Questions/Answers for Repair Cadet Chapel 28 Aug 2017
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8903-17-R-0071 D-B-B Repair Cadet Chapel at United States Air Force Academy, CO Questions and Answers
FA8903-17-R-0071
Offeror Generated Question Document Page # Government Response
1 The draft solicitation references attached forms for team members and projects (PIW). May we use our own forms if we include the same information in the same order?
USAFA_Cadet_Chapel_- _Draft_Section_L_Step1_- _11AUG2017.pdf
14 For consistency and to limit quantity of data allowed, Offerors are required to use the forms provided.
2 Does the Historic Treatment Specialist need to be a third party or can the prime use in-house expertise, if available to be on site?
USAFA_Cadet_Chapel_- _Draft_Section_L_Step1_- _11AUG2017.pdf
14 The prime may use in-house expertise. Clarified in Step 1, Section L, Factor 4
3 Please clarify section 4.3.3 Technical Factor 2, Team Experience for Specialized Scope, section a.) “submitted projects must demonstrate direct experience not experience as a general contractor.” What does “direct experience” mean? Many construction companies that specialize in the restoration of historic facilities are general contractors that have self-perform capabilities.
USAFA_Cadet_Chapel_- _Draft_Section_L_Step1_- _11AUG2017.pdf
14 Offeror may utilize self perform (i.e. in-house) capabilities or proposed subcontractor(s) experience. Direct experience means that Offeror and/or subcontractor actually performed the specialized scope. Step 1, Section L, Factor 2 language revised to clarify.
4 Please clarify section 4.3.3 Technical Factor 2, Team Experience for Specialized Scope, section b. 1) “submit two project submissions for team member responsible for custom fabrication (not installer or prime contractor) of exterior metal envelop...” Are you asking us to lock in sub consultants and include their info in the Phase I proposal stage? We are unclear of what “not installer or prime contractor” means.
USAFA_Cadet_Chapel_- _Draft_Section_L_Step1_- _11AUG2017.pdf
14 Submitted projects must demonstrate direct experience (prime contractor in-house or proposed subcontractor) performing the fabrication, construction, or restoration work described. Experience as a general contractor or installer without demonstration of direct experience fabricating, constructing, or restoring will not be considered. The Government is requesting that the Offeror submit the qualifications of the subcontractor(s) whom they intend to utilize for the performance of this project in Phase I (i.e. Factor 2). The Government does not require the prime or the subcontractor(s) to enter into exclusive teaming agreements. However, if awarded the contract, the Offeror will be required to utilize those specialty scope in-house/subcontractors proposed in Phase I.
FA8903-17-R-0071
Offeror Generated Question Document Page # Government Response
5 Please clarify section 4.3.3 Technical Factor 2, Team Experience for Specialized Scope, section b. 2) “submit five project descriptions of teaming member (not prime contractor) responsible for plaster...” Are you asking us to lock in sub consultants and include their info in the Phase I proposal stage?
15 Submitted projects must demonstrate direct experience (prime contractor in-house or subcontractor) performing the fabrication, construction, or restoration work described.
Experience as a general contractor or installer without demonstration of direct experience fabricating, constructing, or restoring will not be considered. The Government is requesting that the Offeror submit the qualifications of the subcontractor(s) whom they intend to utilize for the performance of this project in the Phase I (i.e. Factor 2). The Government does not require the prime or the subcontractor(s) to enter into exclusive teaming agreements. However, if awarded the contract, the Offeror will be required to utilize those specialty scope in-house/subcontractors proposed in Phase I.
6 Please clarify section 4.3.3 Technical Factor 2, Team Experience for Specialized Scope, section b. 3) “submit five project descriptions for teaming member (not prime contractor) responsible for fabrication of stained glass dalles de verre windows...” Are you asking us to lock in sub consultants and include their info in the Phase I proposal stage?
USAFA_Cadet_Chapel_- _Draft_Section_L_Step1_- _11AUG2017.pdf
15 Submitted projects must demonstrate direct experience (prime contractor in-house or subcontractor) performing the fabrication, construction, or restoration work described.
Experience as a general contractor or installer without demonstration of direct experience fabricating, constructing, or restoring will not be considered. The Government is requesting that the Offeror submit the qualifications of the subcontractor(s) whom they intend to utilize for the performance of this project in the Phase I (i.e. Factor 2). The Government does not require the prime or the subcontractor(s) to enter into exclusive teaming agreements. However, if awarded the contract, the Offeror will be required to utilize those specialty scope in-house/subcontractors proposed in Phase I.
FA8903-17-R-0071
Offeror Generated Question Document Page # Government Response
7 Is there a reason for the dalles de verre window fabrication requirement? The actual work is not dalles de verre but metal framed glass with no epoxy. Should the requirement be a company that can cast the replacement glass that is requested in the RFP and has experience removing, cataloging, storing and reinstalling window systems? There are a couple dalles de verre windows but they are not part of the project, just protecting them. Please advise.
USAFA_Cadet_Chapel_- _Draft_Section_L_Step1_- _11AUG2017.pdf and Draft Design Drawings and Draft Specifications
While the work is existing dalle de verre glass blocks are set into an aluminum frame with thiocol sealant, the work on these strip windows needs to be done using conservation methodologies. The qualifications for this work are to be provided as specified.
8 Given the special nature of this project, it might be a risk to the government to have prime contractors lock in specialty trade contractors at Phase I. This may reduce price competition because primes will request specialty contractors make exclusive agreements, which may preclude the best trade contractors moving to Phase II. More customary in a Best Value Competion, Primes submit key trade partners at Phase II once they have had a chance to collect pricing and approach.
Due to specialized nature of this project, the Government has determined that the specialized scope elements are an essential part of the Prequalification of Sources.
Prime/subcontractors are not required to enter into exclusive agreements. The prime will be required to utilize the team member(s) submitted in Phase I for specialty scope elements if awarded the contract.
9 Given the nature of a Best Value Phase II proposal, it is very difficult to get PPQs and special forms from trade partners. In order to give the government the Best Value, trade parters will be turning in their price proposals with moments to spare.
PPQs are only required for Factor 1. Special forms are being provided by the Government to ensure order and consistency. Prime's may fill out the forms (if necessary) for their teaming partners. Step 2 will include sufficient time for Offerors to request price proposals from their selected team members..
10 To what degree will the AFCEC control the selection of specialty subcontractors? Will the AFCEC be able to insist upon using a particular specialty subcontractor, or will prime contractors' bids simply be evaluated as-is?
Step One, Section L 16 The prequalification solicitation requires the prime to submit projects demonstrating experience (in-house or subcontractor) for specialty scope elements (Factor 2). The prime will be required to utilize the same team members submitted in Step 1 for performance of the contract.
FA8903-17-R-0071
Offeror Generated Question Document Page # Government Response
11 Will specialty subcontractors be required to carry their own bonding, or will specialty subcontractors fall under prime contractor's bonding?
Step One, Section L 11 The Government only requires bonds from the Offeror. The Government does not require bonds from subcontractor(s). However, this does not preclude prime contractors from requiring bonds from their subcontractors if that is their practice.
12 Will prime contractors be able to communicate with project consultants hired by the AFCEC? Prime contractors may not be able to adequately judge the unique capabilities of specialty subcontractors without the help of a consultant (specifically referring to the pipe organ restoration component of the project)
N/A N/A No. The required experience for specialty subcontractors is included in the RFP. All questions must be submitted in writing to the Contracting Officer.
13 Section 1.4.3 states that a Lightning Protection and Grounding System test plan must be provided. Section 1.4.4 states that inspections must include the witnessing of ground resistance measurements for ground rods with test wells. No existence of test wells or ground rods were confirmed during the site walk on 3 Aug 2017. If they do exist, what are their locations? If they do not exist, how must we proceed with the testing and inspecting of grounding components for the requirements set forth in sections 1.4.3 and 1.4.4?
Specifications-26-20-00 Section 26 41 00 Lightning Protection Systems 11/13 Section 1.4.3 and Section 1.4.4
3 Ground rods with test wells will need to be verified by the Contractor in the field. If they do not exist or are not accessible, alternate testing means shall be submitted for approval and provided.
14 Can it be confirmed that the existing grounding system meets the current NFPA 780, UL96A, AFI 32-1065 and UFC 3-575-01 Standards for a class II structure?
1.)UFC 3-575-01 2.)2017
NFPA780 3.)2014
UL96A 4.)
AFI 32-1065
1.)UFC
PG10 2-1-1
2.)PG11
3.)PG65
4.)PG31
The scope of work for this Contractor shall include validating the existing grounding and lightning protection system and its compliance with applicable codes listed.
FA8903-17-R-0071
Offeror Generated Question Document Page # Government Response
15 Detail sheet EG601, key note 2 states that the existing #2 bonding jumper and grounding electrodes are to remain and be reused. However, the existing #2 cable does not meet class 2 requirements? How would you have us proceed?
13-0110^2306^EG601 DWG Drawing #
EG601
If the existing grounding system conductors and components are not accessible to be validated and/or tested by the Contractor, alternate means of compliance with applicable codes shall be submitted for approval and provided.
16 Document requests submital of 5 project descriptions in last 5 years for Dalles de Verre in historic buildings. This requirement may be pretty unrealstic to full-fill as this medium was largely popular in the 1960's and 1970's and has mostly fallen out of favor - Certainly in "Historic Buildings". The dalles at theupper section of the Cadet Chapel are not fabricated in a very tradtional method as they are assmebled in an aluminum matrix (the lower windows are the traditional cement or epoxy matrix, but are not part of the project scope). This makes specific experience with Dalle de Verre less applicable. For this project experience with large scale projects in historic buildings both secular and non-secular, complex staginig and scheduling , detailed documentation, and understanding the submittal process are all much more applicable when considering experience. Would projects that demonstrate these capabilities be acceptable as opposed to only dalle de verre as indicated?
Step One, Section L Section L, Step 1 requires submission of five (5) project descriptions for Dalles de Verre having achieved substantial completion within the last fifteen (15) years of the date of release of this solicitation. While the work is existing dalle de verre glass blocks are set into an aluminum frame with thiocol sealant, the work on these strip windows needs to be done using conservation methodologies.
The project experience for large scale project with complex staging and scheduling are relevant to the overall project but for the historic glazing, the requirements identified for the dalles de verre need to be met. Qualifications for this work will be revised to require: Submit five (5) project descriptions having achieved substantial completion for fabrication or replication of Dalles de Verre glazing to facilities as described in Specifications 08 01 80. In lieu of submission of five (5) Dalles de Verre projects, up to three (3) project descriptions will be considered for projects having achieved substantial completion which include replication of existing stained glass, matching color and appearance as described in Specifications 08 01 80. These projects may be substituted for Dalles de Verre project descriptions, but a total of five (5) projects must be submitted.
17 3 Aug 2017 Site Visit: What is perimeter of construction containment area? Safe zones?
he anticipated area of work for this project is shown on plan G-004. Contractor is to limit all construction activities and disturbances to this area. Area of disturbance will be approximately 4.0 acres.
18 3 Aug 2017 Site Visit: Are original drawings still available? Can they be made available for contractors?
Original drawings are available and will be made available to the contractor after award.
FA8903-17-R-0071
Offeror Generated Question Document Page # Government Response
19 3 Aug 2017 Site Visit: Will chapel be 100% closed during construction? How is base handling worship services during construction?
Yes, chapel will be 100% closed. Worship services will be conducted at alternate location(s)
20 3 Aug 2017 Site Visit: What kind of electrical service feeds the blowers (organ related)?
The existing motor control center, rated 480-volt, 3-phase and located in the basement mechanical room presently feeds the blowers for the Protestant and Catholic organs.
21 3 Aug 2017 Site Visit: Where has ACM been identified? See sheets HA201 and HA202 and as noted on other HA sheets.
22 3 Aug 2017 Site Visit: What are the humidity swings in chapel (organ related)?
An existing humidification system is provided for the organ blower room but does not appear to be currently functioning. Humidity in the building is not otherwise controlled except by the air conditioning system.
23 3 Aug 2017 Site Visit: Where does humidification come from (organ related)?
The humidification system for the organ blower room is located against the south wall of the basement mechanical room. The humidification system is a DriSteem system with water softner installed in 2000. The humidification is introduced into the supply air duct after the reheat coil in the mechanical room.
24 3 Aug 2017 Site Visit: Who or what company currently performs maintenance on the pipe organ(s)?
The Pipe organs are maintained by Norman Lane & Co., Denver Colorado
25 3 Aug 2017 Site Visit: What artifacts will be responsibility of
GC?
USAFA will remove all artifacts from the Chapels prior to start of construction. The inventory provided to the Contractor will identify any remaining fixtures, furnishings and equipment that will remain in the building during construction.
FA8903-17-R-0071
Offeror Generated Question Document Page # Government Response
26 3 Aug 2017 Site Visit: How well are the existing dimensions and locations of the structural steel trusses known?
Original construction documents and photographs indicate that structural steel frames were shop fabricated and shipped to the Colorado Springs on rail car. Based on this, it is believed that similar steel frame elements (lower steel tetrahedron frames for example), were fabricated to consistent dimensions, within shop tolerances. Steel frames were designed to be bolted and welded together after assembly on the building.
Field tolerances are expected for field assembly.
27 3 Aug 2017 Site Visit: How much variability between the design drawings and the actual conditions are anticipated?
Current design drawings are based on the available original shop drawings for the structural steel and the cladding. Current design drawings state that dimensions should be field verified by contractor before beginning fabrication work that relies on as-constructed dimensions. A field survey by the contractor of the steel frame, after removal of the existing cladding, may be necessary to establish as-constructed dimensions.
28 3 Aug 2017 Site Visit: How are the weather-resistant metal panels intended to be fabricated to the exact dimensions for each location's custom dimensions?
The dimensions of the weather-resistant panels are dependent on the dimensions of the steel tetrahedron frames. Based on the answer to Q. 26 above, the tetrahedron frames are anticipated to be relatively consistent between similar tetrahedrons, pending confirmation by contractor field survey.
29 3 Aug 2017 Site Visit: Is the intent to build templates to use to fabricate the panels?
Means and methods of fabricating panels are contractor’s responsibility. One anticipated approach is that contractor will field survey the structural steel frame and establish panel dimensions that accommodate most of the panels. Current design drawings provide a joint between the weather-resistant panels and the weather-resistant covers to facilitate some construction tolerance and anticipated movements.
The contractor field survey may reveal the need for some "special" size panels for cases where the structural steel frame dimensions are significantly outside the common frame dimensions.