FMP POF KIM_20251029.xlsx

XLSX spreadsheet 82 KB Posted

Attached to
DRAFT Solicitation CEHNC Fuels Pacific Ocean Division - Far East (POF)
Solicitation number
DRAFTW912DY26RA005
Issued by

About this file

This file is a Facility Maintenance Plan (FMP) for the Kimhae Storage Annex Site #1 in Korea, associated with a U.S. Army Corps of Engineers contract (W912DY-21-F-0076) managed by APTIM Federal Services, LLC. The document details maintenance requirements for multiple fuel storage and dispensing facilities, including a 21,236-barrel JP-8 cut and cover tank, a service station with 5,000-gallon Mogas and diesel aboveground storage tanks, dispensers, and associated infrastructure.

The maintenance plan provides a comprehensive task matrix with detailed maintenance schedules for various components, including valves, pumps, electronic equipment, containment systems, and safety features. Each asset is assigned a unique identifier, maintenance frequency (quarterly, semi-annual, or annual), and specific UFC (Unified Facilities Criteria) section references. The plan covers multiple facilities within the site, such as facility 2017 (bulk storage), 2034 (diesel/mogas dual tank), 2033 (unload stand), and 2026 (vehicle fueling station), with specific maintenance requirements for each component like flow switches, pressure gauges, emergency vents, and ground systems.

View the file

Other files

File Type Posted
CDRL Set 17 - 65-67.pdf PDF
CDRL Set 3 - 9-12.pdf PDF
CDRL Set 13 - 49-52.pdf PDF
Attachment 4 - PPQ Sample.pdf PDF
FMP POF OSN_20251029.xlsx XLSX spreadsheet
FMP POF SUW_20251029.xlsx XLSX spreadsheet
FMP POF KUS_20251029.xlsx XLSX spreadsheet
Attachment 2 Sample Service Order (Appendix A - Attachment 1 Service Order Form).xlsx XLSX spreadsheet
FMP POF CSY_20251029.xlsx XLSX spreadsheet
Attachment 1 PWS amd Appendices POF - V1.pdf PDF
CDRL Set 10 - 37-40.pdf PDF
CDRL Set 16 - 60-64.pdf PDF
CDRL Set 15 - 57-60.pdf PDF
CDRL Set 4 - 13-16..pdf PDF
CDRL Set 2 - 5-8.pdf PDF
CDRL Set 14 - 53-56.pdf PDF
FMP POF KJU_20251029.xlsx XLSX spreadsheet
FMP POF POH_20251029.xlsx XLSX spreadsheet
Attachment 0005 Instructions and Evaluation Factors DRAFT.docx DOCX document
FMP POF WAL_20251029.xlsx XLSX spreadsheet
CDRL Set 7 - 25-28.pdf PDF
CDRL Set 12 - 45-48.pdf PDF
CDRL Set 11 - 41-44.pdf PDF
FMP POF KUN_20251029.xlsx XLSX spreadsheet
FMP POF HUM_20251029.xlsx XLSX spreadsheet
FMP POF K-16_20251029.xlsx XLSX spreadsheet
CDRL Set 6 - 21-24.pdf PDF
CDRL Set 8 - 29-32.pdf PDF
CDRL Set 5 - 17-20.pdf PDF
CDRL Set 1 - 1-4.pdf PDF
CDRL Set 9 - 33-36.pdf PDF
Appendix K Real Property Data.xlsx XLSX spreadsheet
Attachment 3 Technical Eval Form - V1.pdf PDF
FMP POF YCH_20251029.xlsx XLSX spreadsheet
FMP POF TAE_20251029.xlsx XLSX spreadsheet
FMP POF YSG_20251029.xlsx XLSX spreadsheet
FMP POF CRL_20251029.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Administrative

ADMINISTRATIVE
LocationInstallation NameKimhae Storage Annex Site #1
DLA Site CodeKIM
RPSUID2437
Hours of Operation0800-1630
AddressKimhae, Korea
ContractContractor
Contract #
Local POCsPrimary QAE
QAE Phone
QAE Email
Alternate QAE
Alt QAE Phone
Alt QAE Email
Contractor POCsContractor PM
Contractor PM Phone
Contractor PM Email
Contractor QC Manager
Contractor QC Phone
Contractor QC Email
Contractor SOE
Contractor SOE Phone
Contractor SOE Email
Contractor RM
Contractor RM Phone
Contractor RM Email
Contractor SM
Contractor SM Phone
Contractor SM Email
USACE POCsUSACE PM/COR
USACE PM/COR Phone
USACE PM/COR Email
USACE PE
USACE PE Phone
USACE PE Email
USACE KO
USACE KO Phone
USACE KO Email
USACE Monthly Report Inbox

Pacific Ocean Division, POD-AF

W912DY-21-F-0076&"-,Bold"&16Kimhae Storage Annex Site #1
KIMFacility Maintenance Plan

OY3 Q1

&A &P of &N APTIM Federal Services, LLC

Instructions:

This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.

General Facility Description

General Facility Description
Installation NameKimhae Storage Annex Site #1
DLA Site CodeKIM
LocationKimhae, Korea
Service Station (2026): (1) 5,000-gallon Mogas AST and (1) 5,000-gallon diesel AST located in a (2)-compartment tank (2034), (1) diesel dispenser and (1) Mogas dispenser, each with (2) nozzles.

Bulk Storage: (1) 21,236-barrel JP-8 cut and cover tank (2017).

ROKAF maintains the filter separators and receipt /issue stands.

PAE and GSI operate the system and perform routine maintenance, daily, weekly, quarterly and semi-annually.

Pacific Ocean Division, POD-AF

W912DY-21-F-0076&"-,Bold"&16Kimhae Storage Annex Site #1
KIMFacility Maintenance Plan

OY3 Q1

&A &P of &N APTIM Federal Services, LLC

Instructions:

Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.

Include Site Specific Conditions and Restrictions in this tab.

Communication Plan

Pacific Ocean Division, POD-AF

W912DY-21-F-0076&"-,Bold"&16Kimhae Storage Annex Site #1
KIMFacility Maintenance Plan

OY3 Q1

&A &P of &N APTIM Federal Services, LLC

Instructions:

Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.

Include Site Specific Conditions and Restrictions in this tab.

Site Specific Safety Plan

W912DY-21-F-0076&"-,Bold"&16Kimhae Storage Annex Site #1
KIMFacility Maintenance Plan

Instructions:

Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.

PM Schedule

Pacific Ocean Division, POD-AF

W912DY-21-F-0076&"-,Bold"&16&K000000Kimhae Storage Annex Site #1
KIMFacility Maintenance Plan

OY3 Q1

&A &P of &N APTIM Federal Services, LLC

Instructions:

Link PM schedule here

Task Matrix

Applicable Facility AssetsUFC System Level Maintenance FrequencySpecial Considerations
RPUIDReal Property Facility #Facility NameOperational AreaComponent TypeBase Asset IDComponent Unique ID (CUID)APTIM Asset IDAsset DescriptionMakeModelCapacity/SizeQuarterly
Semi AnnualAnnualUFC
Section ReferenceAdditional Manufacturer RM RequirementsOperator/ Equipment RequirementsSystem AvailabilityOther ContractComments
456584KIM-23122312-PIPELINE,LFBulk StorageEC-Electronic EquipmentKIM-2312-ELTREQ-169626202102081551KIMFlow switch on issue (Transfer) pipelineXSection 9-1.9Notify FacilityEAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageEC-Electronic EquipmentKIM-2312-ELTREQ-169490202102081552KIMFlow switch on receipt (Transfer) pipelineXSection 9-1.9Notify FacilityEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageMV-Double Block and Bleed ValvesB-2KIM-2017-DBBVL-16709531313KIMDBB valve on Pump # 1 issue pipelineORBIT211XXXSection 6-6.2.5Notify FacilityEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageMV-Double Block and Bleed ValvesB-4KIM-2017-DBBVL-16709631314KIMDBB valve on Pump # 2 issue pipelineORBIT211XXXSection 6-6.2.5Notify FacilityEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageMV-Double Block and Bleed ValvesB-5KIM-2017-DBBVL-16709731315KIMDBB valve on issue pipelineORBIT211XXXSection 6-6.2.5Notify FacilityEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageMV-Double Block and Bleed ValvesB-6KIM-2017-DBBVL-16709831316KIMDBB valve on issue (return to tank) pipelineORBIT211XXXSection 6-6.2.5Notify FacilityEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageMV-Double Block and Bleed ValvesR-1KIM-2017-DBBVL-16709931317KIMDBB valve on receipt pipeline before HLSO control valveORBIT211XXXSection 6-6.2.5Notify FacilityEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageMV-Double Block and Bleed ValvesS-6KIM-2017-DBBVL-16710031318KIMDBB valve on PRT to receipt pipeline after HLSO Control ValveORBIT211XXXSection 6-6.2.5Notify FacilityEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageMV-Double Block and Bleed ValvesS-2KIM-2017-DBBVL-16710131319KIMDBB valve on sump pump to issue pipeline after control valve (S-1)ORBIT211XXXSection 6-6.2.5Notify FacilityEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageTV-Thermal and Pressure Relief ValvesNo.3KIM-2017-TPRVL-16524131320KIMPressure relief valve on 8 in. receipt pipeline before DBB (R-1)TaylorXXSection 6-6.3Coordinate with FacilityEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StoragePV-Pressure GaugesKIM-2017-PVGA-16965531321KIMPressure gauge on Pump # 1 pipelineKONICSXXXSection 6-7.1EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StoragePV-Pressure GaugesKIM-2017-PVGA-17620331322KIMPressure gauge on Pump # 2 pipelineKONICSXXXSection 6-7.1EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StoragePV-Pressure GaugesKIM-2017-PVGA-16981731323KIMPressure gauge on sump pump to PRT pipelineKONICSXXXSection 6-7.1EAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageMV-Double Block and Bleed ValvesB-6KIM-2312-DBBVL-16710231324KIMDBB valve on issue pipeline before basket strainer (outside building 34082)ORBIT211XXXSection 6-6.2.5Notify FacilityEAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageMV-Double Block and Bleed ValvesB-7KIM-2312-DBBVL-16710331325KIMDBB valve on issue pipeline after flow switch (outside building 34082)ORBIT211XXXSection 6-6.2.5Notify FacilityEAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageMV-Double Block and Bleed ValvesB-9KIM-2312-DBBVL-16710431326KIMDBB valve on issue pipeline after DBB B-7 (outside building 34082)ORBIT211XXXSection 6-6.2.5Notify FacilityEAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageMV-Double Block and Bleed ValvesR-2KIM-2312-DBBVL-16710531327KIMDBB valve on receipt pipeline after flow switch (outside building 34082)ORBIT211XXXSection 6-6.2.5Notify FacilityEAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageMV-Double Block and Bleed ValvesR-3KIM-2312-DBBVL-16710631328KIMDBB valve on receipt pipeline before basket strainer (outside building 34082)ORBIT211XXXSection 6-6.2.5Notify FacilityEAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageMV-Double Block and Bleed ValvesR-4KIM-2312-DBBVL-16710731329KIMDBB valve on receipt pipeline (outside building 34082)ORBIT211XXXSection 6-6.2.5Notify FacilityEAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StoragePV-Pressure GaugesKIM-2312-PVGA-16981831330KIMPressure gauge on issue pipeline after DBB B-9 (outside building 34082)KONICSXXXSection 6-7.1Notify FacilityEAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StoragePV-Pressure and Pressure/Vacuum GaugesKIM-2312-PVGA-17620531331KIMPressure gauge on receipt pipeline before DBB R-4 (outside building 34082)KONICSXXXSection 6-7.1Notify FacilityEAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageTV-Thermal and Pressure Relief ValvesKIM-2312-TPRVL-16524231332KIMPressure relief valve on issue pipeline by DBB B-9 (outside building 34082)TaylorT-8200-1XXSection 6-6.3Coordinate with FacilityEAL required 4 days prior-Set Pre. 150 PSI
456584KIM-23122312-PIPELINE,LFBulk StorageTV-Thermal and Pressure Relief ValvesKIM-2312-TPRVL-16524331333KIMPressure relief valve on receipt pipeline by DBB R-4 (outside building 34082)TaylorT-8200-1XXSection 6-6.3Coordinate with FacilityEAL required 4 days prior-Set Pre. 150 PSI
456584KIM-23122312-PIPELINE,LFBulk StorageMV-Double Block and Bleed ValvesB-8KIM-2312-DBBVL-16710831334KIMDBB valve on issue pipeline (ROKAF / DLA - inside building 34082)ORBIT211XXXSection 6-6.2.5Notify FacilityEAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageMV-Double Block and Bleed ValvesKIM-2312-DBBVL-16710931335KIMDBB valve on receipt pipeline (ROKAF / DLA - inside building 34082)ORBIT211XXXSection 6-6.2.5Notify FacilityEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageMV-Ball ValvesKIM-2017-BLVL-148586KIM000011/2in ball valve for vent on 8in issue pipelineFlo-TiteXSection 6-6.2.4Notify FacilityEAL required 4 days prior-FIT
455582KIM-20172017-BULK STOR, JET FLBulk StorageMV-Ball ValvesKIM-2017-BLVL-148587KIM000021/2in ball valve for vent on 8in receipt pipelineFlo-TiteXSection 6-6.2.4Notify FacilityEAL required 4 days prior-FIT
455582KIM-20172017-BULK STOR, JET FLBulk StorageMV-Ball ValvesKIM-2017-BLVL-148588KIM000033/4in ball valve for PRV (inlet side) located on 8in receipt pipelineFlo-TiteXSection 6-6.2.4Notify FacilityEAL required 4 days prior-FIT
455582KIM-20172017-BULK STOR, JET FLBulk StorageMV-Ball ValvesKIM-2017-BLVL-148589KIM000043/4in ball valve for PRV (outlet side) located on 8in receipt pipelineFlo-TiteXSection 6-6.2.4Notify FacilityEAL required 4 days prior-FIT
455582KIM-20172017-BULK STOR, JET FLBulk StorageMV-Ball ValvesS-3KIM-2017-BLVL-148590KIM000052in ball valve on sump pump to PRT pipelineVelanXSection 6-6.2.4Notify FacilityEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageMV-Ball ValvesS-4KIM-2017-BLVL-148591KIM000061-1/2in ball valve on sump pump to PRT (by PRT) pipelineKPL VALVE IND. CO. LTD.XSection 6-6.2.4Notify FacilityEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageMV-Ball ValvesS-5KIM-2017-BLVL-157863KIM000072in ball valve on PRT to slop tank pipelineFlo-TiteXSection 6-6.2.4Notify FacilityEAL required 4 days prior-FIT
455582KIM-20172017-BULK STOR, JET FLBulk StorageCS-Dike/Berm with Walls and FloorsKIM-2017-DKBW-167917KIM00008Containment for PRTXSection 8-10.2 / 8-10.2.1EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageCV-General System Control ValvesB-1KIM-2017-GSCVL-153094KIM00009Control valve on Pump # 1 pipelineCla-ValXXSection 4-3.2.1Operate System to TestEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageCV-General System Control ValvesB-3KIM-2017-GSCVL-153095KIM00010Control valve on Pump # 2 pipelineCla-ValXXSection 4-3.2.1Operate System to TestEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageCV-General System Control ValvesKIM-2017-GSCVL-153096KIM00011Control valve on issue (return to tank) pipeline after DBB (B-6)Cla-ValXXSection 4-3.2.1Operate System to TestEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageCV-General System Control ValvesKIM-2017-GSCVL-153097KIM00012Control valve for HLSO valve on 8 inch receipt pipelineCla-ValXXSection 4-3.2.1Operate System to TestEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageCV-General System Control ValvesS-1KIM-2017-GSCVL-153098KIM00013Control valve on sump pump to PRT pipelineCla-ValXXSection 4-3.2.1Operate System to TestEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageTA-Tank Pressure/Vacuum VentsKIM-2017-TPVVT-176681KIM000236in pressure / vacuum vent (East next to PRT)S&JXSection 8-9.3Notify FacilityEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageTA-Tank Pressure/Vacuum VentsKIM-2017-TPVVT-171070KIM000246in pressure / vacuum vent (West)S&JXSection 8-9.3Notify FacilityEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StoragePM-Vertical Turbine/Sub-merged Turbine Pumps# 1KIM-2017-VTSP-171044KIM00026Issue Pump # 1Goulds PumpsVIT-FFXXXSection 3-8.1.3 / 3-8.3Operate System to TestEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StoragePM-Vertical Turbine/Sub-merged Turbine Pumps# 2KIM-2017-VTSP-171045KIM00027Issue Pump # 2Goulds PumpsVIT-FFXXXSection 3-8.1.3 / 3-8.3Operate System to TestEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StoragePM-Vertical Turbine/Sub-merged Turbine PumpsKIM-2017-VTSP-170881KIM00028Sump PumpGoulds PumpsVIT-FFXXXSection 3-8.1.3 / 3-8.3Operate System to TestEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageEQ-Real PropertyKIM-2017-ASSET-153992KIM00029On/Off Switch for Pump # 1AppletonEDSC150F2Non-Appx G ClassEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageEQ-Real PropertyKIM-2017-ASSET-153993KIM00030On/Off Switch for Pump # 2AppletonEDSC150F2Non-Appx G ClassEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageTK-Underground Field-Constructed Tanks2017KIM-2017-UGFET-171407KIM00031Field-constructed cut and cover tankXSection 8-6EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StoragePS-Product Saver TanksKIM-2017-PRDST-176682KIM00032Product Recovery TankXSection 8-9.10Notify FacilityEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageTK-Underground Single-Walled Shop-Fabricated TanksKIM-2017-UGSSFT-170882KIM00033Slop TankXSection 8-5.4.1EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageEQ-Real PropertyKIM-2017-ASSET-153994KIM000341/2in needle valve for pressure gauge (Pump # 1 pipeline)JeonilJBF-6RNon-Appx G ClassEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageEQ-Real PropertyKIM-2017-ASSET-153995KIM000351/2in needle valve for pressure gauge (Pump # 2 pipeline)JeonilJBF-6RNon-Appx G ClassEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageEC-Electronic EquipmentKIM-2017-ELTREQ-171408KIM00036Flow Switch on issue pipelineDELTA M CorporationVS5100-N06-S6-00400-110-LE-00XSection 9-1.9Notify FacilityEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageEQ-Real PropertyKIM-2017-ASSET-153996KIM000371/2in needle valve for pressure gauge (Sump Pump pipeline)JeonilJBF-6RNon-Appx G ClassEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageMV-Check ValvesKIM-2017-CKVL-162827KIM000392in check valve on sump pump to PRT pipelineXSection 6-6.2.8Notify FacilityEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageTG-Servo GaugeKIM-2017-SRVGA-171047KIM00040Automatic Tank Gauge (ATG)Honeywell854 ATGXXXSection 8-9.8.3EAL required 4 days prior-Another ContractFactory Mutual System - ENRAF
455582KIM-20172017-BULK STOR, JET FLBulk StorageEQ-Real PropertyKIM-2017-ASSET-153997KIM0004110in manual gauge hatch coverS&JNon-Appx G ClassEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageEC-Electronic EquipmentKIM-2017-ELTREQ-153998KIM00042EFSO located inside the tank vaultAppletonEDSK-1JAXSection 9-1.9EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageEQ-Real PropertyKIM-2017-ASSET-153999KIM00043On/Off Switch for Sump PumpAppletonEDSC150F2Non-Appx G ClassEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageEC-Electronic EquipmentKIM-2017-ELTREQ-154000KIM00044Exhaust fan located next to the vault entranceXSection 9-1.9EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageEC-Electronic EquipmentKIM-2017-ELTREQ-154001KIM00045Exhaust fan located across from the vault entranceXSection 9-1.9EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageMV-Ball ValvesS-6KIM-2017-BLVL-157914KIM000462in ball valve on PRT to Tank 2017 receipt pipelineFlo-TiteXSection 6-6.2.4Notify FacilityEAL required 4 days prior-FIT
456584KIM-23122312-PIPELINE,LFBulk StorageMV-Ball ValvesKIM-2312-BLVL-157935KIM001253/4in ball valve on issue (PRV inlet) pipeline (outside building 34082)Kaneko SangyoXSection 6-6.2.4Notify FacilityEAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageMV-Ball ValvesKIM-2312-BLVL-157936KIM001261in ball valve on issue (PRV outlet) pipeline (outside building 34082)Kaneko SangyoXSection 6-6.2.4Notify FacilityEAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageMV-Ball ValvesKIM-2312-BLVL-157937KIM001271in ball valve on issue (isolation valve for pressure gauge) pipeline (outside building 34082)XSection 6-6.2.4Notify FacilityEAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageMV-Ball ValvesKIM-2312-BLVL-157938KIM001283/4in ball valve on receipt (PRV inlet) pipeline (outside building 34082)Kaneko SangyoXSection 6-6.2.4Notify FacilityEAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageFT-Basket StrainerKIM-2312-BSTR-171418KIM00138Basket strainer on issue pipeline (outside building 34082)Islip Flow ControlsB150FSBW1XXSection 3-6.4EAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageFT-Basket StrainerKIM-2312-BSTR-171419KIM00139Basket strainer on receipt pipeline (outside building 34082)Islip Flow ControlsB150FSBW1XXSection 3-6.4EAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageMV-Ball ValvesKIM-2312-BLVL-157939KIM001433/4in ball valve on receipt (PRV outlet) pipeline (outside building 34082)Kaneko SangyoXSection 6-6.2.4Notify FacilityEAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageMV-Ball ValvesKIM-2312-BLVL-157940KIM0014415A ball valve on receipt (isolation valve for pressure gauge) pipeline (outside building 34082)XSection 6-6.2.4Notify FacilityEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageEC-Static Grounding SystemsKIM-2017-STGS-204176KIM1101245Static grounding system for tank 2017XSection 9-1.6.2EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageEC-LightingKIM-2017-LIGHT-204178KIM1101246Tank vault lightingXXSection 9-1.8EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StoragePL-Aboveground PipingKIM-2017-AGPL-204170KIM1101247Piping for tank 2017XXSection 6-1.3EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageCS-Containment Drain ValvesKIM-2017-CSGEN-204180KIM1101248Containment drain valve for the PRT containmentXSection 8-10.1EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StoragePM-Vertical Turbine/Sub-merged Turbine PumpsKIM-2017-VTSP-204181KIM1101249Water pump located inside tank 2017 vault (Small Pump)XXXSection 3-8.1.3 / 3-8.3EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageCS-Pipe PenetrationsKIM-2017-PPEN-204183KIM1101250Pipe penetrations for tank 2017XXSection 8-10.6EAL required 4 days prior-
1161129KIM-20282028-PETROLEUM OPERATIONS FACILITY NEXT TO FAC #2017Bulk StorageEC-PanelboardsPKIM-2028-PNB-204185KIM1101251Panelboard P located inside facility 2028XSection 9-1.5EAL required 4 days prior-
1161129KIM-20282028-PETROLEUM OPERATIONS FACILITY NEXT TO FAC #2017Bulk StorageEC-Control Panels - Elec EquipKIM-2028-ELEQ-204187KIM1101252MCC control panel for tank 2017 located inside facility 2028AppletonXSection 9-1.2EAL required 4 days prior-
1161129KIM-20282028-PETROLEUM OPERATIONS FACILITY NEXT TO FAC #2017Bulk StorageEC-Control Panels - Elec EquipKIM-2028-ELEQ-204188KIM1101253ATG control panel for tank 2017 located inside facility 2028AppletonXSection 9-1.2EAL required 4 days prior-
1161129KIM-20282028-PETROLEUM OPERATIONS FACILITY NEXT TO FAC #2017Bulk StorageEC-Control Panels - Elec EquipKIM-2028-ELEQ-204189KIM1101254PLC control panel for tank 2017 located inside facility 2028AppletonXSection 9-1.2EAL required 4 days prior-
1161129KIM-20282028-PETROLEUM OPERATIONS FACILITY NEXT TO FAC #2017Bulk StorageEC-Control Panels - Elec EquipKIM-2028-ELEQ-204190KIM1101255Remote alarm control panel for tank 2017 located inside facility 2028AppletonXSection 9-1.2EAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageEC-LightingKIM-2312-LIGHT-204192KIM1101256Tank vault lightingXXSection 9-1.8EAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StoragePL-Aboveground PipingKIM-2312-AGPL-204194KIM1101257Issue and receiving pipingXXSection 6-1.3EAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageCS-Containment Drain ValvesKIM-2312-CSGEN-204196KIM1101258Containment drain valve for the issue and receiving area containmentXSection 8-10.1EAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageEC-Electronic EquipmentKIM-2312-ELTREQ-204197KIM1101259Flow switch located on the issue line inside the cabinetXSection 9-1.9EAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageEC-Electronic EquipmentKIM-2312-ELTREQ-204198KIM1101260Flow switch located on the receipt line inside the cabinetXSection 9-1.9EAL required 4 days prior-
456584KIM-23122312-PIPELINE,LFBulk StorageCS-Dike/Berm Floors (curbed)KIM-2312-ETHDW-204200KIM1101261Containment for the emergency eyewash/shower stationXSection 8-10.2.2EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageEC-LightingKIM-2017-LIGHT-204207KIM1102231Tank pipe vault room lighting located on the side of tank 2017XXSection 9-1.8EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageEC-Electronic EquipmentKIM-2017-ELTREQ-204208KIM1102232Exhaust fan for the tank pipe vault room lighting located on the side of tank 2017XSection 9-1.9EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StoragePL-Aboveground PipingKIM-2017-AGPL-204209KIM1102233Piping located on the side of tank 2017XXSection 6-1.3EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StoragePM-Vertical Turbine/Sub-merged Turbine PumpsKIM-2017-VTSP-204210KIM1102234Water pump located inside the tank pipe vault room for tank 2017 (Small Pump)XXXSection 3-8.1.3 / 3-8.3EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageCS-Containment Drain ValvesKIM-2017-CSGEN-204211KIM1102235Containment drain valve for the piping containment located on the side of tank 2017XSection 8-10.1EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageCS-Containment Drain ValvesKIM-2017-CSGEN-204212KIM1102236Containment drain valve for the piping (drain/issue/receive) containment located behind ROKAF facility 34047XSection 8-10.1EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageCS-Dike/Berm Floors (curbed)KIM-2017-ETHDW-204214KIM1102237Containment for the piping located on the side of tank 2017XSection 8-10.2.2EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageCS-Dike/Berm Floors (curbed)KIM-2017-ETHDW-204215KIM1102238Containment for the piping (drain/issue/receive) located behind ROKAF facility 34047XSection 8-10.2.2EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StoragePC-Aboveground Piping and Equipment CoatingKIM-2017-AGPCT-204217KIM1102239Piping (drain/issue/receive) located behind ROKAF facility 34047Section 6-10.1EAL required 4 days prior-
1161129KIM-20282028-PETROLEUM OPERATIONS FACILITY NEXT TO FAC #2017Bulk StorageEC-Static Grounding SystemsKIM-2028-STGS-204202KIM1102242Static grounding system for facility 2028XSection 9-1.6.2EAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageTA-External High Level Shutoff Valves (HLSO)KIM-2017-EHLSVL-176687KIM202202070939External HLSO valve on 8 inch receipt pipelineXXSection 8-9.6.1Operate System to TestEAL required 4 days prior-
455582KIM-20172017-BULK STOR, JET FLBulk StorageEC-Ground Reels - Static Grounding SystemsKIM-2017-STGS-176688KIM202202090918Ground Reel next to the slop tankXXSection 9-1.6.2EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationTV-Thermal and Pressure Relief ValvesKIM-2034-TPRVL-16524431336KIMPressure relief valve on issue pipeline (top of the Mogas tank)TaylorT-7700-1XXSection 6-6.3Coordinate with FacilityEAL required 4 days prior-Set Pressure 65 PSIG
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationTV-Thermal and Pressure Relief ValvesKIM-2034-TPRVL-16524531337KIMPressure relief valve on issue pipeline (top of the Diesel tank)TaylorT-7700-1XXSection 6-6.3Coordinate with FacilityEAL required 4 days prior-Set Pressure 65 PSIG
1196418KIM-20332033-UNLOAD STAND AT FACILITY 2026Gas StationMV-Ball ValvesKIM-2033-BLVL-157915KIM000473in ball valve for diesel receipt pipeline (inside cabinet)APOLLOXSection 6-6.2.4Notify Facility; KEY REQUIREDEAL required 4 days prior-
1196418KIM-20332033-UNLOAD STAND AT FACILITY 2026Gas StationMV-Ball ValvesKIM-2033-BLVL-157916KIM000481/2in ball valve for diesel receipt pipeline (inside cabinet)APOLLOXSection 6-6.2.4Notify Facility; KEY REQUIREDEAL required 4 days prior-
1196418KIM-20332033-UNLOAD STAND AT FACILITY 2026Gas StationMV-Ball ValvesKIM-2033-BLVL-157917KIM000493in ball valve for mogas receipt pipeline (inside cabinet)XSection 6-6.2.4Notify Facility; KEY REQUIREDEAL required 4 days prior-Blinded and not being used
1196418KIM-20332033-UNLOAD STAND AT FACILITY 2026Gas StationEC-Ground Reels - Static Grounding SystemsKIM-2033-STGS-170883KIM00050Ground Cables (Reels)AppletonSD11XXSection 9-1.6.2EAL required 4 days prior-
1196418KIM-20332033-UNLOAD STAND AT FACILITY 2026Gas StationGF-Remote Dispenser PumpsKIM-2033-RDSP-171409KIM00051Pump located below cabinentPrice Pump CompanyRC30CPBF-402-21211RE-FMXXXSection 7-15.1Operate System to TestEAL required 4 days prior-
1196418KIM-20332033-UNLOAD STAND AT FACILITY 2026Gas StationEC-EFSO-Elec EquipKIM-2033-EFSO-166022KIM00052Emergency Shutoff SwitchXSection 9-1.2Operate System to TestEAL required 4 days prior-
1196418KIM-20332033-UNLOAD STAND AT FACILITY 2026Gas StationEQ-Real PropertyKIM-2033-ASSET-154002KIM000533in female camlock fitting for diesel receipt pipeline (inside cabinet)Non-Appx G ClassEAL required 4 days prior-
1196418KIM-20332033-UNLOAD STAND AT FACILITY 2026Gas StationEQ-Real PropertyKIM-2033-ASSET-154003KIM000543in female camlock fitting for mogas receipt pipeline (inside cabinet)Non-Appx G ClassEAL required 4 days prior-
1196418KIM-20332033-UNLOAD STAND AT FACILITY 2026Gas StationMV-Ball ValvesKIM-2033-BLVL-157918KIM000551/2in ball valve for mogas receipt pipeline (inside cabinet)APOLLOXSection 6-6.2.4Notify Facility; KEY REQUIREDEAL required 4 days prior-
1196418KIM-20332033-UNLOAD STAND AT FACILITY 2026Gas StationMV-Ball ValvesKIM-2033-BLVL-157919KIM000561/2in ball valve for mogas receipt pipeline (inside cabinet) - bottom sideAPOLLOXSection 6-6.2.4Notify Facility; KEY REQUIREDEAL required 4 days prior-
1196418KIM-20332033-UNLOAD STAND AT FACILITY 2026Gas StationMV-Ball ValvesMB-1KIM-2033-BLVL-157920KIM000573in ball valve on receipt pipeline before pumpAPOLLOXSection 6-6.2.4Notify FacilityEAL required 4 days prior-Blinded and not being used
1196418KIM-20332033-UNLOAD STAND AT FACILITY 2026Gas StationMV-Ball ValvesMB-2KIM-2033-BLVL-157921KIM000583in ball valve on receipt pipeline (Mogas) after pumpAPOLLOXSection 6-6.2.4Notify FacilityEAL required 4 days prior-Blinded and not being used
1196418KIM-20332033-UNLOAD STAND AT FACILITY 2026Gas StationMV-Check ValvesKIM-2033-CKVL-162828KIM000593in check valve on receipt pipeline (Mogas) after pumpXSection 6-6.2.8Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationMV-Ball ValvesKIM-2034-BLVL-157922KIM000602in ball valve on issue pipeline on top of the Mogas tankFlow-TekXSection 6-6.2.4Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationMV-Ball ValvesKIM-2034-BLVL-157923KIM000611in ball valve on PRV inlet on top of the Mogas tankFlow-TekXSection 6-6.2.4Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationMV-Ball ValvesKIM-2034-BLVL-157924KIM000621/2in ball valve on issue pipeline (before tee) on top of the Mogas tankFlow-TekXSection 6-6.2.4Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationMV-Ball ValvesKIM-2034-BLVL-157925KIM000631in ball valve on PRV outlet on top of the Mogas tankFlow-TekXSection 6-6.2.4Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationMV-Ball ValvesKIM-2034-BLVL-157926KIM000641in ball valve on issue / vent pipeline on top of the Mogas tankFlow-TekXSection 6-6.2.4Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationMV-Ball ValvesM-1KIM-2034-BLVL-157927KIM000651in ball valve on receipt pipeline on top of the Mogas tankXSection 6-6.2.4Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationMV-Ball ValvesKIM-2034-BLVL-157928KIM000661in ball valve on receipt / vent pipeline on top of the Mogas tankFlow-TekXSection 6-6.2.4Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationMV-Ball ValvesKIM-2034-BLVL-157929KIM000672in ball valve on issue pipeline on top of the Diesel tankFlow-TekXSection 6-6.2.4Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationMV-Ball ValvesKIM-2034-BLVL-157930KIM000681in ball valve on PRV inlet on top of the Diesel tankFlow-TekXSection 6-6.2.4Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationMV-Ball ValvesKIM-2034-BLVL-157931KIM000691/2in ball valve on issue pipeline (before tee) on top of the Diesel tankFlow-TekXSection 6-6.2.4Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationMV-Ball ValvesKIM-2034-BLVL-157932KIM000701in ball valve on PRV outlet on top of the Diesel tankFlow-TekXSection 6-6.2.4Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationMV-Ball ValvesKIM-2034-BLVL-157933KIM000712in ball valve on the bottom side diesel receipt pipeline (connected to Facility 2033)Flow-TekXSection 6-6.2.4Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationMV-Ball ValvesKIM-2034-BLVL-157934KIM000722in ball valve on the bottom side mogas receipt pipeline (connected to Facility 2033)Flow-TekXSection 6-6.2.4Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationTK-Aboveground Shop-Fabricated TanksGH-2034-2-ASTKIM-2034-AGSFP-176683KIM0007510,000 gallon compartment tank; Diesel Tank GH-2034-1 (5,000 gal) & MOGAS Tank GH-2034-2 (5,000 gal)XXSection 8-5.1EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationMV-Check ValvesKIM-2034-CKVL-162829KIM000762in check valve on issue pipeline (top of the Mogas tank)XSection 6-6.2.8Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationGF-Remote Dispenser PumpsKIM-2034-RDSP-171048KIM00077Red Jacket Pump for Mogas tankXXXSection 7-15.1Operate System to TestEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationEQ-Real PropertyKIM-2034-ASSET-154004KIM000784in manual gauge hatch cover for Mogas TankTankTechNon-Appx G ClassEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationTA-Emergency VentsKIM-2034-EMGVT-170884KIM00080Emergency vent for Mogas tankMorrison Bros. Co.Fig. 244XSection 8-9.4Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationSF-Emergency Eyewash/ShowersKIM-2034-EMEWSH-171410KIM00081Emergency Eyewash & Shower Station located next to the MOGAS dispenserXXXSection 11-3Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationGF-Remote Dispenser PumpsKIM-2034-RDSP-176684KIM00082Red Jacket Pump for Diesel tankXXXSection 7-15.1Operate System to TestEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationMV-Check ValvesKIM-2034-CKVL-162830KIM000832in check valve on issue pipeline (top of the Diesel tank)XSection 6-6.2.8Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationEQ-Real PropertyKIM-2034-ASSET-154005KIM000844in manual gauge hatch cover for Diesel TankTankTechNon-Appx G ClassEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationTA-Emergency VentsKIM-2034-EMGVT-170885KIM00085Emergency vent for Diesel tankMorrison Bros. Co.Fig. 244XSection 8-9.4Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationTA-Emergency VentsKIM-2034-EMGVT-171411KIM00086Emergency vent located at the center of Diesel and Mogas tankMorrison Bros. Co.Fig. 244XSection 8-9.4Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationEQ-Real PropertyKIM-2034-ASSET-154006KIM000872in camlock fitting on the bottom side diesel receipt pipeline (connected to Facility 2033)DixonNon-Appx G ClassEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationEQ-Real PropertyKIM-2034-ASSET-154007KIM000882in camlock fitting on the bottom side mogas receipt pipeline (connected to Facility 2033)DixonNon-Appx G ClassEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser CabinetKIM-2034-DSCB-153309KIM00089Dispenser for Mogas dispenser # 3 and # 4Wayne3/G 7242D / 2GHJKXSection 7-7Key RequiredEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser MetersKIM-2034-DSMTR-171412KIM00090Dispenser Meter for Mogas dispenser # 3WayneDM2XSection 7-8Key Required; OPERATE SYSTEM TO TESTEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser FiltersKIM-2034-DSFLR-165720KIM00091Dispenser Filter for Mogas dispenser # 3Cim-Tek Filtration400 HS-30XSection 7-9Key RequiredEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Emergency Shutoff Valves (Shear Valves)KIM-2034-ESHVL-170886KIM00092Dispenser Shear Valve for Mogas dispenser # 3 and # 4XSection 7-12Key Required; OPERATE SYSTEM TO TESTEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser NozzlesKIM-2034-DSNZ-153431KIM00093Nozzle for Mogas - dispenser # 3OPW11APXSection 7-2Operate System to TestEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser NozzlesKIM-2034-DSNZ-153432KIM00094Nozzle for Mogas - dispenser # 4OPW11APXSection 7-2Operate System to TestEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-SwivelsKIM-2034-DSSW-171413KIM00095Swivel for Mogas - dispenser # 3OPW241TPSXSection 7-5EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-SwivelsKIM-2034-DSSW-176685KIM00096Swivel for Mogas - dispenser # 4OPW241TPSXSection 7-5EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-BreakawaysKIM-2034-DSBW-153240KIM00097Breakaway Valve for Mogas - dispenser # 3OPW66RECXSection 7-4EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-BreakawaysKIM-2034-DSBW-153241KIM00098Breakaway Valve for Mogas - dispenser # 4OPW66RECXSection 7-4EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser HosesKIM-2034-DSHS-165759KIM00101Dispener Hose (long) for Mogas - dispenser # 3Vapor Systems TechnologieXSection 7-3EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser HosesKIM-2034-DSHS-165760KIM00102Dispener Hose (long) for Mogas - dispenser # 4Vapor Systems TechnologieXSection 7-3EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationEC-Electronic EquipmentKIM-2034-ELTREQ-171414KIM00103Flow Switch on Mogas receipt pipelineWayne3/G 7242D / 2GHJKXSection 9-1.9Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser MetersKIM-2034-DSMTR-171415KIM00104Dispenser Meter for Mogas dispenser # 4WayneDM2XSection 7-8Key Required; OPERATE SYSTEM TO TESTEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser FiltersKIM-2034-DSFLR-165722KIM00105Dispenser Filter for Mogas dispenser # 4Cim-Tek Filtration400 HS-30XSection 7-9Key RequiredEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationTA-Tank Pressure/Vacuum VentsKIM-2034-TPVVT-171416KIM00106Tank Pressure / Vacuum Vent for Diesel and Mogas AST (Diesel)XSection 8-9.3Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser CabinetKIM-2034-DSCB-153310KIM00107Dispenser for Diesel dispenser # 1 and # 2Wayne3/G 7242D / 2GHJKXSection 7-7Key RequiredEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser MetersKIM-2034-DSMTR-176686KIM00108Dispenser Meter for Diesel dispenser # 1WayneDM2XSection 7-8Key Required; OPERATE SYSTEM TO TESTEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser FiltersKIM-2034-DSFLR-165724KIM00109Dispenser Filter for Diesel dispenser # 1Cim-Tek Filtration400 HS-30XSection 7-9Key RequiredEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Emergency Shutoff Valves (Shear Valves)KIM-2034-ESHVL-171051KIM00110Dispenser Shear Valve for Diesel dispenser # 1 and # 2XSection 7-12Key Required; OPERATE SYSTEM TO TESTEAL required 4 days prior-
1196418KIM-20332033-UNLOAD STAND AT FACILITY 2026Gas StationPM-Centrifugal PumpsKIM-2033-CENP-170887KIM00111Self-priming centrifugal pump for MogasPacer pump3/G 7242D / 2GHJKXXXSection 3-8.1Operate System to TestEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser MetersKIM-2034-DSMTR-171052KIM00112Dispenser Meter for Diesel dispenser # 2WayneDM2XSection 7-8Key Required; OPERATE SYSTEM TO TESTEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser FiltersKIM-2034-DSFLR-165726KIM00113Dispenser Filter for Diesel dispenser # 2Cim-Tek Filtration400 HS-30XSection 7-9Key RequiredEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationTA-Tank Pressure/Vacuum VentsKIM-2034-TPVVT-171054KIM00114Tank Pressure / Vacuum Vent for Diesel and Mogas AST (Mogas)XSection 8-9.3Notify FacilityEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser NozzlesKIM-2034-DSNZ-171417KIM00115Nozzle for Diesel - dispenser # 1OPW11APXSection 7-2Operate System to TestEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser HosesKIM-2034-DSHS-165761KIM00117Dispener Hose (short) for Diesel - dispenser # 1XSection 7-3EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser HosesKIM-2034-DSHS-165762KIM00118Dispener Hose (long) for Diesel - dispenser # 1Vapor Systems TechnologieXSection 7-3EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-BreakawaysKIM-2034-DSBW-153242KIM00119Breakaway Valve for Diesel - dispenser # 1OPW66RECXSection 7-4EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser NozzlesKIM-2034-DSNZ-171055KIM00120Nozzle for Diesel - dispenser # 2OPW11APXSection 7-2Operate System to TestEAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-SwivelsKIM-2034-DSSW-170888KIM00121Swivel for Diesel - dispenser # 2OPW241TPSXSection 7-5EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser HosesKIM-2034-DSHS-165763KIM00122Dispener Hose (short) for Diesel - dispenser # 2XSection 7-3EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-Dispenser HosesKIM-2034-DSHS-165764KIM00123Dispener Hose (long) for Diesel - dispenser # 2Vapor Systems TechnologieXSection 7-3EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-BreakawaysKIM-2034-DSBW-153243KIM00124Breakaway Valve for Diesel - dispenser # 2OPW66RECXSection 7-4EAL required 4 days prior-
1112127KIM-20262026-VEH FL STNGas StationSF-Fuel Truck Containment AreasKIM-2026-FTKRCC-204147KIM1101231Tank, dispenser, and offload containment areaXXSection 11-1.1EAL required 4 days prior-
1112127KIM-20262026-VEH FL STNGas StationCS-Containment Drain ValvesKIM-2026-CSGEN-204148KIM1101232Containment drain valve for the tank, dispenser and offload containmentXSection 8-10.1EAL required 4 days prior-
1196418KIM-20332033-UNLOAD STAND AT FACILITY 2026Gas StationEC-Static Grounding SystemsKIM-2033-STGS-204150KIM1101233Static grounding system for the offload areaXSection 9-1.6.2EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationDS-SwivelsKIM-2034-DSSW-204151KIM1101234Swivel for Diesel – dispenser # 1OPWXSection 7-5EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationEC-Card and Key LocksKIM-2034-CKLK-204153KIM1101235VIL Key Reader for diesel dispenser 1 & 2 and MOGAS dispenser 3 & 4XSection 9-3EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationEC-PanelboardsKIM-2034-PNB-204155KIM1101236Panelboard located next to the offload area in the fence in areaXSection 9-1.5EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationEC-Static Grounding SystemsKIM-2034-STGS-204157KIM1101237Static grounding system for facility 2034XSection 9-1.6.2EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationCS-Containment Drain ValvesKIM-2034-CSGEN-204159KIM1101238Containment drain valve for the emergency eyewash/shower stationXSection 8-10.1EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationCS-Dike/Berm Floors (curbed)KIM-2034-ETHDW-204161KIM1101239Containment for the emergency eyewash/shower stationXSection 8-10.2.2EAL required 4 days prior-
1196419KIM-20342034-DIESEL/MOGAS DUEL TANK, 5,000 GA EACH AT FACILITY 2026Gas StationPC-Aboveground Piping and Equipment CoatingKIM-2034-AGPCT-204163KIM1101240Piping for tank/facility 2034Section 6-10.1EAL required 4 days prior-
PWS Appx K-3KIM-20352035-TBA-CANOPY OVER OFFLOAD STAND NEAR FAC 2026Gas StationEC-Static Grounding SystemsKIM-2035-STGS-204165KIM1101241Static grounding system for the canopyXSection 9-1.6.2EAL required 4 days prior-
PWS Appx K-3KIM-20352035-TBA-CANOPY OVER OFFLOAD STAND NEAR FAC 2026Gas StationEC-Lightning Protection SystemsKIM-2035-LPTS-204172KIM1101242Lightning protection system for the canopyXSection 9-4EAL required 4 days prior-
PWS Appx K-3KIM-20352035-TBA-CANOPY OVER OFFLOAD STAND NEAR FAC 2026Gas StationEC-LightingKIM-2035-LIGHT-204168KIM1101243Tank vault lightingXXSection 9-1.8EAL required 4 days prior-
PWS Appx K-3KIM-20352035-TBA-CANOPY OVER OFFLOAD STAND NEAR FAC 2026Gas StationSF-CanopiesKIM-2035-CNPY-204174KIM1101244Canopy for tank and dispenser areaXSection 11-2.2EAL required 4 days prior-
1171656KIM-20272027-VEH PKNG REFL BEHIND FACILITY 2024Gas StationSF-Fuel Truck Containment AreasKIM-2027-FTKRCC-204204KIM1102240Fuel truck parking areaXXSection 11-1.1EAL required 4 days prior-

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .