Attachment_4 _Seed_Project_-_Repair_(Replace)_Suction_Valves _SPS.pdf
PDF 6 MB Posted
- Attached to
- Facilities Acquisitions for Restoration and Modernization (FARM) Federal contract opportunity
- Solicitation number
- FA9101-16-R-0100
About this file
Attachment 4 Seed Project - Repair (Replace) Suction Valves SPS
View the file
Other files for this federal contract opportunity
Show all 50
Facilities Acquisitions for Restoration and Modernization (FARM) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
BV11
EXISTING PLAN - BUILDING 1507
BV10 BV9 BV8 BV7 BV6 BV5 BV4
LEGEND: NOTES:
JB
EXISTING ELEVATION - EAST WALL -
BUILDING 1507
JB
TYPICAL EXISTING LIMIT SWITCH WIRING IN PIT SECTION: LIMIT SWITCH CONDUIT
BV4 TO BV11 TYPICAL LIMIT SWITCH MOUNTING
Drawing Approved Electronically
RELEASED FOR EXECUTION
09/29/2014
N ot
S en si tiv e
NOTES:
LEGEND:
DEMOLITION 120VAC CONTROL SCHEMATIC
KEY: DEMOLITION 120VAC CONTROL SCHEMATIC
KEY:
KEY:
BUTTERFLY VALVE REMOTE CONTROL PANEL SURGE SUPPRESSOR REMOTE
CONTROL PANEL
BV12 REMOTE CONTROL PANEL
DEMOLITION WIRING DIAGRAM
NO. 12 BUTTERFLY VALVE
W
B
EXISTING BV12 REMOTE
CONTROL PANEL - FRONT VIEW
36" BUTTERFLY VALVES
W W W WW W WW
B B B B B B B B
EXISTING BUTTERFLY VALVE REMOTE CONTROL PANEL - FRONT VIEW
SURGE SUPPRESSOR VALVE
W
B
EXISTING SURGE SUPPRESSOR
REMOTE CONTROL PANEL -
FRONT VIEW
BV7 BV8 BV9
DEMOLITION BUTTERFLY VALVE WIRING DIAGRAM
BV6 BV5 BV4
DEMOLITION BV10, BV11 AND BV12 WIRING DIAGRAM
EQUIPMENT DEMOLITION - ELEVATION NORTHWEST WALL - BUILDING 1507
DEMOLITION ONE-LINE DIAGRAM
BUTTERFLY VALVE 480V 3Ø
HYDRAULIC POWER UNIT
BV11
EXISTING PLAN - BUILDING 1507
BV10 BV9 BV8 BV7 BV6 BV5 BV4
ENLARGED TYPICAL DETAIL
ANZY129010
JOB NO. 13437
REPAIR/MAINTAIN SUCTION VALVES SPS 25K PUMPS, FAC 1507
OPERATING FLOOR PLAN - SECONDARY PUMPING STATION - BUILDING 1507 - (FOR REFERENCE ONLY)
GENERAL NOTES:
DESIGN CONDITIONS TABLE
DEMOLITION PLAN - ELEVATION 1073.5 - BUILDING 1507
BALCONY FLOOR
DETAIL - SECTION
TYPICAL HANGER LIMIT SWITCH MOUNTING DETAIL OF MOTORDETAIL - VIEW
DETAIL - VIEW
DEMOLITION NOTES:
INSTALLATION PLAN - ELEVATION 1073.5 - BUILDING 1507
BALCONY FLOOR
TYPICAL HANGER LIMIT SWITCH MOUNTINGDETAIL - VIEW
DETAIL - VIEW
CONSTRUCTION NOTES:
FARM
FA9101-16-R-0100
Attachment 4
FA9101-16-R-0100
Attachment 4
Seed Project:
Repair (Replace) Suction Valves, Secondary Pumping Station (SPS)
28 January 2016
DRESSER, 36" O.D., STYLE 39 COUPLING
36" PIPE ELBOW / SLIP-ON DETAIL
2" BYPASS DETAIL (TYPICAL)
DRAIN DETAIL (TYPICAL)
PLATE DETAIL (TYPICAL)
DETAIL
HIGH PRESSURE OIL ACCUMULATOR SYSTEM - FRONT VIEW HIGH PRESSURE OIL ACCUMULATOR SYSTEM - SIDE VIEW
HIGH PRESSURE OIL ACCUMULATOR SYSTEM - FRAME ASSEMBLY U-BOLT DETAIL
CONSTRUCTION NOTES:
STL FL BAR
1/2"x6"
1/2"x6"
LEGEND
HYDRAULIC SCHEMATIC
SEQUENCE OF OPERATION:
NOTE:
13437-14-007 NOT SENSITIVE
ANZY129010
SPEC NO. 13437-14-007
30 September 2014
CONSTRUCTION SPECIFICATION
FOR
REPAIR/MAINTAIN SUCTION VALVES SPS 25K PUMPS,
FACILITY 1507
ARNOLD ENGINEERING DEVELOPING COMPLEX
ARNOLD AIR FORCE BASE, TENNESSEE 37389-9998
NOT SENSITIVE
IRA-1476
ANZY129010 INDEX-1
INDEX
DIVISION 01 GENERAL REQUIREMENTS
01 10 00 Summary 01 33 00 Submittal Procedures 01 45 00 Regulatory Requirements 01 74 19 Construction Waste Management and Disposal
DIVISION 02 EXISTING CONDITIONS
02 08 00 Asbestos Removal 02 08 50 Lead Removal 02 41 16 Selective Demolition
DIVISIONS 03 – 04 NOT USED
DIVISION 05 METALS
05 05 00 Metal Fastening 05 50 00 Metal Fabrications
DIVISIONS 06 – 08 NOT USED
DIVISION 09 FINISHES
09 90 00 Painting and Coating
DIVISIONS 10 – 21 NOT USED
DIVISION 22 PLUMBING
22 05 29 Hangers and Supports for Plumbing Piping and
Equipment 22 05 53 Identification for Plumbing Piping and Equipment 22 11 00 Facility Water Distribution
DIVISIONS 23 - 25 NOT USED
DIVISION 26 ELECTRICAL
26 05 03 Equipment Wiring Connections 26 05 19 Low-Voltage Electrical Power Conductors and
Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Equipment 26 05 33 Raceways and Boxes for Electrical Systems 26 05 53 Identification for Electrical Systems 26 27 16 Electrical Cabinets and Enclosures 26 29 13 Enclosed Controllers
DIVISIONS 27-32 NOT USED
ANZY129010 INDEX-2
DIVISION 33 UTILITIES
33 12 16 Water Utility Distribution Valves
DIVISIONS 34-39 NOT USED
DIVISION 40 PROCESS INTEGRATION
40 95 13 Process Control Panels and Hardware
DIVISIONS 41-49 NOT USED
ANZY129010 01 10 00-1
SECTION 01 10 00
SUMMARY
PART 1 GENERAL
1.1 The work consists of replacing the existing eight (8) 36-inch suction isolation valves, and the existing hydraulic control system in Building 1504 at Arnold Engineering Development Complex, Arnold Air Force Base, Tennessee. Major items of work include, but are not limited to the following:
A. Demolish existing butterfly valve hydraulic system and remote control system as indicated on drawings.
B. Demolish existing valves and piping as indicated on drawings.
C. Install new isolation valves, actuators, and piping as indicated on drawings.
D. Install new butterfly valve hydraulic system and controls as indicated on drawings.
E. Install new piping and insulation as indicated on drawings.
F. Install new butterfly valve remote control panel.
G. The Government will drain the Secondary Pumping Station Reservoir prior to water pipe demolition.
H. Valve work is located in a confined space and all work will be in accordance with AEDC SHE Standard B5.
I. Other incidental tasks and repair necessary to complete the work as required by the specifications and drawings.
1.2 DEFINITIONS
A. Certain terms used in the contract documents are defined below.
Definitions and explanations contained in this section are not complete, but are general for the work to the extent that they are not stated more explicitly in another element of the contract documents.
1. Furnish. The term "furnish" means to supply and deliver to the project site, ready for unloading, unpacking, assembly, installation, and similar operations.
2. Install. The term "install" describes operations at the project site, including the actual unloading, unpacking, assembly, erection, placing, anchoring, applying, working to dimensions, finishing, curing, protecting, cleaning, and similar operations.
3. Provide. The term "provide" means "provide complete in place";
that is, "furnish and install.”
ANZY129010 01 10 00-2
4. Indicated. Where "as indicated" or words of similar import are used, it shall be understood that the reference is made to the drawings accompanying this contract unless stated otherwise.
5. Postconsumer material (FAR 52.223-9): a material or finished product that has served its intended use and has been discarded for disposal or recover, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered materials”.
6. Recovered material (FAR 2.101): waste materials and by-products recovered or diverted from solid waste. The term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
7. Biobased product (FAR 2.101): a product determined by the U.S.
Department of Agriculture (USDA) to be a commercial or industrial product (other than food or feed) that is composed, in whole or in significant part, of biological products, including renewable domestic agricultural materials (including plant, animal, and marine materials) or forestry materials.
8. USDA-designated item (FAR 233.401): a generic grouping of products that are or can be made with Biobased materials (1) that is listed by USDA in a procurement guideline (7 CFR 2902, Subpart B); and (2) for which USDA has provided purchasing recommendations.
1.3 CODES AND STANDARDS
A. AEDC Safety, Health, and Environmental (SHE) Standards latest version, available at http://www.aerospacetestingalliance.com/en/vendors/-site-work/safety-standards/
1. A6 with Supplement User and Subcontractor Safety
(Mandatory Documents/Submittals).
2. A9 Hazard Communication.
3. A10 Job Safety Analysis.
4. B1 Master Work Permit.
5. B2 Logout Tagout (LOTO).
6. B3 Control of Hazardous Areas Using
Safety Signs, Tags, and Barricades.
7. B5 Confined Spaces.
8. B6 Low Voltage Electrical Safety Related
Work Practices.
9. C6 Excavations, Trenching, and Shoring.
10. D3 Identification of Piping Systems.
11. D6 Aerial Work Platforms.
12. D8 Portable Power Tools.
13. D9 Fixed and Portable Ladders.
14. D10 Scaffolds.
15. D14 Cross-Connection and Backflow
Prevention.
ANZY129010 01 10 00-3
16. E7 Asbestos.
17. E17 Oil and Hazardous Substances Spill
Response.
18. E18 Managing Wastes Containing Chemical or Petroleum Products.
19. E19 Lead and Heavy Metal.
20. F2 Personal Protection Equipment (PPE).
21. F5 Hazardous Noise and Hearing
Conservation.
22. F6 Fall Protection.
B. Air Force Federal Acquisition Regulation:
1. AFFARS 2.101 Definitions of Words and Terms.
2. AFFARS 233.401 Use of Recovered Materials Definition.
3. AFFARS 52.223-9 Estimate of Percentage of Recovered
Material Content for EPA-Designated Items.
4. AFFARS 5352.223-9000 Elimination of Use of Class I Ozone Depleting Substances (ODS).
C. Code of Federal Regulations, latest version:
1. 7 CFR 2902 Subpart B Guidelines for Designating Biobased
Products for Federal Procurement, Designated Items.
2. 29 CFR 1926.1101 Asbestos.
3. 40 CFR 261 Identification and Listing of Hazardous
Waste.
4. 40 CFR 370 EPA Hazardous Chemical Reporting and Community Right to Know Requirement.
D. US Army Corp of Engineers:
1. USACE EM 385-1-1 Safety and Health Requirements
Manual, 2008.
1.4 JOB CONDITIONS
A. Plan and execute this project in a manner to minimize downtime.
Schedule all work in advance with the Government Representative.
Hydraulic system and electrical work may be installed before or after the Government drains the reservoir and the new water piping has been installed. All work involving the water piping including valves and other piping accessories shall be performed during the one month secondary reservoir outage. The outage shall be coordinated with the Government Representative and shall occur between the months of November through February. Outage dates may change based on Government operations.
ANZY129010 01 10 00-4
B. Work may require coordination with test schedule. Coordinate with Government Representative.
C. Furnish new components and devices, complete, with all necessary materials for installation to meet this objective.
D. Do not interrupt existing utilities or commence power outages without signed authorization from the Government Representative. Submit each utility outage request for Government approval at least two weeks prior to each requested outage date. Outages may be granted depending upon the Government’s schedule for facility use, and may occur on weekends and/or holidays. Plan and execute this project in a manner to minimize downtime. Schedule all work in advance with the Government Representative. Work may be governed by testing requirements.
Coordinate with the Government Representative.
E. Keep work area clean and free from waste and debris. Dispose of waste as directed by the Government Representative.
F. Do not close or obstruct egress width to any building or site exit without written permission from the Government Representative.
G. Do not disable or disrupt building fire or life safety systems without written permission from the Government Representative.
H. Conform to applicable procedures when any hazardous or contaminated materials are discovered.
I. Cease operations immediately for any unsafe conditions and notify the Government Representative. Do not resume operations until authorized by the Government Representative.
J. Provide temporary barricades and other forms of protection as required to protect Government personnel and the general public from injury due to the work. Provide temporary signage as needed or directed in accordance with AEDC SHE Standard B3.
K. Remove protections at the completion of work.
L. Do not close, block, or otherwise obstruct streets, walks, or other occupied or used facilities without written permission from the Contracting officer.
M. Submit sketches of proposed scaffolding, if utilized. All scaffolding shall be in accordance with AEDC SHE Standard D10 and shall be inspected, approved, and tagged by the Contractor’s scaffold competent person after it has been erected and prior to use.
N. Submit record as-built drawings.
ANZY129010 01 10 00-5
1.5 PROTECTION OF EXISTING IMPROVEMENTS:
A. Protection of the grounds, walkways and structures from deterioration due to excessive vehicular traffic, equipment disturbance, and material staging is critical to maintaining the quality appearance of AEDC. The Contractor shall protect against damage incurred by service vehicles, construction activities, maintenance and repair, and all other work that detracts from the overall appearance of the grounds and increases the costs of grounds maintenance.
B. Prior to commencement of work, inspect areas in which work will be performed. Submit a report with the Contracting Officer listing existing conditions which could be construed as damage resulting from the work.
The Government Representative may also photograph or video tape areas or improvements susceptible to damage to document conditions prior to the start of work.
C. The activity of vehicles and equipment on the grounds shall be limited to only that which is essential and required for completing the work. The Government Representative will approve all access and haul routes required for the work prior to any on site operations to preclude damage to sensitive utilities or improvements which may not be readily apparent.
D. Minimize travel paths and staging areas to limit the impact and damage to work areas. Lay out the work site, material and equipment staging, and vehicle and equipment activity to minimize visibility and aesthetic impact of activities to surrounding areas.
E. Protect above and below grade utilities, plant life, lawns, and other features or improvements to remain.
F. Protect benchmarks, existing structures, sidewalks, curbs, and pavements from excavation equipment and vehicular traffic.
G. Use protective materials, such as sheeting, steel plating, rigger pads, to protect grounds and pavement from heavy equipment activity and damage.
H. Protect existing facilities from falling debris during construction such as roof materials, ductwork scraps, or other materials, by use of protective materials such as sheeting, steel plates, netting, or other materials.
I. Provide temporary weather protection during any interval between demolition and removal of existing construction on exterior surfaces and installation of new construction to ensure no water leakage or damage occurs to the structure, interior areas, or contents of the existing facility.
J. Implement a daily procedure for area clean up and organized parking of vehicles and equipment.
ANZY129010 01 10 00-6
K. Provide temporary barricades, shoring, bracing, supports or other forms of protection as required to protect all existing improvements not scheduled to be demolished for both above and below ground improvements and to prevent movement, settlement, collapse or damage of any kind.
L. Maintain personnel and vehicular access and existing utilities to all buildings and other structures during the course of the work. Any changes or interruptions shall be coordinated and approved by the Government Representative well in advance. Temporary protections or services may be required as a condition of approval of any such change or interruption.
M. The Contractor shall be responsible for damage caused by the work and shall repair or replace same to the satisfaction of the Government. Obtain Government Representative’s approval of methods, materials, equipment or products for repair or replacement prior to use. All such repair or replacement shall be performed promptly at no additional cost to the Government. The Government will place special emphasis and requirements for repair or replacement of damage to underground utilities, lawns, grassed areas, existing structures, sidewalks, curbing, railings and pavements.
N. Remove all temporary barricades, shoring, bracing, supports or other forms of protection at completion of work. Restore all adjacent structures and surfaces to conditions existing prior to construction. Clean up all stockpiles and spoil areas, and restore all surrounding areas to conditions existing prior to construction.
1.6 SAFETY REQUIREMENTS:
A. All work shall be accomplished in compliance with AEDC SHE Standards A6 with supplement, A9, A10, B1, B2, B3, B5, B6, C6, D3, D6, D8, D9, D10, D14, E7, E17, E18, E19, F2, F5, and F6. Submit a safety and health plan in accordance with AEDC SHE Standard A6 and USACE EM 385-1- 1.
1.7 DISPOSAL OF CONTAMINATED EQUIPMENT
A. The Contractor shall clean equipment or material of contaminants prior to disposal at the AEDC Salvage Yard (with the exception of lead paint, unless the paint is flaking in which case the flaking paint shall be removed prior to transport to prevent contamination during transport). If cleaned equipment is to be turned-in to the Government for storage or excessing, a GC-1785, Special Material Turn-in Certification, shall be completed and submitted to the Government with the equipment or material prior to disposal. The Government Representative will assist the Contractor in filling out the form and in coordinating with Industrial Hygiene and Environmental Quality.
ANZY129010 01 10 00-7
1.8 CONNECTIONS TO POTABLE WATER
A. Contractor shall not make any connections to an AEDC potable water system without specific approval from the Government Representative.
B. Notify Government Representative if connections to hose bibs are needed. Do not connect to any hose bibs without Government-supplied backflow preventer and specific approval from Government Representative.
1.9 DELIVERY, STORAGE, AND HANDLING
A. Deliver all equipment properly packaged in factory containers and/or mounted on shipping skids.
B. Provide and store all equipment in a clean, dry space, and protect from dirt, fumes, moisture, construction debris, and traffic. Ensure that all equipment is prepared for anticipated storage conditions.
C. Where equipment is stored outdoors, ensure electrical components are stored above grade and enclosed with watertight wrapping. Provide 120V temporary power to space heaters or provide temporary heat if required to protect equipment.
D. Notify Government Representative a minimum of two weeks prior to delivery of large equipment being stored on-site. Contractor shall offload equipment at a location designated by the Government Representative.
E. All handling, loading, and offloading of all equipment shall be done by the Contractor.
F. Handle and store all equipment in accordance with manufacturer’s instructions.
1.10 TOOL CONTROL: Coordinate tool control with the Government Representative.
1.11 EPA-DESIGNATED ITEMS
A. The Contractor, on completion of this contract in accordance with AFFARS 52.223-9, shall:
1. Estimate the percentage of the total recovered material content for
EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and
2. Submit this estimate to the Contracting Officer.
ANZY129010 01 10 00-8
1.12 ELIMINATION OF ODS CHEMICALS
A. The use of Class I ozone depleting substances (ODS) is prohibited.
Reference text of AFFARS clause 5352.223-9000.
1.13 DISALLOWED PRODUCTS
A. Do not use products or materials that contain lead, chromium, mercury, cadmium, silver, barium, selenium, beryllium, or arsenic on this project except as expressly authorized by the Contracting Officer. If no substitutes for products containing the listed materials are available, and the Contracting Officer approves the use of products containing the listed materials, highlight and detail their exact location on the drawings.
1.14 ASBESTOS PRODUCTS
A. Do not use products or materials that contain asbestos on this project except as expressly authorized by the Contracting Officer. If no substitutes for asbestos products are available, and the Contracting Officer approves the use of asbestos products, highlight and detail their exact location on the drawings and identify their location in the field following 29 CFR
1926.1101 guidelines.
1.15 HAZARDOUS WASTE
A. Where hazardous waste (as identified in 40 CFR 261) is generated, follow the procedures in AEDC SHE Standard E18, Chemical and Petroleum Products Waste Management, for storing and turning in hazardous waste.
These procedures include the requirement to complete Forms GC-565 and GC-1337, which will be furnished by the Government Representative.
1.16 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA
A. The following procedures shall be followed to meet 40 CFR 370, EPA Hazardous Chemical Reporting and Community Right to Know
1. Procedures:
a. The Contractor shall furnish information on the hazardous materials he brings on AEDC property prior to beginning on-site work. Hazardous materials may include solvents, paints, adhesives, acids, or any other substance which could be included within the definitions in paragraph 2.
b. The information required is:
1) Company name, point of contact, and phone number.
2) Brief statement indicating how the hazardous material will be used within the scope of the contract.
3) List of all hazardous materials to be used (product name, manufacturer’s name, and address).
ANZY129010 01 10 00-9
4) Amount of each material to be stored on site and where it will be stored.
5) Where the product Safety Data Sheet (SDS) will be maintained.
c. All unused product is the responsibility of the Contractor and shall be removed from AEDC property at the completion of the project.
d. The Contractor shall coordinate with the Government Representative and the Hazardous Waste Operations Group (454-3628) if any hazardous waste is to be generated.
2. Definitions
a. Hazard communication standard. A chemical right-to-know law under OSHA that requires chemical manufacturers and importers to assess the hazards of chemicals they make or import and to distribute this information to inform workers of the hazards associated with these chemicals. This written information is a Safety Data Sheet (SDS).
b. Hazard classes. Hazardous materials that have been grouped into classes by the Department of Transportation (DOT). These classes include explosives, flammables, oxidizers and organic peroxides, compressed gases, corrosives, and poisons.
c. Hazardous material. Any substance that may be harmful when used. Specific substances have been designated as hazardous under the Clean Water Act, the Resource and Conservation and Recovery Act, and the hazardous air pollutants under the Clean Air Act.
d. Hazardous waste. Any waste that may cause or significantly contribute to serious illness or death or that may pose a substantial threat to human health or the environment, if not properly managed. Hazardous wastes may be solids, liquids, semi-solids, or compressed gases.
1.17 PROPRIETARY AND BRAND NAMES: Proprietary and brand names used in this document are meant to describe physical, performance, and quality characteristics of items and materials, and are not meant to limit competition or exclude Contractors, Vendors, or Manufacturers from submitting like products to the Contracting Officer for approval.
END OF SECTION
ANZY129010 01 33 00-1
SECTION 01 33 00
SUBMITTAL PROCEDURE
1.1 DESCRIPTION OF REQUIREMENTS. This section specifies procedural requirements for non-administrative submittals, including but not limited to shop drawings, product data, manufacturer’s certificate, design data, calculations, and verifications, manufacturer’s instructions, manufacturer’s field service reports, samples, operation and maintenance manuals, and other miscellaneous work-related submittals. These submittals are required to amplify, expand, and coordinate other information contained in the contract.
Non-work-related submittals are addressed elsewhere in the contract rather than in the specification and may include items such as: contract progress schedule, permits, payment applications, performance and payment bonds, insurance certificates, and progress reports.
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections of the specification or statement of work.
1.2 SUBMITTAL PROCEDURE
A. Definition: For the purposes of this section, the term “Contractor” denotes the prime Contractor.
B. Listing: At the end of this section is a summarized listing of item submittals requiring approval for the work. The listing is included for the convenience of users of the contract documents. The listing may not be all inclusive and additional item submittals may be required. Within 14 calendar days after receiving contract award, Contractor shall submit a copy of the summarized submittal listing with calendar dates assigned to each item submittal indicating when submittal will be received by the Government. If contract requires a pre-construction conference, Contractor may submit completed submittal listing at the conference.
C. Risk: Do not proceed with the part of the work covered by an item submittal including purchasing, fabricating, and delivering until approval is received. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection. Any fabrication or other work performed in advance of the receipt of accepted item submittals and approvals shall be entirely at the Contractor’s risk and expense.
D. Transmittal Timing: Coordinate the preparation and processing of item submittals with the performance of the work. Prepare and transmit each item submittal to the Contracting Officer sufficiently in advance of the
ANZY129010 01 33 00-2
performance of related work and other applicable activities. Transmit related item submittals for the same unit of work so that processing will not be delayed by the Government's need to review submittals concurrently for coordination. No delay damages or time extensions will be allowed for time lost in late submittals.
E. Content: Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements. All submittals which are generic and list more information than is specifically required shall be marked to identify required information. Complete AF Form 3000 and attach as cover sheet for each submittal. Contractor may include multiple item numbers on an AF Form 3000.
F. Language: All item submittals shall be written in English, including documents, notes on drawings, sketches, and/or samples, calculations, manuals, and all other instances of written text and communication.
G. Units: All item submittals shall be marked or show dimensions and values in the same units as specified in the contract documents.
H. Review Time: Allow sufficient time so that contract performance will not be delayed as a result of the time required to properly process submittals, including time for re-submittals, if necessary. Allow 14 calendar days for initial Government processing of each submittal. No extension of time will be authorized because of the Contractor's failure to transmit submittals to the Government sufficiently in advance of the work.
I. Contractor Certification: All submittals shall be carefully reviewed by an authorized representative of the Contractor prior to submission to the Government. Each submittal shall be dated, signed, and certified by the Contractor as being correct and in strict conformance with the contract documents. No consideration for review by the Government of any Contractor’s submittal will be made for any items which have not been so certified by the Contractor. All noncertified submittals will be returned to the Contractor without action taken by the Government, and any delays caused thereby shall be the total responsibility of the Contractor.
J. Deviations: Should any item submittals required by the contract documents show deviations from the contract requirement, the Contractor shall make specific mention of such deviations in the letter of transmittal, including stating cost effects, and product and system limitations which may adversely affect the work, in order that if acceptable, suitable action may be taken for proper adjustment of the contract; otherwise the Contractor will not be relieved of the responsibility for executing the work in accordance with the contract documents and the approved submittals.
Contractor shall clearly mark the proposed variation in all documentation and specifically point out deviations from contract requirements in transmittal letters. Failure to point out deviations may result in the
ANZY129010 01 33 00-3
Government requiring rejection and removal of such work at no additional cost to the Government. Deviations from contract requirements require Government approval and will only be considered when advantageous to the Government. When proposing deviations, deliver written request to the Contracting Officer, with documentation of the nature and features of the deviation and why the deviation is desirable and beneficial to the Government. If lower cost is a benefit, include an estimate of the cost savings. In addition to documentation required for deviation, include the submittal information required for the item. Allow an additional 14 calendar days beyond normal submittal review period for consideration by the Government of submittals with deviations.
K. Approved Submittals: The part of the work covered by the approved item submittal may proceed provided it complies with the requirements of the contract documents. Final acceptance will depend upon that compliance.
The term “Approved” shall only indicate that there is no exception taken to the submittal. Approval of the item submittal shall not be construed as a complete check, and indicates only that the general method or other information appears to meet the contract requirements. Approval does not relieve the Contractor of the responsibility for any error which may exist.
After item submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment, or changes to any other information will be considered unless accompanied by an explanation of why a substitution or change is necessary.
L. Disapproved Submittals: Contractor shall correct disapproved item submittals and resubmit for approval within timeframe noted. If no date is given, Contractor shall submit corrected submittal within 14 calendar days.
If the Contractor considers any correction or notation on the returned submittal to constitute a change to the contract drawings, specification, or statement of work the Contractor shall notify the Contracting Officer.
M. Responsibility: The Government’s review of Contractor submittals shall not relieve the Contractor of the entire responsibility for the correctness of details and dimensions and conformance to the specifications. The Contractor shall assume all responsibility and risk for any mistakes and/or costs due to any errors in submittals.
N. Inconsistencies: If a conflict or inconsistency arises between an approved item submittal and the contract documents, the contract documents shall govern.
1.3 SPECIFIC SUBMITTAL DESCRIPTIONS AND REQUIREMENTS: Submittal requirements for individual units of work are specified in the applicable specification section or Statement of Work (SOW). Except as otherwise indicated in the individual specification sections or SOW, comply with the following requirements for each type of submittal.
ANZY129010 01 33 00-4
A. Shop Drawings: These are technical drawings and data specially prepared for this contract including fabrication and installation drawings, setting and seaming diagrams, and coordination drawings (for use on-site). Shop drawings include drawings, diagrams and schedules specifically prepared to illustrate some portion of the work, diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project, or drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated. Information required on shop drawings includes dimensions, identification of specific products and materials which are included in the work, compliance with specified standards, and notations of coordination requirements with other work.
Provide special notations of dimensions that have been established by field measurements. Highlight, encircle, or otherwise indicate deviations from the contract documents on the shop drawings. Furnish one hard copy and one electronic copy.
B. Product Data: This data includes standard printed information on manufactured products that has not been specially prepared for this contract, including manufacturers' product specifications illustrating size, physical appearance and other characteristics of materials, installation instructions, standard color charts, catalog cuts, illustrations, schedules, standard wiring diagrams, standard product operating and maintenance manuals, and samples of warranty language when the contract requires extended product warranties. General information required specifically as product data includes manufacturers' standard printed recommendations for application and use, compliance with recognized standards of trade associations and testing agencies, the application of their labels and seals (if any), special notation of dimensions which have been verified by way of field measurement, and special coordination requirements for interfacing the material, product, or system with other work. Furnish three hard copies and one electronic copy.
C. Samples: These are physical examples of work, including, swatches showing color, texture, and pattern, color-range sets, and units of work to be used for independent inspection and testing. Samples include fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged, color samples from the manufacturer’s standard line (or custom color samples if specified) to be used in selecting or approving colors for the project, and field samples and mock-ups constructed on the project site to establish standards by which the ensuring work can be judged. This includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work. Submit samples for the Contracting Officer's visual review of general kind, color, pattern, and texture for a final check of the coordination of these characteristics with other related elements of the
ANZY129010 01 33 00-5
work and for quality control comparison of these characteristics between the final sample submittal and the actual work as it is delivered and installed. Submit one each.
D. Design Data: Design data includes design calculations, mix designs, analyses or other data pertaining to a part of work. Refer to individual sections of the specification or statement of work for required quantities, formats, and signatures or certifications required. Furnish three hard copies and one electronic copy.
E. Test Plans and Reports: Test plans shall include planned testing, including a description of the test, equipment and supplies needed, and step-by-step notation of test activities and tasks. Test reports include reports signed by an authorized official of a testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accordance with the specified requirements.
Testing shall have been within three years of date of contract award for the project. Reports also include findings of tests required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to the job site, findings of tests made at the job site or on a sample taken from the job site, investigation reports, daily logs and checklists, and final acceptance test and operational test procedures. Furnish three hard copies and one electronic copy of each such report required.
F. Certificates: These include statements printed on the manufacturer’s letterhead and signed by the responsible officials of the manufacturer of a product, system or material attesting that the product, system or material meets specification requirements. Certificates include documentation required of the Contractor, or of a manufacturer, supplier, installer or subcontractor through the Contractor, to further demonstrate the quality of orderly progressions of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications. Examples include confined space entry permits, and text of posted operating instructions.
Certificates shall be dated after award of the project contract and clearly name the project. Furnish three hard copies and one electronic copy of each certificate required.
G. Manufacturer’s Instructions: Preprinted material describing installation of a product, system or material, including special notices and Material Safety Data sheets concerning impedances, hazards and safety precautions.
Furnish three hard copies and one electronic copy.
H. Manufacturer’s Field Reports: Documentation of the testing and verification actions taken by a manufacturer’s representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with the manufacturer’s standards or instructions. The documentation shall
ANZY129010 01 33 00-6
be signed by an authorized official of a testing laboratory or agency and shall state the test results, and indicate whether the material, product, or system has passed or failed the test. Furnish three hard copies and one electronic copy.
I. Operation and Maintenance Data: Data furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer’s help and product line documentation necessary to maintain and install the equipment, and needed by operating and maintenance personnel for the safe and efficient operation, maintenance, and repair of the item. The data is intended to be incorporated in an operations and maintenance manual or control system.
Furnish two hard copies and one electronic copy.
J. Final Design Drawings and Documentation: Final design documentation including drawings, specifications, estimates, and other required deliverables. Electronic documentation submitted shall include every associated component file of drawings and other documentation, including raster images, jpeg, tiff, Excel, and any related items required to view, modify, or manipulate the electronic files. Furnish a CD-ROM of all final design documentation, and drawings in AutoCAD 2005 format or later, to the Contracting Officer for approval prior to applying for final payment.
K. Record (As-Built) Drawings: Record drawings showing final configuration of work accomplished. Show all changes, additions, and deviations from the original contract drawings and documentation. If no changes occur, furnish certification to that effect. Drawings may be redlined hardcopies or electronic drawings, and shall accurately show as-built conditions during the progress of the job. If electronic, furnish drawings on a CD-ROM, in AutoCAD 2005 format or later, including every associated component file of the drawings, including raster images, jpeg, tiff, Excel, and any related items required to view, modify, or manipulate the electronic files. Submit to the Contracting Officer for approval prior to applying for final payment.
L. Miscellaneous Submittals: These are work-related, non-administrative submittals that do not fit in the previous categories, including the following:
1. Maintenance agreements. Furnish one hard copy and one electronic copy.
2. Survey data and reports. Furnish one hard copy and one electronic
3. Project photographs. Furnish both hard copies and digital files.
4. Keys and other security protection devices.
5. Maintenance tools, spare parts, and overrun or maintenance stock.
Refer to individual sections of the specification for required quantities of spare parts, extra and overrun stock, maintenance tools and devices, keys, and similar physical units to be submitted.
6. Qualification certificates. Furnish one hard copy and one electronic
ANZY129010 01 33 00-7
7. Employee training certificates and documentation showing successful completion of training.
8. Documentation of percentage of recovered material content used during contract.
9. Contractor safety and work plans and schedules.
10. Warranties.
1.4 REQUIRED SUBMITTALS
No. Section Reference Submittal Description Due 1 01 10 00 para 1.4D Outage Request 2 weeks prior to outage 2 01 10 00 para 1.4M Proposed Scaffolding Before beginning work 3 01 10 00 para 1.4N Record As-Built Drawings Before final inspection 4 01 10 00 para 1.5B Existing Conditions Report Which could be Construed as Damage Resulting from Work
Before beginning work
5 01 10 00 para 1.7A Safety and Health Plan 10 days after contract award
6 01 10 00 para 1.8A Form GC-1785 Prior to disposal 7 01 10 00 para 1.12.A.2 Percentage of Recovered Material
Content Before final inspection
8 01 10 00 para 1.14A Disallowed Products Locations Before final inspection 9 01 10 00 para 1.15A Asbestos Locations Before final inspection
10 01 10 00 para 1.16A Forms GC-565 and GC-1337 Before final inspection 11 01 10 00 para 1.17.A.1.a Hazardous Material Info Before beginning work 12 01 33 00 para 1.2B Summarized submittal listing with delivery dates 14 days after contract award 13 01 74 19 para 1.3A Construction Waste Management
Plan Before beginning on-site work 14 02 08 00 para 1.3A Employee Certification Before beginning work 15 02 08 00 para 1.3B Training and Medical Certifications Before beginning work 16 02 08 00 para 1.3C Training and Hazard
Communications Certification
17 02 08 00 para 1.3D Product List Before beginning work 18 02 08 00 para 1.3E Equipment List Before beginning work 19 02 08 00 para 1.3F Notice of Violation Before beginning work 20 02 08 00 para 1.3G Environmental, Health, and Safety
21 02 08 00 para 1.3H Asbestos Removal Plan Before beginning work 22 02 08 00 para 1.3I Air Sampling Reports Before beginning work 23 02 08 00 para 1.3J Testing Certifications Before beginning work 24 02 08 00 para 1.3K CPR Certification Before beginning work 25 02 08 00 para 1.3L Insurance Coverage Certification Before beginning work 26 02 08 00 para 1.3M Sampling List Before beginning work
Table I. Required submittal list - Continued
ANZY129010 01 33 00-8
27 02 08 00 para 1.3N Operator’s Log and Shipper’s Log Before beginning work
28 02 08 00 para 1.3O Daily Logs: Sign-In and Field Notes Before beginning work
29 02 08 50 para 1.4A Employee Certification Before beginning work 30 02 08 50 para 1.4B Training and Medical Certification Before beginning work
31 02 08 50 para 1.4C Notice of Violation Before beginning work
32 02 08 50 para 1.4D Environmental, Health, and Safety
33 02 08 50 para 1.4E Training and Hazard Communications Certification
34 02 08 50 para 1.4F Product List Before beginning work
35 02 08 50 para 1.4G Lead Abatement Plan Before beginning work
36 02 08 50 para 1.4H Air & Substrate Sampling Reports Before beginning work
37 02 08 50 para 1.4I Testing Laboratory Qualifications Before beginning work
38 02 08 50 para 1.4J Air Monitoring Results Before beginning work
39 02 08 50 para 1.4K Equipment List Before beginning work
40 02 08 50 para 1.4L Rental Equipment List Before beginning work
41 02 08 50 para 1.4M Shower Water Test Results Before beginning work
42 02 41 16 para 1.2A Demolition plan and Schedule Before beginning work 43 05 05 00 para 1.3A Welders Certification & Weld
Procedures Qualification
44 05 50 00 para 1.3A Shop Drawing Before beginning on-
45 05 50 00 para 1.3B Weld Connections Before beginning on-
46 09 90 00 para 1.4A Product Data Prior to purchase 47 09 90 00 para 1.4B Samples Prior to purchasing 48 22 05 29 para 1.3A Product Data Before beginning work
49 22 05 29 para 1.3B Manufacturer’s Installation Instructions
50 22 05 53 para 1.3A Product Data Before beginning work
51 22 05 53 para 1.3B Manufacturer’s Installation
52 22 07 00 para 1.3A Product Data Before beginning work
53 22 07 00 para 1.3B Manufacturer’s Installation
54 22 11 00 para 1.3.A.1 Piping Product Data Before beginning work
55 22 11 00 para 1.3.A.2 Valves Product Data Before beginning work
56 22 11 00 para 1.3.A.3 Hydraulic Power Pack Product Data Before beginning work
57 22 11 00 para 1.3.A.4 Hydraulic Motor Product Data Before beginning work
58 22 11 00 para 1.3.A.5 Hydraulic Valve Product Data Before beginning work 59 22 11 00 para 1.3.A.6 Hydraulic Reservoir Product Data Before beginning work
Table I. Required submittal list - Continued
ANZY129010 01 33 00-9
60 22 11 00 para 1.3.A.7 Hydraulic Accumulator Product
Data
61 22 11 00 para 1.3B Manufacturer’s Installation
62 22 11 00 para 1.3C Operation and Maintenance Data Before beginning work
63 22 11 00 para 1.3D Hydrostat Test Reports 10 days after test 64 22 11 00 para 1.3E As-Built Drawings Before final inspection 65 26 05 03 para 1.3A Manufacturer’s Descriptive
Literature
66 26 05 19 para 1.3A Product Data Before beginning work
67 26 05 19 para 1.3B Test Results Day of Test 68 26 05 26 para 1.3A Manufacturer’s Descriptive
69 26 05 33 para 1.3A Product Data Before beginning work 70 26 27 16 para 1.3A Product Data Before beginning work 71 26 27 16 para 1.3B Manufacturer’s Installation
72 26 29 13 para 1.3A Proposed Equipment Manufacturer and Part Number
Prior to purchase
73 26 29 13 para 1.3B Manufacturer’s Descriptive
74 26 29 13 para 1.3C Wiring Diagrams Prior to purchase 75 33 12 16 para 1.3A Product Data Prior to purchase 76 33 12 16 para 1.3B Shop Drawings Before installation 77 33 12 16 para 1.3C Maintenance Manual Before final inspection 78 33 12 16 para 1.3D Operation Manual Before final inspection 79 33 12 16 para 1.3E Hydrostatic and Shop Leakage Test
Reports Prior to shipment of valves 80 33 12 16 para 1.3F Warranty Before final inspection 81 40 95 13 para 1.4A Shop Drawings Before installation 82 40 95 13 para 1.4B Product Data Prior to purchase 83 40 95 13 para 1.4C Factory Test Reports Prior to shipment of valves 84 40 95 13 para 1.4D Manufacturer’s Installation
85 40 95 13 para 1.4E Manufacturer's Field Reports 1 week after fabrication 86 40 95 13 para 1.4F Project Record Documents Before final inspection 87 40 95 13 para 1.4G Operation and Maintenance Manual Before final inspection
Table I. Required submittal list - Completed.
ANZY129010 01 45 00-1
SECTION 01 45 00
REGULATORY REQUIREMENTS
1.1 This section lists regulations, codes, and standards which specify procedural and administrative requirements imposed upon the work.
1.2 The Contractor shall comply with provisions of the following documents to the extent referenced herein.
A. Government Documents:
1. AEDC Safety, Health, and Environmental (SHE) Standards latest version, work/safety-standards/
a. A6 with Supplement User and Subcontractor Safety
(Mandatory Documents/Submittals).
b. A9 Hazard Communication.
c. A10 Job Safety Analysis.
d. B1 Master Work Permit.
e. B2 Logout Tagout (LOTO).
f. B3 Control of Hazardous Areas Using
Safety Signs, Tags, and Barricades.
g. B5 Confined Spaces.
h. B6 Low Voltage Electrical Safety Related
Work Practices.
i. C6 Excavations, Trenching, and Shoring.
j. D3 Identification of Piping Systems.
k. D6 Aerial Work Platforms.
l. D8 Portable Power Tools.
m. D9 Fixed and Portable Ladders.
n. D10 Scaffolds.
o. D14 Cross-Connection and Backflow
Prevention.
p. E7 Asbestos.
q. E17 Oil and Hazardous Substances Spill
Response.
r. E18 Managing Wastes Containing
Chemical or Petroleum Products.
s. E19 Lead and Heavy Metal.
t. F2 Personal Protection Equipment (PPE).
u. F5 Hazardous Noise and Hearing
Conservation.
v. F6 Fall Protection.
2. Air Force Federal Acquisition Regulations:
a. AFFARS 2.101 Definitions of Words and Terms.
b. AFFARS 233.401 Use of Recovered Materials Definition.
ANZY129010 01 45 00-2
c. AFFARS 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items.
d. AFFARS 5352.223-9000 Elimination of Use of Class I Ozone Depleting Substances (ODS).
3. Code of Federal Regulations, latest version:
a. 7 CFR 2902 Subpart B Guidelines for Designating Biobased
Products for Federal Procurement, Designated Items.
b. 29 CFR 1910.134 Respiratory Protection.
c. 29 CFR 1910.1200 Hazard Communication.
d. 29 CFR 1926.55 Gases, Vapors, Fumes, Ducts, and
Mists.
e. 29 CFR 1926.57 Ventilation.
f. 29 CFR 1926.59 Hazard Communication.
g. 29 CFR 1926.62 Lead Standard.
h. 29 CFR 1926.1101 Asbestos.
i. 40 CFR 61 National Emission Standards for
Hazardous Air Pollutants (NESHAP).
j. 40 CFR 260 Hazardous Waste Management
Systems: General.
k. 40 CFR 261 Identification and Listing of Hazardous
l. 40 CFR 262 Generators of Hazardous Waste.
m. 40 CFR 370 EPA Hazardous Chemical Reporting and Community Right to Know
n. 49 CFR 172 Department of Transportation (DOT) Regulations for Use of Hazardous Materials Tables and for Communication.
o. 49 CFR 178 DOT Specifications for Packaging.
4. Environmental Protection Agency:
a. EPA SW-846 Proposed Sampling and Analytical Methodologies for Additions to Test Methods for Evaluating Solid Waste:
Physical/Chemical Methods, 2012.
5. Public Law:
a. PL 101-637 The Asbestos School Hazard
Abatement Reauthorization Act
(ASHARA), 1990.
6. Tennessee Department of Environment and Conservation Standard:
a. TDEC Chapter 1200-01-20 Asbestos Accreditation Requirements, 2009.
b. TDEC Chapter 1200-3-11-02 Hazardous Air Contaminants, Asbestos, 2006.
7. US Army Corp of Engineers:
a. USACE EM 385-1-1 Safety and Health Requirements Manual, 2008.
ANZY129010 01 45 00-3
B. Non-Government Documents:
1. American Institute of Steel Construction:
a. AISC 303-10 Code of Standard Practice for Steel Buildings and Bridges.
b. AISC 325-11 Steel Construction Manual.
2. American Society of Mechanical Engineers:
a. ASME A13.1-13 Scheme for the Identification of Piping Systems.
b. ASME B1.20.1-13 Pipe Threads, General Purpose (Inch).
c. ASME B16.3-11 Malleable Iron Threaded Fittings
Classes 150…