FARM_Seed_Site_Visit_Industry_Comments_and_Resolutions_-_26_February_2016.pdf

PDF 109 KB Posted

Attached to
Facilities Acquisitions for Restoration and Modernization (FARM) Federal contract opportunity
Solicitation number
FA9101-16-R-0100
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Questions and Answers to Final RFP 26 Feb 16

View the file

Other files for this federal contract opportunity

Other files attached to Facilities Acquisitions for Restoration and Modernization (FARM), newest first.
File Type Posted
FARM_Seed_Site_Visit_Industry_Comments_and_Resolutions_-_3_March_2016.pdf PDF
FARM_Seed_Site_Visit_Industry_Comments_and_Resolutions_-_24_February_2016.pdf PDF
Amendment_0003_with_attachments.pdf PDF
Attachment_6 _Seed_Project_-_Replace_Boilers_2 _3 _and_4_Air_Systems_Steam_Plant_A.pdf PDF
Amendment_0001_withAtch.pdf PDF
Attachment_L-10 _Agenda_for_Seed_Project_Site_Visit.pdf PDF
Attachment_5 _Seed_Project_-_Repair_161kV_Circuit_Switchers.pdf PDF
Attachment_7 _Seed_Project_-_Replace_Unit_Sub_1 _Model_Shop.pdf PDF
Attachment_L-8 _Seed_Project_Pricing_Sheet.pdf PDF
Attachment_6 _Seed_Project_-_Replace_Boilers_2 _3 _and_4_Air_Systems_Steam_Plant_A.pdf PDF
Attachment_1 _Statement_of_Work.pdf PDF
Attachment_9 _Section_M.pdf PDF
Attachment_8 _Section_L.pdf PDF
Attachment_L-5 _Subcontractor_Consent_Letter.pdf PDF
Attachment_L-7 _Cross_Reference_Matrix.xlsx XLSX spreadsheet
Attachment_L-2 _Past_Performance_Questionnaire.pdf PDF
FA9101-16-R-0100.pdf PDF
Attachment_L-4 _Client_Authorization_Letter.pdf PDF
Attachment_2 _Scheduled_Government_Furnished_Property.pdf PDF
Attachment_4 _Seed_Project_-_Repair_(Replace)_Suction_Valves _SPS.pdf PDF
Attachment_L-1 _PPI_Tool.pdf PDF
Attachment_L-9 _Sample_Project_-_Hydraulic_System_Upgrade.pdf PDF
FA9101-16-R-0100_Cover_Letter.pdf PDF
Attachment_3 _Wage_Determination.pdf PDF
Attachment_L-3 _PPQ_Cover_Letter.pdf PDF
Attachment_L-6 _Relevancy_Matrix.xlsx XLSX spreadsheet
Amendment_0002.pdf PDF
Attachment_5 _Seed_Project_-_Repair_161kV_Circiut_Switchers.pdf PDF
ppi_tool.accdb —
Questions_and_Answers_to_draft_RFP.pdf PDF
Industry_Announcement_11Jan16.pdf PDF
Amendment_0001.pdf PDF
Attachment_L-6 _Relevancy_Matrix.pdf PDF
FA9101-16-R-0100.pdf PDF
Attachment_L-8 _Seed_Project_Pricing_Sheet.pdf PDF
Attachment_L-9 _Sample_Project_-_Hydraulic_System_Upgrade.pdf PDF
Attachment_L-7 _Cross_Reference_Matrix.pdf PDF
Attachment_L-4 _Client_Authorization_Letter.pdf PDF
dRFP_Cover_Letter.pdf PDF
Attachment_L-5 _Subcontractor_Consent_Letter.pdf PDF
Attachment_3 _Wage_Determination.pdf PDF
Attachment_L-3 _PPQ_Cover_Letter.pdf PDF
Attachment_4 _Seed_Project_-_Repair_(Replace)_Suction_Valves _SPS.pdf PDF
Attachment_L-2 _Past_Performance_Questionnaire.pdf PDF
Attachment_8 _Section_L.pdf PDF
Attachment_7 _Seed_Project_-_Replace_Unit_Sub_1 _Model_Shop.pdf PDF
Attachment_L-1 _PPI_Tool.pdf PDF
Attachment_5 _Seed_Project_-_Replace_HVAC_G-Range_Service_Tunnel.pdf PDF
Attachment_6 _Seed_Project_-_Replace_Boilers_2 _3 _and_4_Air_Systems_Steam_Plant_A.pdf PDF
Attachment_2 _Special_Contract_Rqts.pdf PDF
Show all 50

Facilities Acquisitions for Restoration and Modernization (FARM) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Responses to Final RFP Questions on Request for Proposal

Solicitation No. FA9101-16-R-0100, Facilities Acquisition for Restoration and Modernization (FARM)

26 February 2016

Question OPR Response

It is identified that ACM Abatement will be required as part of this project. Please provide the ACM Assessment Report and/or ACM quantities to be abated.

For Attachment 7, Seed Project - Replace Unit Sub 1, Model Shop, no

ACM Assessment Report is available for release at this time. The known ACM material for this project is as follows: "Woven (fiber/cloth covered) jacketed wiring insulation Bus bar support bracket insulation

Arc chutes Duct seal Transite electrical conduit."

Amendment One-Section L-3.3.1 Volume Organization Table, Page

11- This section provides a table of contents that requires the volume to be organized according to the table. The 3rd item listed in the Table of Contents states “Past Performance References (See

Paragraph L-3.3.3.1).” When this section (L-3.3.3.1) is reviewed, several items are listed in this section that are also listed in the

Table of Contents on Page 11 of Amendment One. These items include 1) Information required by the Past Performance Tool, 2)

List of Submitted References 3) Relevancy Matrix 4) Consent

Letters 5) Authorization Letters 6) List of Questionnaire Recipients.

What exactly is required to be included in this section as some of the items are duplicated with other sections of the table of contents?

Section L-3.3.1, Volume Organization, identifies how the past performance volume should be organized. The first page of the volume will be the table of contents, which will list the items in the table in L-

3.3.1 and their page number in the volume. Next, offerors should include the two-page summary as described in L-3.3.2. Next, offerors should include the hard copies from the PPI tool, which satisfies the requirements of paragraphs L-3.3.3.1, L-3.3.3.2, and L-3.3.3.3. The remaining sections of the volume are the relevancy matrix, organizational structure change history, consent letters, client authorization letters, and list of questionnaire recipients. Items should not be duplicated.

Amendment One-Section L-3.3.1 Volume Organization Table, Page

11- This section provides a table of contents that requires the volume to be organized according to the table. Section L-3.3.3.1-

What is meant by Information required by the Past Performance

Tool? The past performance Information Submission is specified in

Section L-3.3.3.2.

Offerors will use the PPI Tool to provide information on recent and relevant contracts. The hard copy generated from the information inputted into the PPI Tool should satisfy the requirements of paragraphs L-3.3.3.1, L-3.3.3.2, and L-3.3.3.3.

26 February 2016

Question OPR Response

Amendment One-Section L-3.3.1 Volume Organization Table, Page

11- This section provides a table of contents that requires the volume to be organized according to the table. Section L-3.3.3.3

Relevancy Contracts and Recency Determination- What is required for this section. It is our understanding that this information is to be provided within the Past Performance Information Tool?

Offerors will use the PPI Tool to provide information on recent and relevant contracts. The hard copy generated from the information inputted into the PPI Tool should satisfy the requirements of paragraphs L-3.3.3.1, L-3.3.3.2, and L-3.3.3.3.

There are two places where a Cage Code and/or DUNS number are required in the documents to be used for past performance. One is on Attachment 2, Past Performance Questionnaire, D. Cage Code, and the other is on Attachment L-1, Past Performance Information for Offerors, #15 Cage Code and DUNS Number. We have subcontractors who have never worked for the federal government as a prime contractor, and therefore, do not have DUNS numbers or Cage Codes. How do we respond, especially in the PPI Tool where the information has to be electronically entered?

If the information is unknown or unavailable, enter "N/A." Offerors should be able to enter "N/A" in the PPI Tool.

In the TO for the Unit Sub the specifications mention to follow

AEDC standard E-18 Managing Waste Containing Chemical or

Petroleum Products on how to dispose of PCB oil. This standard contains the following statement, “Waste that are managed by other standards include asbestos, explosives and polychlorinated biphenyls (PCBs) [See AEDC Safety, Health and Environmental (SHE)

Standards D11, Ionizing Radiation; E-7, Asbestos ; E-15, Explosive

Safety and E-16 , Polychlorinated Biphenyls.]

Question: Standard E-16 is not available on the website containing the AEDC Standards. Please provide this standard so we can get a full understanding of handling the oil from the transformer in the unit sub replacement.

SHE Standard E-16, Polychlorinated Biphenyls, has been added to the

FARM competition library.

26 February 2016

Question OPR Response

Question: Is the duct work and dust collector bin between the boiler and ID fan covered with ACM insulation? If so, please provide an approximate surface area of ACM insulation that requires disposal.

For Attachment 6, Seed Project - Replace Boilers 2, 3, and 4 Air

Systems, Steam Plant A, based on drawing M3 note 5 the mechanical dust collector contains asbestos. The surface area to be removed is approximately 180 square feet.

Construction note #1 & 4/M3 on M3 & D&F/M5 on M5; please label & size the 5th accumulator for emergency conditions

For Attachment 4, Seed Project - Repair (Replace) Suction Valves, SPS, on drawing M3 and M5, the 5th accumulator that is not labeled or sized will not be replaced.

Please complete note #1 For Attachment 4, Seed Project - Repair (Replace) Suction Valves, SPS, on drawing M7, Note 1 is missing a comma. It should read, "Before working on hydraulic system, discharge accumulators."

In regard to your Responses to Final RFP Questions on Request for

Proposal dated 24 February 2016, there is a Question on Page 8 referring to subcontractor participation for the Past Performance

Volume and the OPR Response stated “The past performance volume is required for the “offeror” (prime contractors) not subcontractors.” The RFP L-3.3.2. Summary and L-3.3.3. Past

Performance (PPI) Sheets refers to Offerors, subcontractors, or joint venture partners and Para L-3.3.3.1 and L-3.3.3.3 refers to providing information from the Offerors and Subcontractors. Also

Attachment L-1 Past Performance Information (PPI) for Offerors on

Page 2, Item 6 Application Setup refers to entering Past

Performance information for Subcontractors. Can you please clarify?

The past performance volume is to be submitted by the "offeror"

(prime contractors); however, it shall include the past performance information for the prime contractor and any subcontractors.