General Decision Number C0170032.pdf

PDF 573 KB Posted

Attached to
Repair Cadet Chapel, USAF Academy, Colorado Springs, CO
Solicitation number
FA8903-17-R-0071
Issued by

About this file

Not Listed

View the file

Other files

File Type Posted
FA8903-17-R-0071_Clarification_Notice.pdf PDF
Section_L_Step_1_ITO_Prequal_13_Nov_17.pdf PDF
FA8903-17-R-0071_Amendment_03_signed.pdf PDF
Section_L_Step_1_ITO_Prequal_14_Nov_17.pdf PDF
QA_RprCadetChapUSAFA_7Nov17.pdf PDF
App_F_-_Draft_Final_Specs_11-02-17.pdf PDF
FA8903-17-R-0071_Amendment_01.pdf PDF
Section_M_Step_2_Eval_for_Award_10_Oct_2017.pdf PDF
App_E_Draft_Final_Design_12OCT2017.pdf PDF
FA8903-17-R-0071_SF33 Request for Proposal.pdf PDF
Attachment L1-8 Client Authorization Letter.pdf PDF
App C - Empirical HazMat 2015 Report.pdf PDF
App C - Empirical HazMat 2015 Report.pdf PDF
QA_for_Repair_Cadet_Chapel_USAF__Academy_19_Oct_2017.pdf PDF
App B - Maxim HazMat 2004 Report.pdf PDF
App C - Empirical HazMat 2015 Report.pdf PDF
Attachment L1-3 Project Information Worksheet —
Attachment L1-1 Contact Information.pdf PDF
Attachment L2-2 Total Evaluated Price Summary Sheet.xlsx XLSX spreadsheet
App B - Maxim HazMat 2004 Report.pdf PDF
App F - Specs, Rpr Cadet Chapel 10-16-17.pdf PDF
Section L Step 2 ITO Award 10 Oct 2017.pdf PDF
Attachment L1-6 Past Performance Questionnaire —
Attachment L2-1 Contact Information.pdf PDF
Attachment L2-3 Administrative Advisor Access to Proprietary Information.pdf PDF
Section M Step 1 Eval for Prequal 13 Oct 17.pdf PDF
Section L Step 1 ITO Prequal 13 Oct 17.pdf PDF
Attachment L1-7 Consent Letter Sample.pdf PDF
App D - USAFA Environmental Standards.pdf PDF
Attachment L1-5 Supplement Detailed Project Form —
App E - Design Dwgs, Rpr Cadet Chapel —
App D - USAFA Environmental Standards.pdf PDF
Attachment L1-2 Administrative Advisor Access to Proprietary Information.pdf PDF
SOW Repair Cadet Chapel USAFA 04 Oct 17.pdf PDF
Appendix_G.pdf PDF
App A - Hunter HazMat 1989 Report.pdf PDF
App A - Hunter HazMat 1989 Report.pdf PDF
App D - USAFA Environmental Standards.pdf PDF
App B - Maxim HazMat 2004 Report.pdf PDF
Attachment L1-4 Specialized Scope Information Worksheet —
App A - Hunter HazMat 1989 Report.pdf PDF
CONWRITE 05 Oct 2017.pdf PDF
QA_for_Repair_Cadet_Chapel_USAF__Academy_FINAL_28_Aug_2017.pdf PDF
USAFA_Cadet_Chapel_-_Draft_Section_L_Step_2_-_11Aug2017.pdf PDF
USAFA_Cadet_Chapel_-_Draft_Section_L_Step_1_-_11AUG2017.pdf PDF
USAFA_Cadet_Chapel_-_Draft_Section_M_Step_1_-_11Aug2017.pdf PDF
USAFA_Cadet_Chapel_-_Draft_Section_M_Step_2_-_11Aug2017.pdf PDF
FA8903-17-R-0071_Site_Visit_Attendees.pdf PDF
USAFA_Cadet_Chapel_Site_Walk_3_AUG_2017.pptx PPTX presentation
Q&A.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: CO170032 08/18/2017 CO32

Superseded General Decision Number: CO20160032

State: Colorado

Construction Type: Building

County: El Paso County in Colorado.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017 1 01/27/2017 2 04/07/2017 3 04/21/2017 4 05/19/2017 5 06/02/2017 6 06/09/2017 7 07/21/2017 8 08/18/2017

ASBE0028-002 07/01/2016

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 29.73 13.93

ELEC0113-005 06/01/2017

Rates Fringes

ELECTRICIAN (Includes Low Voltage Wiring)..................$ 31.00 15.38

ELEV0025-001 01/01/2017

Rates Fringes

ELEVATOR MECHANIC................$ 42.35 31.58

9/27/2017https://www.wdol.gov/wdol/scafiles/davisbacon/co32.dvb

FA8903-17-R-0071

General Decision Number: C017032

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0009-017 05/01/2017

Rates Fringes

POWER EQUIPMENT OPERATOR

(Crane) 141 tons and over...........$ 29.82 10.10 50 tons and under...........$ 27.75 10.10 51 to 90 tons...............$ 27.92 10.10 91 to 140 tons..............$ 28.55 10.10

IRON0024-009 05/01/2017

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 26.30 12.25

IRON0024-011 05/01/2017

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 26.30 12.25

* PAIN0079-009 08/01/2017

Rates Fringes

PAINTER (Spray)..................$ 20.50 8.41

PLAS0577-002 05/01/2016

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 25.50 10.98

PLUM0058-003 07/01/2017

Rates Fringes

PLUMBER (Excludes HVAC Duct, Pipe and Unit Installation)......$ 32.00 14.10

PLUM0058-004 07/01/2017

Rates Fringes

PIPEFITTER, Includes HVAC Pipe Installation (Excludes HVAC Duct and Unit Installation)....................$ 32.00 14.10

9/27/2017https://www.wdol.gov/wdol/scafiles/davisbacon/co32.dvb

SFCO0669-002 04/01/2017

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 36.73 20.47

SHEE0009-005 07/01/2017

Rates Fringes

SHEET METAL WORKER (Excludes HVAC Duct, Pipe and Unit Installation)....................$ 33.26 16.61

SUCO2013-008 07/31/2015

Rates Fringes

BRICKLAYER.......................$ 21.96 0.00

CARPENTER........................$ 22.63 6.98

LABORER: Common or General......$ 13.40 1.40

LABORER: Mason Tender - Brick...$ 15.99 0.00

LABORER: Mason Tender - Cement/Concrete..................$ 16.00 0.00

LABORER: Pipelayer..............$ 16.96 3.68

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 20.26 8.62

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.58 2.42

OPERATOR: Grader/Blade..........$ 21.50 0.00

PAINTER (Brush and Roller).......$ 17.20 0.00

ROOFER...........................$ 16.71 0.00

SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 25.18 6.30

SHEET METAL WORKER (HVAC Unit Installation Only)...............$ 24.00 2.18

TRUCK DRIVER: Dump Truck........$ 17.34 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave

9/27/2017https://www.wdol.gov/wdol/scafiles/davisbacon/co32.dvb for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average

9/27/2017https://www.wdol.gov/wdol/scafiles/davisbacon/co32.dvb rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

9/27/2017https://www.wdol.gov/wdol/scafiles/davisbacon/co32.dvb

Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

9/27/2017https://www.wdol.gov/wdol/scafiles/davisbacon/co32.dvb

File details come from the government source that posted it. Updated .