About this file

Information Brief for Consolidated Air Force Satellite Control Network (AFSCN) Modifications Maintenance Operations (CAMMO) -Attached is an information brief on CAMMO.

View the file

Other files for this federal contract opportunity

Other files attached to Consolidated Air Force Satellite Control Network (AFSCN) Modifications, Maintenance & Operations (CAMMO) Contract, newest first.
File Type Posted
Industry_Day__2_Master_Brief_v1_0.pdf PDF
Notification_of_Industry_Day__2.docx DOCX document
FBO_Notice_Update_on_CAMMO_DRFP _Industry_Day__2_and_One-on-one_Meetings.docx DOCX document
CAMMO_Feedback_Matrix_RFI__4_Govt_Response_ver_1_0.xlsx XLSX spreadsheet
CAMMO_Feedback_Matrix_RFI__4_Govt_Response_ver_1_0.pdf PDF
CAMMO_Feedback_Matrix_RFI__3_Govt_Response_ver_1_2.pdf PDF
CAMMO_Feedback_Matrix_RFI__3_Govt_Response_ver_1_2.xlsx XLSX spreadsheet
CAMMO_Notional_WBS_ver_3_0.xlsx XLSX spreadsheet
CAMMO_Notional_Performance_Work_Statement_(PWS)_ver_4_0.pdf PDF
CAMMO_Notional_CLIN_Structure_ver_2_0.pdf PDF
CAMMO_Notional_DD_254_ver_2_0.pdf PDF
CAMMO_Notional_Incentive_Plan_ver_2_0.pdf PDF
CAMMO_Notional_Section_M_ver_2_0a.pdf PDF
CAMMO_Feedback_Matrix_RFI_number_4_v1_0.xlsx XLSX spreadsheet
Response_to_Industry_Day_Questions_Ver_1_0.pdf PDF
Response_to_Industry_Day_Questions_Ver_1_0.xlsx XLSX spreadsheet
CAMMO_Lab_Tour__Slides_DELTA_Pkg.pdf PDF
CAMMO_ATB_Script.pdf PDF
CAMMO_ATB_Lab_Tour_2014_Slides_-_Updated.pdf PDF
CAMMO_Transportables_Script.pdf PDF
CAMMO_Industry_Day_Briefing_Business_Attendees.pdf PDF
CAMMO_50_OG_Industry_Day_Tour_2014_Slides.pdf PDF
CAMMO_50_SCS_Mod_3-4_Industry_Day_2014_Script.pdf PDF
CAMMO_22_SOPS_Industry_Day_2014_Script.pdf PDF
CAMMO_50_OG_Industry_Day_2014_Script.pdf PDF
CAMMO_EOSOF_Industry_Day_2014_Script.pdf PDF
CAMMO_VTS_Industry_Day_2014_Script.pdf PDF
CAMMO_Bidders_Library_Access_Instructions.pdf PDF
CAMMO_Industry_Day_Master_Brief_FBO.pdf PDF
Notional_CAMMO_WBS_ver_2_0.xlsx XLSX spreadsheet
4_OO-ALC_PA_Template_(2013).docx DOCX document
2_NDA_Company_5CC.docx DOCX document
1_OO-ALC_CAMMO_PPP_One-On-One_Request_Form.docx DOCX document
CAMMO_Feedback_Matrix_RFI_3_v1_0.xlsx XLSX spreadsheet
CAMMO_Notional_CLIN_Structure_v1_0.pdf PDF
CAMMO_Bidders_Library_Access_Agreement_(NDA).pdf PDF
CAMMO_Notional_Incentive_Plan_Ver_1_0.pdf PDF
CAMMO_PWS__Ver_3_0.pdf PDF
CAMMO_Milestones_v0_1.pdf PDF
Notification_of_Industry_Day_v01.pdf PDF
Clarification_Q A_1_for_RFI_2nd_Set_Question__3.pdf PDF
1_Aug_13_Draft_CAMMO_PWS_v1.pdf PDF
1_Aug_13_Info_to_Accompany_Draft_CAMMO_PWS.pdf PDF
1_Aug_13_CAMMO_RFI__2nd_Set.pdf PDF
Save_the_Date_for_CAMMO_Information_Brief_v4.pdf PDF
Save_the_Date_for_CAMMO_Information_Brief.pdf PDF
CAMMO_RFI_Small_Business_16May13.docx DOCX document
CAMMO_RFI_Small_Business_v1_3.docx DOCX document
CAMMO_Sources_Sought_v1_4_(3).docx DOCX document
AFSCN_Config_Chart_Ver_4_1.pdf PDF
Show all 50

Consolidated Air Force Satellite Control Network (AFSCN) Modifications, Maintenance & Operations (CAMMO) Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S P A C E A N D M I S S I L E S Y S T E M S C E N T E R

Information Brief:

Consolidated Air Force Satellite Control

Network (AFSCN) Modifications, Maintenance, and Operations (CAMMO)

Greg Staven – Program Manager Christina Ming – Contracting Officer

6 August 2013

Acquisition Objectives

Vertically Integrate Weapon System Tasks while Maintaining Performance with No Additional Risk at Reduced Operation, Maintenance, and Sustainment

(OM&S) Cost How to achieve:

• Combine depot & organic level maintenance

• Eliminate redundant tasks

• Cross utilization of resources

• Performance & cost incentives

• Robust competition with cost reduction requirement over time Small Business:

• 50th Space Wing, through Wing Information & Communications Support (WICS) contract, anticipates small business set-aside contract for remaining tasks not vertically integrated into other weapon system contracts (e.g., CAMMO, COOLSS, WOOLSS, GCS)

• SMC (CAMMO) will establish aggressive (e.g., 25%) small business participation goal

Vertical Integration Tasks

• Vertically Integrate weapon system tasks from three contracts

• Engineering, Development, & Sustainment (EDS): FA8818-06-D-0024

• Factory Compatibility Testing (FCT) – determine/execute req for deployment of a transportable to support FCT at CONUS locations (fee for service)

• Network & Space Operations & Maintenance (NSOM): FA2550-08-C-8011

• Operations & Operations Support – responsible to configure, operate and provide

TT&C services 24/7 for all locations to include transportable contingencies

• Level I (Organizational) Maintenance (Mx) – identify, analyze, correct and document all malfunctions/out-of-tolerance conditions for routine on-site mx actions to include Mission Unique Equipment (MUE)

• Remote Site Support (BOS type functions) - facility security, safety, environmental compliance; personnel security; AF Records Information Management Program; wireless communication systems management (land mobile radio, satellite telephone, cell phone/pagers); financial management/resource advisor; audio-visual/video teleconferencing operations; billeting coordinator; local area network/computer systems technical support to include information assurance; and Communications Security (COMSEC) program mgt

• Satellite Control Network Contract (SCNC): F04701-02-D-0006

• Level II (Depot) Mx – ECPs, PDMs, EDLM/UDLMs, TAs

• Sustainment - perform logistics assessments and provide logistics/supply support services for all associated hardware and software

• Sustainment Modifications – obsolescence upgrades, bad actor replacements, automation improvements, Information Assurance (IA) control compliance

Presenter Presentation Notes TT&C = Telemetry, Tracking, & Command ECP = Engineering Change Proposal PDM = Programmed Depot Maintenance EDLM = Emergency Depot Level Maintenance UDLM = Unscheduled Depot Level Maintenance TA = Technical Assist

FY13 FY14 FY15 FY16 FY17 FY18

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

CAMMO

EDS – Factory Compatibility

NSOM – Operations & L1 Mx

SCNC*- L2 Mx, Sustainment & Mods

* SCNC will continue completing development/sustainment mods through FY16

Contract Transition

- FCT transitions at CAMMO award

- Operations & L1 Mx transitions from NSOM to CAMMO 60-90 days after award

- L2 Mx, Sustainment tasks incrementally transitions from SCNC to CAMMO over 2yrs

- Allows process learning and training thru joint sustainment/maintenance teams

Milestone Target Date Draft PWS Release July 13

Industry Information Meeting Aug 13 Acquisition Strategy Panel Sep 13

Draft RFP Release Nov 13 Industry Day Nov 13 RFP Release Feb 14

Milestone Schedule

Presenter Presentation Notes

Site Location Primary Air Force Satellite Control Network (AFSCN) Operations Control Node (OCN)

Schriever AFB, CO

21 SOPS, Ellison Onizuka Satellite Operations Facility, (Backup OCN) Vandenberg AFB, CA

21 SOPS, Vandenberg Tracking Station (AFSCN) Vandenberg AFB, CA

21 SOPS Diego Garcia Diego Garcia Island (British Indian Ocean Territory)

21 SOPS, Guam Tracking Station Andersen AFB, Guam

21 SOPS, Hawaii Tracking Station Kaena Point, HI

22 SOPS, Colorado Tracking Station Schriever AFB, CO

23 SOPS, New Boston AFS New Boston AFS, NH

23 SOPS, Eastern Vehicle Checkout Facility Cape Canaveral AFS, FL

23 SOPS, Thule Tracking Station Thule AB, Greenland

23 SOPS, Telemetry & Commanding Station Oakhanger, United Kingdom

Performance Locations

Slide Number 1
Acquisition Objectives
Vertical Integration Tasks
��Contract Transition
Slide Number 5
Performance Locations

File details come from the government source that posted it. Updated .