Attach_L_13_QCM_Outline_API_653_Pool.docx

DOCX document 31 KB Posted

Attached to
AFCEC FUELS MATOC Federal contract opportunity
Solicitation number
FA890324R0003
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

This document outlines requirements for proposed on-site quality control managers for specialized API 653 tank repairs under the AFCEC FUELS MATOC solicitation. It requires submission of experience outlines for two proposed on-site QCMs, including general descriptions of their DoD construction experience as QCMs and narratives for two specialized API 653 tank repair projects each served in a QCM or superintendent role. Projects must demonstrate the individual served for a minimum of four months and involve repairs valued over $1 million, including mechanical, patch plate/pit, welding and coating work. Submissions are limited to two pages per proposed QCM.

View the file

Other files for this federal contract opportunity

Other files attached to AFCEC FUELS MATOC, newest first.
File Type Posted
FUELS SOW Draft 20231215.pdf PDF
Sections L and M FUELS 20231215.pdf PDF
Attach_L_15_QCM_Outline_Hydrant_Pool.docx DOCX document
Attach_L_07_Corporate_Project_Mgr_Outline.docx DOCX document
Attach_L_12_Super_Outline_API_653_Pool.docx DOCX document
Attach_L_14_Super_Outline_Hydrant_Pool.docx DOCX document
Attach_L_02_Q_and_A_Answers 15 Dec 23.pdf PDF
Solicitation Amendment FA890324R00030001 SF 30 20231215.pdf PDF
Attach_L_06_Corporate_PgM_Outline.docx DOCX document
Attach_L_10_Super_Outline_General_Pool.docx DOCX document
Attach_L_11_QCM_Outline_General_Pool.docx DOCX document
Subcontracting Plan Template.docx DOCX document
Construction Pricing and Purchasing Forecasts__01_12_2023.pdf PDF
Draft Answers to Attach L-02 Q_and_A.xlsx XLSX spreadsheet
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment L-13 Onsite Quality Control Manager Experience Outline

API 653 REPAIR POOL

· Name of Proposed Onsite QCM: [Must be used during performance of this contract – Do not submit this individual if you submitted him/her in the role of Superintendent for any Pool)]

· Current Employer: [Must be employed by the Prime Offeror (or entity of the Prime JV Offeror)]

· Total Years of Experience as a Quality Control Manager: [DoD experience + Commercial/Private experience. DO NOT INCLUDE EXPERIENCE AS A Superintendent, TRADESPERSON/LABORER, etc). QCM experience can be for ANY type of construction – it does NOT have to be for Fuels Infrastructure and it can be experience gained when employed by any Construction Firm.]

· Years Experience performing DoD Construction as a QCM:

· Years Experience in the Commercial/Private Sector as QCM: [Commercial/Private experience is not required, but the data helps (if applicable) to support the DoD experience timelines.]

· [Note 1: Ensure DoD + Commercial/Private Experience = Total Years]

· [Note 2: Round the “years” to .25, .5, or .75, as applicable.]

· [Note 3: In cases where the individual has been employed to serve both as a Superintendent and a QCM, only identify the time as QCM (remove any time where the individual served only in the Superintendent role). If the individual was dual or triple hatted (SS/QCM or SS/QCM/SSHO) then the full time on that project can be counted towards time as QCM.]

· General description/narrative of experience in DoD Construction to capture at least 5 years working DoD Construction specifically as an On-Site QCM. [Refer to example provided in Attachment L-06 Corporate PgM Outline] Role/General Work Type [Highlight role and DoD Construction experience] Claiming DoD Exp (Yes or No)

Company Name
Month/Year Worked
Total Years DoD Construction as On-Site QCM

Total Qualified Experience

[Project #(1 or 2) – Project Title]

· Individual’s Employer (Construction Firm) for this project:

· Role/Position Served: [Onsite QCM or Superintendent only]

· Project Title:

· DoD Installation where work was performed: [Must be on a US DoD Installation or allied country installation.]

· Total Specialized API 653 Tank RepairsContract/Task Order Value:

· Value of Project’s [or “Phase”, if applicable] API 653 Repairs:

· [Must be at least $1M in tank repairs resultant from an API 653 inspection

· Tank must have been Taken out of service and returned to Operator upon completion

· Must have performed multi-disciplinary repairs:

· mechanical repairs

· patch plate/pit repairs

· substantial welding (not just incidental welding); AND

· significant coatings (full interior/exterior shell coatings-not just spot coatings)]

· Identify if you are submitting the entire project, or a phase of the project. [If submitting a “phase,” summarize/identify the phase of work being submitted IAW Section L&M Paragraph 4.1.2 definition of “Project”. i.e., a single BOD’d API 653 Tank Repair]

· Date of Field Mobilization for Project [or “Phase,” if applicable]:

· Date of BOD for Project [or “Phase” if applicable]: [Must be within 5 years of this RFP date]

· Narrative Description of Specialized API 653 Repairs Project:

· [Carefully review the description of “Specialized API 653 Tank Repairs.”

· Generally describe the entire project.

· Briefly identify in abbreviated fashion the project’s entire scope – ensuring the project meets the description of Specialized API 653 Tank Repairs.

· Clearly articulate what phase of work you are submitting for this proposal, if applicable, IAW Section L&M Paragraph 4.1.2 definition of “Project”.

· Do NOT include incidental work around an API 653 fuel tank.]

· Provide a statement certifying the extent the individual served in the identified role (Superintendent or QCM) for that project: [At a minimum, they must have served in that role for a minimum of four (4) months in the field (any time between construction mobilization and BOD)].

*Instructive language shown in [Italics]. Offerors must delete or modify instructive language. Two (2) On-Site QCM personnel are required for evaluation. Ensure two (2) projects are submitted for each On-Site QCM proposed. Do not submit more than threetwo (32) pages total for On-Site QCM.

File details come from the government source that posted it. Updated .