About this file

AFSCN Config Chart

View the file

Other files for this federal contract opportunity

Other files attached to Consolidated Air Force Satellite Control Network (AFSCN) Modifications, Maintenance & Operations (CAMMO) Contract, newest first.
File Type Posted
Industry_Day__2_Master_Brief_v1_0.pdf PDF
Notification_of_Industry_Day__2.docx DOCX document
FBO_Notice_Update_on_CAMMO_DRFP _Industry_Day__2_and_One-on-one_Meetings.docx DOCX document
CAMMO_Feedback_Matrix_RFI__4_Govt_Response_ver_1_0.pdf PDF
CAMMO_Feedback_Matrix_RFI__4_Govt_Response_ver_1_0.xlsx XLSX spreadsheet
CAMMO_Feedback_Matrix_RFI__3_Govt_Response_ver_1_2.xlsx XLSX spreadsheet
CAMMO_Notional_DD_254_ver_2_0.pdf PDF
CAMMO_Notional_Incentive_Plan_ver_2_0.pdf PDF
CAMMO_Notional_Section_M_ver_2_0a.pdf PDF
CAMMO_Feedback_Matrix_RFI_number_4_v1_0.xlsx XLSX spreadsheet
CAMMO_Notional_CLIN_Structure_ver_2_0.pdf PDF
CAMMO_Notional_Section_L_ver_2_0a.pdf PDF
CAMMO_Notional_Section_H_ver_1_0.pdf PDF
CAMMO_Notional_WBS_ver_3_0.pdf PDF
Response_to_Industry_Day_Questions_Ver_1_0.xlsx XLSX spreadsheet
CAMMO_ATB_Lab_Tour_2014_Slides_-_Updated.pdf PDF
CAMMO_Transportables_Script.pdf PDF
CAMMO_ATB_Script.pdf PDF
CAMMO_Lab_Tour_Slides.pdf PDF
CAMMO_Repair_Lab_and_Warehouse_script.pdf PDF
CAMMO_Industry_Day_Briefing_Business_Attendees.pdf PDF
CAMMO_VTS_Industry_Day_2014_Script.pdf PDF
CAMMO_22_SOPS_Industry_Day_2014_Script.pdf PDF
CAMMO_50_OG_Industry_Day_2014_Script.pdf PDF
CAMMO_EOSOF_Industry_Day_2014_Script.pdf PDF
CAMMO_22_SOPS_Industry_Day_Tour_2014_Slides.pdf PDF
CAMMO_Bidders_Library_Access_Instructions.pdf PDF
CAMMO_Industry_Day_Master_Brief_FBO.pdf PDF
Notional_CAMMO_WBS_ver_2_0.xlsx XLSX spreadsheet
OO-ALC_PPP_and_Capabilities.ppt PPT presentation
1_OO-ALC_CAMMO_PPP_One-On-One_Request_Form.docx DOCX document
CAMMO_Notional_Incentive_Plan_Ver_1_0.pdf PDF
CAMMO_PWS__Ver_3_0.pdf PDF
CAMMO_Feedback_Matrix_RFI_3_v1_0.xlsx XLSX spreadsheet
CAMMO_Notional_CLIN_Structure_v1_0.pdf PDF
CAMMO_Bidders_Library_Access_Agreement_(NDA).pdf PDF
CAMMO_Notification_of_Industry_Day_-_Appendix_A.docx DOCX document
Notification_of_Industry_Day_v01.pdf PDF
Updated_CAMMO_Milestones_dated_19_Dec_13.pdf PDF
Clarification_Q A_1_for_RFI_2nd_Set_Question__3.pdf PDF
1_Aug_13_Draft_CAMMO_PWS_v1.pdf PDF
1_Aug_13_Info_to_Accompany_Draft_CAMMO_PWS.pdf PDF
1_Aug_13_CAMMO_RFI__2nd_Set.pdf PDF
Save_the_Date_for_CAMMO_Information_Brief_v4.pdf PDF
Save_the_Date_for_CAMMO_Information_Brief_v3.pdf PDF
Save_the_Date_for_CAMMO_Information_Brief-2.pdf PDF
Save_the_Date_for_CAMMO_Information_Brief.pdf PDF
CAMMO_Info_Brief_(6_Aug_13).pdf PDF
CAMMO_RFI_Small_Business_16May13.docx DOCX document
CAMMO_Sources_Sought_v1_4_(3).docx DOCX document
Show all 50

Consolidated Air Force Satellite Control Network (AFSCN) Modifications, Maintenance & Operations (CAMMO) Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARTS

LPUE

RDT&E

SQPSK

USBE

VCE

Air Force Satellite Control Network

Core, HPA’s and Antenna Configurations Oakhanger, U.K.

23 SOPS, OL-A

TCS

“LION”

Det 2, 21 SOPS

2D

Guam GTS

“GUAM”

Schriever AFB

22 SOPS

CTS

“PIKE”

13M

ARTS-A

Antedo 6I

Det 3, 21 SOPS

HTS

“HULA”

0H 408 Hawaii

Vandenberg AFB

46’

Flight, 21 SOPS

ARTS-B

3xHPA

RBC-A

13M

VTS

“COOK” 05

0A

TVCF Antenna Van (ARTS)

23’ RDT&E

Thule, GL 11M

ARTS-A

TTS

“POGO”

0F

DMSPE

RDT&E

Det 1, 23 SOPS

New Hampshire NHS

“BOSS” 0C

10M

ARTS-B

RDT&E

EVCF

“BEACH”

Cape Canaveral

AFS

23 SOPS, OL-B

2I

TVCF Core Van (ARTS-A)

USBE

6’

RBC-B

LPA

Transportables

UNDER CONSTRUCTION

TRBC HPA Van (RBC)

UNDER CONSTRUCTION

TRBC Transportable (RBC)

Switch

TSTR Core Van (ARTS)

UNDER CONSTRUCTION

RBC TSTR (RSTR)

TSTR Ant Van (ARTS)

SQPSK

SQPSK

1959 1961

SQPSK

SQPSK

60’

ARTS-C

46’

ARTS-B

RDT&E

SQPSK

ARTS-C

46’

RDT&E

23 SOPS

Version 4.1 – 07 Feb 2013

This product is derived from a HTSI original document and is currently sustained by RNLE.

Ant. In Storage

46’

ARTS-B

RDT&E

DMSPE

FB4469

DGS

Det 1, 21 SOPS

Diego Garcia

“REEF”

3I

SQPSK

10M

ARTS-A

USBE

RDT&E

RBC-B

13M

RBC-C

13M

RDT&E

UNDER CONSTRUCTION

TSTR (RBC)

RBC-B

13M

RBC-A

13M

60’

ARTS-A

3xHPA

Q-65 Radome

SQPSK

RDT&E

3H 3C

Skynet

Switch

TVCF Antenna Van (ARTS)

23’

TVCF Core Van (ARTS-A)

Comm Equipment

RBC-B

Q-65 Radome

13M

46’

ARTS-B

SQPSK

DMSPE

13M 4xHPA

ARTS-A

RDT&E

SQPSK

DMSPE

SQPSK

RBC-C

13M

Q-65 Radome Skynet

USBE

Antedo

TVCF Antenna Van (ARTS)

XxHPA

XX

XXX

RDT&E

TVCF Core Van (ARTS-A)

Q-65 Radome

DMSPE

LPUE Low Power Uplink Enhancement – Available at VTS and planned at EVCF.

Defense Meteorological Satellite Program Enhancement – Single unit available at TTS and NHS each of which is switchable between their respective ARTS-A and ARTS-B antennas.

Inflatable Raydell Teflon® Kevlar® fiber radome rated at 200 MPH (currently located at GTS-A and GTS-B). GTS-A and GTS-B (as well as DGS-B) radomes have desalinization & dehumidification equipment .

Gray codes are Forward Supply Point codes (i.e. Line Replacement Unit items, etc.). Light blue codes are Bench Stock codes (Consumable items, etc.). NOTE: TSTR has the DODAAC signified in black.

The large X Signifies the number of combined ARTS HPAs to support the antenna. All other antennas without labels are single legacy HPA’s.

The dashed box indicates equipment that will be installed in the future.

Research Development Test & Evaluation (RDT&E) rack connected to select ARTS core/antenna.

ARTS antennas with diameters of: 10M, 13M (Antedo), 37’, 46’, 60’ .

USBE Unified S-Band Enhancement – located at DGS-A and TVCF.

Transportable Vehicle Checkout Facility Core Van - Contains all mobile equipment, with exception to the actual antenna and HPA, to run temporary AFSCN missions. Currently operational at Cape Canaveral.

Transportable Vehicle Checkout Facility (TVCF) Antenna Van - Contains both the transportable antenna and the HPA necessary to run temporary AFSCN missions when connected to the TVCF Core Van. Currently stored at VTS.

Antenna located at Cape Canaveral to be utilized for both RBC and ARTS configurations.

RBC Antenna system on contract and under construction.

(Currently HTS RBC-A, NHS RBC-B, TTS RBC-C).

Inflatable radomes are intended to protect RBC, Antedo and ARTS antennas. The radomes are constructed from Raydell R- 60 Teflon® Fiberglass composite rated at 134 MPH or, when indicated on the chart, the Q-65 radome rated at 200 MPH.

Signifies RBC antenna. Currently all RBC antennas include 13M diameter dishes.

The solid circle and the Decagon signify an inflatable radome and a space frame radome respectively. Both radomes are used to protect a legacy ARTS antenna. The “XX” depicts the radome diameter. The “YY” depicts the antenna diameter.

NOTE:

• Each RBC is equipped with: Titan 13M, 3-Axis Antenna, Inflatable Radome, Sky Crane MX Lift, Core & Console to include RDT&E, All CONUS sites have UFE (OCONUS sites do not), LPUE (Low Power Uplink Enhancement)

• RBC deliveries include: VTS-A, DGS-B, TCS-C and GTS-B.

VCE

LPA Low Power Amplifier (LPA). Similar to the Low Power Uplink Enhancement but used only on the RBC side of the EVCF.

SQPSK Staggered Quadrature Phased Shift Keying. provide automated downlink demodulation capabilities.

Legend Legend

Legend Legend Vehicle Checkout Equipment – to be located at EVCF

RBC

LPA Switch

19XX

Located on the bottom-right side corner, this indicates the year of operational stand-up.

Version 4.1 – 07 Feb 2013

YY YY

USBE

ARTS

LPUE

RDT&E

SQPSK

USBE

VCE

Skynet Enhancement used only by the United Kingdom with a direct commanding input into the ARTS Core system on the TCS-A and TCS-B sides.

Slide Number 1
Slide Number 2

File details come from the government source that posted it. Updated .