Section_J_Atch_07 _C4_PWS.pdf
PDF 126 KB Posted
- Attached to
- Shared Early Warning System (SEWS) II Federal contract opportunity
- Solicitation number
- FA8723-16-R-0005
About this file
Section J - Attachment 07
View the file
Other files for this federal contract opportunity
Show all 50
Shared Early Warning System (SEWS) II has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION J, ATTACHMENT 7, C4 PERFORMANCE WORK STATEMENT (PWS)
Section J, Attachment 7, C4 Performance Work Statement: FA8723-16-R-0005
SHARED EARLY WARNING SYSTEM (SEWS) PRIME CONTRACT RE-COMPETE
(SEWS II)
FOREIGN MILITARY SALES (FMS) CASE KU-D-DAA (C4) PERFORMANCE WORK
STATEMENT (PWS)
TASK ORDER 06
SOLICITATION NO.: FA8723-16-R-0005
ATTACHMENT 07
23 SEPTEMBER 2016
Air Force Materiel Command
Air Force Life Cycle Management Center
Battle Management Directorate
Strategic Warning and Surveillance Systems Division
(AFLCMC/HBQS)
RECORD OF REVISIONS:
VERSION DESCRIPTION Date
001 Initial 05 Feb 2016
002 Draft 31 May 2016
003 Final 23 Sep 2016
1. OVERVIEW
The Contractor provides support for Shared Early Warning System (SEWS) in the United States (U.S.) Central Command (USCENTCOM) Area of Responsibility (AOR). This Performance Work Statement (PWS) specifically addresses a SEWS Foreign Military Sales (FMS) customer which will be referred to as C4. Support to this case is provided jointly by Contractor and Government representatives.
1.1 PROGRAM OBJECTIVES
The SEWS Program objectives are targeted at reducing total cost of ownership, increasing system interoperability, evolving to integrated Command and Control (C2) architectures that more readily adapt to mission change, and ensuring mission integrity and continuity of operations throughout the evolutionary process. The joint Contractor and SEW System Program Office (SPO) program objectives are to:
1. Maximize flexibility while meeting all operational, functional, and technical requirements on a 24x7x365 basis
2. Employ effective cost, schedule, plans, and real-time adjustments that ensure the system functions at peak performance levels. The efficiencies are expected to keep costs controlled and turn actions quickly
3. Maintain mission performance by sharing cross-trained personnel across theaters
4. Identify and manage risks proactively by identifying issues as they arise and making the SEW SPO aware of concerns
5. Generate, maintain, and use near real time Missile Event Information (MEI) data
1.2 SCOPE
This PWS specifically addresses work concentrated in the following areas:
1. Operations, Maintenance, and Support (OM&S) of the CENTCOM sponsored partner for the C4 FMS Case
2. Migrate existing SEW systems to a standardized architecture; field a common SEW architecture
3. Integrate new SEW capability through systems engineering efforts
4. Install, integrate, relocate, and sustain existing SEWS equipment, training, and system upgrades
5. System design modifications required to maintain Government approved functional architecture
6. Support, design, implement, maintain, and monitor system security requirements as identified in applicable Cybersecurity guidance and directives
7. Achieve interoperability and collaboration among U.S., COCOMs, and COCOM-sponsored partners, where practicable
8. Enable and perform external integration with Air Force (AF), Department of Defense (DoD), and other interfacing systems with emphasis on interoperability and organizational level sustainment
1.2.1 PARTNER SPECIFIC INFORMATION
The existing SEWS architecture for C4 has six (6) main sites, each located on separate military bases within the country.
2. SEWS II SUPPORT REQUIREMENTS
2.1 PROGRAM MANAGEMENT AND INTEGRATION
The Contractor shall manage all tasks in an integrated manner across all Task Orders/Delivery Orders (TOs/DOs). The Contractor shall plan, organize, coordinate, integrate, execute, and manage all requirements included in this PWS. The Contractor shall maintain efficiency in cost, schedule, and performance, and eliminate duplication of work among multiple TOs/DOs, particularly for activities that require “hand-offs” between TOs/DOs (e.g., changes driven by a project that is incorporated into the baseline documentation). The Contractor shall identify risks, resolve problems, and verify effectiveness of corrective actions. Results of Contractor actions taken to improve performance shall be tracked and shared with the Government, and lessons learned incorporated into applicable processes.
2.1.1 CONTROL/COST ACCOUNT MANAGEMENT
The Contractor shall ensure all charges are properly allocated in accordance with the Contract Work Breakdown Structure (CWBS).
2.1.1.1 CONTRACT WORK BREAKDOWN STRUCTURE (CWBS) AND CWBS
DICTIONARY
The Contractor shall include C4-specific tasks in the integrated CWBS and CWBS dictionary. The Contractor shall use the CWBS as the primary framework for contract planning, budgeting, and reporting of the cost, schedule, and technical performance status to the Government for this TO. Prior to implementing any changes to the CWBS and/or associated definitions, at any level included in the Government’s Preliminary WBS, the Contractor shall request and obtain Government approval of the change.
2.1.2 SECURITY
The Contractor shall meet applicable security requirements included in the SEWS II DD Form 254, DoD Contract Security Classification Specification. The PM shall notify the Contracting Officer Representative (COR), Procurement Contracting Officer (PCO), and PM within 24 hours of any security incident involving SEWS II contractor personnel.
2.1.3 ASSOCIATE CONTRACTOR AGREEMENTS
(RESERVED)
2.1.4 DOCUMENT AVAILABILITY
The Contractor shall make all documents and materials created or modified because of this TO available in the Integrated Data Environment (IDE). The Contractor shall submit documents for Foreign Disclosure Office (FDO) approval as required by law. The Contractor shall make the documents and materials available within thirty (30) days of their creation, modification, or completion, as applicable, unless other requirements in this contract specify or allow a longer period. See IDE paragraph 2.1.4.1.
2.1.4.1 INTEGRATED DATA ENVIRONMENT (IDE)
The Contractor shall maintain C4-specific products in the SEWS program Integrated Data Environment (IDE) as the authoritative data repository for System, Technical Baseline, Contract, and Program documentation. The information shall be made available to SEW SPO personnel upon request and be remotely accessible.
2.1.5 INTEGRATED MASTER SCHEDULE (IMS)
The Contractor shall include C4-specific activities in the overarching Integrated Master Schedule (IMS) for all SEW SPO activities as described.
2.1.5.1 INTEGRATED MASTER SCHEDULE WORKING GROUP (IMSWG)
The Contractor shall address C4-specific activities during the bi-monthly Government chaired Integrated Master Schedule Working Group (IMSWG).
2.1.6 INTEGRATED RISK MANAGEMENT
The Contractor shall integrate C4-specific risks into the consolidated SEWS risk management process. The Contractor shall pro-actively communicate all C4-specific risks to the Government. For each risk, the Contractor shall:
1. Identify risks;
2. Analyze and characterize, to include risk probability, consequence (technical, schedule, cost), and associated rationale(s);
3. For Contractor risks, identify a sustainment risk handling strategy (assume, transfer, mitigate, avoid, watch) and strategy rationale for each risk is identified. The rationale should include an assessment of overall cost, schedule, or technical impact of the handling strategy versus the risk consequence;
4. For Contractor risks, identify detailed mitigation activities for each “mitigated” risk;
5. Map risks and significant mitigation activities to the CWBS and IMS; and,
6. Provide C4-specific risk analysis at the monthly Government chaired Risk Review
Boards (RRB).
2.1.7 COST AND SCHEDULE
The Contractor shall manage the tasks within this PWS to remain within cost and schedule.
2.1.8 INTEGRATED PROGRAM MANAGEMENT PLAN (PMP)
The Contractor shall include the management of C4 FMS activities in the integrated program-level PMP. This program-level PMP shall describe the processes the Contractor uses to track output-oriented metrics and tie them to cost data and program milestones.
2.1.9 PROGRAM OFFICE MEETINGS AND REVIEWS
The Contractor shall include C4-specific contract performance, issues, systems performance, and status during the SEW SPO weekly review meetings. Additionally, the Contractor shall include C4-specific information into the consolidated quarterly review of funding, history, outstanding actions, and status of significant interest items to be presented at the Contractor Program Manager Review (CPMR).
2.1.10 FINANCIAL REPORTS
The Contractor shall provide financial reports to include a C4-specific Contract Funds Status Report (CFSR) and contribute C4-specific information into the consolidated Financial Actual Report and the consolidated Program Hours Worked (PHW) Report.
CDRL A003 – Contract Funds Status Report (CFSR).
2.1.11 SYSTEM SAFETY PROGRAM
The Contractor shall include C4-specific information into the System Safety Program Plan IAW the methodology in MIL-STD-882E, DoD Standard Practice for System Safety.
2.1.12 GENERAL SUPPORT REQUIREMENTS
The Contractor shall review Government draft documents and products (e.g., Memorandums Of Agreement (MOA)/Memorandums of Understanding (MOU), Authorization & Assessment (A&A) packages, Defense Information Assurance Security Accreditation Working Group (DSAWG) products and packages, equipment lists, U.S., COCOM, and COCOM-sponsored partner requirements) and provide input within five (5) business days. The Contractor shall assist the SEW SPO in developing International Agreements (e.g., FMS Cases) and coordinating equipment releasability and disclosure.
2.1.13 SECURITY WORKING GROUP
The Contractor shall include C4-specific information/inputs and recommendations at quarterly Government chaired SEWS Security Working Group meetings.
2.2 SYSTEMS ENGINEERING (SE) AND SUSTAINMENT
The Contractor shall plan, organize, coordinate, integrate, execute, and manage all SE and Sustainment efforts on this TO at the appropriate levels to be effective and efficient.
The Contractor shall invite the Government to participate in all E-1 specific Contractor technical and management Integrated Product Teams (IPTs), working groups, and review boards. The Contractor shall contribute C4-specific information into the integrated Systems Engineering Management Plan (SEMP) to document the Contractor’s Systems Engineering (SE) processes.
2.2.1 SYSTEMS ENGINEERING (SE) SUPPORT
The Contractor shall plan, organize, coordinate, integrate, execute, and manage all C4-specific SE efforts on SEWS II at the appropriate levels to be effective, yet efficient. The Contractor shall maintain efficiency in performance and eliminate duplication of work among multiple TOs/DOs. The Contractor shall participate in the overall system architecture, integration, and sustainment of the C4-specific system, to include evolving, standardizing, and normalizing the system architecture while providing required capabilities.
2.2.1.1 SYSTEM TECHNICAL BASELINE
The Contractor shall develop, maintain, update, and integrate the Government-controlled C4-specific System Technical Baseline artifacts and documentation as identified in the SEW System Technical Baseline Matrix. The Contractor shall use Configuration Management (CM) processes to maintain, update, and integrate artifacts and documents.
The Contractor shall ensure compatibility with the Government CM processes. The Contractor shall re-integrate artifacts and documentation as a result of any C4-specific TOs/DOs into the baseline to ensure the master set of artifacts and documentation is complete, current, and accurate. The Contractor shall ensure all C4-specific artifacts and documentation reside in the IDE. CDRL A00C – Interface Design Description (IDD), A00H – Software User Manual (SUM), A00K – System Administrator Manual (SAM), A00P – System Subsystem Design Description (SSDD), A00R – Technical Data Package (TDP), A00B – Interface Control Document (ICD), A002 – COTS Manuals and Associated Supplemental Data, and A008 – DoD Architecture Framework (DoDAF) Documentation.
2.2.1.2 EVENT RECORDINGS AND ANALYSIS
The Contractor shall conduct daily recordings of events and look for any discrepancies of overall system performance. The Contractor shall monitor inputs and outputs to ensure system integrity. The Contractor shall perform event analysis to evaluate system performance and respond to any issues or questions from the C4 partner. Results of the analysis and recommended corrective actions shall be provided to the Government within five (5) business days. CDRL A00S – Technical Report – Studies/Services.
2.2.1.3 INTEGRATION AND TEST FACILITY (ITF)
The Contractor shall support C4-specific integration and test activities. The Contractor shall be capable of supporting a full range of integration activities for both the currently fielded system as well as maintenance and modernization releases.
2.2.1.3.1 INTEGRATION
The Contractor shall integrate system modifications and updates into the existing C4-specific system architecture. The Contractor shall conduct an integration test and trial period prior to shipment of any system or component to any location and implementation on the operational SEW System. The Contractor shall conduct a one (1) week (at a minimum) trial period to verify and validate system requirements of the integrated components. The Contractor shall provide the Government a test plan for approval prior to entering into the trial period. CDRL A00T Test Plan – Test Procedures.
2.2.1.3.2 COMMERCIAL-OFF-THE-SHELF (COTS) SOFTWARE (SW) UPDATES
The Contractor shall assess and integrate all COTS incremental patches or upgrades within the ITF in accordance with industry best practices. The Contractor shall conduct sustaining engineering analysis of COTS SW updates in the ITF to ensure SEW SRD requirements are maintained.
2.2.1.3.3 GOVERNMENT-OFF-THE-SHELF (GOTS) SOFTWARE (SW) UPDATES
The Contractor shall assess and integrate up to twelve (12) GOTS SW incremental patches or upgrades annually within the ITF. The Contractor shall conduct sustaining engineering analysis of current GOTS SW upgrades to demonstrate capabilities included in subsystems satisfy the SEW SRD requirements. The Contractor shall prepare and submit deficiency reports for any identified issues and provide the reports to the Government. CDRL A00S – Technical Report – Studies/Services.
2.2.1.3.4 RESEARCH AND DEVELOPMENT (R&D)
(RESERVED).
2.2.1.4 ENGINEERING MEETINGS AND REVIEWS
The Contractor shall prepare and present any C4-specific system configuration changes, engineering issues, and potential courses of action at a bi-weekly Government chaired/conducted SEWS Joint Engineering Review Boards (JERB). CDRL A001 – Briefing Material and A00W – Briefing Minutes.
The Contractor shall prepare and present the JERB-approved course of action for system configuration change(s) at monthly Government chaired/conducted SEWS Configuration Control Boards (CCBs). All CCBs shall be preceded by a JERB (engineering proposals shall include a Government engineering review and a CCB Presentation). CDRL A001 – Briefing Material and A00W – Briefing Minutes.
The Contractor shall provide C4-specific inputs and recommendations at the weekly Government chaired/conducted SEWS System Engineering Integrated Product Team meetings (SE-IPT).
The Contractor shall provide C4-specific inputs and recommendations at quarterly Government chaired/conducted SEWS Test Working Group meetings.
2.2.2 CYBERSECURITY
The Contractor shall provide the following Cybersecurity functions: vulnerability assessment testing; security control impact assessment on proposed or discovered system changes; risk assessments; mitigation and remediation development and implementation; engineering design proof-of-concept demonstrations; development of security control implementation strategies; development, implementation, and maintenance of automated auditing solutions and continuous monitoring solutions; JERB presentations; and Incident Response/Reporting. The Contractor’s SEWS II efforts shall comply with DoDI 8500.01, DoDI 8510.01, and other Cybersecurity guidance and directives as applicable.
2.2.2.1 CYBERSECURITY TESTING
The Contractor shall test C4-specific upgrades for Cybersecurity compliance after installation of any new equipment in the C4-specific system operational baseline within the US Accreditation Boundary (reflected on network topology drawing) to ensure there is no change in risk posture prior to operational implementation of equipment in sustaining engineering or maintenance efforts. The Contractor shall notify the Government if any system modification results in a change in risk posture. Government approval must be provided prior to operational implementation. The Contractor shall conduct security assessment scans prior to an independent/external entity’s testing or in conjunction with Authorization and Assessment (A&A) tasks on a six (6) month basis. The Contractor shall provide security assessment scan results to the Government. CDRL A00L – System Authorization and Accreditation Artifacts.
2.2.2.2 ASSESSMENT AND AUTHORIZATION (A&A)
(RESERVED).
2.2.2.3 PERSONNEL CERTIFICATION REQUIREMENTS
The Contractor shall ensure all Contractor personnel granted privileged access to system components or assigned to cybersecurity positions shall meet DoDI 8570.01 certification requirements.
2.2.2.4 INFORMATION SYSTEM SECURITY OFFICER (ISSO)
(RESERVED).
2.2.2.5 CROSS DOMAIN SOLUTION (CDS) APPROVAL PACKAGES
2.3 OPERATIONS, MAINTENANCE, AND SUPPORT (OM&S)
The Contractor shall operate, maintain, and support the C4-specific operational system 24x7x365 to provide timely and accurate missile event information.
2.3.1 CENTRALIZED DISTRIBUTION FACILITY (CDF) OPERATIONS
The Contractor shall operate, maintain, and support the C4-specific deployed systems to meet the requirements detailed in the SEW SRD.
2.3.1.1 SYSTEM MONITORING & TROUBLE TICKETS
The Contractor shall monitor and provide technical assistance and support 24x7x365 for incoming queries and issues. Upon receipt of an incoming query or issue, the Contractor shall document and log the issue, actions taken, and the Point of Contact (POC) to whom they spoke into a trouble ticket. The Contractor shall log all trouble tickets into the IDE database and monitor trouble tickets through resolution and close out.
2.3.1.2 SYSTEM OUTAGE REPORTING
The Contractor shall notify the Government of any C4-specific system outages, including planned outages. On critical outages (no SEW data to customer), the Contractor shall report via direct contact (in person/over phone) to the SEW SPO POC and via email to the applicable COCOM POC within one (1) hour of being notified of the outage. On non-critical issues/outages (SEW data still being delivered to customer), the Contractor shall report via email to the SEW SPO and the applicable COCOM POC within one (1) business day. Reports shall include at a minimum: description explaining nature of the outage;
time and date of outage; when and how technician was notified; time of technician response; name of technician(s); date and time of restoration; a comprehensive narrative description of internal and external troubleshooting efforts and fix actions; external POC names and ticket numbers. The Contractor shall integrate C4-specific information into the daily system status, weekly summary, monthly availability, and monthly outage reports.
2.3.1.3 COMMUNICATION SECURITY (COMSEC)
The Contractor shall install and sustain secure devices acquired through a National Security Agency (NSA) FMS Case in direct support of C4. The Contractor shall coordinate with the installation COMSEC office to provision and maintain necessary crypto key material. The Contractor shall perform COMSEC account custodial duties IAW DoD 5220.22-M and perform sustainment activities such as periodic crypto key updates.
2.3.2 SEWS MAINTENANCE AND SUPPORT SERVICES
2.3.2.1 PREVENTATIVE MAINTENANCE
The Contractor shall conduct daily checks (during normal CDF hours of operation) of the C4-specific system and shall communicate with customers’ systems’ maintainers and sponsoring COCOMs to ensure the systems are fully operational at all times. The Contractor shall communicate to the SEW SPO any potential non-compliance with the SEW SRD present course(s) of action within five (5) business days. CDRL A00S – Technical Reports – Study/Services.
2.3.2.2 SYSTEM OUTAGE RESTORAL
The Contractor shall exhaust all capabilities and resources to restore system capability to the state prior to the system outage. The Contractor shall notify, coordinate, and facilitate resolution by working with any Contractors, vendors, suppliers, and other agencies. Once all resources are exhausted, and if necessary, the Contractor recommends to the Government if/when an emergency on-site support (EOSS) and/or Government intervention/assistance is necessary.
On critical outages (no SEWS data to customer), the Contractor shall prepare and present to the Government a restoral plan within two (2) hours. On non-critical issues/outages (SEW data still being delivered to customer), the Contractor shall prepare and present to the Government a restoral plan within two (2) business days.
2.3.2.3 EXTERNAL COORDINATION
The Contractor shall ensure entire system performance by notifying, coordinating, and facilitating resolution by working with any Contractors, including coordination with commercial vendors for support, suppliers, and/or other agencies (e.g., foreign partner WAN provider) to keep the SEWS fully functional to meet the technical requirements.
2.3.2.4 CDF EXERCISE SUPPORT
(RESERVED).
2.3.2.5 INTEGRATED LOGISTICS SUPPORT
The Contractor shall plan, organize, coordinate, integrate, execute, and manage all logistics tasks included in this PWS.
2.3.2.5.1 INTEGRATED LOGISTICS SUPPORT PLAN (ILSP)
The Contractor shall include C4-specific information into the ILSP. The ILSP must describe the planning and management functions to be performed by the Contractor, as well as the Performance Based Logistics framework that will be used for OM&S of the C4 systems.
2.3.2.5.2 INTEGRATED LOGISTICS SUPPORT WORKING GROUP (ILSWG)
The Contractor shall include C4-specific information into the monthly Government chaired
ILSWG.
2.3.2.5.3 INVENTORY
The Contractor shall maintain a complete up-to-date inventory of all C4-specific SEWS secure and non-secure equipment (including equipment model and specifics, specific location of equipment, status of functionality and disposition status) by site and installation date. The Contractor shall maintain and deliver the inventory list to the Government two
(2) weeks prior to any scheduled on-site OM&S activity. CDRL A00D – Inventory Listing.
2.3.2.5.3.1 SPARING ANALYSIS
The Contractor shall perform and update sparing analyses to determine and maintain the most appropriate levels, locations and distribution methods of spares for each unit/subassembly installed to meet the performance requirements for the C4 systems.
The analyses shall identify any assumptions, formulas, or models used. The Contractor shall provide sparing analysis/updates to the Government at the ILSWG.
2.3.2.5.4 OBSOLESCENCE MANAGEMENT (OM)
The Contractor shall continuously track and analyze hardware, software, and firmware for Original Equipment Manufacturer vendor support to identify when vendor support ends. The Contractor shall identify and present the results of the supportability analysis during the ILSWG. The Contractor shall also coordinate with the GOTS Programs of Record (PoRs) for obsolescence of any GOTS items.
The Contractor shall resolve form/fit/function/interface Line Replaceable Unit (LRU)-level obsolescence issues through standard depot maintenance practices. If not form/fit/function/interface equipment LRU-level obsolescence issues, the Contractor shall provide OM mitigation options and recommended action if any, during the ILSWG.
2.3.2.5.5 PROCUREMENT
The Contractor shall procure, acquire, and manage all equipment, spares, maintenance agreements, warranties, support agreements, and licenses in the Government’s name to support C4. The Contractor shall comply with all warranty terms for all COTS products installed in the systems. The Contractor shall maintain the capability to procure out-of-cycle equipment (FMS-funded surge CLIN). The Contractor shall maintain the capability to purchase equipment in country with Government approval. The Contractor shall deliver all maintenance agreements, warranties, licenses, and support agreements to the Government at contract end. CDRL A002 – COTS Manuals and Associated Supplemental Data.
2.3.2.5.5.1 HW/SW LICENCES
The Contractor shall, when purchasing COTS hardware and software licenses for use on the C4 systems, use mandatory Air Force and Department of Defense contracts before purchasing the hardware and software in the open market. Examples of such contracts are AFWAY, NETCENTS II, and the DoD’s Enterprise Software Initiative (ESI) Blanket Purchase Agreement (BPAs).
2.3.2.5.6 PACKAGING, HANDLING, STORAGE, & TRANSPORTATION (PHS&T)
The Contractor shall be responsible for PHS&T activities for all system equipment and consumables. The Contractor shall utilize their proposed depot storage facility for C4-specific items. The Contractor shall utilize the designated Freight Forwarder to complete shipments to the COCOM-sponsored partner as identified in the TO. The Contractor shall ensure all shipments are received at the destination within the required timelines through coordination and verification activities. Associated transportation documentation shall be developed and maintained in the approved IDE (e.g., DD 1149, Export Documentation, receipt verification). The COCOM-sponsored partner is responsible to distribute assets to appropriate storage/installation location(s).
2.3.2.5.6.1 EXPORT OF TECHNICAL SERVICES
The Contractor shall comply with the requirements of the International Traffic in Arms Regulations (ITAR), including guidance from the Secretary of the Air Force – International Affairs (SAF/IA), and applicable authorized delegated FDOs, to export defense services and defense articles for FMS Cases/activities. The Contractor shall register with Directorate of Defense Trade Controls (DDTC) to maintain direct contact with the SEWS customers.
2.3.2.5.7 DISPOSITION/DEMILITARIZATION
(RESERVED).
2.3.3 SEWS ON-SITE OPERATIONS, MAINTENANCE, & SUPPORT (OM&S)
The Contractor shall travel to C4 partner sites to conduct on-site system familiarization training and OM&S activities. The Government specifies the scheduling, location, and specific OM&S travel requirements (See Table 3). The Contractor shall include all on-site OM&S travel schedules in the IMS. The Contractor shall travel IAW the “Authorization to Support” letter for technical and travel support, signed by the PCO, effective for the TO duration.
2.3.3.1 ON-SITE OM&S
The Contractor shall conduct pre-trip planning, post-trip reports, routine site equipment maintenance, crypto re-key, cybersecurity upgrades, site surveys, site relocations, system testing support, redline technical baseline artifacts, physical configuration audit of the operational system (inventory), anti-virus updates, client and server back-ups, and provide exercise support. The Contractor shall implement and perform semi-annual GOTS and COTS software updates/upgrades. For each installed location, the Contractor shall keep current and provide to each site a System Administration Manual (SAM). The Contractor shall ensure any documentation provided to a non-U.S. customer be approved for release by the FDO prior to transfer of the material. CDRL A00V – Trip Report, A00G
– Site Survey, and A00K – System Administration Manual.
2.3.3.1.1 OPERATIONAL INTEGRATION TEST
After shipment and installation of any system or component to a customer location, the Contractor shall perform testing to verify system performance within the operational SEWS. The Contractor shall develop and deliver an operational integration test plan which captures how the Contractor will demonstrate system completeness and mission performance. Testing may be conducted after hours due to time differences from the CDF to the COCOM-sponsored customer. CDRL A00T – Test Plan – Test Procedures.
2.3.3.2 EMERGENCY ON-SITE SUSTAINMENT (EOSS)
The Contractor shall only respond to Emergency and Urgent on-site support requests after the SEW SPO or delegate authorizes such actions. The Contractor shall conduct emergency on-site support when directed by the Government and as identified in Table
3. Unplanned trips (not identified in Table 3) will utilize Time and Material (T&M) CLINs.
The contractor shall provide the government daily status updates until the EOSS activities are completed. The Contractor, upon completion of EOSS activities, shall notify the Program Office the EOSS activities are complete and shall provide the total time required to return to operations.
2.3.3.3 COCOM HEALTH CHECKS AND EXERCISE SUPPORT
(RESERVED).
2.3.3.4 FAMILIARIZATION TRAINING
The Contractor shall conduct annual on-site system familiarization training at C4-specific partner sites in conjunction with a semi-annual OM&S activities. The Government will specify the scheduling, locations, specific training requirements, and frequency of training (See Table 3). The Contractor shall submit a Training Plan to the Government for review.
The familiarization training shall include both C4 SEWS-specific communications systems training and TDP (e.g., GCCS-J) training. The training program covers the entire C4-specific SEWS with a focus on operations, configuration, and maintenance. The
Contractor shall develop, maintain, and/or update student and instructor training materials. The Contractor shall ensure any documentation provided to a non-U.S.
customer is approved for release by the FDO prior to transfer of the material. CDRL A00U
– Training Material.
2.3.4 ON-SITE TECHNICIAN/ENGINEER
3. GENERAL INFORMATION
3.1 GOVERNMENTAL SUPERVISION OF CONTRACTOR EMPLOYEES
The Government will not supervise or otherwise direct Contractor employees. The Government will inspect Contractor performance in accordance with (IAW) the Quality Assurance Surveillance Plan (QASP) and any other clauses included in the contract.
3.2 PLACE OF PERFORMANCE
CDF and ITF tasks shall be performed at the Government-owned facility located on Peterson AFB, Colorado. The Contractor shall perform the required work at the locations identified in their proposal and at C4-specific in-country sites. The Contractor shall perform portions of the required work at the Contractor’s own facilities or off-site locations.
3.3 BASE SUPPORT
(RESERVED).
3.4 DUTY HOURS
When working on U.S. Government sites, normal duty hours are 0730-1630, Monday through Friday. When working on C4-specific sites, normal duty hours are 0730-1630, Sunday through Thursday. Portions of the required work support continuous operations (24 hours per day, 7 days per week, 365 days per year).
3.5 LEGAL HOLIDAYS
The Federal Government observes the following holidays:
New Year's Day Martin Luther King's Birthday President's Day Memorial Day Independence Day Labor Day Columbus Day Veteran's Day Thanksgiving Day Christmas Day
3.6 SECURITY REQUIREMENTS
3.6.1 PERSONNEL SECURITY
The Contractor shall comply with the SEWS DD Form 254. The Contractor is responsible for acquiring required clearances. The highest personal security clearance required by this TO is Top Secret/SCI. The Contractor may be given access to applicable documentation to include requirements, plans, specifications, studies, and analyses up to and including Top Secret/SCI classification.
3.6.2 CONTRACTOR IDENTIFICATION
The Contractor shall comply with their company identification procedures. The Contractor shall comply with all Government identification requirements for Contractors for the Government facilities and locations where the Contractor performs work. The Contractor shall identify its Contractor status when interacting with Government personnel at meetings, in emails, and during telephonic exchanges.
3.6.3 PERFORMANCE OF SERVICES DURING CRISES
In the case of crises declared by the President of the United States, the Secretary of Defense, or an overseas Combatant Commander, some of the services required by this contract are considered mission essential. Contractor must have access to the CDF during crisis and potentially travel to C4-specific in-country sites. Refer to the Mission Essential Plan, Section J, Attachment 27.
3.6.4 TRAVEL REQUIREMENTS
Contractor employees may be required to travel to various locations within the continental U.S., COCOM, or COCOM-sponsored sites. All travel shall be in accordance with JTR, SAF/IA guidance, Department of State Standardized Regulations, FDO guidance, and in compliance with the DoD Foreign Clearance Guide, individual protection, and individual deployment policies required by the specific COCOMs, and foreign country entry and exit requirements.
3.6.5 EXPORT OF TECHNICAL SERVICES
The Contractor shall comply with ITAR, SAF/IA guidance, and applicable authorized delegated FDO guidance. The Contractor will have direct contact with the SEWS customers and shall register with DDTC, coordinate ITAR exemptions, and obtain approved Technical Assistance Agreements (TAAs) as required.
4. SERVICE DELIVERY SUMMARY (SDS)
Table 1 defines the Contractor service requirements to be used for the performance and evaluation of this TO. The Performance Objective is a reference point for Government personnel and does not relieve the Contractor from any contractual requirements.
Table 1. Service Delivery Summary Performance
Objective Performance Objective PWS Section
Threshold (Acceptable Quality Levels)
Method of Surveillance
Program Management
The Contractor shall utilize industry best practices and enterprise level systems to provide insight into contract cost, schedule and performance factors. The Contractor shall, subject to Government approval, implement common processes, procedures, and maintenance practices where feasible. The Contractor shall demonstrate resource stewardship and transparency by employing industry standards for maintenance management, systems engineering, project management, customer centered mission support, safety, security, environmental, quality management, and other logistical functions.
The Contractor contributes Task Order-specific activities to the overarching IMS.
IMS deliverables are current, accurate, and do not contain omissions.
The IMS contains no more than three (3) program/schedule errors per Delivery.
Upon CDRL review;
Weekly Meetings
The Contractor identifies Task Order-specific risks to the SEWS risk management process, focusing on system performance, technical requirements, cost, and schedule.
The Contractor shall proactively identify issues and risks to the Government as they are aware of concerns, and manages/mitigates them to meet PWS, SRD, and mission requirements.
Provide status of program and technical risks to include Government and Contractor program risks.
Weekly Meeting;
Monthly Program Review
Objective Performance Objective PWS Section
Threshold (Acceptable Quality Levels)
Method of Surveillance
Measurement of the Contractor’s synergy of operations as to how well they are cross-utilizing/sharing human capital.
Provide status of efficiency report maintained to facilitate cross-utilized resource sharing.
Monthly Program Review
The Contractor provides timely and accurate financial reports and informs Government of issues pertaining to costs that impact project overruns and under-runs.
Timeliness for the CFSR is defined in the CDRL A003 – Contractor Funds Status Report; the Financial Actuals Report is due monthly fourteen (14) calendar days after the accounting month cut-off; the PHW is due within ten (10) workdays of each quarter’s end.
Zero (0) late financial report deliveries over the life of the contract; Issues pertaining to all cost overruns and under-runs addressed in financial reports.
100% Surveillance;
Periodic Inspection;
Trend Analysis;
Contractor Metrics
Systems Engineering
Apply repeatable and tailored SE principles and practices to all aspects of SEWS II. Establish and implement a structured SE program appropriately tailored to the cost, schedule, performance, risk, and technical complexities. The SE program should bring value to the Program Office. The Contractor provides systems engineering support as required to ensure that PWS, SRD, and mission requirements are met, including:
Maintain the SEWS-unique architectures
SEW architectures updated 15 business days after return from OM&S trips and maintained in the
IDE
Periodic inspection;
random sampling
Cybersecurity security assessment Must be within 5% of independent verification
Upon delivery
Objective Performance Objective PWS Section
Threshold (Acceptable Quality Levels)
Method of Surveillance
Mission System Sustainment
The operational users receive MEI data at the TDP per the performance requirements of the SRD, ORD, or FMS Case. The Contractor must also meet the requirements of the PWS by:
Sustain the SEW system to meet the performance standards specified by the SEWS SRD or FMS Case.
As specified in the SEWS SRD or FMS Case.
Periodic inspection;
Contractor metrics;
Customer complaint
Monitor and provide 24x7x365 support to ensure that data is passing to the remote locations and the TDPs display the data properly.
24x7x365 support is provided 100% of the time.
Periodic inspection;
Contractor metrics;
Customer complaint
During degraded system performance, the Contractor shall:
Coordinate, and facilitate resolution by working with any Contractors, vendors, suppliers, and other agencies to keep the SEWS fully functional to meet the SRD and FMS Case requirements.
Resolved 90% of issues without Government intervention.
Periodic inspection;
Contractor metrics;
Customer complaint
On critical outages (no SEW data to customer) – the Contractor shall:
Present a restoral plan within two
(2) hours
On non-critical issues/outages (SEW data still being delivered to customer) – the Contractor shall:
Present a restoral plan within two
(2) business days
Percentage of Government Accepted Restoral Results (RR):
At a minimum, the RR% was 75% as expressed as the percentage of RRs required (RRR) the Government accepted (RRA):
RR% = RRA / RRR
Periodic inspection;
Contractor metrics;
Customer complaint
5. INDEX OF CONTRACT DATA REQUIREMENTS LISTING (CDRL)
Table 2 is the index of CDRLs for the C4 Task Order.
Table 2. Deliverables
DM # Title
A001 Briefing Material
A002 Commercial-Off-The-Shelf (COTS) Manuals and Associated Supplemental Data
A003 Contract Funds Status Report (CFSR)
A005 Data Accession List (DAL)
A008 DoD Architecture Framework (DoDAF) Documents
A00B Interface Control Description (ICD)
A00C Interface Design Description (IDD)
A00D Inventory Listing
A00G Site Survey
A00H System User Manual (SUM)
A00K System Administrator Manual (SAM)
A00L System Authorization and Accreditation (A&A) Artifacts
A00P System Subsystem Design Description (SSDD)
Table 2. Deliverables
DM # Title
A00R Technical Data Package (TDP)
A00S Technical Report – Study/Services
A00T Test Plan – Test Procedures
A00U Training Material
A00W Briefing Minutes
6. TRAVEL TABLES
Table 3. C4 Basic PoP (1 OCTOBER 2017 – 11 MAY 2022)
(CLIN 0034 LABOR, CLIN 0035 TRAVEL)
Purpose Location GFY Trips No Trvlrs
Labor Category (e.g.
GCCS / Tech, Engr)
Trvl Days Rest / Week
End Days Work Days
Work Duty
Hours
Total Trip
Days
Danger Area (Y or N)
Travel hrs/tvlr
/trp
Total Trvl Hrs
Work Hrs/Tvlr
Total Work Hrs
Total Hrs
EOSS C4 FY18 1 1 1 Tech 3 0 5 8 8 N 60 60 40 40 100
OM&S C4 FY18 2 2
1 Tech, 1
GCCS
3 3 10 10 16 N 60 240 100 400 640
CPN C4 FY18 1 2
1 Tech, 1
GCCS
3 3 10 10 16 N 60 120 100 200 320
EOSS C4 FY19 1 2
1 Tech, 1
GCCS
3 0 5 8 8 N 60 120 40 80 200
OM&S C4 FY19 2 2
1 Tech, 1
GCCS
3 3 10 10 16 N 60 240 100 400 640
EOSS C4 FY20 1 1 1 Tech 3 0 5 8 8 N 60 60 40 40 100
OM&S C4 FY20 2 2
1 Tech, 1
GCCS
3 3 10 10 16 N 60 240 100 400 640
EOSS C4 FY21 1 1 1 Tech 3 0 5 8 8 N 60 60 40 40 100
OM&S C4 FY21 1 2
1 Tech, 1
GCCS
3 3 10 10 16 N 60 120 100 200 320
EOSS C4 FY22 1 1 1 Tech 3 0 5 10 8 N 60 60 50 50 110
Table 3. C4 2nd PoP (12 MAY 2022 TO 30 SEPTEMBER 2022)
(CLIN 1034 LABOR, CLIN 1035 TRAVEL)
Purpose Location GFY Trips No Trvlrs
Labor Category (e.g.
GCCS / Tech, Engr)
Trvl Days Rest / Week
End Days Work Days
Work Duty
Hours
Total Trip
Days
Danger Area (Y or N)
Travel hrs/tvlr
/trp
Total Trvl Hrs
Work Hrs/Tvlr
Total Work Hrs
Total Hrs
OM&S C4 FY22 1 2
1 Tech, 1
GCCS
3 3 10 10 16 N 60 120 100 200 320
7. MANDATORY AND ADVISORY PUBLICATION AND DOCUMENTS
7.1.1 The Government has identified publications and documents that are mandatory (applicable) and advisory (reference) for this PWS. Mandatory coded publications and documents require contractor compliance. Advisory coded publications and documents provide guidance to the contractor to the extend necessary to accomplish the tasks and requirements in this PWS.
7.1.2 Publications preceded by “in accordance with”, or “IAW”, or indicated as “applicable” are mandatory requirements upon the contractor and are incorporated by reference into this PWS. In those cases, the remainder of the document is advisory. The contractor shall comply with the current version of the referenced publications reference.
The contractor shall notify the Government PCO within thirty (30) days of receipt of revisions, changes, supplements, and notifications of rescission (including referenced publications in this PWS and federal, state, and local regulations and statutes), if there is a cost impact resulting from such revisions, changes, supplements, and rescissions. If the Government PCO is not notified, and the contractor performs IAW such revisions, changes, supplements, and rescissions, it will be at no increase to the contract’s price.
Revisions, changes, supplements, and rescissions to publications that increase cost will not become effective until directed by the Government PCO.
7.1.3 PRECEDENCE OF DOCUMENTS
7.1.3.1 If there is a conflict between or among two or more publications, those coded mandatory shall control advisory/guidance. Between or among those similarly coded, those issued by a higher authority shall control over those issued by a lower authority. Between or among those issued at the same level of authority, those with a later date of issue shall control over those with earlier dates of issue. Any task set forth in any such reference that shall call for the exercise of discretionary Government authority that cannot be delegated, shall be subject to the final approval of the Government official having such authority.
7.1.3.2 Values in this PWS identifying specific section/paragraph indicate application to the whole section, i.e., 3 indicates applies to whole section, 3.3 indicates applies only to paragraph 3.3 in Section 3. When a paragraph is cited, subparagraphs are implied, i.e., citing 3.3 implies 3.3.1, 3.3.2… 3.3.X are also cited.
7.1.3.3 Requirements may change due to publication revisions, additions, or deletions; therefore, the contractor shall search for current documentation (including advisory) prior to creation of a contractor process or documentation.
7.1.4 APPLICABLE DOCUMENTS:
1. Joint Travel Regulations, 1 October 2014
2. Directorate of Defense Trade Controls (DDTC)
3. The International Traffic in Arms Regulations (ITAR) 22 CFR, Parts 120-130
4. MIL-STD-882E, Department of Defense Standard Practice System Safety, 11 February 2000
5. DoD 5220.22-M, National Industrial Security Program, 28 February 2006
6. DoDI 8500.01, Cybersecurity, 14 March 2014
7. DoDI 8510.01, Risk Management Framework (RMF) for DoD Information Technology (IT), 12 March 2014
8. DoDD 8570.01-M, Information Assurance Training, Certification, and Workforce Management, 15 August 2004
9. Shared Early Warning (SEW) System Requirements Document (SRD), Version 1.0, 15 April 2016
10. Shared Early Warning (SEW) Systems Engineering Plan (SEP), Version 1.0, 31 October 2008
11. Shared Early Warning System (SEW) Technical Baseline Matrix
7.1.5 REFERENCE DOCUMENTS:
1. Presidential Decision Directive (PDD)/NSC-17 for U.S. Policy on Ballistic Missile Defense (BMD), 11 December 1993
2. SEWS Program Budget Decision (PBD) 756, Major Command, Control, Communications, and Intelligence (C3I) Initiatives, 23 December 1998
3. SEWS Program Management Directive (PMD) 2438, 14 April 2000
4. DoD Product Support Manager (PSM) Guidebook, November 2015
5. AFMAN 33-283, Communications Security (COMSEC) Operations, 3 September 2014 (and change 1, 4 June 2015)
6. AFI 63-101/20-101, Integrated Life Cycle Management, 23 February 2015
7. AFI 33-200, Air Force Cybersecurity Program Management, 31 August 2015
8. AFI 33-210, Air Force Certification and Accreditation (C&A) Program (AFCAP), 23 December 2008 (incorporating Change 1, 2 October 2014)
File details come from the government source that posted it. Updated .