SEWS_II_SF33_22Sep16.pdf
PDF 610 KB Posted
- Attached to
- Shared Early Warning System (SEWS) II Federal contract opportunity
- Solicitation number
- FA8723-16-R-0005
About this file
FA8723-16-R-0005
View the file
Other files for this federal contract opportunity
Show all 50
Shared Early Warning System (SEWS) II has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 350)
RATING
DO-A7
PAGE OF PAGES
1 102
2. CONTRACT NO. 3. SOLICITATION NO. 4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
5. DATE ISSUED
6. REQUISITION/PURCHASE NO.
FA8723-16-R-0005
7. ISSUED BY AFLCMC/HBQK CODE FA8723 8. ADDRESS OFFER TO (If other than Item 7)
AFLCMC/HBQK
1050 E STEWART AVE
PETERSON AFB, CO 80914-2902
JAMEY J. CIESIELSKI 719-556-9469
JAMEY.CIESIELSKI@US.AF.MIL
JAMEY J. CIESIELSKI
CONTRACTING OFFICER
AFLCMC/HBQK
130 WEST PAINE ST, BLDG 1840
PETERSON AFB, CO 80914-2100
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.
SOLICITATION
9. The offeror shall deliver proposals (to include its Past Performance Information) to the PCO no later than 12:00 pm MST, 23 November 2016.
10. FOR
INFORMATION
CALL:
A. NAME
See Block 7
B. TELEPHONE (Include area code)
(NO COLLECT CALLS)
C. E-MAIL ADDRESS
11. TABLE OF CONTENTS
() SEC. DESCRIPTION PAGE(S) () SEC DESCRIPTION PAGE(S)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
A SOLICITATION/CONTRACT FORM 1 I CONTRACT CLAUSES 72
B SUPPLIES OR SERVICES AND PRICES/COSTS 2 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACH.
C DESCRIPTION/SPECS./WORK STATEMENT 60 J LIST OF ATTACHMENTS 100
D PACKAGING AND MARKING 61 PART IV - REPRESENTATIONS AND INSTRUCTIONS
E INSPECTION AND ACCEPTANCE 62 K REPRESENTATIONS, CERTIFICATIONS, K - 1
F DELIVERIES OR PERFORMANCE 63 AND OTHER STATEMENTS OF OFFERORS
G CONTRACT ADMINISTRATION DATA 69 L INSTRS, CONDS, AND NOTICES TO OFFERORS L - 1
H SPECIAL CONTRACT REQUIREMENTS 71 M EVALUATION FACTORS FOR AWARD M - 1
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within ____270 ____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date of receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
10 CALENDAR DAYS
20 CALENDAR DAYS
30 CALENDAR DAYS
CALENDAR DAYS
14. ACKNOWLEDGEMENTS OF AMENDMENTS
(The offeror acknowledges receipt of amend-
AMENDMENT NO. DATE AMENDMENT NO. DATE
ments to the SOLICITATION for offerors and related documents numbered and dated:
15A. NAME
AND
CODE FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
ADDRESS
OF
OFFEROR
15B. TELEPHONE NO. (Include area code)
15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETI-
TION: 23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 33 (REV. 9-97)
PREVIOUS EDITION IS UNUSABLE Prescribed by GSA ConWrite Version 6.15.2 FAR (48 CFR) 53.21(c) Created 22 Sep 2016 1:15 PM
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
SECTION B FA8723-16-R-0005
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0001 __________ Noun: TRANSITION U.S. SERVICES
PSC: D318
Contract type: V - COST PLUS INCENTIVE FEE Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. The Contractor shall perform under a transition plan after contract award as set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and shall furnish and deliver to the Government all transition services required to meet the objectives set forth in the Transition Performance Work Statement (PWS), Task Order 01, dated 23 September 2016 (see attachment 2).
B. Period of Performance: Award date plus 3 months (estimated to be 01 July 2017 - 30 September 2017, but subject to change)
C. This is a Cost Plus Incentive Fee CLIN:
Target Cost: $__________
Target Fee:(6%) $__________
Target Cost & Fee: $_________
(Target Fee 6%; Max Fee 9%; Min Fee 3%; Share Ratio (over and under): 80/20)
See attachment 21, Incentive Fee Plan
0002 __________ Noun: TRANSITION U.S. TRAVEL
PSC: D318
Contract type: S - COST Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. This is a cost reimbursable CLIN while performing service efforts under this CLIN.
Travel will be reimbursed in accordance with Federal Acquisition Regulation (FAR) 31.205-46, with maximums that do not exceed the per diem rates in effect at the time of travel as set forth in the Joint Travel Regulation (JTR). The contractor shall not incur travel expenses unless funding is available. General and administrative (G&A) cost may be added as applicable. No profit or fee shall be added on reimbursable travel costs.
B. Period of Performance: Award date plus 3 months (estimated to be 01 July 2017 - 30
C. Estimated Cost: $_____
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0003 __________ Noun: TRANSITION FMS SERVICES
PSC: D318
Contract type: V - COST PLUS INCENTIVE FEE Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. The Contractor shall perform under a transition plan after contract award as set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and shall furnish and deliver to the Government all transition services required to meet the objectives set forth in the Transition Performance Work Statement (PWS), Task Order 01, dated 23 September 2016 (see attachment 2).
C. This is a Cost Plus Incentive Fee CLIN:
Target Cost: $__________
Target Fee:(6%) $__________
Target Cost & Fee: $________
(Target Fee 6%; Max Fee 9%; Min Fee 3%; Share Ratio(over and under): 80/20)
See attachment 21, Incentive Fee Plan
0004 __________
Noun: TRANSITION FMS TRAVEL
PSC: D318
Contract type: S - COST Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. This is a cost reimbursable CLIN while performing service efforts under this CLIN.
Travel will be reimbursed in accordance with Federal Acquisition Regulation (FAR) 31.205-46, with maximums that do not exceed the per diem rates in effect at the time of travel as set forth in the Joint Travel Regulation (JTR). The contractor shall not incur travel expenses unless funding is available. General and administrative (G&A) cost may be added as applicable. No profit or fee shall be added on reimbursable travel costs.
C. Estimated Cost: $_________
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0005 __________ Noun: YR1 U.S. SUPPORT SERVICES
PSC: D318
Contract type: V - COST PLUS INCENTIVE FEE Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. The Contractor shall furnish and deliver to the Government the technical support services required to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II U.S. Support Performance Work Statement (PWS), dated 23 September 2016 (see attachment 3).
B. Period of Performance: 12 months (estimated to be 01 October 2017 - 30 September 2018, but subject to change)
C. This is a Cost Plus Incentive Fee CLIN:
Target Cost: $__________
Target Fee:(6%) $__________
Target Cost & Fee: $_________
(Target Fee 6%; Max Fee 9%; Min Fee 3%; Share Ratio (over and under): 80/20)
See attachment 22, Incentive Fee Plan
0006 __________
Noun: YR1 U.S. SUPPORT TRAVEL
PSC: D318
Contract type: S - COST Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. This is a cost reimbursable CLIN while performing service efforts under this CLIN.
Travel will be reimbursed in accordance with Federal Acquisition Regulation (FAR) 31.205-46, with maximums that do not exceed the per diem rates in effect at the time of travel as set forth in the Joint Travel Regulation (JTR). The contractor shall not incur travel expenses unless funding is available. General and administrative (G&A) cost may be added as applicable. No profit or fee shall be added on reimbursable travel costs.
B. Period of Performance: 12 months (estimated to be 01 October 2017 - 30 September 2018, but subject to change)
C. Estimated Cost: $130,000
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0007 1 __________ Lot __________ Noun: YR1 U.S. SUPPORT MATERIAL
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The Contractor shall furnish and deliver to the Government required equipment (software and hardware products) to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II U.S. Support Performance Work Statement (PWS), dated 23 September 2016 (see attachment 3).
B. Period of Performance: 12 months (estimated to be 01 October 2017 - 30 September 2018, but subject to change)
C. Estimated Cost:$175,000
0008 __________
Noun: YR1 U.S. RESEARCH & TEST SERVICES
PSC: D318
Contract type: U - COST PLUS FIXED FEE Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. The contractor shall perform tasks to support risk reduction, system evolution, capabilities extensions, improvements, adaptations, etc. These tasks include but are not limited to tests to demonstrate that an upgraded component or subsystem doesn't degrade overall system performance; tests to demonstrate a capability that has been included in a Program of Record (POR) subsystem meets expectations. The Contractor shall explore new technologies and their impact on scalability, availability, and program costs. Objectives are set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II U.S. Support Performance Work Statement (PWS), dated 23 September 2016 (see attachment 3).
B. Period of Performance: 12 months or otherwise will be specified in individual task order(s)
C. This is a Cost Plus Fixed Fee CLIN:
Estimated Cost: $_________
Fixed Fee (no more than 7% and no less than 3%): $__________
Total CPFF:__________
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0009 __________ Noun: U.S. RESEARCH & TEST TRAVEL
PSC: D318
Contract type: S - COST Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. This is a cost reimbursable CLIN while performing service efforts under this CLIN.
Travel will be reimbursed in accordance with Federal Acquisition Regulation (FAR) 31.205-46, with maximums that do not exceed the per diem rates in effect at the time of travel as set forth in the Joint Travel Regulation (JTR). The contractor shall not incur travel expenses unless funding is available. General and administrative (G&A) cost may be added as applicable. No profit or fee shall be added on reimbursable travel costs.
B. Period of Performance: 12 months or otherwise will be specified in individual task order(s)
C. Estimated Cost: to be specified in individual task orders
0010 1 __________ Lot __________ Noun: YR1 U.S. RESEARCH & TEST EQUIPMENT
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: SOURCE Acceptance: SOURCE
FOB: SOURCE
Descriptive Data:
A. The Contractor shall furnish and deliver to the Government required equipment (software and hardware products) to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW SEWS II U.S. Support Performance Work Statement (PWS), dated 23 September 2016 (see attachment 3).
B. Period of Performance: 12 months or otherwise will be specified in individual task order(s)
C. Estimated Cost: $100,000
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0011 __________ Noun: U.S. SUSTAINING ENGINEERING SERVICES CPIF
PSC: D318
Contract type: V - COST PLUS INCENTIVE FEE Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. The Contractor shall furnish and deliver to the Government Sustaining Engineering (SE) services required to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW any future TO Performance Work Statement(s) containing future projects identified at a later date.
B. The period of performance: To be cited in each individual task order
C. This is a Cost Plus Incentive Fee CLIN:
Target Cost: TBD AFTER IDIQ AWARD
Target Fee:(6%) TBD AFTER IDIQ AWARD
Target Cost & Fee: TBD AFTER IDIQ AWARD
Incentive Fee Plan for this CLIN TBD after IDIQ award
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0012 __________ Noun: U.S. SUSTAINING ENGINEERING SERVICES CPFF
PSC: D318
Contract type: U - COST PLUS FIXED FEE Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. The Contractor shall furnish and deliver to the Government Sustaining Engineering (SE) services required to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW any future TO Performance Work Statement(s) containing future projects identified at a later date.
B. The period of performance: To be cited in each individual task order
C. This is a Cost Plus Fixed Fee CLIN: TBD AFTER IDIQ AWARD
Estimated Cost: TBD AFTER IDIQ AWARD
Fixed Fee (no more than 7% and no less than 3%): TBD AFTER IDIQ AWARD
Total CPFF: To be cited in each individual task order
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0013 __________ Noun: U.S. SUSTAINING ENGINEERING SERVICES FPIF(F)
PSC: D318
Contract type: L - FIXED PRICE INCENTIVE FIRM Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. The Contractor shall furnish and deliver to the Government Sustaining Engineering (SE) services required to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW any future TO Performance Work Statement(s) containing future projects identified at a later date.
B. The period of performance: To be cited in each individual task order
The ordering period for all CLINs is sixty months from the effective date of the contract.
The period of performance or delivery date of any order with this CLIN shall not exceed 24 months from the last day of the ordering period.
C. This is a Fixed Price Incentive Firm CLIN:
Target Cost: $ TBD after IDIQ award
Target Profit: $ TBD after IDIQ award
Target Profit %: TBD after IDIQ award
Target Price: $ TBD after IDIQ award
Ceiling Price: $ TBD after IDIQ award
Ceiling %: TBD after IDIQ award
Share Formula: TBD
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0014 __________ Noun: U.S. SUSTAINING ENGINEERING TRAVEL
PSC: D318
Contract type: S - COST Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. This is a cost reimbursable CLIN while performing service efforts under this CLIN.
Travel will be reimbursed in accordance with Federal Acquisition Regulation (FAR) 31.205-46, with maximums that do not exceed the per diem rates in effect at the time of travel as set forth in the Joint Travel Regulation (JTR). The contractor shall not incur travel expenses unless funding is available. General and administrative (G&A) cost may be added as applicable. No profit or fee shall be added on reimbursable travel costs.
B. Period of Performance: TBD - to be cited in each individual task order
C. Estimated Cost: To be cited in each individual task order
0015 __________
Noun: U.S. TECHNICAL REFRESH SERVICES CPIF
PSC: D318
Contract type: V - COST PLUS INCENTIVE FEE Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. The Contractor shall furnish and deliver to the Government Technical Refresh services required to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW any future TO Performance Work Statement(s) containing future technical refresh requirements identified at a later date.
B. The period of performance: To be cited in each individual task order
C. This is a Cost Plus Incentive Fee CLIN:
Target Cost: TBD
Target Fee:(6%) TBD
Target Cost & Fee: TBD
Incentive Fee Plan for this CLIN TBD after IDIQ award
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0016 __________ Noun: U.S. TECHNICAL REFRESH SERVICES CPFF
PSC: D318
Contract type: U - COST PLUS FIXED FEE Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. The Contractor shall furnish and deliver to the Government Technical Refresh services required to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW any future TO Performance Work Statement(s) containing future technical refresh requirements identified at a later date.
B. The period of performance: To be cited in each individual task order
C. This is a Cost Plus Fixed Fee CLIN: TBD AFTER IDIQ AWARD
Estimated Cost: TBD AFTER IDIQ AWARD
Fixed Fee (no more than 7% and no less than 3%): TBD
Total CPFF: TBD AFTER IDIQ AWARD
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0017 __________ Noun: U.S. TECHNICAL REFRESH SERVICES FPIF(F)
PSC: D318
Contract type: L - FIXED PRICE INCENTIVE FIRM Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. The Contractor shall furnish and deliver to the Government Technical Refresh services required to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW any future TO Performance Work Statement(s) containing future technical refresh requirements identified at a later date.
B. The period of performance: To be cited in each individual task order
C. This is a Fixed Price Incentive Firm CLIN:
Target Cost: $ TBD after IDIQ award
Target Profit: $ TBD after IDIQ award
Target Profit %: TBD after IDIQ award
Target Price: $ TBD after IDIQ award
Ceiling Price: $ TBD after IDIQ award
Ceiling %: TBD after IDIQ award
Share Formula: TBD
0018 __________
Noun: U.S. TECHNICAL REFRESH TRAVEL
PSC: D318
Contract type: S - COST Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. This is a cost reimbursable CLIN while performing service efforts under this CLIN.
Travel will be reimbursed in accordance with Federal Acquisition Regulation (FAR) 31.205-46, with maximums that do not exceed the per diem rates in effect at the time of travel as set forth in the Joint Travel Regulation (JTR). The contractor shall not incur travel expenses unless funding is available. General and administrative (G&A) cost may be added as applicable. No profit or fee shall be added on reimbursable travel costs.
B. Period of Performance: TBD - to be cited in each individual task order
C. Estimated Cost: TBD - to be cited in each individual task order
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0019 1 __________ Lot __________ Noun: U.S. TECHNICAL REFRESH EQUIPMENT
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The Contractor shall furnish and deliver to the Government required technical refresh equipment (software and hardware products) to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW any future TO Performance Work Statement(s) containing future requirements identified at a later date.
B. The period of performance: To be cited in each individual task order
C. Estimated Cost: To be cited in each individual task order
0020 __________
Noun: U.S. EMERGENCY/URGENT ACTIONS
PSC: D318
Contract type: Y - TIME AND MATERIALS Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. These needs will be identified in the individual task orders.
B. The period of performance: To be cited in each individual task/delivery order.
C. Not to Exceed Cost: The cost of CLIN 0020 is not to exceed $500,000.00.
0021 __________
Noun: FMS EMERGENCY/URGENT ACTIONS
PSC: D318
Contract type: Y - TIME AND MATERIALS Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. These needs will be identified in the individual task orders.
B. The period of performance: To be cited in each individual task/delivery order.
C. Not to Exceed Cost: The cost of CLIN 0021 is not to exceed $1,500,000.00.
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0022 __________ Noun: C1 POP 1 FMS SERVICES
PSC: D318
Contract type: U - COST PLUS FIXED FEE Start Date: 01 OCT 2017 Completion Date: 26 MAR 2022 Descriptive Data:
A. The Contractor shall furnish and deliver to the Government the technical support services required to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II FMS C1 Performance Work Statement (PWS), Task Order 03, dated 23 September 2016 (see attachment 4).
B. The period of performance: 1 October 2017 - 26 March 2022 OR post-transition - 26 March 2022
C. This is a Cost Plus Fixed Fee CLIN:
Estimated Cost: $_________
Fixed Fee (no more than 7% and no less than 3%): $__________
Total CPFF: $__________
D. F.O.B. Destination
0023 __________
Noun: C1 POP 1 FMS TRAVEL
PSC: D318
Contract type: S - COST Start Date: 01 OCT 2017 Completion Date: 26 MAR 2022 Descriptive Data:
A. This is a cost reimbursable CLIN while performing service efforts under this CLIN.
Travel will be reimbursed in accordance with Federal Acquisition Regulation (FAR) 31.205-46, with maximums that do not exceed the per diem rates in effect at the time of travel as set forth in the Joint Travel Regulation (JTR). The contractor shall not incur travel expenses unless funding is available. General and administrative (G&A) cost may be added as applicable. No profit or fee shall be added on reimbursable travel costs.
B. Period of Performance: 01 October 2017 - 26 March 2022 OR post-transition - 26 March 2022
C. Estimated Cost: $200,000
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0024 1 __________ Lot __________ Noun: C1 POP 1 FMS EQUIPMENT
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: SOURCE Acceptance: SOURCE
FOB: SOURCE
Descriptive Data:
A. The Contractor shall furnish and deliver to the Government required equipment (software and hardware products) to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II FMS C1 Performance Work Statement (PWS), Task Order 03, dated 23 September 2016 (see attachment 4).
B. The period of performance: 1 October 2017 - 26 March 2022 OR post-transition - 26
C. Estimated Cost: TBD in individual task order(s) or task order modifications
0025 1 __________
Noun: C1 POP 1 FMS SURGE
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The Contractor shall procure replacement equipment in support of Emergency On Site Sustainment (EOSS) trips and out of cycle equipment needs, IAW the SEWS II FMS C1 Performance Work Statement (PWS), Task Order 03, dated 23 September 2016 (see attachment 4).
B. The period of performance: 1 October 2017 - 26 March 2022 OR post-transition - 26
C. Estimated Cost: $30,000
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0026 __________ Noun: C2 POP 1 FMS SERVICES
PSC: D318
Contract type: U - COST PLUS FIXED FEE Start Date: 01 OCT 2017 Completion Date: 21 JUL 2018 Descriptive Data:
A. The Contractor shall furnish and deliver to the Government the technical support services required to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II FMS C2 Performance Work Statement (PWS), Task Order 04, dated 23 September 2016 (see attachment 5).
B. The period of performance: 1 October 2017 - 21 July 2018 OR post-transition - 21 July
C. This is a Cost Plus Fixed Fee CLIN:
Estimated Cost: $______________
Fixed Fee (no more than 7% and no less than 3%): $__________
0027 __________
Noun: C2 POP 1 FMS TRAVEL
PSC: D318
Contract type: S - COST Start Date: 01 OCT 2017 Completion Date: 21 JUL 2018 Descriptive Data:
A. This is a cost reimbursable CLIN while performing service efforts under this CLIN.
Travel will be reimbursed in accordance with Federal Acquisition Regulation (FAR) 31.205-46, with maximums that do not exceed the per diem rates in effect at the time of travel as set forth in the Joint Travel Regulation (JTR). The contractor shall not incur travel expenses unless funding is available. General and administrative (G&A) cost may be added as applicable. No profit or fee shall be added on reimbursable travel costs.
B. Period of Performance: 1 October 2017 - 21 July 2018 OR post-transition - 21 July
C. Estimated Cost: $42,000
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0028 1 __________ Lot __________ Noun: C2 POP 1 FMS EQUIPMENT
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The Contractor shall furnish and deliver to the Government required equipment (software and hardware products) to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II FMS C2 Performance Work Statement (PWS), Task Order 04, dated 23 September 2016 (see attachment 5).
B. The period of performance: 1 October 2017 - 21 July 2018 OR post-transition - 21 July
0029 1 __________
Noun: C2 POP 1 FMS SURGE
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The Contractor shall procure replacement equipment in support of Emergency On Site Sustainment (EOSS) trips and out of cycle equipment needs, IAW the SEWS II FMS C2 Performance Work Statement (PWS), Task Order 04, dated 23 September 2016 (see attachment 5).
B. The period of performance: 1 October 2017 - 21 July 2018 OR post-transition - 21 July
C. Estimated Cost: $10,000
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0030 __________ Noun: C3 POP 1 FMS SERVICES
PSC: D318
Contract type: U - COST PLUS FIXED FEE Start Date: 01 OCT 2017 Completion Date: 19 DEC 2018 Descriptive Data:
A. The Contractor shall furnish and deliver to the Government the technical support services required to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II FMS C3 Performance Work Statement (PWS), Task Order 05, dated 23 September 2016 (see attachment 6).
B. The period of performance: 1 October 2017 - 19 December 2018 OR post-transition - 19 December 2018
C. This is a Cost Plus Fixed Fee CLIN:
Estimated Cost: $_____________
Fixed Fee (no more than 7% and no less than 3%): $__________
Total CPFF: $___________
0031 __________
Noun: C3 POP 1 FMS TRAVEL
PSC: D318
Contract type: S - COST Start Date: 01 OCT 2017 Completion Date: 19 DEC 2018 Descriptive Data:
A. This is a cost reimbursable CLIN while performing service efforts under this CLIN.
Travel will be reimbursed in accordance with Federal Acquisition Regulation (FAR) 31.205-46, with maximums that do not exceed the per diem rates in effect at the time of travel as set forth in the Joint Travel Regulation (JTR). The contractor shall not incur travel expenses unless funding is available. General and administrative (G&A) cost may be added as applicable. No profit or fee shall be added on reimbursable travel costs.
B. Period of Performance: 1 October 2017 - 19 December 2018 OR post-transition - 19 December 2018
C. Estimated Cost: $115,000
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0032 1 __________ Lot __________ Noun: C3 POP 1 FMS EQUIPMENT
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The Contractor shall furnish and deliver to the Government required equipment (software and hardware products) to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II FMS C3 Performance Work Statement (PWS), Task Order 05, dated 23 September 2016 (see attachment 6).
B. The period of performance: 1 October 2017 - 19 December 2018 OR post-transition - 19 December 2018
0033 1 __________
Noun: C3 POP 1 FMS SURGE
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The Contractor shall procure replacement equipment in support of Emergency On Site Sustainment (EOSS) trips and out of cycle equipment needs, IAW the SEWS II FMS C3 Performance Work Statement (PWS), Task Order 05, dated 23 September 2016 (see attachment 6).
B. The period of performance: 1 October 2017 - 19 December 2018 OR post-transition - 19 December 2018
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0034 __________ Noun: C4 POP 1 FMS SERVICES
PSC: D318
Contract type: U - COST PLUS FIXED FEE Start Date: 01 OCT 2017 Completion Date: 28 APR 2021 Descriptive Data:
A. The Contractor shall furnish and deliver to the Government the technical support services required to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II FMS C4 Performance Work Statement (PWS), Task Order 06, dated 23 September 2016 (see attachment 7).
B. The period of performance: 1 October 2017 - 28 April 2021 OR post-transition - 28 April 2021
C. This is a Cost Plus Fixed Fee CLIN:
Estimated Cost: $_________
Fixed Fee (no more than 7% and no less than 3%): $__________
Total CPFF: $_________
0035 __________
Noun: C4 POP 1 FMS TRAVEL
PSC: D318
Contract type: S - COST Start Date: 01 OCT 2017 Completion Date: 28 APR 2021 Descriptive Data:
A. This is a cost reimbursable CLIN while performing service efforts under this CLIN.
Travel will be reimbursed in accordance with Federal Acquisition Regulation (FAR) 31.205-46, with maximums that do not exceed the per diem rates in effect at the time of travel as set forth in the Joint Travel Regulation (JTR). The contractor shall not incur travel expenses unless funding is available. General and administrative (G&A) cost may be added as applicable. No profit or fee shall be added on reimbursable travel costs.
B. Period of Performance: 1 October 2017 - 28 April 2021 OR post-transition - 28 April
C. Estimated Cost: $180,000
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0036 1 __________ Lot __________ Noun: C4 POP 1 FMS EQUIPMENT
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The Contractor shall furnish and deliver to the Government required equipment (software and hardware products) to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II FMS C4 Performance Work Statement (PWS), Task Order 06, dated 23 September 2016 (see attachment 7).
B. The period of performance: 1 October 2017 - 28 April 2021 OR post-transition - 28 April 2021
0037 1 __________
Noun: C4 POP 1 FMS SURGE
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The Contractor shall procure replacement equipment in support of Emergency On Site Sustainment (EOSS) trips and out of cycle equipment needs, IAW the SEWS II FMS C4 Performance Work Statement (PWS), Task Order 06, dated 23 September 2016 (see attachment 7).
B. The period of performance: 1 October 2017 - 28 April 2021 OR post-transition - 28 April 2021
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0038 __________ Noun: C7 POP 1 FMS SERVICES
PSC: D318
Contract type: U - COST PLUS FIXED FEE Start Date: 01 OCT 2017 Completion Date: 14 DEC 2019 Descriptive Data:
A. The Contractor shall furnish and deliver to the Government the technical support services required to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II FMS C7 Performance Work Statement (PWS), Task Order 07, dated 23 September 2016 (see attachment 8).
B. The period of performance: 1 October 2017 - 14 December 2019 OR post-transition - 14 December 2019
C. This is a Cost Plus Fixed Fee CLIN:
Estimated Cost: $_________
Fixed Fee (no more than 7% and no less than 3%): $__________
D. F.O.B Destination
0039 __________
Noun: C7 POP 1 FMS TRAVEL
PSC: D318
Contract type: S - COST Start Date: 01 OCT 2017 Completion Date: 14 DEC 2019 Descriptive Data:
A. This is a cost reimbursable CLIN while performing service efforts under this CLIN.
Travel will be reimbursed in accordance with Federal Acquisition Regulation (FAR) 31.205-46, with maximums that do not exceed the per diem rates in effect at the time of travel as set forth in the Joint Travel Regulation (JTR). The contractor shall not incur travel expenses unless funding is available. General and administrative (G&A) cost may be added as applicable. No profit or fee shall be added on reimbursable travel costs.
B. Period of Performance: 1 October 2017 - 14 December 2019 OR post-transition - 14 December 2019
C. Estimated Cost: $1,749,000
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0040 1 __________ Lot __________ Noun: C7 POP 1 FMS EQUIPMENT
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The Contractor shall furnish and deliver to the Government required equipment (software and hardware products) to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II FMS C7 Performance Work Statement (PWS), Task Order 07, dated 23 September 2016 (see attachment 8).
B. The period of performance: 1 October 2017 - 14 December 2019 OR post-transition - 14 December 2019
0041 1 __________
Noun: C7 POP 1 FMS SURGE
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The Contractor shall procure replacement equipment in support of Emergency On Site Sustainment (EOSS) trips and out of cycle equipment needs, IAW the SEWS II FMS C7 Performance Work Statement (PWS), Task Order 07, dated 23 September 2016 (see attachment 8).
B. The period of performance: 1 October 2017 - 14 December 2019 OR post-transition - 14 December 2019
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0042 __________ Noun: E1 POP 1 FMS SERVICES
PSC: D318
Contract type: U - COST PLUS FIXED FEE Start Date: 01 OCT 2017 Completion Date: 18 JUN 2019 Descriptive Data:
A. The Contractor shall furnish and deliver to the Government the technical support services required to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II FMS E1 Performance Work Statement (PWS), Task Order 08, dated 23 September 2016 (see attachment 9).
B. The period of performance: 1 October 2017 - 18 June 2019 OR post-transition - 18 June 2019
C. This is a Cost Plus Fixed Fee CLIN:
Estimated Cost: $__________
Fixed Fee (no more than 7% and no less than 3%): $__________
0043 __________
Noun: E1 POP 1 FMS TRAVEL
PSC: D318
Contract type: S - COST Start Date: 01 OCT 2017 Completion Date: 18 JUN 2019 Descriptive Data:
A. This is a cost reimbursable CLIN while performing service efforts under this CLIN.
Travel will be reimbursed in accordance with Federal Acquisition Regulation (FAR) 31.205-46, with maximums that do not exceed the per diem rates in effect at the time of travel as set forth in the Joint Travel Regulation (JTR). The contractor shall not incur travel expenses unless funding is available. General and administrative (G&A) cost may be added as applicable. No profit or fee shall be added on reimbursable travel costs.
B. Period of Performance: 1 October 2017 - 18 June 2019 OR post-transition - 18 June
C. Estimated Cost: $153,000
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0044 1 __________ Lot __________ Noun: E1 POP 1 FMS EQUIPMENT
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The Contractor shall furnish and deliver to the Government required equipment (software and hardware products) to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II FMS E1 Performance Work Statement (PWS), Task Order 08, dated 23 September 2016 (see attachment 9).
B. The period of performance: 1 October 2017 - 18 June 2019 OR post-transition - 18
0045 1 __________
Noun: E1 POP 1 FMS SURGE
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The Contractor shall procure replacement equipment in support of Emergency On Site Sustainment (EOSS) trips and out of cycle equipment needs, IAW the SEWS II FMS E1 Performance Work Statement (PWS), Task Order 08, dated 23 September 2016 (see attachment 9).
B. The period of performance: 1 October 2017 - 18 June 2019 OR post-transition - 18
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0046 __________ Noun: P3 POP 1 FMS SERVICES
PSC: D318
Contract type: U - COST PLUS FIXED FEE Start Date: 01 OCT 2017 Completion Date: 14 MAY 2018 Descriptive Data:
A. The Contractor shall furnish and deliver to the Government the technical support services required to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II FMS P3 Performance Work Statement (PWS), Task Order 09, dated 23 September 2016 (see attachment 10).
B. The period of performance: 1 October 2017 - 14 May 2018 OR post-transition - 14 May 2018
C. This is a Cost Plus Fixed Fee CLIN:
Estimated Cost: $__________
Fixed Fee (no more than 7% and no less than 3%): $__________
0047 __________
Noun: P3 POP 1 FMS TRAVEL
PSC: D318
Contract type: S - COST Start Date: 01 OCT 2017 Completion Date: 14 MAY 2018 Descriptive Data:
A. This is a cost reimbursable CLIN while performing service efforts under this CLIN.
Travel will be reimbursed in accordance with Federal Acquisition Regulation (FAR) 31.205-46, with maximums that do not exceed the per diem rates in effect at the time of travel as set forth in the Joint Travel Regulation (JTR). The contractor shall not incur travel expenses unless funding is available. General and administrative (G&A) cost may be added as applicable. No profit or fee shall be added on reimbursable travel costs.
B. Period of Performance: 1 October 2017 - 14 May 2018 OR post-transition - 14 May
C. Estimated Cost: $321,000
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0048 1 __________ Lot __________ Noun: P3 POP 1 FMS EQUIPMENT
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The Contractor shall furnish and deliver to the Government required equipment (software and hardware products) to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II FMS P3 Performance Work Statement (PWS), Task Order 09, dated 23 September 2016 (see attachment 10).
B. The period of performance: 1 October 2017 - 14 May 2018 OR post-transition - 14 May 2018
0049 1 __________
Noun: P3 POP 1 FMS SURGE
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The Contractor shall procure replacement equipment in support of Emergency On Site Sustainment (EOSS) trips and out of cycle equipment needs, IAW the SEWS II FMS P3 Performance Work Statement (PWS), Task Order 09, dated 23 September 2016 (see attachment 10).
B. The period of performance: 1 October 2017 - 14 May 2018 OR post-transition - 14 May 2018
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0050 __________ Noun: P4 POP 1 FMS SERVICES
PSC: D318
Contract type: U - COST PLUS FIXED FEE Start Date: 01 OCT 2017 Completion Date: 27 FEB 2019 Descriptive Data:
A. The Contractor shall furnish and deliver to the Government the technical support services required to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II FMS P4 Performance Work Statement (PWS), Task Order 10, dated 23 September 2016 (see attachment 11).
B. The period of performance: 1 October 2017 - 27 February 2019 OR post-transition - 27 Feb 2019
C. This is a Cost Plus Fixed Fee CLIN:
Estimated Cost: $_____________
Fixed Fee (no more than 7% and no less than 3%): $__________
Total CPFF: $___________
D. F.O.B. Destination
E. No freight forwarder has been designated for this case. Contractor will ship to U.S.
sites within country.
0051 __________
Noun: P4 POP 1 FMS TRAVEL
PSC: D318
Contract type: S - COST Start Date: 01 OCT 2017 Completion Date: 27 FEB 2019 Descriptive Data:
A. This is a cost reimbursable CLIN while performing service efforts under this CLIN.
Travel will be reimbursed in accordance with Federal Acquisition Regulation (FAR) 31.205-46, with maximums that do not exceed the per diem rates in effect at the time of travel as set forth in the Joint Travel Regulation (JTR). The contractor shall not incur travel expenses unless funding is available. General and administrative (G&A) cost may be added as applicable. No profit or fee shall be added on reimbursable travel costs.
B. Period of Performance: 1 October 2017 - 27 February 2019 OR post-transition - 27 Feb 2019
C. Estimated Cost: $54,000
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0052 1 __________ Lot __________ Noun: P4 POP 1 FMS EQUIPMENT
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The Contractor shall furnish and deliver to the Government required equipment (software and hardware products) to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II FMS P4 Performance Work Statement (PWS), Task Order 10, dated 23 September 2016 (see attachment 11).
B. The period of performance: 1 October 2017 - 27 February 2019 OR post-transition - 27
0053 1 __________
Noun: P4 POP 1 FMS SURGE
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The Contractor shall procure replacement equipment in support of Emergency On Site Sustainment (EOSS) trips and out of cycle equipment needs, IAW the SEWS II FMS P4 Performance Work Statement (PWS), Task Order 10, dated 23 September 2016 (see attachment 11).
B. The period of performance: 1 October 2017 - 27 February 2019 OR post-transition - 27
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0054 1 __________ Lot __________ Noun: DATA
PSC: D318
NSN: N - Not Applicable DD1423 is Exhibit: A Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The contractor shall deliver data in accordance with and as specified in Section J, Exhibit A (Contract Data Requirements List (CDRL)) and as specified in each individual task order.
B. This CLIN is Not Separately Priced (NSP). CLINs will be identified on each task order.
C. Period of Performance: To be cited in each individual task order.
0055 __________
Noun: FMS SERVICES
PSC: D318
Contract type: U - COST PLUS FIXED FEE Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. This CLIN is for FMS services for SEWS II new FMS partners. The Contractor shall furnish and deliver to the Government the technical support services required to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and as specified in each individual task order.
B. The period of performance: To be cited in each individual task order.
C. This is a Cost Plus Fixed Fee CLIN:
Estimated Cost: TBD AFTER IDIQ AWARD
Fixed Fee (no more than 7% and no less than 3%): will be the same fixed fee rate as for the existing FMS cases
Total CPFF: TBD AFTER IDIQ AWARD
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0056 __________ Noun: FMS TRAVEL
PSC: D318
Contract type: S - COST Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. This CLIN is for FMS travel for SEWS II new FMS partners. This is a cost reimbursable CLIN while performing service efforts under this CLIN. Travel will be reimbursed in accordance with Federal Acquisition Regulation (FAR) 31.205-46, with maximums that do not exceed the per diem rates in effect at the time of travel as set forth in the Joint Travel Regulation (JTR). The contractor shall not incur travel expenses unless funding is available. General and administrative (G&A) cost may be added as applicable. No profit or fee shall be added on reimbursable travel costs.
B. Period of Performance: To be cited in each individual task order.
C. Estimated Cost: To be cited in each individual task order.
0057 1 __________
Noun: FMS EQUIPMENT
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. This CLIN is for FMS equipment for SEWS II new FMS partners. The Contractor shall furnish and deliver to the Government required equipment (software and hardware products) to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and as specified in each individual task order.
B. The period of performance: To be cited in each individual task order.
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0058 1 __________ Lot __________ Noun: FMS SURGE
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. This CLIN is for FMS surge for SEWS II new FMS partners. The Contractor shall procure replacement equipment in support of Emergency On Site Sustainment (EOSS) trips and out of cycle equipment needs, as specified in each individual task order.
B. The period of performance: To be cited in each individual task order.
1005 __________
Noun: YR2 U.S. SUPPORT SERVICES
PSC: D318
Contract type: V - COST PLUS INCENTIVE FEE Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. The Contractor shall furnish and deliver to the Government the technical support services required to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II U.S. Support Performance Work Statement (PWS), dated 23 September 2016 (see attachment 3).
B. Period of Performance: 12 months (estimated to be 01 October 2018 - 30 September 2019, but subject to change)
C. This is a Cost Plus Incentive Fee CLIN:
Target Cost: $__________
Target Fee:(6%) $__________
Target Cost & Fee: $_________
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
1006 __________ Noun: YR2 U.S. SUPPORT TRAVEL
PSC: D318
Contract type: S - COST Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. This is a cost reimbursable CLIN while performing service efforts under this CLIN.
Travel will be reimbursed in accordance with Federal Acquisition Regulation (FAR) 31.205-46, with maximums that do not exceed the per diem rates in effect at the time of travel as set forth in the Joint Travel Regulation (JTR). The contractor shall not incur travel expenses unless funding is available. General and administrative (G&A) cost may be added as applicable. No profit or fee shall be added on reimbursable travel costs.
B. Period of Performance: 12 months (estimated to be 01 October 2018 - 30 September 2019, but subject to change)
1007 1 __________
Noun: YR2 U.S. SUPPORT MATERIAL
PSC: D318
NSN: N - Not Applicable Contract type: S - COST Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The Contractor shall furnish and deliver to the Government required equipment (software and hardware products) to meet the objectives set forth in the SEWS II Overarching Contract Scope Document dated 23 September 2016 (see attachment 1), and IAW the SEWS II U.S. Support Performance Work Statement (PWS), dated 23 September 2016 (see attachment 3).
B. Period of Performance: 12 months (estimated to be 01 October 2018 - 30 September 2019, but subject to change)
C. Estimated Cost:$175,000
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
1008 __________ Noun: YR2 RESEARCH & TEST SERVICES
PSC: D318
Contract type: U - COST PLUS FIXED FEE Start Date: ASREQ Completion Date: ASREQ Descriptive Data:
A. The contractor shall perform tasks to support risk reduction, system evolution, capabilities extensions, improvements, adaptations, etc. These tasks include but are not limited to tests to demonstrate that an upgraded component or subsystem doesn't degrade overall system performance; tests to demonstrate a capability that has been included in a Program of Record (POR) subsystem meets expectations.