Amendment A001 .pdf

PDF 457 KB Posted

Attached to
AK FS CNF 1015(2), Russian River Campground Access Phase 2 Federal contract opportunity
Solicitation number
69056722B000007
Issued by
Department of Transportation Federal Highway Administration

About this file

This document is an amendment to a federal solicitation for construction services. The solicitation is from the Department of Transportation Federal Highway Administration for a project called AK FS CNF 1015(2), Russian River Campground Access Phase 2. The amendment revises the special contract requirements section and enclosures to include price adjustment terms for pay items containing asphalt binder and fuel. Monthly adjustments will be calculated using a base price index and monthly performance price index obtained from industry publications. Price adjustments will apply when the ratio of the indexes varies by 10% or more from the base. The maximum monthly and final adjustments are limited to 50% of the base price.

View the file

Other files for this federal contract opportunity

Other files attached to AK FS CNF 1015(2), Russian River Campground Access Phase 2, newest first.
File Type Posted
BidTab AK FS CNF 101(2).pdf PDF
BidSum AK FS CNF 1015(2).pdf PDF
QA_07-06a-2022.pdf PDF
QA_07-06-2022.pdf PDF
QA_07-05a-2022.pdf PDF
QA_07-05-2022.pdf PDF
Amendment A005.pdf PDF
QA_07-01a-2022.pdf PDF
QA_07-01-2022.pdf PDF
QA_06-30-2022.pdf PDF
Amendment A004.pdf PDF
QA_06-29-2022.pdf PDF
QA_06-24-2022.pdf PDF
Amendment A003.pdf PDF
QA_06-23-2022.pdf PDF
QA_06-22-2022.pdf PDF
Amendment A002.pdf PDF
ak-f-cnf_101502_EW_ElemCompQtysRpt_100.pdf PDF
GR 04-22 AK FS CNF 1015(2) - Russian River Campground Phase II Geotechnical Report (REVISED 5-3-22).pdf PDF
RussianRiver_CG_controlsheet.xlsx XLSX spreadsheet
ak-f-cnf-101502_Prof_Rpt_AP640LT.xlsx XLSX spreadsheet
Final ak-f-cnf101502_Plan_Set.pdf PDF
ak-f-cnf101502_Appr_Calcs_EW_AP603LT_100.pdf PDF
ak-f-cnf-101502_Horiz_Ali_Rpt.pdf PDF
ak-f-cnf-101502_Prof_Rpt_AP603LT.xlsx XLSX spreadsheet
ak-f-cnf-101502_Horiz_Ali_Rpt.xlsx XLSX spreadsheet
IFB AK FS CNF 1015(2).pdf PDF
ak-f-cnf_101502_EW_CorrCompQtysRpt_100.pdf PDF
Physical Data.zip ZIP file
ak-f-cnf-101502_Super_Rpt.pdf PDF
ak-f-cnf-101502_Horiz_Ali_Rpt_AP640LT.xlsx XLSX spreadsheet
ak-f-cnf101502_Appr_Calcs_EW_AP640LT_100.pdf PDF
AK_signedSWPPP_AK FS CNF 1015(2) for contract.pdf PDF
ak-f-cnf101502_xs_01_new.pdf PDF
RussianRiverRd_RetainingWallMemo 12-10-2019.pdf PDF
ak-f-cnf101502_xs_01_culv.pdf PDF
Russian River - Hydraulics_Construction_Handoff_Memo.pdf PDF
ak-f-cnf-101502_Prof_Rpt.pdf PDF
ak-f-cnf-101502_Prof_Rpt_AP640LT.pdf PDF
ak-f-cnf-101502_Prof_Rpt_AP603LT.pdf PDF
ak-f-cnf-101502_Horiz_Ali_Rpt_AP640LT.pdf PDF
ak-f-cnf-101502_Horiz_Ali_Rpt_AP603LT.pdf PDF
ak-f-cnf-101502_Horiz_Ali_Rpt_AP603LT.xlsx XLSX spreadsheet
ak-f-cnf-101502_Super_Rpt.xlsx XLSX spreadsheet
ak-f-cnf-101502_Prof_Rpt.xlsx XLSX spreadsheet
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A001 N/A

N/A

N/A

N/A

N/A

N/A

AK FS CNF 1015(2), Russian River Campground Access Phase 2

Amendment A001 is issued to revise the following:

SPECIAL CONTRACT REQUIREMENTS Pages E-21 and E-22

ENCLOSURES: Pages E-21 and E-22

N/A Department of Transportation FHWA Western Federal Lands Division 610 E Fifth Street Vancouver WA 98661

N/A

N/A

69056722B000007

N/A

See Block 14

1 3

06/07/2022

06/14/2022

N/A

N/A

N/A

N/A marino.chea Cross-Out marino.chea Cross-Out marino.chea Cross-Out marino.chea Cross-Out marino.chea Cross-Out marino.chea Cross-Out marino.chea Cross-Out marino.chea Cross-Out marino.chea Cross-Out marino.chea Cross-Out

E-21 DIVISION 100

Special Contract Requirements Project: AK FS CNF 1015(2), Russian River Campground Access, Phase 2 of Engineers Construction Equipment Ownership and Operating Expense Schedule (CEOOES) for the region where costs are incurred. Adjust the rates for used equipment and for other variable parameters used in the schedules. Provide the CO with a completed WFLHD Form 103, proposed CEOOES rates for each piece of equipment with supporting calculations, and any other necessary documentation about the equipment to calculate allowable ownership and operating costs using CEOOES.

An electronic version of the WFLHD Form 103 form is available at:

https://highways.dot.gov/federal-lands/construction/forms-wfl.

For equipment that is not planned to be used at the time of the preconstruction conference, but is later used on the project, provide required information and data prior to mobilizing the equipment to the project.

109.06A Adjustments for Price Fluctuations. (Added Subsection).

Price adjustments for pay items listed in Table 109-1 will be made when the price fluctuation for products used in the performance of the work exceed specified limits. Adjustments are not intended to compensate for normal day-to-day fluctuations, seasonal changes, or to serve as a guarantee of full compensation for price fluctuations. It does provide for sharing in a portion of the risk, which could result from unusual price fluctuations. No price adjustments will be made for work performed beyond the fixed completion date.

Table 109-1 Pricing Adjustment Pay Items

Line Item Number

Pay Item Number

Pay Item Description

Product

A0460 20401-0000 Roadway excavation Fuel

A0480 20411-0000 Select borrow Fuel

A0760 30202-2000 Roadway aggregate, method 2

Fuel

A0780 40301-0100 Asphalt concrete pavement, type 1

Asphalt binder & Fuel

Monthly adjustments will be accrued with the payment or rebate to be made in the final voucher.

A partial price adjustment payment may be made once every 12 months or when the unpaid accrued increase exceeds $10,000 when requested in writing. The Government will withhold a rebate when the deductive accrual exceeds $10,000.

The maximum allowable monthly and final adjustment for payment to the Contractor or rebate to the Government is limited to 50 percent of the Base Price Index.

(a) Asphalt binder adjustment. The Government will determine price indexes using price data obtained from the Asphalt Weekly Monitor® by Poten and Partners, Inc. The weekly high and low selling price data for Asphalt Concrete Pavement, Type 1, reported for Anchorage,Seattle

Revised by Amendment A001

E-22 DIVISION 100

Special Contract Requirements Project: AK FS CNF 1015(2), Russian River Campground Access, Phase 2

AKWA, will be averaged and used to establish a Base Price Index (BPI) and a Monthly Performance Price Index (MPPI). These indexes are defined as follows:

(1) Base Price Index. The Base Price Index (BPI) is a price index determined by the arithmetic average for prices in the four Asphalt Weekly Monitor® publications immediately preceding the bid opening.

BPI(Asphalt Binder) = $ [PRICE TO BE INSERTED AT AWARD] per ton

(2) Monthly Performance Price Index. The Monthly Performance Price Index (MPPI) is the arithmetic average of the weekly price data from four Asphalt Weekly Monitor® publications issued before the last Wednesday of the month in which the work was performed.

The BPI and MPPI will be posted at:

https://highways.dot.gov/federal-lands/business/escalation-factors-wfl.

Asphalt binder contained in recycled asphalt pavement (RAP) incorporated into the mix will be excluded from price adjustments. Price adjustments to asphalt binder will be calculated by the Government using a ratio of the MPPI/BPI to determine price adjustments as follows:

No price adjustment – When the ratio MPPI/BPI falls within the range of 0.90 to 1.10, no price adjustment will be made for asphalt binder used in construction work performed during the relevant month.

Government rebate – When the ratio MPPI/BPI is calculated to be less than 0.90, the Government is due a rebate as follows:

Government Rebate = (0.90 – MPPI/BPI) (BPI) (Q)

Contractor payment – When the ratio MPPI/BPI is calculated to be greater than 1.10, the Contractor is due additional payment as follows:

Contractor Payment = (MPPI/BPI – 1.10) (BPI) (Q) where:

Q = Table 109-1 pay item quantity (tons or metric tons) x ((% Asphalt Binder/100) – (% RAP/100 x % asphalt binder in RAP/100));

% Asphalt Binder = % Binder by Mass of Total Mix from the approved job-mix formula;

% RAP = percent recycled asphalt pavement from the approved job-mix formula; and

% asphalt binder in RAP = percent of asphalt binder in recycled asphalt pavement from the approved job-mix formula.

Revised by Amendment A001

File details come from the government source that posted it. Updated .