DFAC RFP ATTCH 3 - PPQ.pdf

PDF 605 KB Posted

Attached to
FULL FOOD SERVICE EDWARDS AFB DINING FACILITY (DFAC) Federal contract opportunity
Solicitation number
FA9301-11-R-0002
Issued by
Department of the Air Force Materiel Command Test Center

About this file

DFAC RFP ATTCH 3

View the file

Other files for this federal contract opportunity

Other files attached to FULL FOOD SERVICE EDWARDS AFB DINING FACILITY (DFAC), newest first.
File Type Posted
FA9301-11-R-0002 Amendment 0009.pdf PDF
FA9301-11-R-0002 A0008.pdf PDF
Updated Wage Determination 1996-0077 Rev 25 Dated 21 Jan 2011.mht.pdf PDF
FA9301-11-R-0002 A0007.pdf PDF
Amendment 6.doc DOC document
Final EAFB PWS A0005.pdf PDF
FA9301-11-R-0002 A0005.pdf PDF
FA9301-11-R-0002 A0004.pdf PDF
Final EAFB PWS ammendment 0004.pdf PDF
Pre-Proposal Conference Slides.pdf PDF
9-24-10.doc DOC document
DFAC Layout.pdf PDF
FA9301-11-R-0002-A0001.pdf PDF
FA9301-11-R-0002-A0003.pdf PDF
Final EAFB PWS.pdf PDF
FA9301-11-R-0002-A0002.pdf PDF
PWS Ammendment 01.pdf PDF
FA9301-11-R-0002-A0001.pdf PDF
Attendance Site Visit 9-14-10.pdf PDF
FBO EAFB Sample Menu.pdf PDF
DFAC RFP ATTCH 2 - WAGE DETERMINATION.pdf PDF
FBO USAFCashierGuide.pdf PDF
Q A Site Visit 9-14-10.pdf PDF
FBO CFS MENU 2009.pdf PDF
FBO CFS MC Procedures.pdf PDF
DFAC RFP ATTCH 4 - Mission Essential.pdf PDF
FBO CFS Handbook_2.1.pdf PDF
DFAC RFP ATTCH 1- EAFB PWS.pdf PDF
FA9301-11-R-0002 DFAC RFP Final 9-16-10.pdf PDF
09-09-10.docx DOCX document
09-04-10.docx DOCX document
EAFB DFAC PWS.pdf PDF
wdol kern county.pdf PDF
Sample Menu Items.docx DOCX document
Bld 2412.pdf PDF
DFAC Draft RFP.pdf PDF
DFAC GFE.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST AND PRESENT PERFORMANCE QUESTIONNAIRE

SUBJECT: Request for Past Performance Evaluation

TO:

You have been identified as a point of contact for a past and/or present performance evaluation of the firm listed on the attached questionnaire. This firm is currently being considered for a Full Food Service contract at Edwards AFB, CA.

Your prompt attention to this questionnaire will be greatly appreciated. If you have any questions concerning this request, I can be contacted at (insert contractor phone number).

Please submit completed questionnaire to the Government Contract Specialist identified on the attached questionnaire.

Contractor Signature

1 Atch

Past and Present Performance Questionnaire

09/09/2010

FA9301-11-R-0002 DFAC RFP Attachment 3 Page 1 of 5

PAST AND PRESENT PERFORMANCE QUESTIONNAIRE

A. GENERAL INFORMATION:

Contractor’s Name: ___________________ Telephone Number:___________________

Address: _________________________ Fax Number:________________________

Point of Contact: _____________________________

Project Title and Brief Description of Work:

Contract Number Provided by Offeror: _________________ Dollar Amount:_________*

Contract Period or Dates of Performance Provided by Offeror: ______________________

Contractor performed as the Prime Contractor Sub-Contractor Key Personnel

* Note: If offeror holds or has held other contracts with your agency/organization in the last 3 years, please complete separate evaluation forms for those contracts as well.

B. RESPONDENT INFORMATION:

Name of Respondent: _____________________ Title: ___________________________

Address: _____________________ Telephone Number: ___________________

_____________________________ Fax Number: ________________________

_____________________________ Email Address: _______________________

C. SEND COMPLETED SURVEY FORM TO:

2Lt James Ciccone Ronda Satori

AFFTC/PKOA AFFTC/PKOA

james.ciccone@edwards.af.mil ronda.satori@edwards.af.mil fax: (661) 275-7833

FA9301-11-R-0002 DFAC RFP Attachment 3 Page 2 of 5 mailto:james.ciccone@edwards.af.mil mailto:ronda.satori@edwards.af.mil

D. PERFORMANCE INFORMATION: Choose the appropriate letter on the scale (E, G, S, M, U, and N) that most accurately describes the contractor’s performance or situation. PLEASE

PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF M or U.

E G S M U N

Exceptional Good Satisfactory Marginal Unsatisfactory Neutral

Performance meets contractual requirements with many exceeded to the

Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than a few minor problems for which corrective actions taken by the contractor were highly effective.

Performance meets contractual requirements with some exceeded to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than some minor problems for which corrective actions taken by the contractor were effective.

Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor were satisfactory.

Performance does not meet some contractual requirements.

The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.

does not meet most contractual requirements and recovery is not likely in a timely manner.

The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

was not observed or not applicable to the current effort being reported against.

FA9301-11-R-0002 DFAC RFP Attachment 3 Page 3 of 5

CONTRACTOR’S NAME: _______________ CONTRACT #: _______________

Place an “X” in the appropriate column using the definitions matrix above.

The contractor: E G S M U N

1.

How well did the Supervisor/Dining Facility Services Manager ensure conformance to contract, staffing, and quality requirements?

2.

How well did the Supervisor/Dining Facility Services Manager ensure proper cash handling, inventory control, and accounting procedures?

3. How well did the contractor supervise and train personnel.

4. How well did the contractor ensure guest flow rate and customer service?

5.

How well did the contractor place orders for food and supplies in appropriate quantities based on projected number of diners?

6.

How well did the contractor verify quantities received/inventory shipment of food and supplies adequately and store items properly and timely?

7.

How well did the contractor take care to identify any items that should not be accepted due to spoilage improper refrigeration, etc?

8.

How well did the contractor take all precautions according to the contract to prevent food-borne illnesses?

9.

How well did the contractor serve quality food with regards to freshness, flavor, color, texture, and nutritional value.

10.

How well did the contractor cook and maintain food items at appropriate temperatures

(both hot and cold)?

11. How well did contractor replenish entrée items, beverages , & supplies in a timely manner?

12. How well did the contractor keep the kitchen and dining area clean & orderly at all times?

13.

How well did the contractor/contract employees present a neat, well-groomed, and orderly appearance? (i.e. proper uniform; hand washing ; personal hygiene)

14.

Did the contractor have a Quality Control Plan ___ YES _____ NO?

How well did the contractor follow and monitor the Quality Control Plan.

15.

How well did the contractor care for facilities and equipment provided for use under contract?

16.

How well did the contractor maintain and repair the equipment provided for use under contract?

17.

How well did the contractor promptly report damage to equipment/facilities or submit work orders regarding need for maintenance and repair to equipment & facilities?

18.

How effective was the contractor’s safety program to ensure compliance with federal, state, local regulations and create a safe job site?

19.

Did the contractor use OSHA’s Voluntary Protection Programs to promote effective worksite-based safety and health? ___YES ___NO

If yes

What was the contractors Total Case Incident Rate (TCIR) _____

What was the contractors Days Away, Restricted or Transferred (DART) rate________

FA9301-11-R-0002 DFAC RFP Attachment 3 Page 4 of 5

The contractor: E G S M U N

20.

Did the contractor perform any meal service during an emergency or contingency operation

_______YES ________NO

How well did the contractor perform emergency/contingency meal service?

21.

How flexible, cooperative, and reasonable was the contractor in meeting mission requirements, particularly when faced with short-notice mission changes?

22.

Provide overall rating for this contractor. Would you contract with them again if given the choice? ________YES _____NO

Please provide any additional information you feel is important and not covered elsewhere*:

*If applicable, please reference the appropriate question number.

Thank you for your remarks, and be sure to return this form to the Contracting Agency and not to the Contractor you are providing a reference for.

Name of Company Being Evaluated: ___________________________

Respondents Signature: ______________________________________

Date Completed: ___________________

FA9301-11-R-0002 DFAC RFP Attachment 3 Page 5 of 5

File details come from the government source that posted it. Updated .