This document contains an outline template for proposing site superintendent and site safety and health officer experience on a federal fuels infrastructure multiple-award task order contract solicitation. The outline requires offerors to provide details on two proposed individuals including their construction safety certification dates and years of experience as a site superintendent on Department of Defense projects and in commercial construction. It also requires descriptions of at least two relevant Department of Defense construction projects with values over $500,000 in electrical and/or mechanical work, where each proposed individual served as either a site superintendent or quality control manager for at least four months. The related solicitation is for an indefinite-delivery, indefinite-quantity multiple-award task order contract through the Air Force Civil Engineer Center for fuels infrastructure work, with NAICS code 237990 and a small business set-aside. It does not specify a period of performance or place of performance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FUELS SOW Draft 20231215.pdf | ||
| Sections L and M FUELS 20231215.pdf | ||
| Attach_L_15_QCM_Outline_Hydrant_Pool.docx | DOCX document | |
| Solicitation Amendment FA890324R00030001 SF 30 20231215.pdf | ||
| Attach_L_06_Corporate_PgM_Outline.docx | DOCX document | |
| Attach_L_11_QCM_Outline_General_Pool.docx | DOCX document | |
| Attach_L_07_Corporate_Project_Mgr_Outline.docx | DOCX document | |
| Attach_L_12_Super_Outline_API_653_Pool.docx | DOCX document | |
| Attach_L_13_QCM_Outline_API_653_Pool.docx | DOCX document | |
| Attach_L_14_Super_Outline_Hydrant_Pool.docx | DOCX document | |
| Attach_L_02_Q_and_A_Answers 15 Dec 23.pdf | ||
| Subcontracting Plan Template.docx | DOCX document | |
| Draft Answers to Attach L-02 Q_and_A.xlsx | XLSX spreadsheet | |
| Construction Pricing and Purchasing Forecasts__01_12_2023.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment L-10 Site Superintendent/SSHO Experience Outline
GENERAL POOL
· Name of Proposed Site Superintendent/SSHO [#1 or #2]: [Must be used during performance of this contract. Do not submit this individual if you submitted him/her in the role of Onsite QCM for any Pool]
· Current Employer: [Must be employed by the Prime Offeror (or entity of the Prime JV Offeror)]
· Completion Date of the 30-Hour OSHA Construction Safety Course: [Must be within 5 years of this RFP]
· Total Years of Experience as a Site Superintendent: [DoD experience + Commercial/Private experience. DO NOT INCLUDE EXPERIENCE AS A QCM, TRADESPERSON/LABORER, etc). Superintendent experience can be for ANY type of construction – it does NOT have to be for Fuels Infrastructure and it can be experience gained when employed by any Construction Firm.]
· Years Experience performing DoD Construction as a Site Superintendent:
· Years Experience in the Commercial/Private Sector as Site Superintendent: [Commercial/Private experience is not required, but the data helps (if applicable) to support the DoD experience timelines.]
· [Note 1: Ensure DoD + Commercial/Private Experience = Total Years]
· Note 2: Round the “years” to .25, .5, or .75, as applicable.]
· [Note 3: In cases where the individual has been employed to serve both as a Superintendent and a QCM, only identify the time as Superintendent (remove any time where the individual served only in the QCM role). If the individual was dual or triple hatted (SS/QCM or SS/QCM/SSHO) then the full time on that project can be counted towards time as Superintendent.]
· General description/narrative of experience in DoD Construction to capture at least 5 years working DoD Construction specifically as a Site Superintendent and at least one year as an SSHO. [Refer to example provided in Attachment L-06 Corporate PgM Outline] Role/General Work Type [Highlight role and DoD Construction experience] Claiming DoD Exp (Yes or No)
| Company Name |
| Month/Year Worked |
| Total Years DoD Construction as Site Superintendent /SSHO |
Total Qualified Experience
[Project #(1 or 2) – Project Title]
· Individual’s Employer (Construction Firm) for this project:
· Role/Position Served: [Must be as Superintendent or QCM only]
· Project Title:
· DoD Installation where work was performed: [Must be on a US DoD Installation or allied country installation.]
· Total DoD POL Wetted System RepairsProject Value:
· Value of Project’s (or “Phase”, if applicable) Electrical and Mechanical Work: [Must be at least $500K in Electrical and/or Mechanical work]
· Identify if you are submitting the entire project, or a phase of the project. [If submitting a “phase,” summarize/identify the phase of work being submitted IAW Section L&M Paragraph 4.1.2 definition of “Project”. i.e., a single BOD’d API 653 Tank Repair or BOD’d MSS repair, etc.]
· Date of Field Mobilization for Project [or “Phase” if applicable]:
· Date of BOD for Project [or “Phase,” if applicable]: [Must be within 5 years of this RFP date]
· Narrative Description of DoD POL Wetted System Repairs Project:
· [Carefully review the description of “DoD POL Wetted System Repairs”
· Generally describe the entire project.
· Briefly identify in abbreviated fashion the project’s entire scope, to include non-electrical or non-mechanical work such as Containment, Cathodic Protection, Coatings, Canopies, Structural Building repairs, etc
· Clearly articulate what phase of work you are submitting for this proposal, if applicable, IAW Section L&M Paragraph 4.1.2 definition of “Project”.]
· Provide a statement certifying the extent the individual served in the identified role (QCM or Superintendent) for that project: [At a minimum, they must have served in that role for a minimum of four (4) months in the field (any time between construction mobilization and BOD)].
*Instructive language shown in [Italics]. Offerors must delete or modify instructive language. Two (2) Site Superintendent/SSHO personnel are required for evaluation. Ensure two (2) projects are submitted for each Site Superintendent/SSHO proposed. Do not submit more than threetwo (32) pages total for each Site Superintendent/SSHO.