This document outlines requirements for a project manager's experience on a federal fuels infrastructure contract. It provides a template for offerors to submit details on their proposed project manager, including years and types of experience, and descriptions of at least two past projects involving Department of Defense (DoD) petroleum, oils and lubricants wetted system repairs valued at a minimum of $500,000 for electrical and/or mechanical work. The related solicitation is for the Air Force Civil Engineer Center Fuels Multiple Award Task Order Contract (FA890324R0003), to provide fuels infrastructure-related construction services at DoD installations. Offerors must utilize the proposed project manager during contract performance and describe their experience leading DoD construction projects as a project manager over the past five years, including roles, dates and locations of work.

View the file

Other files for this federal contract opportunity

Other files attached to AFCEC FUELS MATOC, newest first.
File Type Posted
FUELS SOW Draft 20231215.pdf PDF
Sections L and M FUELS 20231215.pdf PDF
Attach_L_15_QCM_Outline_Hydrant_Pool.docx DOCX document
Solicitation Amendment FA890324R00030001 SF 30 20231215.pdf PDF
Attach_L_06_Corporate_PgM_Outline.docx DOCX document
Attach_L_10_Super_Outline_General_Pool.docx DOCX document
Attach_L_11_QCM_Outline_General_Pool.docx DOCX document
Attach_L_02_Q_and_A_Answers 15 Dec 23.pdf PDF
Attach_L_12_Super_Outline_API_653_Pool.docx DOCX document
Attach_L_13_QCM_Outline_API_653_Pool.docx DOCX document
Attach_L_14_Super_Outline_Hydrant_Pool.docx DOCX document
Subcontracting Plan Template.docx DOCX document
Draft Answers to Attach L-02 Q_and_A.xlsx XLSX spreadsheet
Construction Pricing and Purchasing Forecasts__01_12_2023.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment L-07 Project Manager Experience Outline

· Name of Proposed Project Manager (PM): [Must be utilized during performance of this contract]

· Current Employer: [Must be employed by the Prime Offeror (or entity of the Prime JV Offeror)]

· Total Years of Experience as a PM: [DoD experience + Commercial/Private experience. DO NOT INCLUDE EXPERIENCE AS A QCM, SS, TRADESPERSON/LABORER, etc). PM experience can be for ANY type of construction – it does NOT have to be for Fuels Infrastructure and it can be experience gained when employed by any Construction Firm.]

· Years Experience performing DoD Construction as a PM:

· Years Experience in the Commercial/Private Sector as a PM: [Commercial/Private experience is not required, but the data helps (if applicable) to support the DoD experience timelines.]

· [Note 1: Ensure DoD + Commercial/Private Experience = Total Years]

· [Note 2: Round the “years” to .25, .5, or .75, as applicable.]

· General narrative description of experience in DoD Construction to capture at least five (5) years working DoD Construction specifically as a Project Manager. [Refer to example provided in Attachment L-06 Corporate PgM Outline] Role/General Work Type [Highlight role and DoD Construction experience] Claiming DoD Exp (Yes or No)

Company Name
Month/Year Worked
Total Years DoD Construction as PM

Total Qualified Experience

[Project #(1 or 2) – Project Title]

· Individual’s Employer (Construction Firm) for this project:

· Role/Position Served: [Project Manager only]

· Project Title:

· DoD Installation where work was performed: [Must be on a US DoD Installation or allied country installation.]

· Total DoD POL Wetted System RepairProject Value:

· Value of Project’s [or “Phase” if applicable] Electrical and Mechanical Work: [Must be at least $500K in Electrical and/or Mechanical work]

· Identify if you are submitting the entire project, or a phase of the project. [If submitting a “phase,” summarize/identify the phase of work being submitted IAW Section L&M Paragraph 4.1.2 definition of “Project”. i.e., a single BOD’d API 653 Tank Repair or BOD’d MSS repair, etc]

· Date of Field Mobilization for Project [or “Phase” if applicable]:

· Date of BOD for Project [or “Phase” if applicable]: [Must be within 5 years of this RFP date]

· Narrative Description of DoD POL Wetted System Repairs Project:

· [Carefully review the description of “DoD POL Wetted System Repairs”.

· Generally describe the entire project.

· Briefly identify in abbreviated fashion the project’s entire scope, to include non-electrical or non-mechanical work such as Containment, Cathodic Protection, Coatings, Canopies, Structural Building repairs, etc

· Clearly articulate what phase of work you are submitting for this proposal, if applicable, IAW Section L&M Paragraph 4.1.2 definition of “Project”.]

· Provide a statement certifying the extent the individual served in the identified role for that project. (At a minimum, they must have served in that role for all pre-construction activities, and at least half of the field construction duration of the project.

*Instructive language shown in [Italics]. Offerors must delete or modify instructive language. Ensure two (2) projects are submitted. Do not submit more than threetwo (32) pages total for PM.