00119 | Breakaway Valve for Diesel - dispenser # 1 | OPW | 66REC | X | Section 7-4 | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Nozzles | KIM-2034-DSNZ-171055 | KIM00120 | Nozzle for Diesel - dispenser # 2 | OPW | 11AP | X | Section 7-2 | Operate System to Test | EAL required 4 days prior- | ||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Swivels | KIM-2034-DSSW-170888 | KIM00121 | Swivel for Diesel - dispenser # 2 | OPW | 241TPS | X | Section 7-5 | EAL required 4 days prior- | |||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Hoses | KIM-2034-DSHS-165763 | KIM00122 | Dispener Hose (short) for Diesel - dispenser # 2 | X | Section 7-3 | EAL required 4 days prior- | |||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Dispenser Hoses | KIM-2034-DSHS-165764 | KIM00123 | Dispener Hose (long) for Diesel - dispenser # 2 | Vapor Systems Technologie | X | Section 7-3 | EAL required 4 days prior- | ||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Breakaways | KIM-2034-DSBW-153243 | KIM00124 | Breakaway Valve for Diesel - dispenser # 2 | OPW | 66REC | X | Section 7-4 | EAL required 4 days prior- | |||||||||
| 1112127 | KIM-2026 | 2026-VEH FL STN | Gas Station | SF-Fuel Truck Containment Areas | KIM-2026-FTKRCC-204147 | KIM1101231 | Tank, dispenser, and offload containment area | X | X | Section 11-1.1 | EAL required 4 days prior- | ||||||||||
| 1112127 | KIM-2026 | 2026-VEH FL STN | Gas Station | CS-Containment Drain Valves | KIM-2026-CSGEN-204148 | KIM1101232 | Containment drain valve for the tank, dispenser and offload containment | X | Section 8-10.1 | EAL required 4 days prior- | |||||||||||
| 1196418 | KIM-2033 | 2033-UNLOAD STAND AT FACILITY 2026 | Gas Station | EC-Static Grounding Systems | KIM-2033-STGS-204150 | KIM1101233 | Static grounding system for the offload area | X | Section 9-1.6.2 | EAL required 4 days prior- | |||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | DS-Swivels | KIM-2034-DSSW-204151 | KIM1101234 | Swivel for Diesel – dispenser # 1 | OPW | X | Section 7-5 | EAL required 4 days prior- | ||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | EC-Card and Key Locks | KIM-2034-CKLK-204153 | KIM1101235 | VIL Key Reader for diesel dispenser 1 & 2 and MOGAS dispenser 3 & 4 | X | Section 9-3 | EAL required 4 days prior- | |||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | EC-Panelboards | KIM-2034-PNB-204155 | KIM1101236 | Panelboard located next to the offload area in the fence in area | X | Section 9-1.5 | EAL required 4 days prior- | |||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | EC-Static Grounding Systems | KIM-2034-STGS-204157 | KIM1101237 | Static grounding system for facility 2034 | X | Section 9-1.6.2 | EAL required 4 days prior- | |||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | CS-Containment Drain Valves | KIM-2034-CSGEN-204159 | KIM1101238 | Containment drain valve for the emergency eyewash/shower station | X | Section 8-10.1 | EAL required 4 days prior- | |||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | CS-Dike/Berm Floors (curbed) | KIM-2034-ETHDW-204161 | KIM1101239 | Containment for the emergency eyewash/shower station | X | Section 8-10.2.2 | EAL required 4 days prior- | |||||||||||
| 1196419 | KIM-2034 | 2034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026 | Gas Station | PC-Aboveground Piping and Equipment Coating | KIM-2034-AGPCT-204163 | KIM1101240 | Piping for tank/facility 2034 | Section 6-10.1 | EAL required 4 days prior- | ||||||||||||
| PWS Appx K-3 | KIM-2035 | 2035-TBA-CANOPY OVER OFFLOAD STAND NEAR FAC 2026 | Gas Station | EC-Static Grounding Systems | KIM-2035-STGS-204165 | KIM1101241 | Static grounding system for the canopy | X | Section 9-1.6.2 | EAL required 4 days prior- | |||||||||||
| PWS Appx K-3 | KIM-2035 | 2035-TBA-CANOPY OVER OFFLOAD STAND NEAR FAC 2026 | Gas Station | EC-Lightning Protection Systems | KIM-2035-LPTS-204172 | KIM1101242 | Lightning protection system for the canopy | X | Section 9-4 | EAL required 4 days prior- | |||||||||||
| PWS Appx K-3 | KIM-2035 | 2035-TBA-CANOPY OVER OFFLOAD STAND NEAR FAC 2026 | Gas Station | EC-Lighting | KIM-2035-LIGHT-204168 | KIM1101243 | Tank vault lighting | X | X | Section 9-1.8 | EAL required 4 days prior- | ||||||||||
| PWS Appx K-3 | KIM-2035 | 2035-TBA-CANOPY OVER OFFLOAD STAND NEAR FAC 2026 | Gas Station | SF-Canopies | KIM-2035-CNPY-204174 | KIM1101244 | Canopy for tank and dispenser area | X | Section 11-2.2 | EAL required 4 days prior- | |||||||||||
| 1171656 | KIM-2027 | 2027-VEH PKNG REFL BEHIND FACILITY 2024 | Gas Station | SF-Fuel Truck Containment Areas | KIM-2027-FTKRCC-204204 | KIM1102240 | Fuel truck parking area | X | X | Section 11-1.1 | EAL required 4 days prior- |