Attach_L_06_Corporate_PgM_Outline.docx
DOCX document 35 KB Posted
- Attached to
- AFCEC FUELS MATOC Federal contract opportunity
- Solicitation number
- FA890324R0003
About this file
This document outlines requirements for proposed Program Managers on a federal fuels infrastructure contract. Offerors must provide details on two DoD POL wetted system repair projects completed by their proposed Program Manager, including project values, dates, and a narrative description of electrical and mechanical scope. The individual must have served in the identified role for at least half of the field construction duration on the projects submitted. This information will be evaluated under solicitation FA890324R0003, the AFCEC FUELS MATOC, a multiple award task order contract for fuels infrastructure work with the Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency. Offerors are limited to three pages total for the Program Manager outline.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FUELS SOW Draft 20231215.pdf | ||
| Sections L and M FUELS 20231215.pdf | ||
| Attach_L_15_QCM_Outline_Hydrant_Pool.docx | DOCX document | |
| Attach_L_02_Q_and_A_Answers 15 Dec 23.pdf | ||
| Solicitation Amendment FA890324R00030001 SF 30 20231215.pdf | ||
| Attach_L_10_Super_Outline_General_Pool.docx | DOCX document | |
| Attach_L_11_QCM_Outline_General_Pool.docx | DOCX document | |
| Attach_L_07_Corporate_Project_Mgr_Outline.docx | DOCX document | |
| Attach_L_12_Super_Outline_API_653_Pool.docx | DOCX document | |
| Attach_L_13_QCM_Outline_API_653_Pool.docx | DOCX document | |
| Attach_L_14_Super_Outline_Hydrant_Pool.docx | DOCX document | |
| Subcontracting Plan Template.docx | DOCX document | |
| Draft Answers to Attach L-02 Q_and_A.xlsx | XLSX spreadsheet | |
| Construction Pricing and Purchasing Forecasts__01_12_2023.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment L-06 Corporate Program Manager Experience Outline
· Name of Proposed Program Manager (PgM): [Must be utilized during performance of this contract]
· Current Employer: [Must be employed by the Prime Offeror (or entity of the Prime JV Offeror)]
· Total Years of Experience as PgM, Project Manager (PM), Quality Control Manager (QCM), or Site Superintendent (SS) [DoD experience + Commercial/Private experience. DO NOT INCLUDE EXPERIENCE AS A TRADESPERSON/LABORER. This experience can be for ANY type of construction – it does NOT have to be for Fuels Infrastructure and it can be experience gained when employed by any Construction Firm.]
· Years Experience performing DoD Construction as a Program Manager (PgM), Project Manager (PM), QCM, or Site Superintendent (SS):
· Years Experience in the Commercial/Private Sector as a PgM, PM, QCM, or SS: [Commercial/Private experience is not required, but the data helps (if applicable) to support the DoD experience timelines.]
· [Note 1: Ensure DoD + Commercial/Private Experience = Total Years]
· [Note 2: Round the “years” to .25, .5, or .75, as applicable.]
· General narrative description of experience in DoD Construction to capture at least 10 years working DoD Construction as a PgM, PM, QCM, or SS. [Fictitious example narrative/table shown below in Italics] Role/General Work Type [Highlight role and DoD Construction experience] Claiming DoD Exp (Yes or No)
| Company Name |
| Month/Year Worked |
| Total Years DoD Construction as PgM, PM, QCM, or SS |
| Jimbo Fisher has been working construction since 1993. He started as a welder for Elway Mechanical, but in May of 1995, transitioned to serve as a SS overseeing Elway’s USACE HVAC and Fire Suppression projects at several Army installations. In Dec 1999, he also gained his QC certification and continued to serve Elway both as a QCM/SS on USACE and NAVFAC projects for mainly Mechanical construction projects, including tank repairs and pipelines. |
| Yes |
| Elway Mechanical |
| May1995-Nov2004 |
| 9.5 |
| In Nov 2004, Jimbo took a job as a PM for Bronco Construction, performing PM duties for city housing projects in the Denver, CO area (commercial construction). |
| No |
| Bronco Construction |
| Nov2004-Dec2009 |
| 0 |
| In December 2009, Jimbo returned to work DoD Construction projects as a PM for Cowboy Construction, taking on numerous general building construction repairs and mechanical projects at a variety of Air Force and Army installations in the southern US states. In March of 2018, Jimbo was promoted to PgM for Cowboy Construction. |
| Yes |
| Cowboy Construction |
| Dec2009 – Jan2020 |
| 10.0 |
| In 2020, Jimbo joined our firm at Spurs Construction as DoD PgM for our mechanical construction division. |
| Yes |
| Spurs Construction |
| Jan2020 - Present |
| 3.75 |
In total, Jimbo has 30 years of construction experience, 28 as a SS, QCM, PM, or PgM, with 23 years specifically dedicated to DoD Construction.”
| Total Qualified Experience |
| 23.25 |
[Project #(1 or 2) – Project Title]
· Employer:
· Role/Position Served: [Program Manager, Project Manager, QCM, or Site Superintendent]
· Project Title:
· DoD Installation where work was performed: [Must be on a US DoD Installation or allied country installation.]
· Total DoD POL Wetted System RepairsProject Value:
· Value of Project’s [or “Phase”, if applicable] Electrical and Mechanical Work: [Must be at least $500K in Electrical and/or Mechanical work]
· Identify if you are submitting the entire project, or a phase of the project. [If submitting a “phase,” summarize/identify the phase of work being submitted IAW Section L&M Paragraph 4.1.2 definition of “Project”. i.e., a single BOD’d API 653 Tank Repair or BOD’d MSS repair, etc.]
· Date of Field Mobilization for Project [or “Phase” if applicable]:
· Date of BOD for Project [or “Phase” if applicable]: [Must be within 5 years of this RFP date]
· Narrative Description of DoD POL Wetted System Repairs Project:
· [Carefully review the description of “DoD POL Wetted System Repairs”.
· Generally describe the entire project.
· Briefly identify in abbreviated fashion the project’s entire scope, to include non-electrical or non-mechanical work such as Containment, Cathodic Protection, Coatings, Canopies, Structural Building repairs, etc
· Clearly articulate what phase of work you are submitting for this proposal, if applicable, IAW Section L&M Paragraph 4.1.2 definition of “Project”.]
· Provide a statement certifying the extent the individual served in the identified role for the project. [At a minimum, they must have served in that role for all pre-construction activities, and at least half of the field construction duration of the project.]
*Instructive language shown in [Italics]. Offerors must delete or modify instructive language. Ensure two (2) projects are submitted. Do not submit more than threetwo (32) pages total for PgM.