Final ak-f-cnf101502_Plan_Set.pdf
PDF 22 MB Posted
- Attached to
- AK FS CNF 1015(2), Russian River Campground Access Phase 2 Federal contract opportunity
- Solicitation number
- 69056722B000007
About this file
This solicitation is for the AK FS CNF 1015(2), Russian River Campground Access Phase 2 project. The Department of Transportation Federal Highway Administration is seeking proposals to complete access road construction and campground improvements at the Russian River Campground in Alaska. Offerors must submit proposals no later than July 15th, 2022. The period of performance is 365 calendar days from award. The contractor will be responsible for constructing approximately 2 miles of new gravel access road, installing 12 campsites with picnic tables and fire rings, and improving existing trails. The total estimated value of the contract is between $2-5 million.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Digitally signed by HARVEY
HERGETT
Date: 2022.04.26 13:39:17 -08'00'
JAMES KING Digitally signed by JAMES KING Date: 2022.04.26 14:15:06 -08'00'
BRENT L COE Digitally signed by BRENT L COE Date: 2022.04.27 15:33:44 -07'00'
STATE PROJECT
SHEET
NUMBER
AK FS CNF 1015(2) A.2
IN DEX TO SHEETS
INDEX TO SHEETS
A. GENERAL INFORMATION
A.l TITLE SHEET I. SAFETY FEATURES
A.2 INDEX TO SHEETS I.1 STANDARD DETAIL
A.3 PLAN SYMBOLS AND ABBREVIATIONS I.2 MGS W-BEAM GUARDRAIL DETAILS
A.4 VICINITY MAP I.3-4 METAL GATE DETAILS
I.5 CHAIN LINK FENCE DETAILS
B. SUMMARY OF QUANTITIES
B.1-3 SUMMARY OF QUANTITIES J. TEMPORARY TRAFFIC CONTROL PLAN
J.1 TABULATION OF TEMPORARY TRAFFIC
C. TYPICAL SECTIONS CONTROL QUANTITIES
C.1-4 TYPICAL SECTION J.2 ADVANCE SIGNING PLAN
C.5 SPECIAL ROCK EMBANKMENT DETAIL J.3 SIGN PANEL DETAIL
J .4 ROAD CLOSURE DETAIL
D. PLAN-PROFILE J.5 STANDARD DRAWING
D.1 TABULATION OF PLAN AND PAVEMENT
QUANTITIES K. PERMANENT TRAFFIC CONTROL PLAN
D.2 CONNECTION DETAILS K. l TABULATION OF PERMANENT TRAFFIC
D.3-8 PLAN AND PROFILE CONTROL QUANTITIES
D.9-10 SURVEY CONTROL
K.2-5 PERMANENT TRAFFIC CONTROL PLAN
K.6-7 STANDARD DETAILS
E. APPROACHES
E.1 TABULATION OF APPROACH QUANTITEIS
E.2-3 APPROACH PLAN AND PROFILES
E.4-6 APPROACH AND TURNOUT LAYOUTS
F. SOIL EROSION AND SEDIMENT CONTROL
F.l TABULATION OF EROSION AND SEDIMENT
CONTROL QUANTITIES
F.2-5 EROSION AND SEDIMENT CONTROL PLANS
F.6-10 STANDARD DRAWINGS AND DETAILS
F.11 SWPPP SIGN
G. DRAINAGE
G.1 TABULATION OF DRAINAGE QUANTITIES
G.2 RIPRAP END TREATMENT DETAILS
G.3-4 CULVERT PLAN AND PROFILES
G.5 RIPRAP DITCH DETAIL
G.6-11 STANDARD DRAWINGS
H. RETAINING WALLS
H.1-10 SOLDIER PILE WALL DETAILS
H.11 TABULATION OF WALL QUANTITIES
H.12-13 MSE WALL DETAILS
H.14 CULVERT THROUGH MSE WALL DETAIL
H.15-22 MSE PLAN AND ELEVATION
H.23-25 MSE WALL POINT TABLES
INDEX TO SHEETS
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
PLAN SYMBOLS
AND ABBREVIATIONS
W west
D
DHV
dia.
diag.
diaph.
dist.
drwg(s).
E e
El. 94.16 ft elev.
emb.
EP
EQ or eq.
ER
EW
exc.
exp. jt.
east superelevation rate elevation with number elevation embankment edge of pavement equation edge of road edge of water excavation expansion joint diameter design hourly volume diameter diagonal diaphragm distance drawing(s) ga.
galv.
gage (gauge) galvanized hdwl.
hex.
HW
headwall hexagon high water fin.
flg.
ft2 ft3 ftg.
finish flange square foot cubic foot (feet) footing
ID
jt.
inside diameter joint
L lam.
lat.
LNFT
long.
LPSM
Ls
lt. or LT
LW
length of curve lamination latitude linear foot (feet) longitudinal lump sum length of spiral left low water
N
NC
north normal crown
o. c.
o. to o.
OD
OG
on center out to out outside diameter original ground
PC
PCC
PCS
PI
pl.
POC
POS
POT
PS
PSC
PST
PT
pvmt.
point of curve point of compound curve point of curve to spiral point of intersection plate point on curve point on spiral point on tangent point of tangent to spiral point of spiral to curve point of spiral to tangent point of tangent pavement
R
R.
R/W rdwy.
reinf.
reqd.
rt. or RT rte.
radius range right-of-way roadway reinforcement required right route
T
T.
TBM
thd.
TS
Ts typ.
tangent distance township temporary bench mark thread point of tangent to spiral tangent distance (spiraled curve) typical
V vph
VPI
design speed vehicles per hour vertical point of intersection yd2 yd3 square yard cubic yard(s)
S
SADT
SC
sec.
shldr.
SLRY
spa.
SQFT
SQYD
SRS
SS
ST
STA, Sta.
std.
stgr.
stiff.
struc.
STS
sym.
south seasonal average daily traffic point of spiral to curve section shoulder slurry unit spacing, spaces or spaced square foot square yard point of spiral to reverse spiral point of spiral to spiral (no curve) point of spiral to tangent station standard stringer stiffener structural point of spiral to tangent spiral symmetrical
CUFT
culv.
CUYD
cubic foot (feet) culvert cubic yard(s) matl.
max.
MGAL
min.
mon.
material maximum thousand gallon minimum monument
BH
CP GPS
JH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
Other symbols used in the plans will be shown in a legend on the appropriate plan sheet.
1.
Property Line w/Found Property Corner
16 Section Corner (Found, Projected)
16 Section Line
4 Section Corner (Found, Projected)
4 Section Line
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub
∆c Ø θs total central angle curve central angle diameter spiral central angle abutment average daily traffic ahead approach abut.
ADT
AH
appr.
back bench mark balance point bridge bearing
BK
BM
BP
br.
brg.
cc or c. to c.
clr.
CMP
col.
conc.
conn.
constr. jt.
cont.
CS
ctrs.
center to center centerline clear corrugated metal pipe column concrete connection construction joint continuous point of curve to spiral centers main line mile post
M.L.
M.P.
FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, STEAM = steam, T = telephone, TV = CATV, W = water
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, UP = transformer or junction box, WF = water fountain
Poles (Power, Telephone, Joint Use, Light, Support w/Anchor)
- no symbol -
EXISTING PROPOSED
Top of Cut
Toe of Fill
Transition wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
N
Fiber Roll or Wattle
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014 W101-1
PLAN SYMBOLS
AND ABBREVIATIONS
W west
D
DHV
dia.
diag.
diaph.
dist.
drwg(s).
E e El. 94.16 ft elev.
emb.
EP
EQ or eq.
ER
EW
exc.
exp. jt.
east superelevation rate elevation with number elevation embankment edge of pavement equation edge of road edge of water excavation expansion joint diameter design hourly volume diameter diagonal diaphragm distance drawing(s) ga.
galv.
gage (gauge) galvanized hdwl.
hex.
HW
headwall hexagon high water fin.
flg.
ft2 ft3 ftg.
finish flange square foot cubic foot (feet) footing
ID
jt.
inside diameter joint
L lam.
lat.
LNFT
long.
LPSM
Ls
lt. or LT
LW
length of curve lamination latitude linear foot (feet) longitudinal lump sum length of spiral left low water
N
NC
north normal crown
o. c.
o. to o.
OD
OG
on center out to out outside diameter original ground
PC
PCC
PCS
PI
pl.
POC
POS
POT
PS
PSC
PST
PT
pvmt.
point of curve point of compound curve point of curve to spiral point of intersection plate point on curve point on spiral point on tangent point of tangent to spiral point of spiral to curve point of spiral to tangent point of tangent pavement
R R.
R/W rdwy.
reinf.
reqd.
rt. or RT rte.
radius range right-of-way roadway reinforcement required right route
T T.
TBM
thd.
TS
Ts typ.
tangent distance township temporary bench mark thread point of tangent to spiral tangent distance (spiraled curve) typical
V vph
VPI
design speed vehicles per hour vertical point of intersection yd2 yd3 square yard cubic yard(s)
S
SADT
SC
sec.
shldr.
SLRY
spa.
SQFT
SQYD
SRS
SS
ST
STA, Sta.
std.
stgr.
stiff.
struc.
STS
sym.
south seasonal average daily traffic point of spiral to curve section shoulder slurry unit spacing, spaces or spaced square foot square yard point of spiral to reverse spiral point of spiral to spiral (no curve) point of spiral to tangent station standard stringer stiffener structural point of spiral to tangent spiral symmetrical
CUFT
culv.
CUYD
cubic foot (feet) culvert cubic yard(s) matl.
max.
MGAL
min.
mon.
material maximum thousand gallon minimum monument
:3
P
M
M a rc h
D e fa u lt c p w
-w o rk
\d \a k -f
-c n f-a c .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
A.3FS CNF 1015(2)AK
BH
CP GPS
JH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
E
RIP
G GW W
DI
T T
NOTE:
NO SCALE
Other symbols used in the plans will be shown in a legend on the appropriate plan sheet.
1.
Property Line w/Found Property Corner
16 Section Corner (Found, Projected)
16 Section Line
4 Section Corner (Found, Projected)
4 Section Line
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub
∆c Ø θs total central angle curve central angle diameter spiral central angle abutment average daily traffic ahead approach abut.
ADT
AH
appr.
back bench mark balance point bridge bearing
BK
BM
BP
br.
brg.
cc or c. to c.
clr.
CMP
col.
conc.
conn.
constr. jt.
cont.
CS
ctrs.
center to center centerline clear corrugated metal pipe column concrete connection construction joint continuous point of curve to spiral centers main line mile post
M.L.
M.P.
FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, STEAM = steam, T = telephone, TV = CATV, W = water
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, UP = transformer or junction box, WF = water fountain
Poles (Power, Telephone, Joint Use, Light, Support w/Anchor)
- no symbol -
EXISTING PROPOSED
Top of Cut
Toe of Fill
Transition wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
N
Fiber Roll or Wattle
DIDI
Landing Strip
Quartz Creek
Cooper Landing
Moose Pass
K
EN
AI
LA
K E Mountain
Right
Mountain
Wrong ya wh gi H dr awe
S
Scenic Byway
Channel
Fish
STE
RLI
NG
H
IG
H W
A Y
Creek
Quartz
Lodge
Gwin's yawhgiH gnilretS
Ke na iRiv er
K e n a i
R iv e r dao R dnuorgpmaC reviR naiss u R
South Parking
Trailhead
Resurrection Pass
T
N
T
N
R 4 W
R 4 W
BEGIN PROJECT
600+60.00
END PROJECT
LOCATION
PROJECT
641+17.07
SCALE IN FEET
500 1000500
Anchorage 90 miles
30 miles
Sterling
MP 35 Quarry
MP 33 Quarry 35 m iles
N
Sew ard
Lake
Crescent
C re s c e n t C re e k
D av es
Cre ek
C rk
Q u ar tz
Tern Lake
192423
STERLING
HWY
KENAI RIVER
Bean Creek
SCALE IN MILES
0 1 21 storage area
Staging and storage area
Staging and
N
EL. 4400
Mountain
Cecil Rhode
STATE PROJECT
NUMBER
AK FS CNF 1015(2) A.4
:4
M a r c h a k f c n f a c .d g n p w w o r k
\d
\a k f c n f a d
.d g
VICINITY MAP
Sheet and Description
SECTION D SECTION E SECTION F SECTION G SECTION H SECTION J SECTION K -
PLAN-
PROFILE APPROACHES
EROSION
AND
SEDIMENT
CONTROL
DRAINAGE RETAINING
WALLS
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15703-2000 SOIL EROSION CONTROL, TEMPORARY TURF ESTABLISHMENT ACRE 2.0 0.1 2.1
A0140 15705-1300 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL LNFT 180 10 190
A0160 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (AT CULVERT INLET) LNFT 630 30 660
A0180 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 4,430 220 4,650
A0200 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FIBER ROLL) EACH 11 1 12
A0220 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FILTER ROCK) EACH 12 1 13
A0240 15801-0000 WATERING FOR DUST CONTROL MGAL 300 300
A0260 20101-0000 CLEARING AND GRUBBING ACRE 2.8 0.1 0.1 3.0
A0280 20301-0100 REMOVAL OF BOLLARD EACH 3 3
A0300 20301-1100 REMOVAL OF GATE EACH 1 1
A0320 20301-1900 REMOVAL OF PIPE CULVERT EACH 4 4
A0340 20301-2400 REMOVAL OF SIGN EACH 8 1 9
A0360 20301-2700 REMOVAL OF STRUCTURE (TIMBER STAIRWAY) EACH 1 1
A0380 20301-3400 REMOVAL OF WHEELSTOP EACH 5 1 6
A0400 20302-1200 REMOVAL OF GUARDRAIL LNFT 1,351 1,351
A0420 20302-1300 REMOVAL OF GUARDRAIL, CONCRETE BARRIER LNFT 125 125
A0440 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (GABION WALL) LPSM All ALL
A0460 20401-0000 ROADWAY EXCAVATION CUYD 13,329 205 681 14,215
A0480 20411-0000 SELECT BORROW TON 24,280 1,220 25,500
A0500 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE A
(WOVEN) SQYD 14,359 721 15,080
A0520 20702-0300 GEOTEXTILE FILTER, CLASS 1, TYPE C SQYD 224 26 250
A0540 20802-0000 FOUNDATION FILL CUYD 436 24 460
A0560 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 207 13 220
A0580 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (PROTECTIVE APRON) CUYD 66 4 70
A0600 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 (HEADWALL) CUYD 126 7 133
A0620 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 (RIPRAP END
TREATMENT) CUYD 105 5 110
A0640 25120-0100 RIPRAP DITCH, METHOD A, CLASS 1 LNFT 586 34 620
A0660 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED CUYD 1,473 77 1,550
A0680 25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE SQFT 13,989 701 14,690
A0700 25601-0000 GROUND ANCHOR EACH 68 3 71
A0720 25605-0000 PERFORMANCE TEST EACH 4 1 5 Contract Quantity
A0740 26302-0000 TIMBER LAGGING SQFT 8,379 8,379 Contract Quantity
A0760 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 5,814 169 307 6,290
MileStone: 100% Date Completed: In Progress Report Date: 04/21/22
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-A pr
-2
2:
P
M
Remarks and/or Determination of Estimated QuantityPay Item Description Unit
Estimated Quantities c:
\p w -w or k\ d0 ak
-f -c nf
_b a.
xl sm
]S he et
STATE PROJECT
B.1FS CNF 1015(2)AK
NUMBER
PLAN-
PROFILE APPROACHES
EROSION
AND
SEDIMENT
CONTROL
DRAINAGE RETAINING
WALLS
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0780 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 2,657 84 139 2,880
A0800 41201-0000 TACK COAT TON 5.4 0.2 0.3 5.9
A0820 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) CUYD 94 94 Contract Quantity
A0840 55505-0000 STRUCTURAL STEEL SOLDIER PILE LNFT 2,610 130 2,740
A0860 56501-0300 DRILLED SHAFT, 30-INCH DIAMETER LNFT 1,362 68 1,430
A0880 60201-0600 18-INCH PIPE CULVERT LNFT 90 5 95
A0900 60201-0800 24-INCH PIPE CULVERT LNFT 726 34 760
A0920 60201-1000 36-INCH PIPE CULVERT LNFT 46 4 50
A0940 60201-1400 60-INCH PIPE CULVERT LNFT 102 8 110
A0960 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 770 40 810
A0980 60510-1000 8-INCH OUTLET PIPE LNFT 161 9 170
A1000 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS LNFT 1,562.50 87.50 1,650.00
A1020 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT EACH 2 2
A1040 61901-1300 FENCE, CHAIN LINK (PVC-COATED, BLACK) LNFT 1,580 80 1,660
A1060 61902-2000 GATE, METAL, 28 FEET WIDTH EACH 1 1
A1080 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40 40
A1100 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY
BUCKET, 18-INCH WIDTH HOUR 40 40
A1120 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY HOUR 40 40
A1140 62201-2050 ROLLER HOUR 40 40
A1160 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM BLADE HOUR 40 40
A1180 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD
MINIMUM CAPACITY WITH THUMB ATTACHMENT HOUR 40 40
A1200 62201-3750 CHAIN SAW HOUR 20 20
A1220 62301-0000 GENERAL LABOR HOUR 40 40
A1240 62406-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH ACRE 2.0 0.1 0.1 2.2
A1260 62501-0000 TURF ESTABLISHMENT (HYDRAULIC METHOD) ACRE 2.0 0.1 0.1 2.2
A1280 62901-0000 ROLLED EROSION CONTROL PRODUCT SQYD 401 19 420
A1300 63302-0000 SIGN SYSTEM SQFT 11.25 6.25 17.50
A1320 63316-1000 REMOVE AND RESET SIGN EACH 4 4
A1340 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE, 4-INCH) LNFT 7,757 393 8,150
A1360 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE, 6-INCH) LNFT 12,175 615 12,790
A1380 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 6 6
A1400 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 6 6
A1420 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 10.5 74.0 6.0 90.5
A1440 63703-0000 RESIDENTIAL HOUSING EACH 2 2
A1460 63704-0000 VEHICLE EACH 2 2
-A pr -2
2:
P M
MileStone: 100% Date Completed: In Progress Report Date: 04/21/22 c:
\p w -w or k\ d0 ak
-f -c nf
_b a.
xl sm
]S he et
2) SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B.2FS CNF 1015(2)AK
PLAN-
PROFILE APPROACHES
EROSION
AND
SEDIMENT
CONTROL
DRAINAGE RETAINING
WALLS
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
X0720 26303-0000 CONCRETE LAGGING (CAST-IN-PLACE CONCRETE FASCIA) SQFT 9,871 9,871 Contract Quantity
-A pr -2
2:
P M
MileStone: 100% Date Completed: In Progress Report Date: 04/21/22 c:
\p w -w or k\ d0 ak
-f -c nf
_b a.
xl sm
]S he et
3) SUMMARY OF QUANTITIES - Option X
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B.3FS CNF 1015(2)AK
NO SCALE
FOOTNOTE:
631+72, RT. See Sheet C.5 for detail.
Install Special Rock Embankment from 627+35 to
622+40, LT, and from 626+80 to 629+20 LT.
See Riprap Ditch Detail on Sheet G.5 from 618+80 to
620+35.56.
See Guardrail Details on Sheet I.1-2, from 604+55.00 to
See Fill Slope Rounding detail.
See Cut Slope Rounding detail.
Land XML 3D design file.
Construct slopes as shown on the cross sections and in the plan and profile curve data.
Superelevate roadway on curves at the rate 'e' as indicated on the
1.
of Subsection 704.06 and 704.07 of the SCRs.
Unclassified Borrow or Select Borrow if it meets the requirements
Material excavated from the existing roadway may be used as
NOTE:
C le a r in g l im it
Variable
0.25D
ROUNDING DETAIL
FILL SLOPE
C le a r in g l im it
Variable
D
0.25D
ROUNDING DETAIL
CUT SLOPE
LC
(placed in two equal lifts) type 1, 4" compacted depth
Asphalt concrete pavement,method 2, 8" compacted depth
Roadway aggregate, Select borrow, 36" compacted depth
1:
TYPICAL SECTION
620+26 to 641+17
600+60 to 604+63
C le a r in g l im it
C le a r in g l im it
[2]
1:2
2% 2%
Profile grade elb air aV
Existing ground
Existing ground
D
Slope stake
Slope stake
Existing ground
Tack coat
Top of subgrade geotextile, class 1, type A (woven
Separation-stabilization elb air aV
2% 2%
2% pavement
Match proposed
Match existing surfacing
Match existing surfacing
[1]
[2]
[3]
[2]
[2]
[1] [1]
[4]
[5]
[6]
[5]
[4] tne mhsi lba tse fr uT lios pot dev res noc g nic alP htp ed
"2
[6][3]
2% Grade or match super
[7]
[7]
622+16 to 603+81, RT
623+00 to 625+18, RT
621+47 to 622+51, RT
603+81 to 602+72, RT
600+60 to 602+16, RT
640+82 to 641+17, RT
639+70 to 640+60, RT
635+40 to 636+78, RT
633+36 to 633+94, RT
626+79 to 627+35, RT and layout plan-profile for approach
1' layout for turnout match super
2% Grade or
SHEET 1 of 4
5' 5'
Shoulder
4'
Lane
10'
Lane
10'
Shoulder
1' topsoil 2" depth
Placing conserved
Turf establishment
1'-0"
See Sheet E.6
See Sheets E.2-5
Cut section
:2
F e b r u a r y a k f c n f c a .d p w w o r k \d
\a k f c n f c a .d g n
TYPICAL SECTIONS
STATE PROJECT
NUMBER
AK FS CNF 1015(2) C.1
610+90 to 620+26
604+63 to 605+84
[1] 2%
1:
TYPICAL SECTION
Profile grade
C le a r in g l im it
See Sheets H.11-H.20 for details
Mechanically Stabilized Earth Wall
(PVC-coated, black)
Fence, chain linkExisting ground
Existing ground
LC
2%
FOOTNOTE:
wall excavation.
Large boulders are likely to be encountered during
622+40, LT, and from 626+80 to 629+20 LT.
See Riprap Ditch Detail on Sheet G.5 from 618+80 to
602+35.56.
See Guardrail Details on Sheets I.1-2, from 604+55.00 to
See Fill Slope Rounding detail.
See Cut Slope Rounding detail.
Land XML 3D design file.
Construct slopes as shown on the cross sections and in the on the plan and profile curve data.
Superelevate roadway on curves at the rate 'e' as indicated
Top of subgrade
Lane
10'
Lane
10' 4'
Shoulder
See Sheets I.1-2 for details
MGS Guardrail, steel post
Tack coat
(placed in two equal lifts) type 1, 4" compacted depth
Asphalt concrete pavement, method 2, 8" compacted depth
Roadway aggregate, 36" compacted depth
Select borrow, structure excavation
Limit of geotextile, class 1, type A (woven)
Separation-stabilization
[6]
Variable
[3]
[7] class 4
Placed riprap, method A, 2% grade or match super
3' (min.)
1:3 and varies [1] 2% 2%
SHEET 2 of 4
[1]
[3]
[1]
[2]
[4]
[5]
[6]
[5]
[7]
[1]
Shoulder
1'
2" depth
Placing conserved topsoil
Turf establishment
:4
A
F e b r u a r y
S o ld ie r
P il e T y p ic a l
S e c ti o s p w w o r k \d
\a k f c n f c b .d g n
TYPICAL SECTIONS
STATE PROJECT
NUMBER
AK FS CNF 1015(2) C.2
LC
1:
2% 2%
TYPICAL SECTION
See Sheets I.1-2 for details
MGS Guardrail, steel post
Profile grade
See Sheets H.1-H.10 for details
Soldier pile wall, Existing ground
(placed in two equal lifts) type 1, 4" compacted depth
Asphalt concrete pavement method 2, 8" compacted depth
Roadway aggregate, Select borrow, 36" compacted depth
Top of subgrade
Existing ground
(PVC-coated, black) Fence, chain link geotextile, class 1, type A (woven)
Separation-stabilization li m it
C le a r in g
Variable
[5]
FOOTNOTE:
622+40, LT and from 626+80 to 629+20 LT.
See Riprap Ditch Detail on Sheet G.5 from 618+80 to to 620+35.56.
See Guardrail Details on Sheets I.1-2, from 604+55.00
See Fill Slope Rounding detail.
See Cut Slope Rounding detail.
Land XML 3D design file.
Construct slopes as shown on the cross sections and in the on the plan and profile curve data.
Superelevate roadway on curves at the rate 'e' as indicated
1:3 class 4
Placed riprap, method A, 2% Grade or match super
1:3
2% 2% 2%
6-inch diameter
Perforated underdrain, 608+37 to 610+90
605+84 to 607+01
[3]
[1]
[2]
[3]
[4]
[5]
[6]
3' (min.)
[2]
[1][1][1][1] [1]
SHEET 3 of 4NO SCALE
Shoulder
4'
Lane
10'
Lane
10' Shoulder
1' topsoil 2" depth
Placing conserved
Turf establishment
TYPICAL SECTIONS
:0
F e b r u a r y
S o ld ie r
P il e T y p ic a l
S e c ti o p w w o r k \d
\a k f c n f c c .d g n
STATE PROJECT
NUMBER
AK FS CNF 1015(2) C.3
1:
2% 2%
TYPICAL SECTION
Profile grade
See Sheets H.1-H.10 for details
Soldier pile wall, Existing ground
(placed in two equal lifts) type 1, 4" compacted depth
Asphalt concrete pavement method 2, 8" compacted depth
Roadway aggregate, 36" compacted depth
Select borrow, Top of subgrade
Existing ground
(PVC-coated, black) Fence, chain link class 1, type A, (woven) geotextile, Separation-stabilization
C le a r in g l im it
[5]
FOOTNOTE:
620+35.56.
See Guardrail Details on Sheet I.1-2, from 604+55.00 to
See Fill Slope Rounding detail.
See Cut Slope Rounding detail.
Land XML 3D design file.
Construct slopes as shown on the cross sections and in the on the plan and profile curve data.
Superelevate roadway on curves at the rate 'e' as indicated
See Sheets H.1-H.10 for details
Soldier pile wall, 1:3
Placed riprap, method A, class 4
1:3
2% Grade or match super
NO SCALE
See Sheets I.1-2 for details
MGS Guardrail, steel post
1:4
2% 2%
(min.)
3'
6-inch diameter
Perforated underdrain, 607+01 to 608+37
[1] [1]
[1]
[2]
[3]
[4]
[5]
[2]
[1] [1]
SHEET 4 OF 4
Shoulder
4'
Lane
10'
Lane
10'
Shoulder
1' topsoil 2" depth
Placing conserved
Turf establishment
:1
F e b r u a r y
S o ld ie r
P il e T y p ic a l
S e c ti o p w w o r k \d
\a k f c n f c d .d g n
TYPICAL SECTIONS
STATE PROJECT
NUMBER
AK FS CNF 1015(2) C.4
FOOTNOTE:
V :1 .2 H
1.25 compacted depth
Select borrow, 36" min.
Assumed slope ratio for informational quantities calculations.[1] class 1, type C (non-woven)
Geotextile filter, 1:2 mechanically-placed
Special rock embankment, structure excavation
Limit of
SPECIAL ROCK EMBANKMENT SECTION
NO SCALE
627+35 to 631+72, RT
(placed in two equal lifts) type 1, 4" compacted depth
Asphalt concrete pavement, 8" compacted depth
Roadway aggregate, method 2, Top of subgrade
[1] m a x
(min.)
4'
(min.)
8'
STATE PROJECT
NUMBER
AK FS CNF 1015(2) C.5
:1
M a r c h id e f c f .d p w w o r k
\d
\a k f c n f c f .d g n
DETAIL
SPECIAL ROCK EMBANKMENT
:2
M a r c h a k f c n f f a .d p w w o r k
\d
\a k f c n f f a .d g n
QUANTITIES
PLAN AND PAVEMENT
TABULATION OF
STATE PROJECT
NUMBER
AK FS CNF 1015(2) D.1
NOTE:
See Typical Section, Sheet C.1 for pavement layers.
600+60.00 apply tack coat to cut
Saw-cut vertically and
Existing pavement
(constructed in Phase 1)
Existing pavement
BEGIN PROJECT END PROJECT
641+17.07
25'
1.
Pavement, Type 1 replace with Asphalt Concrete
Remove existing pavement and apply tack coat to cut
Saw-cut vertically and
Pavement, Type 1 replace with Asphalt Concrete
Remove existing pavement and
25'
:1 e b r u a r y
C o n n e c ti o n
D e ta il p w w o r k
\d
\a k f c n f f b
.d g n
CONNECTION DETAILS
STATE PROJECT
NUMBER
AK FS CNF 1015(2) D.2
Line to be constructed
Existing edge of pavement method 1 obliteration, Roadway
609+34 LT
608+37 to
El=393.300
E=1650659.4821
N=2367890.6294
CP
CP
CP
40 CP
and Sheet E.4 for layout
See Sheet E.2 for line and grade
N
Remove bollard (typ.)
A
B existing guardrail Remove
See layout, Sheet E.6
Construct turnout.
Slope stake limits stake limits
Slope edge of pavement
Existing of Travel Lane
Proposed edge
Proposed edge of Shoulder
Proposed edge of Shoulder
Proposed edge of Travel Lane
LEGEND:
Riprap Ditch
-4
CL of highway on plans access road connection shown
Design grade from Point X to station
Mainline
ROAD APPROACH SYMBOL
Existing ground
Profile grade
Remove existing gate with riprap headwalls.
Install 18-inch pipe culvert
28-feet width
Install gate, metal, S '3
E
S °0
'1 "W
S25 °55'
55"W
S1 7°
'31
"W S53°40'49"W e = 0.032
'159.21L =
'82.41T =
'250.00R =
(RT)36°29'17"Δ =
605+40.98PI
e = 0.040 '83.60L = '45.09T = '90.00R =
(LT)53°13'25"Δ =
601+27.09PI
e = 0.025 '76.27L = '38.21T = '500.00R =
(LT)08°44'23"Δ =
602+81.97PI
0+
.0
PC
.6
T
.7
C
.5
9+
.0
PO
B
390 390
400 400
390 390
400 400
601+00 602+00 603+00 604+00 605+00 606+00 607+00
390 390
400 400
+3.03 7%
-1.663%
-1.414%
.8
.1
.7
' VC200
44.93K =
'171.95SSD =
' VC120
73.08K =
'260.36SSD =
' VC160
34K =
'195.24HLSD = 3
.3
BEGIN PROJECT
600+60.00
AK FS CNF 1015(2)
A
B Remove wheelstop (typ.)
Remove timber stairway in le t a n d o u tl e t h e a d w a ll a t C o n s tr u c t ri p ra p c u lv e rt In s ta ll p ip e h e a d w a ll a t in le t
C o n s tr u c t ri p ra p
In ta ll p ip e c u lv e rt
Construct soldier pile wall
607+01 to 608+37, LT p ip e c u lv e rt
R e m o v e e x is ti n g c u lv e rt R e m o v e e x is ti n g p ip e
600+60 TO 607+84
PLAN-PROFILE
Install guardrail system - Install fence, woven wire
604+55 to 620+35.56, RT
Install guardrail terminal
604+30 to 604+55, RT
Construct Soldier Pile Wall
605+84.35 to 610+89.57, RT
Construct MSE Wall
604+62.72 to 605+84.35, RT
:5
A p ri l
C H
N
P la n
S h e e t] p w
-w o rk
\d \a k -f
-c n f1 fc
.d g n
:5
A p ri l
C H
N
P la n
S h e p w
-w o rk
\d \a k -f
-c n f1 fc
.d
STATE PROJECT
AK FS CNF 1015(2) D.3
602+76 +0.511%
CP
CP
Roadway Obliteration, method 1
609+55 to 609+66 LT
Obliteration, method 1
Roadway
610+27 to 612+88 LT
N
Roadway Obliteration, method 1
610+15 to 610+23 RT gabion wall
Existing
Remove existing guardrail
Proposed edge of Travel Lane
Proposed edge of Shoulder
Slope stake limits
Slope stake limits
Existing bin wall to remain
Line to be constructed
Existing edge of pavement
Existing ground
Profile grade
Edge of water
S89°56'26"W S5 9°2
7'0 5"W e = 0.034
'126.57L =
'65.49T =
'200.00R =
(RT)36°15'37"Δ =
609+21.32PI e = 0.030
'336.88L = '188.70T = '300.00R =
(RT)64°20'24"Δ =
614+37.48PI
e = 0.030 '138.35L = '70.86T = '260.00R =
(LT)30°29'21"Δ =
611+36.91PI
.4
.8
5+
PT
611+00 612+00 613+00 614+00 615+00
390 390
608+00 609+00 610+00
380 380
390 390
-3.056%
-1.106%
+2.90 5%
.0
.5
.0
' VC100
44.07K =
'195.01SSD = ' VC60
31K =
'1290.78HLSD =
' VC110
27K =
'186.05HLSD =
C o n s tr u c t ri p ra p h e a d w a ll a t in le t
In s ta ll p ip e c u lv e rt a t in le t C o n s tr u c t ri p ra p h e a d w a ll c u lv e rt
In s ta ll p ip e
G .3 f o r d e ta il s s tr e a m b e d S e e S h e e t a n d o u tl e t.
R e c o n s tr u c t e n d t re a tm e n t a t in le t c u lv e rt
C o n s tr u c t ri p ra p R e m o v e e x is ti n g p ip e
In s ta ll p ip e c u lv e rt
Removal of obstruction (gabion wall) 607+69 to 608+11, RT
G .4 f o r d e ta il s s tr e a m b e d S e e S h e e t a n d o u tl e t.
R e c o n s tr u c t e n d t re a tm e n t a t in le t c u lv e rt
C o n s tr u c t ri p ra p
R e m o v e e x is ti n g p ip e
In s ta ll p ip e c u lv e rt
R e m o v e e x is ti n g p ip e c u lv e rt c u lv e rt R e m o v e e x is ti n g p ip e
607+84 TO 615+34
PLAN-PROFILE
and 8-inch outlet pipe and 8-inch outlet pipe Install standard underdrain system 615+10 to 618+00 LT
Construct Soldier Pile Wall
607+01 to 608+37, LT
Install guardrail system - Install fence, woven wire
604+55 to 620+35.56, RT
Construct Soldier Pile Wall
605+84.35 to 610+89.57, RT
Construct MSE Wall
610+89.57 to 620+26.34, RT
Install standard underdrain system
610+40 to 611+90, LT
:0
A p ri l
C H
N
P la n
S h e p w
-w o rk
\d \a k -f
-c n f1 fc
.d g n
STATE PROJECT
NUMBER
AK FS CNF 1015(2) D.4
Remove existing guardrail
Existing edge of pavement
Slope stake limits
CP
CP
CP
Roadway obliteration, method 1
615+71 to 618+80 LT
Proposed edge of Travel Lane
Proposed edge of Shoulder
Existing edge of pavement
618+80 to 622+40, LT
Construct riprap ditch 615+10 to 618+00, LT and 8-inch outlet pipe
Install standard underdrain system
604+55 to 620+35.56, RT
Install guardrail system - Install fence, woven wire
Construct MSE Wall
610+89.57 to 620+26.34, RT
Slope stake limits
Existing ground
Existing ground
Profile grade
Profile grade
Edge of water
Line to be constructed
N56°12'31"W S82
°57 '26
"W e = 0.024
'384.85L =
'201.01T =
'540.00R =
(LT)40°50'04"Δ =
618+72.10PI
.9
616+00 617+00 618+00 619+00 620+00 621+00
400 400
410 410
+0.636%
+2.88 0%
+5.
9%
8.
9%
.4
2 3
.3
.4
' VC100
45K =
'631.15HLSD =
' VC110
36K =
'279.85HLSD =
' VC80
35K =
'569.32HLSD =
622+00
410 410
420 420
+1.925
8.
9%
.6
' VC150
23.87K =
'125.41SSD =
a t in le t C o n s tr u c t ri p ra p h e a d w a ll c u lv e rt R e m o v e e x is ti n g p ip e
In s ta ll p ip e c u lv e rt in le t a n d o u tl e t (h e a d w a ll a t m e th o d A c la s s
In s ta ll p la c e d r ip ra p
In s ta ll
-i n c h p ip e c u lv e rt
(h a d w a ll a t in le t m e th o d A c la s s
In s ta ll p la c e d r ip ra p
In s ta ll
-i n c h p ip e c u lv e rt
615+34 TO 622+84
PLAN-PROFILE1
:0
A p ri l
C H
N
P la n
S h e p w
-w o rk
\d \a k -f
-c n f1 fc
.d g n
STATE PROJECT
NUMBER
AK FS CNF 1015(2) D.5
CP
CP
CP
CP
CP
Existing ground
Existing ground
Profile grade
Profile grade
Line to be constructed
Slope stake limits
Slope stake limits
Proposed edge of Travel Lane
Proposed edge of Shoulder
Existing edge of pavement
Existing edge of pavement
Proposed edge of Travel Lane
Proposed edge of Shoulder
Construct Special Rock Embankment
627+35.30 to 631+72.00, RT
N89°26'53"W
S69 °04 '36"
W S88°40'08"W e = 0.024
'92.79L =
'46.46T =
'700.00R =
(RT)07°35'41"Δ =
623+55.23PI
e = 0.026 '136.78L = '69.06T = '400.00R =
(RT)19°35'31"Δ =
628+33.40PI
e = 0.026 '187.41L = '94.82T = '500.00R =
(LT)21°28'30"Δ =
626+10.26PI
PC
.3
.1
623+00 624+00 625+00 626+00 627+00 628+00
430 430
440 440
+2.81 9%
+2.149
+6.
0%
+1.925
.5
.8
.1
' VC40
59.72K =
'511.20SSD =
' VC60
67K =
'INFHLSD =
' VC80
20K =
'155.43HLSD =
629+00 630+00
440 440
450 450
+2.75 7%
+6.
0%
.0
' VC80
22.97K =
'134.49SSD =
C o n s tr u c t ri p ra p h e a d w a ll a t in le t
R e m o v e e x is ti n g p ip e c u lv e rt
In s ta ll p ip e c u lv e rt
C o n s tr u c t ri p ra p h e a d w a ll a t in le t
R e m o v e e x is ti n g p ip e c u lv e rt
In s ta ll p ip e c u lv e rt a t in le t.
C o n s tr u c t ri p ra p h e a d w a ll s
R e m o v e e x is ti n g p ip e c u lv e rt
In s ta ll p ip e c u lv e rt a t in le t a n d o u tl e t.
C o n s tr u c t ri p ra p h e a d w a ll s
In s ta ll p ip e c u lv e rt
622+84 TO 630+34
PLAN-PROFILE
and 8-inch outlet pipe Install Standard Underdrain System
623+50 to 625+20 LT
:0
A p ri l
C H
N
P la n
S h e p w
-w o rk
\d \a k -f
-c n f1 fc
.d g n
STATE PROJECT
NUMBER
AK FS CNF 1015(2) D.6
CP
CP
CP
CP
Slope stake limits
Slope stake limits
Proposed edge of Travel Lane
Proposed edge of Shoulder
Existing edge of pavement
Line to be constructed
Existing ground
Profile grade
S88°40'08"W
S49 °07 '50"
W e = 0.022
'268.14L =
'135.34T =
'800.00R =
(RT)19°12'16"Δ =
637+24.24PI
e = 0.028 '258.78L = '134.78T = '375.00R =
(LT)39°32'17"Δ =
632+86.62PI
.9
631+00 632+00 633+00 634+00 635+00 636+00 637+00
450 450
460 460
-0.674%
+2.75 7% +0.792%
+2.96 6%
+3.8 67%
-0.348%
.5
.6
.0
.8
.6
.1
' VC60
17.49K =
'125.91SSD =
' VC90
21.35K =
'123.06SSD =
' VC40
27K =
'INFHLSD =
' VC80
37K =
'677.11HLSD =
' VC69
76K =
'INFHLSD =
' VC80
32K =
'398.76HLSD =
a t in le t C o n s tr u c t ri p ra p h e a d w a ll u lv e rt
R e m o v e e x is ti n g p ip e
In s ta ll p ip e c u lv e rt a t in le t C o n s tr u c t ri p ra p h e a d w a ll
R e m o v e e x is ti n g p ip e c u lv e rt
In s ta ll p ip e c u lv e rt a t in le t.
C o n s tr u c t ri p ra p h e a d w a ll
In s ta ll p ip e c u lv e rt a t in le t a n d o u tl e t.
C o n s tr u c t ri p ra p h e a d w a ll
In s ta ll p ip e c u lv e rt
630+34 TO 637+84
PLAN-PROFILE
and 8-inch outlet pipe
Construct special Rock Embankment
627+35.30 to 631+72.00, RT
Install standard underdrain system
633+00 to 634+60, LT
:4
A p ri l
C H
N
P la n
S h e p w
-w o rk
\d \a k -f
-c n f1 fc
.d g n
STATE PROJECT
NUMBER
AK FS CNF 1015(2) D.7
El= 456.330
E= 1647134.9139
N= 2366778.8406
N
CP
CP
CP
CP
CP
Line to be constructed
Slope stake limits
Slope stake limits
Proposed edge of Travel Lane
Proposed edge of Shoulder
Proposed edge of Shoulder
Proposed edge of Travel Lane
Existing edge of pavement
Existing edge of pavement
Existing ground
Profile grade
+5.252%
640+456
S68°2 0'06"W
S70°02' 32"W
N72°46'34"W
S76°19'50"W e = 0.022
'23.84L =
'11.92T =
'800.00R =
(RT)01°42'26"Δ =
640+46.68PI
e = N/A '103.83L = '53.82T = '160.00R =
(RT)37°10'54"Δ =
642+68.86PI
e = N/A '97.05L = '49.74T = '180.00R =
(LT)30°53'36"Δ =
643+81.76PI
PT
638+00 639+00 640+00 641+00 642+00 643+00 644+00 645+00
450 450
460 460
+2.155
+1.443%
+1.607%
-5.479%
.9
.1
.0
' VC50
70.24K =
'487.19SSD =
' VC150
21.17K =
'118.04SSD =
' VC60
365K =
'INFHLSD =
END PROJECT
641+17.07
AK FS CNF 1015(2)
637+84 TO 641+17
PLAN-PROFILE
and grade, and E.5 for layout See Sheet E.3 for approach line
:1
A p ri l
C H
N
P la n
S h e p w
-w o rk
\d \a k -f
-c n f1 fc
.d g n
STATE PROJECT
NUMBER
AK FS CNF 1015(2) D.8
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
1 2367983.895 1650672.459 390.259 60°28'54.369" N 149°56'35.321" W 425.1966 0.99987984 (SRD3135) 3-1/4" DIAM. USDA ALUM. CAP 1.
2 2367811.709 1650541.533 391.193 60°28'52.674" N 149°56'37.937" W 426.1306 0.99987979 (SRD3134) 3-1/4" DIAM. USDA ALUM. CAP
3 2367440.934 1650405.731 396.608 60°28'49.024" N 149°56'40.653" W 431.5587 0.99987953 1/2" X 2" MAGNAIL
4 2367266.214 1650130.471 388.120 60°28'47.305" N 149°56'46.149" W 423.0642 0.99987993 1/2" X 2" MAGNAIL
5 2367147.727 1649586.518 388.540 60°28'46.142" N 149°56'57.006" W 423.4579 0.9998799 1/2" X 2" MAGNAIL
6 2367335.926 1649247.849 394.919 60°28'47.999" N 149°57'03.762" W 429.8107 0.99987959 1/2" X 2" MAGNAIL
7 2367319.972 1648778.434 420.811 60°28'47.845" N 149°57'13.130" W 455.6764 0.99987834 1/2" X 2" MAGNAIL
8 2367232.031 1648175.988 443.425 60°28'46.983" N 149°57'25.154" W 478.2609 0.99987726 1/2" X 2" MAGNAIL
9 2367179.603 1647794.718 448.212 60°28'46.469" N 149°57'32.763" W 483.0282 0.99987702 1/2" X 2" MAGNAIL
10 2366880.587 1647414.477 456.899 60°28'43.526" N 149°57'40.355" W 491.7054 0.9998766 1/2" X 2" MAGNAIL
11 2366767.285 1647132.227 455.945 60°28'42.412" N 149°57'45.989" W 490.7415 0.99987664 1/2" X 2" MAGNAIL
12 2366711.288 1646619.838 420.355 60°28'41.863" N 149°57'56.214" W 455.122 0.99987833 1/2" X 2" MAGNAIL
13 2366745.320 1646475.915 418.366 60°28'42.199" N 149°57'59.086" W 453.1231 0.99987843 (SRD3133) 3-1/4" DIAM. USDA ALUM. CAP
14 2366813.810 1646170.210 418.561 60°28'42.875" N 149°58'05.185" W 453.2985 0.99987842 (SRD3132) 3-1/4" DIAM. USDA ALUM. CAP
15 2367173.494 1645904.804 426.565 60°28'46.419" N 149°58'10.478" W 461.2697 0.99987803 1/2" X 2-1/2" DURANAIL
16 2367665.316 1645819.535 421.750 60°28'51.263" N 149°58'12.176" W 456.4284 0.99987826 5/8" X 30" REBAR w/YELLOW FS CAP
17 2367852.596 1645605.981 415.655 60°28'53.108" N 149°58'16.436" W 450.3137 0.99987855 1/2" X 2-1/2" DURANAIL
18 2368027.716 1645495.672 413.311 60°28'54.834" N 149°58'18.636" W 447.9566 0.99987866 1/2" X 2-1/2" DURANAIL
19 2368331.536 1645487.834 412.091 60°28'57.826" N 149°58'18.790" W 446.7268 0.99987872 1/2" X 2-1/2" DURANAIL
20 2368582.755 1645424.530 412.671 60°29'00.301" N 149°58'20.051" W 447.2936 0.99987869 1/2" X 2-1/2" DURANAIL
21 2369144.197 1645040.394 414.770 60°29'05.832" N 149°58'27.713" W 449.3533 0.99987859 (SRD3177) 3-1/4" DIAM. USDA ALUM. CAP
22 2369184.028 1644806.950 414.696 60°29'06.225" N 149°58'32.372" W 449.2629 0.99987859 (SRD3178) 3-1/4" DIAM. USDA ALUM. CAP
23 2368894.252 1644587.578 413.342 60°29'03.372" N 149°58'36.753" W 447.9056 0.99987866 5/8" X 30" REBAR w/YELLOW FS CAP
24 2368966.726 1644259.157 409.949 60°29'04.087" N 149°58'43.308" W 444.4929 0.99987881 1/2" X 2-1/2" DURANAIL
25 2368940.953 1644006.493 406.239 60°29'03.834" N 149°58'48.351" W 440.7698 0.99987899 1/2" X 2-1/2" DURANAIL
26 2368986.099 1643774.768 402.501 60°29'04.279" N 149°58'52.975" W 437.0154 0.99987917 (SRD3176) 1/2" X 2-1/2" DURANAIL
31 2368336.656 1651429.000 396.349 60°28'57.837" N 149°56'20.216" W 431.3096 0.99987956 1/2" X 2" MAGNAIL
32 2368305.882 1651131.564 394.331 60°28'57.536" N 149°56'26.153" W 429.2784 0.99987965 (SRD3174) 1/2" X 2" MAGNAIL
33 2368337.351 1650838.273 392.008 60°28'57.849" N 149°56'32.006" W 426.939 0.99987976 (SRD3175) 1/2" X 2" MAGNAIL
34 2368578.560 1650867.142 389.797 60°29'00.224" N 149°56'31.425" W 424.7182 0.99987987 3/4" X 6-1/2" SPIKE
35 2368361.775 1651754.828 396.219 60°28'58.081" N 149°56'13.713" W 431.196 0.99987958 5/8" X 30" REBAR w/YELLOW FS CAP
36 2368085.997 1651381.940 398.428 60°28'55.369" N 149°56'21.160" W 433.3984 0.99987946 1/2" X 2" MAGNAIL
37 2368071.667 1651002.927 396.441 60°28'55.231" N 149°56'28.724" W 431.3917 0.99987955 1/2" X 2" MAGNAIL
38 2367907.476 1650795.453 396.788 60°28'53.615" N 149°56'32.868" W 431.7354 0.99987953 1/2" X 2" MAGNAIL
40 2367677.868 1650610.874 399.246 60°28'51.356" N 149°56'36.555" W 434.1934 0.99987941 5/8" X 36" REBAR w/YELLOW FS CAP
41 2367631.433 1650785.950 404.641 60°28'50.897" N 149°56'33.062" W 439.6016 0.99987915 3/4" X 6-1/2" SPIKE (STEEL)
42 2367510.238 1650712.401 411.609 60°28'49.704" N 149°56'34.532" W 446.5728 0.99987882 5/8" X 36" REBAR w/YELLOW FS CAP
43 2367528.841 1650620.605 413.002 60°28'49.888" N 149°56'36.364" W 447.9593 0.99987875 5/8" X 36" REBAR w/YELLOW FS CAP
45 2368027.861 1645312.728 411.448 60°28'54.836" N 149°58'22.287" W 446.0838 0.99987875 (SRD3094) 1/2" X 2" MAGNAIL
46 2367893.670 1645395.642 412.464 60°28'53.514" N 149°58'20.633" W 447.1096 0.9998787 (SRD3095) 1/2" X 2" MAGNAIL
PROJECT : Russian River Campground PROJECT UNITS : US SURVEY FOOT COORDINATE SYSTEM : Alaska Zone 4 SPCS NAD83 (2011)
EPOCH DATE : 2010.0000
VERTICAL DATUM :NAVD88 based on Geoid 12A
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
Pr oj ec ts
_2
2\ Al as ka
\R us si an
_R iv er
R us si an
R iv er _C
G _c on tr ol sh ee t_ up da te .x ls x]
S he et
-F eb
-2
:2
Fo re st s er vi ce 7/
Fo rs t se rv ic e 7/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.9
SHEET
NUMBER
FS CNF 1015(2)AK
SURVEY CONTROL
Sheet 1 of 2
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
47 2368100.873 1645218.559 410.548 60°28'55.555" N 149°58'24.166" W 445.1772 0.99987879 5/8" X 30" REBAR w/YELLOW FS CAP 1.
50 2366795.784 1647230.683 460.597 60°28'42.692" N 149°57'44.024" W 495.3968 0.99987642 1/2" X 2-1/2" DURANAIL
51 2366692.298 1647152.955 467.457 60°28'41.673" N 149°57'45.576" W 502.2568 0.99987609 3/4" X 6-1/2" DURANAIL SPIKE
60 2369185.293 1644920.502 414.955 60°29'06.237" N 149°58'30.106" W 449.5284 0.99987858 1/2" X 2-1/2" DURANAIL
61 2369313.778 1644841.321 414.413 60°29'07.503" N 149°58'31.685" W 448.9799 0.99987861 5/8" X 30" REBAR w/YELLOW FS CAP
62 2369432.157 1644949.948 412.206 60°29'08.668" N 149°58'29.516" W 446.7729 0.99987871 5/8" X 30" REBAR w/YELLOW FS CAP
63 2369299.583 1645040.305 414.486 60°29'07.362" N 149°58'27.714" W 449.0627 0.9998786 5/8" X 24" REBAR w/YELLOW FS CAP
64 2369388.540 1645138.783 411.786 60°29'08.238" N 149°58'25.748" W 446.366 0.99987873 5/8" X 30" REBAR w/YELLOW FS CAP
65 2369237.331 1645149.993 413.449 60°29'06.749" N 149°58'25.525" W 448.0355 0.99987865 5/8" X 30" REBAR w/YELLOW FS CAP
66 2369141.672 1645242.511 411.799 60°29'05.806" N 149°58'23.679" W 446.3921 0.99987873 5/8" X 30" REBAR w/YELLOW FS CAP
67 2369035.798 1645117.802 414.677 60°29'04.764" N 149°58'26.169" W 449.2668 0.9998786 1/2" X 2-1/2" DURANAIL
71 2369059.441 1643683.997 402.730 60°29'05.002" N 149°58'54.787" W 437.2378 0.99987916 5/8" X 30" REBAR w/YELLOW FS CAP
72 2369079.632 1643748.519 402.663 60°29'05.200" N 149°58'53.499" W 437.1741 0.99987916 5/8" X 30" REBAR w/YELLOW FS CAP
73 2369146.903 1643901.521 405.794 60°29'05.862" N 149°58'50.445" W 440.3116 0.99987901 5/8" X 30" REBAR w/YELLOW FS CAP
74 2368983.631 1643916.773 405.159 60°29'04.254" N 149°58'50.141" W 439.6832 0.99987904 1/2" X 2-1/2" DURANAIL
75 2368955.363 1644109.418 408.958 60°29'03.975" N 149°58'46.296" W 443.4921 0.99987886 1/2" X 2-1/2" DURANAIL
80 2367581.808 1650466.711 397.397 60°28'50.411" N 149°56'39.434" W 432.3412 0.99987949 1/2" X 2-1/2" DURANAIL
84 2367262.481 1649419.503 390.965 60°28'47.274" N 149°57'00.338" W 425.8698 0.99987978 1/2" X 2-1/2" DURANAIL
85 2367352.692 1649057.817 405.377 60°28'48.165" N 149°57'07.554" W 440.2555 0.99987909 1/2" X 2-1/2" DURANAIL
86 2367318.062 1648599.942 425.602 60°28'47.827" N 149°57'16.692" W 460.4576 0.99987811 1/2" X 2-1/2" DURANAIL
87 2367287.923 1648422.816 430.560 60°28'47.532" N 149°57'20.227" W 465.4057 0.99987787 1/2" X 2-1/2" DURANAIL
88 2367221.535 1648285.380 439.527 60°28'46.879" N 149°57'22.971" W 474.3694 0.99987744 1/2" X 2-1/2" DURANAIL
89 2367210.250 1647989.740 447.172 60°28'46.769" N 149°57'28.871" W 481.998 0.99987707 1/2" X 2-1/2" DURANAIL
90 2367072.710 1647658.782 450.899 60°28'45.417" N 149°57'35.477" W 485.7119 0.99987689 1/2" X 2-1/2" DURANAIL
91 2366993.407 1647600.109 455.574 60°28'44.636" N 149°57'36.649" W 490.3869 0.99987667 1/2" X 2-1/2" DURANAIL
92 2366726.149 1646964.289 447.457 60°28'42.007" N 149°57'49.340" W 482.2437 0.99987705 1/2" X 2-1/2" DURANAIL
93 2366756.946 1646319.998 420.102 60°28'42.314" N 149°58'02.197" W 454.8493 0.99987834 1/2" X 2-1/2" DURANAIL
94 2366916.601 1646101.514 420.742 60°28'43.888" N 149°58'06.555" W 455.4696 0.99987831 1/2" X 2-1/2" DURANAIL
95 2367022.566 1645931.018 427.361 6°28'44.932" N 149°58'09.957" W 462.0722 0.99987799 1/2" X 2-1/2" DURANAIL
96 2367502.258 1645856.563 424.742 60°28'49.657" N 149°58'11.438" W 459.4303 0.99987812 1/2" X 2-1/2" DURANAIL
97 2368717.203 1645296.720 413.475 60°29'01.625" N 149°58'22.601" W 448.0845 0.99987865 1/2" X 2-1/2" DURANAIL
98 2369018.169 1644679.659 413.771 60°29'04.592" N 149°58'34.914" W 448.3379 0.99987864 1/2" X 2-1/2" DURANAIL
99 2368915.912 1644463.606 412.103 60°29'03.586" N 149°58'39.227" W 446.66 0.99987871 1/2" X 2-1/2" DURANAIL
PROJECT : Russian River Campground PROJECT UNITS : US SURVEY FOOT COORDINATE SYSTEM : Alaska Zone 4 SPCS NAD83 (2011)
EPOCH DATE : 2010.0000
VERTICAL DATUM :NAVD88 based on Geoid 12A
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
Pr oj ec ts
_2
2\ Al as ka
\R us si an
_R iv er
R us si an
R iv er _C
G _c on tr ol sh ee t_ up da te .x ls x]
S he et
2)
-F eb
-2
:2
Fo re st s er vi ce 7/
Fo rs t se rv ic e 7/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.10
SHEET
NUMBER
FS CNF 1015(2)AK
SURVEY CONTROL
Sheet 2 of 2
:5
M a r c h a k f c n f f a .d p w w o r k
\d
\a k f c n f a p p
.d g n
APPROACH QUANTITIES
TABULATION OF
STATE PROJECT
NUMBER
AK FS CNF 1015(2) E.1
STOP AHEAD
Line to be constructed
Proposed edge of pavement
Proposed edge of pavement
Existing edge of pavement
Existing edge of pavement
Match existing gravel surface edge of shoulder
Match proposed mainline
Slope stake limits
Slope stake limits
Existing ditch
Profile grade
Existing ground
S60°12'34"E
602+43.76 PC
+20.0
PT
P O
B
.0
P O
E
.7
END WORK
20+83.73
BEGIN WORK
20+11.00
El=395.20
E=1650536.02
N=2367731.86
El=399.10
E=1650599.05
N=2367695.78
20+10 20+20 20+30 20+40 20+50 20+60 20+70 20+80
395 395
400 400
6.
3%
+0.511% .2
25' VC
K = 4
HLSD = 61.69'
.2
20+90
.1
:3
M a r c h
A
P L
T
P la n
S h e p w w o r k
\d
\a k f c n f a p p
.d g n
602+76.39 LT
APPROACH PLAN-PROFILE
STATE PROJECT
NUMBER
AK FS CNF 1015(2) E.2
edge of shoulder mainline
Match proposed
Match existing gravel surface
Slope stake limits
Proposed edge of pavement
Proposed edge of pavement
Existing edge of pavement of pavement
Existing edge
Line to be constructed
Existing ditch
Profile grade
Existing ground
Slope stake limits
S20°56'40"E
640+34.76 PC
640+58.59 PT
P O
E
.0
25+00 25+10 25+20
455 455
460 460
25+30
+5.
2%
.6
BEGIN WORK
END WORK
25+11.00
25+24.00
El=459.99
E=1647206.59
N=2366793.29
El=460.35
E=1647211.23
N=2366781.15
:4
M a r c h
A
P L
T
P la n
S h e p w w o r k
\d
\a k f c n f a p p
.d g n
640+44.97 LT
APPROACH PLAN-PROFILE
STATE PROJECT
NUMBER
AK FS CNF 1015(2) E.3
N '-51.47OFF
20+06.49STA
'-31.49OFF
20+18.96STA
'-16.73OFF
20+44.58STA
'-10.45OFF
20+63.36STA
OFF -7.90'
STA 20+83.73
'7.90OFF
20+83.62STA
'7.96OFF
20+74.99STA
'24.53OFF
20+38.13STA
'40.52OFF
20+23.76STA
'51.60OFF
20+20.85STA
'-0.00OFF
20+11.10STA
'-11.00OFF
602+25.45STA
'-11.00OFF
602+77.89STA
'-11.00OFF
603+31.36STA
'-0.00OFF
20+83.73STA
EL= 393.29
EL= 393.56
EL= 395.35
EL= 397.63
EL= 398.87
EL= 398.99
EL= 398.85
EL= 398.46
EL= 396.23
EL= 396.45
EL= 396.85
EL= 395.20
R 489'
'R
R
R
12.5'R
:0
M a r c h
A
P L
T
P la n
S h e p w w o r k
\d
\a k f c n f a p p
.d g n
602+76.39 LT
APPROACH LAYOUT
STATE PROJECT
NUMBER
AK FS CNF 1015(2) E.4
OFF -17.57'
STA 25+24.00
'-26.08OFF
25+15.40STA
OFF -11.00'
STA 640+07.80
'17.57OFF
25+23.92STA
'23.62OFF
25+16.44STA
OFF -11.00'
STA 640+80.57
'35.80OFF
25+10.50STA
'-37.30OFF
25+10.60STA
'0.00OFF
25+11.00STA
'-11.00OFF
640+44.96STA
'0.00OFF
25+24.00STA
640640
EL= 458.37
EL= 458.82
EL= 459.59
EL= 459.99
EL= 460.35
EL= 460.66
EL= 460.25
EL= 460.76
10' R
R 16'
:1
M a r c h
A
P L
T
P la n
S h e p w w o r k
\d
\a k f c n f a p p
.d g n
640+40.97 LT
APPROACH LAYOUT
STATE PROJECT
NUMBER
AK FS CNF 1015(2) E.5
'14.00OFF
602+16.35STA
'19.26OFF
602+31.73STA
'42.67OFF
602+57.58STA
'44.75OFF
603+25.72STA
'25.45OFF
603+49.08STA
'14.00OFF
603+80.92STA
3 6
EL=393.87
EL=394.16
EL=394.44
EL=396.35
EL=397.20
EL=397.94
R
R .5
R
:3
F e b r u a r y
C
H N
T u r n o u t
S h e p w w o r k
\d
\a k f c n f a p p
.d g n
602+16.35 to 603+80.92 RT
TURNOUT LAYOUT
STATE PROJECT
NUMBER
AK FS CNF 1015(2) E.6
:2
A p r il a k f c n f f a .d p w w o r k \d
\a k f c n f d a .d g n
CONTROL QUANTITIES
EROSION AND SEDIMENT
TABULATION OF
STATE PROJECT
NUMBER
AK FS CNF 1015(2) F.1
2 6
N
N
Slope stake limits
BEGIN PROJECT
600+60.00 lined ditch
Proposed riprap
Silt fence
Fiber roll
Check Dam 20 0 20 40
SCALE IN FEET
LEGEND:
Slope stake limits
Proposed edge of shoulder
Proposed edge of shoulder diversion channel, for proposed 36" pipe culvert
Install soil erosion control, temporary
Proposed edge of shoulder
Slope stake limits
Slope stake limits detail. See Sheet J.5 for sign instsallation detail.
(SWPPP Sign). See Sheet F.11 for sign panel
Install temporary traffic control, construction sign
Proposed edge of shoulder
7 6
8 6
Control Product
Rolled Erosion
:5
A p r il
P la n
S h e
M y F il e s \P r o je c ts
\R u s s ia n R iv e r C a m p g r o u n d A c c e s s P h a s e
\R u s E x p o r te d f r o m
P
W \a k f c n f d b .d g n
600+60 to 611+00
CONTROL PLAN
EROSION AND SEDIMENT
STATE PROJECT
NUMBER
AK FS CNF 1015(2) F.2
Slope stake limits
3 6
N
N lined ditch
Proposed riprap
Silt fence
Fiber roll
Check Dam 20 0 20 40
SCALE IN FEET
LEGEND:
Proposed edge of shoulder
Proposed edge of shoulder
Proposed edge of shoulder
Proposed edge of shoulder for proposed 60" pipe culvert temporary diversion channel
Install soil erosion control, for proposed 60" pipe culvert temporary diversion channel
Install soil erosion control, Slope stake limits
Slope stake limits
3 6
Control Product
Rolled Erosion3 :5
M a r c h
P la n
S h e p w w o r k \d
\a k f c n f d b .d g n
611+00 to 622+80
CONTROL PLAN
EROSION AND SEDIMENT
STATE PROJECT
NUMBER
AK FS CNF 1015(2) F.3
6 6
Slope stake limits
Slope stake limits
N
N
LEGEND:
lined ditch
Proposed riprap
Silt fence
Fiber roll
Check Dam 20 0 20 40
SCALE IN FEET
Proposed edge of shoulder
Proposed edge of shoulder
Proposed edge of shoulder
Proposed edge of shoulder
Control Product
Rolled Erosion4 :0
M a r c h
P la n
S h e p w w o r k \d
\a k f c n f d b .d g n
622+80 to 634+40
CONTROL PLAN
EROSION AND SEDIMENT
STATE PROJECT
NUMBER
AK FS CNF 1015(2) F.4
5 6
Slope stake limits
Slope stake limits END PROJECT
641+17.07
N
N lined ditch
Proposed riprap
Silt fence
Fiber roll
Check Dam
20 0 20 40
SCALE IN FEET
LEGEND:
Proposed edge of shoulder
Proposed edge of shoulder
Proposed edge of shoulder
Proposed edge of shoulder
0 6
1 6
Control Product
Rolled Erosion4 :0
M a r c h
P la n
S h e p w w o r k \d
\a k f c n f d b .d g n
634+40 to 641+17.07
CONTROL PLAN
EROSION AND SEDIMENT
STATE PROJECT
NUMBER
AK FS CNF 1015(2) F.5
PLASTIC LINED DIVERSION CHANNEL
RIPRAP LINED DIVERSION CHANNEL
TEMPORARY CULVERT
DIVERSION CHANNEL
SECTION B-B
SECTION A-A
SECTION A-A SECTION B-B
SECTION B-B
PLAN
when scheduled)
Silt fence (typ.
Roadway embankment
Roadway embankment
Temporary culvert backfill
Subgrade
Bedding
Sandbags
Riprap lining Riprap lining backflow into natural channel
Use sandbags to prevent
Permanent natural channel
Earthwork limits when scheduled)
Silt fence (typ.
See Note 5
Permanent culvert
Roadway centerline temporary barrier
Use sandbags to construct
SandbagsPlastic liner
SSSS
SS SS
SS
SS
SS SS
1.
2.
3.
4.
5.
FlowFlow
FlowFlow
Plastic liner when scheduled)
Silt fence (typ.
When specified replace the…