Amendment A003.pdf

PDF 911 KB Posted

Attached to
AK FS CNF 1015(2), Russian River Campground Access Phase 2 Federal contract opportunity
Solicitation number
69056722B000007
Issued by
Department of Transportation Federal Highway Administration

About this file

This amendment modifies a solicitation for construction services related to a Russian River Campground Access project in Alaska. The Department of Transportation Federal Highway Administration is seeking bids to construct permanent soldier pile retaining walls as part of Phase 2 of the campground access project. Revisions include updated qualifications requirements for supervisors and installation experience, a restriction against field cutting of steel beams, and modifications to wall designs and notes on plan sheets. Bidders are required to acknowledge receipt of the amendment by the stated deadline to be considered for award of contract number 69056722B000007.

View the file

Other files for this federal contract opportunity

Other files attached to AK FS CNF 1015(2), Russian River Campground Access Phase 2, newest first.
File Type Posted
BidTab AK FS CNF 101(2).pdf PDF
BidSum AK FS CNF 1015(2).pdf PDF
QA_07-06a-2022.pdf PDF
QA_07-06-2022.pdf PDF
QA_07-05a-2022.pdf PDF
Amendment A005.pdf PDF
QA_07-05-2022.pdf PDF
QA_07-01a-2022.pdf PDF
QA_07-01-2022.pdf PDF
QA_06-30-2022.pdf PDF
Amendment A004.pdf PDF
QA_06-29-2022.pdf PDF
QA_06-24-2022.pdf PDF
QA_06-23-2022.pdf PDF
QA_06-22-2022.pdf PDF
Amendment A002.pdf PDF
Amendment A001 .pdf PDF
AK_signedSWPPP_AK FS CNF 1015(2) for contract.pdf PDF
ak-f-cnf101502_xs_01_new.pdf PDF
RussianRiverRd_RetainingWallMemo 12-10-2019.pdf PDF
ak-f-cnf101502_xs_01_culv.pdf PDF
Russian River - Hydraulics_Construction_Handoff_Memo.pdf PDF
ak-f-cnf-101502_Prof_Rpt.pdf PDF
ak-f-cnf-101502_Prof_Rpt_AP640LT.pdf PDF
ak-f-cnf-101502_Prof_Rpt_AP603LT.pdf PDF
ak-f-cnf-101502_Horiz_Ali_Rpt_AP640LT.pdf PDF
ak-f-cnf-101502_Horiz_Ali_Rpt_AP603LT.pdf PDF
ak-f-cnf-101502_Horiz_Ali_Rpt_AP603LT.xlsx XLSX spreadsheet
ak-f-cnf-101502_Super_Rpt.xlsx XLSX spreadsheet
ak-f-cnf-101502_Prof_Rpt.xlsx XLSX spreadsheet
ak-f-cnf_101502_EW_ElemCompQtysRpt_100.pdf PDF
GR 04-22 AK FS CNF 1015(2) - Russian River Campground Phase II Geotechnical Report (REVISED 5-3-22).pdf PDF
RussianRiver_CG_controlsheet.xlsx XLSX spreadsheet
ak-f-cnf-101502_Prof_Rpt_AP640LT.xlsx XLSX spreadsheet
Final ak-f-cnf101502_Plan_Set.pdf PDF
ak-f-cnf101502_Appr_Calcs_EW_AP603LT_100.pdf PDF
ak-f-cnf-101502_Horiz_Ali_Rpt.pdf PDF
ak-f-cnf-101502_Prof_Rpt_AP603LT.xlsx XLSX spreadsheet
ak-f-cnf-101502_Horiz_Ali_Rpt.xlsx XLSX spreadsheet
IFB AK FS CNF 1015(2).pdf PDF
ak-f-cnf_101502_EW_CorrCompQtysRpt_100.pdf PDF
Physical Data.zip ZIP file
ak-f-cnf-101502_Super_Rpt.pdf PDF
ak-f-cnf-101502_Horiz_Ali_Rpt_AP640LT.xlsx XLSX spreadsheet
ak-f-cnf101502_Appr_Calcs_EW_AP640LT_100.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A003 06/24/2022 N/A See Block 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056722B000007

9B. DATED (SEE ITEM 11)

06/07/2022

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

AK FS CNF 1015(2), Russian River Campground Access Phase 2

See Page 2.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A003, dated 06-24-2022 AK FS CNF 1015(2)

Solicitation No. 69056722B000007 Russian River Campground Access Phase 2

REVISIONS ARE AS FOLLOWS:

SPECIAL CONTRACT REQUIREMENTS

Page F-13, Subsection 263.03, Qualifications. Revises requirements under paragraph (b).

Page F-14, Subsection 263.06, Soldier pile installation. Adds restriction of field cuts.

PLANS

Plan sheet H.12 Revises length and angle for welded wire form; and Adds Note 3.

ENCLOSURES

Pages:

F-13 through F-14

Plan Sheets:

H.12

F-13 DIVISION 250

Special Contract Requirements Project: AK FS CNF 1015(2), Russian River Campground Access, Phase 2

Section 263. — SOLDIER PILE RETAINING WALLS

(ADDED SECTION)

12/12/21–FP14

Description

263.01 This work consists of constructing permanent soldier pile retaining walls.

Material

263.02 Conform to the following Sections and Subsections:

Driven Piles 551 Geocomposite Drain 714.02 Lean Concrete Backfill 614 Paint 719 Permanent Ground Anchors 256 Piling 715 Reinforcing Steel 709.01 Select Granular Backfill 704.08 Steel Structures 555 Structural Concrete 552 Timber Structures 557

Construction Requirements

263.03 Qualifications. Submit the following for acceptance at least 30 days before start of work for soldier piles. Acceptance of the Contractor’s personnel and installation plan does not relieve the Contractor of the responsibility for obtaining the required results in the completed work.

(a) Supervisor and foreman. A résumé for each individual describing their experience on at least 2 soldier piles retaining wall projects of similar size and complexity over the past 5 years.

Include project names, locations, and contract information for project owners; and

(b) A résumé for each professional engineer or professional engineering geologist with at least 5 years of experience in the design and construction of ground anchors soldier pile retaining walls. The on-site engineer or geologist does not need to be a licensed Professional Engineer or Professional Geologist in the state, if they have at least 2 years of experience in the design and construction of ground anchors soldier pile retaining walls working under the direct supervision of the above-referenced professional engineer/engineering geologist.

263.04 Submittals. At least 30 days before starting the soldier pile wall installation work, submit the following according to 104.03:

(a) Start date;

Revised by Amendment A003

F-14 DIVISION 250

Special Contract Requirements Project: AK FS CNF 1015(2), Russian River Campground Access, Phase 2

(b) Equipment and methods of excavation to ensure adequate advancement to the proposed depths suitable to the anticipated site and subsurface conditions, maintain wall and slope stability, and perform cleanout of the hole. Include a containment and disposal plan for excavated material and drilling slurry;

(c) Retaining wall construction sequence;

(d) Soldier pile types and sizes, if proposing alternative to materials specified in the plans.

Provide details of soldier pile placement including internal support bracing and centralization methods;

(e) Details of concrete placement including proposed operational procedures for pumping and/or tremie methods;

(f) Drilling method and materials for ground anchors according to Subsection 256.04, where ground anchors are shown in the plans;

(g) Temporary lagging design details, including locations of pre-drilled holes in piles for lagging screws and timber attachment, and backfill materials and method of installation.

Provide appropriate details of how subsurface drainage is to be accommodated, such as using a geocomposite drain or the use of free-draining backfill, if the lagging cannot be installed tight up against an even soil surface. If free-draining backfill is proposed, describe when and how the backfill will be placed and maintained in placed during top-down construction.

263.05 General. Check existing site conditions for conformance with the plans. Provide logs from on-site engineer or geologist of material condition descriptions from roadway surface to bottom of drilled shafts.

Excavate according to Section 209. Backfill according to Section 208.

Verify limits of wall installation. Submit installation drawings according to Subsection 104.03.

If proposing an alternate construction method, submit to the CO for approval prior to start of work according to Subsection 104.03. See Section 257 for Contractor-designed retaining walls.

263.06 Soldier pile installation. Provide steel beams conforming to the plans or approved drawings. If driven piles are specified, then conform to Section 551. Field cutting steel beams is not allowed. Drive or drill pile, as specified, to the “bottom of pile” or “bottom of shaft” elevation shown on the plans. When pre-drilling, do the following:

(a) Drill through material to “bottom of shaft” elevation as shown in the plans. When caving conditions are encountered, do not excavate further until the Contractor has implemented the method to prevent ground caving as described in their submittal. Do not leave more than 2 inches of loose or disturbed materials in the bottom of the hole for soldier piles with permanent ground anchors, or more than 12 inches of loose material for soldier piles with without permanent ground anchors.

8'-0" to 10'-0"

3.

as approved by the CO.

Wall batter may be constructed by offsetting Welded Wire Forms