AK FS CNF 1015(2), Russian River Campground Access Phase 2 Federal contract opportunity
Solicitation number
69056722B000007
Issued by
Department of Transportation Federal Highway Administration

About this file

This document contains an engineering report and related federal contract opportunity. The engineering report provides technical details for a highway alignment project, including station elevations, horizontal and vertical alignment descriptions, and alignment review information.

The associated federal contract opportunity is a solicitation from the Department of Transportation Federal Highway Administration seeking proposals for the Russian River Campground Access Phase 2 project. Offerors are to provide all labor, materials, equipment, tools, transportation, supervision and other essentials to complete construction of a new campground access road as described in the attached solicitation documents. Proposals are due by July 15th, 2022 and the period of performance is 365 calendar days from issuance of the notice to proceed. The set-aside type was not specified.

View the file

Other files for this federal contract opportunity

Other files attached to AK FS CNF 1015(2), Russian River Campground Access Phase 2, newest first.
File Type Posted
BidTab AK FS CNF 101(2).pdf PDF
BidSum AK FS CNF 1015(2).pdf PDF
QA_07-06a-2022.pdf PDF
QA_07-06-2022.pdf PDF
QA_07-05a-2022.pdf PDF
Amendment A005.pdf PDF
QA_07-05-2022.pdf PDF
QA_07-01a-2022.pdf PDF
QA_07-01-2022.pdf PDF
QA_06-30-2022.pdf PDF
Amendment A004.pdf PDF
QA_06-29-2022.pdf PDF
QA_06-24-2022.pdf PDF
Amendment A003.pdf PDF
QA_06-23-2022.pdf PDF
QA_06-22-2022.pdf PDF
Amendment A002.pdf PDF
Amendment A001 .pdf PDF
ak-f-cnf_101502_EW_ElemCompQtysRpt_100.pdf PDF
GR 04-22 AK FS CNF 1015(2) - Russian River Campground Phase II Geotechnical Report (REVISED 5-3-22).pdf PDF
RussianRiver_CG_controlsheet.xlsx XLSX spreadsheet
ak-f-cnf-101502_Prof_Rpt_AP640LT.xlsx XLSX spreadsheet
Final ak-f-cnf101502_Plan_Set.pdf PDF
ak-f-cnf_101502_EW_CorrCompQtysRpt_100.pdf PDF
Physical Data.zip ZIP file
ak-f-cnf-101502_Super_Rpt.pdf PDF
ak-f-cnf-101502_Horiz_Ali_Rpt_AP640LT.xlsx XLSX spreadsheet
ak-f-cnf101502_Appr_Calcs_EW_AP640LT_100.pdf PDF
AK_signedSWPPP_AK FS CNF 1015(2) for contract.pdf PDF
ak-f-cnf101502_xs_01_new.pdf PDF
RussianRiverRd_RetainingWallMemo 12-10-2019.pdf PDF
ak-f-cnf101502_xs_01_culv.pdf PDF
Russian River - Hydraulics_Construction_Handoff_Memo.pdf PDF
ak-f-cnf-101502_Prof_Rpt.pdf PDF
ak-f-cnf-101502_Prof_Rpt_AP640LT.pdf PDF
ak-f-cnf-101502_Horiz_Ali_Rpt_AP640LT.pdf PDF
ak-f-cnf-101502_Horiz_Ali_Rpt_AP603LT.pdf PDF
ak-f-cnf-101502_Horiz_Ali_Rpt_AP603LT.xlsx XLSX spreadsheet
ak-f-cnf-101502_Super_Rpt.xlsx XLSX spreadsheet
ak-f-cnf-101502_Prof_Rpt.xlsx XLSX spreadsheet
ak-f-cnf101502_Appr_Calcs_EW_AP603LT_100.pdf PDF
ak-f-cnf-101502_Horiz_Ali_Rpt.pdf PDF
ak-f-cnf-101502_Prof_Rpt_AP603LT.xlsx XLSX spreadsheet
ak-f-cnf-101502_Horiz_Ali_Rpt.xlsx XLSX spreadsheet
IFB AK FS CNF 1015(2).pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project:

Description:

File Name:

Last Revised:

Note: All units in this report are in feet unless specified otherwise.

Station Elevation

20+11.100 395.172 20+16.330 395.199

0.005 5.23

20+16.330 395.199 20+28.830 395.263 20+41.330 396.11

0.005 0.068

25.047 3.992 0.196

20+41.330 396.11 20+83.979 398.998

0.068 42.649

Default c:\pw-work\d0415446\ak-f-cnf-101502_COR_02.dgn 4/11/2022 14:41

Horizontal Alignment: AP603LT

START

Horizontal Description:

Horizontal Style: Alignment\Baseline

Vertical Alignment: AP603LT

VPT

END

Tangent Grade:

Tangent Length:

VPT

Length:

Entrance Grade:

Exit Grade:

r = 100 * (g2 - g1) / L:

K = l / (g2 - g1):

Vertical Alignment Review Report

Report Created: Monday, April 11, 2022 Time: 3:27:36 PM

Middle Ordinate:

Element: Linear

VPC

Tangent Grade:

Tangent Length:

Element: Symmetrical Parabola

VPC

VPI

Vertical Description:

Vertical Style: Alignment\Baseline

Element: Linear

File details come from the government source that posted it. Updated .