DRAFT Solicitation CEHNC Fuels Pacific Ocean Division - Far East (POF)
Solicitation number
DRAFTW912DY26RA005
Issued by

About this file

The document is a DD Form 1423 Contract Data Requirements List (CDRL) for a DESC Petroleum Maintenance & Repair contract (W912DY-09-X-XXXX) with a TBD contractor. The CDRL outlines five specific data item requirements to be submitted by the contractor to the CEHNC-CT (Corps of Engineers) office, including: 1) FMSR Kick Off meeting documentation, 2) QCM and Alternate QCM Certificate, 3) Contract Safety Manager OSHA 30-Hour Certificate, 4) Initial Site Visit documentation. Each data item has specific submission guidelines tied to the Performance Work Statement (PWS), with requirements for frequency, distribution, and compliance with referenced specifications, all to be submitted as required with no specified cost for data item preparation.

View the file

Other files

File Type Posted
CDRL Set 7 - 25-28.pdf PDF
CDRL Set 12 - 45-48.pdf PDF
CDRL Set 11 - 41-44.pdf PDF
FMP POF KUN_20251029.xlsx XLSX spreadsheet
FMP POF HUM_20251029.xlsx XLSX spreadsheet
FMP POF KIM_20251029.xlsx XLSX spreadsheet
FMP POF K-16_20251029.xlsx XLSX spreadsheet
Attachment 1 PWS amd Appendices POF - V1.pdf PDF
CDRL Set 10 - 37-40.pdf PDF
CDRL Set 16 - 60-64.pdf PDF
CDRL Set 15 - 57-60.pdf PDF
CDRL Set 4 - 13-16..pdf PDF
CDRL Set 2 - 5-8.pdf PDF
CDRL Set 14 - 53-56.pdf PDF
FMP POF KJU_20251029.xlsx XLSX spreadsheet
FMP POF POH_20251029.xlsx XLSX spreadsheet
Attachment 0005 Instructions and Evaluation Factors DRAFT.docx DOCX document
FMP POF WAL_20251029.xlsx XLSX spreadsheet
CDRL Set 17 - 65-67.pdf PDF
CDRL Set 3 - 9-12.pdf PDF
CDRL Set 13 - 49-52.pdf PDF
Attachment 4 - PPQ Sample.pdf PDF
FMP POF OSN_20251029.xlsx XLSX spreadsheet
FMP POF SUW_20251029.xlsx XLSX spreadsheet
FMP POF KUS_20251029.xlsx XLSX spreadsheet
Attachment 2 Sample Service Order (Appendix A - Attachment 1 Service Order Form).xlsx XLSX spreadsheet
FMP POF CSY_20251029.xlsx XLSX spreadsheet
CDRL Set 6 - 21-24.pdf PDF
CDRL Set 8 - 29-32.pdf PDF
CDRL Set 1 - 1-4.pdf PDF
CDRL Set 9 - 33-36.pdf PDF
Appendix K Real Property Data.xlsx XLSX spreadsheet
Attachment 3 Technical Eval Form - V1.pdf PDF
FMP POF YCH_20251029.xlsx XLSX spreadsheet
FMP POF TAE_20251029.xlsx XLSX spreadsheet
FMP POF YSG_20251029.xlsx XLSX spreadsheet
FMP POF CRL_20251029.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423, AUG 96

CONTRACT DATA REQUIREMENTS LIST

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page ____ of ____ Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.

DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;

Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423 (BACK), AUG 96

addr1_1:
draft1_1:
reg1_1:
repro1_1:
addr1_2:
draft1_2:
reg1_2:
repro1_2:
addr1_3:
draft1_3:
reg1_3:
repro1_3:
draft2_1:
addr2_1:
addr2_2:
reg2_1:
repro2_1:
addr2_3:
draft2_3:
reg2_3:
repro2_3:
addr3_1:
addr3_2:
addr3_3:
draft3_1:
reg3_1:
repro3_1:
draft3_2:
reg3_2:
repro3_2:
draft3_3:
reg3_3:
repro3_3:
addr4_1:
draft4_1:
reg4_1:
repro4_1:
addr4_2:
draft4_2:
reg4_2:
repro4_2:
addr4_3:
draft4_3:
reg4_3:
repro4_3:
draft2_2:
repro2_2:
reg2_2:
line_item:
exhibit:
xtdp: Off
xtm: Off
othercat:
system: DESC Petroleum Maintenance & Repair
ctr_no: W912DY-09-X-XXXX
contr: TBD
data_item1: A017
title1: FMSR Kick Off meeting - All completed
sub1: N/A
auth1: DID DESCA017
ref1: PWS Paragraph 1.2.4
req_ofc1: CEHNC-CT
dd250_1: XX
appcode1:
dist1:
freq1: See BLK 16
asof1: As Required
firstsub1: See BLK 16
subsub1: As Required
group1:
totalprice1:
rmks1: Submit FMSR Kick Off meeting - All completed in accordance with PWS Paragraph 1.2.4 and Specification 01 33 00.
totaldraft1: 0
totalreq1: 0
totalrepro1: 0
data_item2: A018
title2: QCM and Alternate QCM Certificate
sub2: N/A
auth2: DID DESCA018
ref2: PWS App C, Sec 01 45 00.00 10
req_ofc2: CEHNC-CT
dd250_2: XX
appcode2:
dist2:
freq2: See BLK 16
asof2: As Required
firstsub2: See BLK 16
subsub2: As Required
rmks2: Submit QCM and Alternate QCM in accordance with PWS Appendix C, Section 01 45 00.00 10, Paragraph 3.3.3 and Specification 01 33 00.
group2:
totalprice2:
totaldraft2: 0
totalreg2: 0
totalrepro2: 0
data_item3: A019
title3: Contract Safety Manager OSHA 30-Hour Certificate
sub3: N/A
auth3: DID DESCA019
ref3: PWS App C, Sec 01 35 26
req_ofc3: CEHNC-CT
dd250_3: XX
appcode3:
dist3:
freq3: See BLK 16
asof3: As Required
firstsub3: See BLK 16
subsub3: As Required
rmks3: Submit Contract Safety Manager OSHA 30-Hour Certificate in accordance with PWS Appendix C, Section 01 35 26, Paragraph 4.3.2 and Specification 01 33 00.
group3:
totalprice3:
totaldraft3: 0
totalreg3: 0
totalrepro3: 0
data_item4: A020
title4: Initial Site Visit
sub4: N/A
auth4: DID DESCA020
ref4: PWS Paragraph 1.2.5
req_ofc4: CEHNC-CT
dd250_4: XX
appcode4:
dist4:
freq4: See BLK 16
asof4: As Required
firstsub4: See BLK 16
subsub4: As Required
rmks4: Submit Initial Site Visit in accordance with PWS 1.2.5 and Specification 01 33 00.
group4:
totalprice4:
totaldraft4: 0
totalreg4: 0
totalrepro4: 0
prep_by:
prep_date:
app_by:
app_date:
Page: 2
pages: 2
app: Adobe Professional 8.0
Reset:

File details come from the government source that posted it. Updated .