ak-f-cnf-101502_Horiz_Ali_Rpt_AP640LT.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- AK FS CNF 1015(2), Russian River Campground Access Phase 2 Federal contract opportunity
- Solicitation number
- 69056722B000007
About this file
This document contains a federal solicitation and related project file. The solicitation number 69056722B000007 from the Department of Transportation Federal Highway Administration is for the AK FS CNF 1015(2), Russian River Campground Access Phase 2 project. The attached solicitation documents and project file c:\pw-work\d0415446\ak-f-cnf-101502_COR_02.dgn dated April 11, 2022 at 2:42 PM provide details on a horizontal alignment review for the AP640LT alignment from station 25+00.000 to 25+24.000 running tangentially S20.944E for 24 feet in length based on the project default description.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RPTbxrzqyca Horizontal Alignment Review Report
| Report Created: Monday, April 11, 2022 | |
| Time: 2:42:41 PM | |
| Project: | Default |
| Description: | |
| File Name: | c:\pw-work\d0415446\ak-f-cnf-101502_COR_02.dgn |
| Last Revised: | 4/11/22 14:41 |
| Note: All units in this report are in feet unless specified otherwise. |
| Alignment Name: | AP640LT | |||
| Alignment Description: | ||||
| Alignment Style: | Alignment\Baseline | |||
| Station | Northing | Easting | ||
| Element: Linear | ||||
| START | ( ) | 25+00.000 | 2366803.563 | 1647202.653 |
| END | ( ) | 25+24.000 | 2366781.148 | 1647211.232 |
| Tangential Direction: | S20.944°E | |||
| Tangential Length: | 24 |
File details come from the government source that posted it. Updated .