Attachment_L-6 _Relevancy_Matrix.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Facilities Acquisitions for Restoration and Modernization (FARM) Federal contract opportunity
Solicitation number
FA9101-16-R-0100
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Attachment L-6 Relevancy Matrix

View the file

Other files for this federal contract opportunity

Other files attached to Facilities Acquisitions for Restoration and Modernization (FARM), newest first.
File Type Posted
FARM_Seed_Site_Visit_Industry_Comments_and_Resolutions_-_3_March_2016.pdf PDF
FARM_Seed_Site_Visit_Industry_Comments_and_Resolutions_-_26_February_2016.pdf PDF
FARM_Seed_Site_Visit_Industry_Comments_and_Resolutions_-_24_February_2016.pdf PDF
Amendment_0003_with_attachments.pdf PDF
Attachment_6 _Seed_Project_-_Replace_Boilers_2 _3 _and_4_Air_Systems_Steam_Plant_A.pdf PDF
Amendment_0001_withAtch.pdf PDF
Attachment_L-7 _Cross_Reference_Matrix.xlsx XLSX spreadsheet
Attachment_L-2 _Past_Performance_Questionnaire.pdf PDF
FA9101-16-R-0100.pdf PDF
Attachment_L-4 _Client_Authorization_Letter.pdf PDF
Attachment_2 _Scheduled_Government_Furnished_Property.pdf PDF
Attachment_4 _Seed_Project_-_Repair_(Replace)_Suction_Valves _SPS.pdf PDF
Attachment_L-8 _Seed_Project_Pricing_Sheet.pdf PDF
Attachment_6 _Seed_Project_-_Replace_Boilers_2 _3 _and_4_Air_Systems_Steam_Plant_A.pdf PDF
Attachment_1 _Statement_of_Work.pdf PDF
Attachment_9 _Section_M.pdf PDF
Attachment_8 _Section_L.pdf PDF
Attachment_L-5 _Subcontractor_Consent_Letter.pdf PDF
Attachment_L-10 _Agenda_for_Seed_Project_Site_Visit.pdf PDF
Attachment_5 _Seed_Project_-_Repair_161kV_Circuit_Switchers.pdf PDF
Attachment_7 _Seed_Project_-_Replace_Unit_Sub_1 _Model_Shop.pdf PDF
Attachment_L-1 _PPI_Tool.pdf PDF
Attachment_L-9 _Sample_Project_-_Hydraulic_System_Upgrade.pdf PDF
FA9101-16-R-0100_Cover_Letter.pdf PDF
Attachment_3 _Wage_Determination.pdf PDF
Attachment_L-3 _PPQ_Cover_Letter.pdf PDF
Amendment_0002.pdf PDF
Attachment_5 _Seed_Project_-_Repair_161kV_Circiut_Switchers.pdf PDF
ppi_tool.accdb —
Questions_and_Answers_to_draft_RFP.pdf PDF
Industry_Announcement_11Jan16.pdf PDF
Amendment_0001.pdf PDF
Attachment_L-2 _Past_Performance_Questionnaire.pdf PDF
Attachment_8 _Section_L.pdf PDF
Attachment_L-9 _Sample_Project_-_Hydraulic_System_Upgrade.pdf PDF
Attachment_L-7 _Cross_Reference_Matrix.pdf PDF
Attachment_L-4 _Client_Authorization_Letter.pdf PDF
dRFP_Cover_Letter.pdf PDF
Attachment_L-5 _Subcontractor_Consent_Letter.pdf PDF
Attachment_3 _Wage_Determination.pdf PDF
Attachment_L-3 _PPQ_Cover_Letter.pdf PDF
Attachment_4 _Seed_Project_-_Repair_(Replace)_Suction_Valves _SPS.pdf PDF
Attachment_L-6 _Relevancy_Matrix.pdf PDF
FA9101-16-R-0100.pdf PDF
Attachment_L-8 _Seed_Project_Pricing_Sheet.pdf PDF
Attachment_7 _Seed_Project_-_Replace_Unit_Sub_1 _Model_Shop.pdf PDF
Attachment_L-1 _PPI_Tool.pdf PDF
Attachment_5 _Seed_Project_-_Replace_HVAC_G-Range_Service_Tunnel.pdf PDF
Attachment_6 _Seed_Project_-_Replace_Boilers_2 _3 _and_4_Air_Systems_Steam_Plant_A.pdf PDF
Attachment_2 _Special_Contract_Rqts.pdf PDF
Show all 50

Facilities Acquisitions for Restoration and Modernization (FARM) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prime

Name of Prime ContractorPrimeReference 1Reference 2Reference 3Reference 4Reference 5
TECHNICAL CAPABILITIES
Mechanical
M1Air duct, expansion joints, and control/process valves (≥ 36” Ø and 150 psig)
M2High pressure duct/piping & valves (typ. 4" to 8"Ø, ≥ 4000 psig)
M3Large pressure vessels (≥ 2000 psig; ≥ 10K gallons)
M4Desiccant bed air dryers (≤ 300 psia & ≥ 200 lb/s)
M5Turning vanes for large air ducting (up to 50-ft Ø; 0.5-160 psia)
M6Cooling water/raw water pumps (300-50,000 gpm; 30-4,000 hp), filters/strainers, control/process valves,and distribution lines (typ. 6” to 90” Ø)
M7Hydraulic systems with high flow and pressure requirements (20-200 gpm (typ. 2 pumps @ 100 gpm ea) and 2500 psig)
M8Large steam distribution systems (60 kpph boilers, and piping up to 14 inches diameter)
M9Chillers and refrigeration equipment (300-5000 refrigeration tons)
M10Large heat exchangers: air to air; water to air; shell and tube, etc. (∆T up to 325 °F)
Electrical
E1Interior & exterior lighting for industrial buildings
E2Medium voltage gas insulated switchgear (≤ 13.8 kV)
E3Unit Substations (typical 6.9/2.4kV)
E4Motor Control Centers (≤ 600V)
E5Transformers (≤ 161/13.8kV)
E6Uninterruptable Power Supply (UPS)
E7Ducting/vaults/ cables (13.8 & 6.9 kV)
E8Motor Exciters
E9Oil Circuit Breakers (typical 3000 amp & 550kV BIL)
E10Power panels/conduit/wiring (≤ 480V)
E11Variable frequency drives for motors (≥ 600V & ≤ 69kV)
ID&C
I1PLC-based industrial control systems
I2High Speed (< 10ms Loop Time) Facility Control Systems
I3Controls software development and modification
I4Secure Control Systems
I5Data logging system design and integration
I6Control Systems Instrumentation design and integration
MANAGEMENT SUBFACTOR
M-2.2.1.1.1.1.1.Qualified Personnel
M-2.2.1.1.1.1.2.Resource Capacity
M-2.2.1.1.1.1.3.Teaming
M-2.2.1.1.1.1.4.Integrated Scheduling
M-2.2.1.1.1.1.5.Quality Assuarnce
M-2.2.1.1.1.1.6.Subcontracting Management

&"Times New Roman,Regular"ATTACHMENT L-6 RELEVANCY MATRIX &"Times New Roman,Regular"FARM

FA9101-16-R-0100

Attachment 8

Partners

Name of Partner (Subcontractor / JV)PrimeReference 1Reference 2Reference 3
TECHNICAL CAPABILITIES
Mechanical
M1Air duct, expansion joints, and control/process valves (≥ 36” Ø and 150 psig)
M2High pressure duct/piping & valves (typ. 4" to 8"Ø, ≥ 4000 psig)
M3Large pressure vessels (≥ 2000 psig; ≥ 10K gallons)
M4Desiccant bed air dryers (≤ 300 psia & ≥ 200 lb/s)
M5Turning vanes for large air ducting (up to 50-ft Ø; 0.5-160 psia)
M6Cooling water/raw water pumps (300-50,000 gpm; 30-4,000 hp), filters/strainers, control/process valves,and distribution lines (typ. 6” to 90” Ø)
M7Hydraulic systems with high flow and pressure requirements (20-200 gpm (typ. 2 pumps @ 100 gpm ea) and 2500 psig)
M8Large steam distribution systems (60 kpph boilers, and piping up to 14 inches diameter)
M9Chillers and refrigeration equipment (300-5000 refrigeration tons)
M10Large heat exchangers: air to air; water to air; shell and tube, etc. (∆T up to 325 °F)
Electrical
E1Interior & exterior lighting for industrial buildings
E2Medium voltage gas insulated switchgear (≤ 13.8 kV)
E3Unit Substations (typical 6.9/2.4kV)
E4Motor Control Centers (≤ 600V)
E5Transformers (≤ 161/13.8kV)
E6Uninterruptable Power Supply (UPS)
E7Ducting/vaults/ cables (13.8 & 6.9 kV)
E8Motor Exciters
E9Oil Circuit Breakers (typical 3000 amp & 550kV BIL)
E10Power panels/conduit/wiring (≤ 480V)
E11Variable frequency drives for motors (≥ 600V & ≤ 69kV)
ID&C
I1PLC-based industrial control systems
I2High Speed (< 10ms Loop Time) Facility Control Systems
I3Controls software development and modification
I4Secure Control Systems
I5Data logging system design and integration
I6Control Systems Instrumentation design and integration
MANAGEMENT SUBFACTOR
M-2.2.1.1.1.1.1.Qualified Personnel
M-2.2.1.1.1.1.2.Resource Capacity
M-2.2.1.1.1.1.3.Teaming
M-2.2.1.1.1.1.4.Integrated Scheduling
M-2.2.1.1.1.1.5.Quality Assuarnce
M-2.2.1.1.1.1.6.Subcontracting Management

&"Times New Roman,Regular"ATTACHMENT L-6 RELEVANCY MATRIX &"Times New Roman,Regular"FARM

FA9101-16-R-0100

Attachment 8

File details come from the government source that posted it. Updated .