Questions and Answers to Final RFP 26 Feb 16
View the file
Other files for this federal contract opportunity
Show all 50
Facilities Acquisitions for Restoration and Modernization (FARM) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Responses to Final RFP Questions on Request for Proposal
Solicitation No. FA9101-16-R-0100, Facilities Acquisition for Restoration and Modernization (FARM)
26 February 2016
Question OPR Response
It is identified that ACM Abatement will be required as part of this project. Please provide the ACM Assessment Report and/or ACM quantities to be abated.
For Attachment 7, Seed Project - Replace Unit Sub 1, Model Shop, no
ACM Assessment Report is available for release at this time. The known ACM material for this project is as follows: "Woven (fiber/cloth covered) jacketed wiring insulation Bus bar support bracket insulation
Arc chutes Duct seal Transite electrical conduit."
Amendment One-Section L-3.3.1 Volume Organization Table, Page
11- This section provides a table of contents that requires the volume to be organized according to the table. The 3rd item listed in the Table of Contents states “Past Performance References (See
Paragraph L-3.3.3.1).” When this section (L-3.3.3.1) is reviewed, several items are listed in this section that are also listed in the
Table of Contents on Page 11 of Amendment One. These items include 1) Information required by the Past Performance Tool, 2)
List of Submitted References 3) Relevancy Matrix 4) Consent
Letters 5) Authorization Letters 6) List of Questionnaire Recipients.
What exactly is required to be included in this section as some of the items are duplicated with other sections of the table of contents?
Section L-3.3.1, Volume Organization, identifies how the past performance volume should be organized. The first page of the volume will be the table of contents, which will list the items in the table in L-
3.3.1 and their page number in the volume. Next, offerors should include the two-page summary as described in L-3.3.2. Next, offerors should include the hard copies from the PPI tool, which satisfies the requirements of paragraphs L-3.3.3.1, L-3.3.3.2, and L-3.3.3.3. The remaining sections of the volume are the relevancy matrix, organizational structure change history, consent letters, client authorization letters, and list of questionnaire recipients. Items should not be duplicated.
Amendment One-Section L-3.3.1 Volume Organization Table, Page
11- This section provides a table of contents that requires the volume to be organized according to the table. Section L-3.3.3.1-
What is meant by Information required by the Past Performance
Tool? The past performance Information Submission is specified in
Section L-3.3.3.2.
Offerors will use the PPI Tool to provide information on recent and relevant contracts. The hard copy generated from the information inputted into the PPI Tool should satisfy the requirements of paragraphs L-3.3.3.1, L-3.3.3.2, and L-3.3.3.3.
26 February 2016
Question OPR Response
Amendment One-Section L-3.3.1 Volume Organization Table, Page
11- This section provides a table of contents that requires the volume to be organized according to the table. Section L-3.3.3.3
Relevancy Contracts and Recency Determination- What is required for this section. It is our understanding that this information is to be provided within the Past Performance Information Tool?
Offerors will use the PPI Tool to provide information on recent and relevant contracts. The hard copy generated from the information inputted into the PPI Tool should satisfy the requirements of paragraphs L-3.3.3.1, L-3.3.3.2, and L-3.3.3.3.
There are two places where a Cage Code and/or DUNS number are required in the documents to be used for past performance. One is on Attachment 2, Past Performance Questionnaire, D. Cage Code, and the other is on Attachment L-1, Past Performance Information for Offerors, #15 Cage Code and DUNS Number. We have subcontractors who have never worked for the federal government as a prime contractor, and therefore, do not have DUNS numbers or Cage Codes. How do we respond, especially in the PPI Tool where the information has to be electronically entered?
If the information is unknown or unavailable, enter "N/A." Offerors should be able to enter "N/A" in the PPI Tool.
In the TO for the Unit Sub the specifications mention to follow
AEDC standard E-18 Managing Waste Containing Chemical or
Petroleum Products on how to dispose of PCB oil. This standard contains the following statement, “Waste that are managed by other standards include asbestos, explosives and polychlorinated biphenyls (PCBs) [See AEDC Safety, Health and Environmental (SHE)
Standards D11, Ionizing Radiation; E-7, Asbestos ; E-15, Explosive
Safety and E-16 , Polychlorinated Biphenyls.]
Question: Standard E-16 is not available on the website containing the AEDC Standards. Please provide this standard so we can get a full understanding of handling the oil from the transformer in the unit sub replacement.
SHE Standard E-16, Polychlorinated Biphenyls, has been added to the
FARM competition library.
26 February 2016
Question OPR Response
Question: Is the duct work and dust collector bin between the boiler and ID fan covered with ACM insulation? If so, please provide an approximate surface area of ACM insulation that requires disposal.
For Attachment 6, Seed Project - Replace Boilers 2, 3, and 4 Air
Systems, Steam Plant A, based on drawing M3 note 5 the mechanical dust collector contains asbestos. The surface area to be removed is approximately 180 square feet.
Construction note #1 & 4/M3 on M3 & D&F/M5 on M5; please label & size the 5th accumulator for emergency conditions
For Attachment 4, Seed Project - Repair (Replace) Suction Valves, SPS, on drawing M3 and M5, the 5th accumulator that is not labeled or sized will not be replaced.
Please complete note #1 For Attachment 4, Seed Project - Repair (Replace) Suction Valves, SPS, on drawing M7, Note 1 is missing a comma. It should read, "Before working on hydraulic system, discharge accumulators."
In regard to your Responses to Final RFP Questions on Request for
Proposal dated 24 February 2016, there is a Question on Page 8 referring to subcontractor participation for the Past Performance
Volume and the OPR Response stated “The past performance volume is required for the “offeror” (prime contractors) not subcontractors.” The RFP L-3.3.2. Summary and L-3.3.3. Past
Performance (PPI) Sheets refers to Offerors, subcontractors, or joint venture partners and Para L-3.3.3.1 and L-3.3.3.3 refers to providing information from the Offerors and Subcontractors. Also
Attachment L-1 Past Performance Information (PPI) for Offerors on
Page 2, Item 6 Application Setup refers to entering Past
Performance information for Subcontractors. Can you please clarify?
The past performance volume is to be submitted by the "offeror"
(prime contractors); however, it shall include the past performance information for the prime contractor and any subcontractors.