Attachment L1-3 Project Information Worksheet

50 KB Posted

Attached to
Repair Cadet Chapel, USAF Academy, Colorado Springs, CO
Solicitation number
FA8903-17-R-0071
Issued by

About this file

Attachment L1-3

Text of this file

PROJECT INFORMATION WORKSHEET

Contractor

Cage Code DUNS Number

Contract Number

Delivery/Task Order

Contract Type

Project Title

Project Location

Contract Agency/Customer:

Contract Dollar Value

Original Current

Explain the differences in contract values, if applicable:

Period of Performance

Start Date Original End Date Current End Date

Explain the Differences in period of performance, if applicable:

Please check any of the following that apply to this effort:

Similarity in facility type (historic as previously defined) most comparable to the Repair Cadet Chapel project.

Replace existing building exterior envelope (with greater complexity than just a roof replacement)

Physical access constraints requiring complex scaffolding solutions

Complex Phasing/Multiple construction trades performing work in a constrained space requiring coordination of shared access during construction

High rise with exterior envelope modifications (greater than five (5) above grade stories)

Construction value greater than $50M

Limited / controlled site and staging areas

DoD Projects subject to FAR part 22.4

Please, briefly explain your above responses.

Project Details

Description of Project

Describe the specific elements of work performed and how this work is relevant to the Repair Cadet Chapel project. Discuss any unique or relevant considerations and/or technical challenges of each project and how this construction experience directly enhances Offerors' chances of success on the Repair Cadet Chapel project

Include relevant information concerning your compliance with FAR 52.219-8, Utilization of Small Business Concerns, on the contract you are submitting, If applicable:

Identify whether a subcontracting plan was required by the contract you are submitting. If one was required, identify in percentage terms the planned versus the achieved goals during contract performance. Explain why the goals were not met, if applicable.

Key Personnel - Identify name and corporate affiliation for key personnel (see factor 3 for key personnel roles)

Project Manager

Construction/Site Supervisor

Contractor Quality Control Manager

Site Safety and Health Officer

Scheduler

Historic Treatment Specialist

Key Subcontractors for Specialty Scope Elements (relevant to the Chapel renovation)

Customer Points of Contact (name, e-mail, and phone number)

Project Site Manager

Contracting Officer

Administrative POC

INCLUDE PHOTOGRAPHS AS ATTACHMENTS TO THIS FORM (NOT TO EXCEED 3 PAGES)

fc-int01-generateAppearances:
Administrative POC_IF19cCW0HtUfh6JrWNbAjA:
Contracting Officer_Wj8ILDrU0GPLyeZOJtdpbQ:
Project Site Manager_sL4vKD7mCsgU3tmGsx5gNQ:
Key Subcontractors for Special_yDBGQxS443l9mTzcDK0KSA:
Historic Treatment Specialist_ttQ6P6WPU-Chja54uH-P2w:
Scheduler_ev2d6b5-RQ-9C281mAxOCQ:
Site Safety and Health Officer_O013i7U-DpokQKW4KEkemw:
Contractor Quality Control Man_ZXS0kWbqlWRpvtyz2Ke6uQ:
Construction/Site Supervisor_W-T-DX8ZMyuV2Vgnz4PO3w:
Project Manager_qCAMtXi3N8w0JOWxDFX4MQ:
Identify whether a subcontract_x67ME363Q5LFK0ML7Jgvcw:
Include relevant information c_BAASSU2ubHXtIq9TwfpRTw:
Describe the specific elements_LuP9-suyUhHg96kqLG80JQ:
Description of Project_9ZwYpS3w1ucAFziCWZxjUA:
Please, briefly explain your a_lnFGQOPKCxu-LHh-MA6Tdw:
Please check any of the follow_7_bg4CWtxtcVyqi3FUBvbXqA: Off
Please check any of the follow_6_bg4CWtxtcVyqi3FUBvbXqA: Off
Please check any of the follow_5_bg4CWtxtcVyqi3FUBvbXqA: Off
Please check any of the follow_4_bg4CWtxtcVyqi3FUBvbXqA: Off
Please check any of the follow_3_bg4CWtxtcVyqi3FUBvbXqA: Off
Please check any of the follow_2_bg4CWtxtcVyqi3FUBvbXqA: Off
Please check any of the follow_1_bg4CWtxtcVyqi3FUBvbXqA: Off
Please check any of the follow_0_bg4CWtxtcVyqi3FUBvbXqA: Off
Explain the Differences in per_jWx0KBpz0Gmmhz40nSgXuA:
Current End Date_uK0rGDmjQPtoOhd7IUVypw:
Original End Date_B1M5Mfsq7jRfEum2p2X8rQ:
Start Date_Bv51eL7EiLG11sSKorcrYg:
Explain the differences in con_5NZp-iRhgTsd7KQLbVMNpA:
Current_pMIGNOaCPcuBRcpLADGpRQ:
Original_f6YQhFQTv7tjz9K0iS461w:
Contract Agency/Customer:_edNrtZvQoAxX6sVwVaEOhw:
Project Location_hslN3olDZf*cfSXef1NBRA:
Project Title_1gcDqMdJJl1IJZMgJcmusA:
Contract Type_juALrtJaKnht459LEtkcyQ:
Delivery/Task Order_IxaQ01ZeIxKnWS406SI5Fg:
Contract Number_Y99u35Of7cmtPbVL03kdoQ:
DUNS Number_hpnoJhiaS2Tn-AkDpLMJtQ:
Cage Code_9OSTAcgyXCKW3on2GDXcxg:
Contractor_1S9mUkkpfZZ10TwUGtSBhA:

Other files

File Type Posted
FA8903-17-R-0071_Clarification_Notice.pdf PDF
Section_L_Step_1_ITO_Prequal_13_Nov_17.pdf PDF
FA8903-17-R-0071_Amendment_03_signed.pdf PDF
Section_L_Step_1_ITO_Prequal_14_Nov_17.pdf PDF
QA_RprCadetChapUSAFA_7Nov17.pdf PDF
App_F_-_Draft_Final_Specs_11-02-17.pdf PDF
FA8903-17-R-0071_Amendment_01.pdf PDF
Section_M_Step_2_Eval_for_Award_10_Oct_2017.pdf PDF
App_E_Draft_Final_Design_12OCT2017.pdf PDF
FA8903-17-R-0071_SF33 Request for Proposal.pdf PDF
Attachment L1-8 Client Authorization Letter.pdf PDF
App C - Empirical HazMat 2015 Report.pdf PDF
App C - Empirical HazMat 2015 Report.pdf PDF
General Decision Number C0170032.pdf PDF
QA_for_Repair_Cadet_Chapel_USAF__Academy_19_Oct_2017.pdf PDF
App B - Maxim HazMat 2004 Report.pdf PDF
App C - Empirical HazMat 2015 Report.pdf PDF
Attachment L1-3 Project Information Worksheet —
Attachment L1-1 Contact Information.pdf PDF
Attachment L2-2 Total Evaluated Price Summary Sheet.xlsx XLSX spreadsheet
App B - Maxim HazMat 2004 Report.pdf PDF
App F - Specs, Rpr Cadet Chapel 10-16-17.pdf PDF
Section L Step 2 ITO Award 10 Oct 2017.pdf PDF
Attachment L1-6 Past Performance Questionnaire —
Attachment L2-1 Contact Information.pdf PDF
Attachment L2-3 Administrative Advisor Access to Proprietary Information.pdf PDF
Section M Step 1 Eval for Prequal 13 Oct 17.pdf PDF
Section L Step 1 ITO Prequal 13 Oct 17.pdf PDF
Attachment L1-7 Consent Letter Sample.pdf PDF
App D - USAFA Environmental Standards.pdf PDF
Attachment L1-5 Supplement Detailed Project Form —
App E - Design Dwgs, Rpr Cadet Chapel —
App D - USAFA Environmental Standards.pdf PDF
Attachment L1-2 Administrative Advisor Access to Proprietary Information.pdf PDF
SOW Repair Cadet Chapel USAFA 04 Oct 17.pdf PDF
Appendix_G.pdf PDF
App A - Hunter HazMat 1989 Report.pdf PDF
App A - Hunter HazMat 1989 Report.pdf PDF
App D - USAFA Environmental Standards.pdf PDF
App B - Maxim HazMat 2004 Report.pdf PDF
Attachment L1-4 Specialized Scope Information Worksheet —
App A - Hunter HazMat 1989 Report.pdf PDF
CONWRITE 05 Oct 2017.pdf PDF
QA_for_Repair_Cadet_Chapel_USAF__Academy_FINAL_28_Aug_2017.pdf PDF
USAFA_Cadet_Chapel_-_Draft_Section_L_Step_2_-_11Aug2017.pdf PDF
USAFA_Cadet_Chapel_-_Draft_Section_L_Step_1_-_11AUG2017.pdf PDF
USAFA_Cadet_Chapel_-_Draft_Section_M_Step_1_-_11Aug2017.pdf PDF
USAFA_Cadet_Chapel_-_Draft_Section_M_Step_2_-_11Aug2017.pdf PDF
FA8903-17-R-0071_Site_Visit_Attendees.pdf PDF
USAFA_Cadet_Chapel_Site_Walk_3_AUG_2017.pptx PPTX presentation
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .