Mod_03_Rev_1_-_Contractor_Information_-_2019-07-15.pdf

PDF 662 KB Posted

Attached to
Replacement Elevating Transfer Vehicle Federal contract opportunity
Solicitation number
FA8604-19-R-8111
Issued by
Department of the Air Force Materiel Command

About this file

Modification 0003 for Dover ETV RFP FA8604-19-R-8111

View the file

Other files for this federal contract opportunity

Other files attached to Replacement Elevating Transfer Vehicle, newest first.
File Type Posted
Mod_0007_without_Attachment.pdf PDF
Mod_0007--Cover_PD-2019-07-31_-_No_Markups.pdf PDF
MOD_0006--Dover_(App._A_REV_4).pdf PDF
Mark-Ups_Appendix_A_-_ETVs-2019-07-24.pdf PDF
Amendment_0003.pdf PDF
Dover_Question_Set_2_(REV1)_Engr_Answers.xlsx XLSX spreadsheet
FA8604-19-R-8111__0005.pdf PDF
Amend_0004_FA8604-19-R-8111.pdf PDF
8111-Mod_0002.pdf PDF
Dover_Rail_Description.pdf PDF
Dover_Proj._OCF_041_ICS_pg_014-64.pdf PDF
Dover_Proj._OCF_041_ICS__pg_001-14.pdf PDF
Dover_Proj._OCF_041_ICS_pg_097-185.pdf PDF
Dover_Rail_Epoxy_Anchor_Stud_Adhesive_Submittal.pdf PDF
Dover_Rail_Steel_Sole_Plate_Submittal.pdf PDF
Dover_Rail_-_Top_Guide_Rail.pdf PDF
Dover_Rail_DP_Epoxy_2719432234.pdf PDF
Dover_Proj._OCF_041_ICS_pg_065-96.pdf PDF
Dover_Rail_Epoxy_Grout_submittal.pdf PDF
Dover_Proj._OCF_041_ICS_pg_186-206.pdf PDF
PS-012.dwg DWG drawing
PS-001.dwg DWG drawing
PS-009_PS-010_and_PS-011.dwg DWG drawing
PS-015.dwg DWG drawing
PS-017.dwg DWG drawing
PS-004.dwg DWG drawing
PS-006.dwg DWG drawing
PS-005.dwg DWG drawing
PS-016.dwg DWG drawing
PS-018.dwg DWG drawing
PS-013.dwg DWG drawing
PS-007_and_PS-008.dwg DWG drawing
PS-003.dwg DWG drawing
PS-014.dwg DWG drawing
PS-002.dwg DWG drawing
Dover_PIc_Deck-03.jpg JPG image
Dover_Pic_Deck-04.jpg JPG image
DOVER_ETV_Questions_addressed_at_Pre-Proposal_Conference_6.19.19.xlsx XLSX spreadsheet
Dover--C5M_Pull_Sheet_-_Load_Plan.xlsx XLSX spreadsheet
DOVER_Mod-0001.pdf PDF
Dover_Pic_Deck-02.jpg JPG image
ETV_Replacement_Pre-Proposal_Conf_charts.pdf PDF
DOVER_PLATFORM_STABLIZATION_CABLES.pdf PDF
NIST.SP.800-171.pdf PDF
Dover_Pic_Deck-01.jpg JPG image
BDV806-01.dwg DWG drawing
5-31_Dover_RFP.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR INFORMATION

DOVER AFB, ELEVATING TRANSFER REPLACEMENT

30 JANUARY 2019

Revision 1: 15 July 2019

1. SERVICES AVAILABLE TO THE CONTRACTOR

A. Work Schedule for the System:

Normal Working Hours Days Of The Week

1st Shift 0700 to 1700 Monday thru FridaySaturday

2nd Shift 1700 to 2100 Monday thru FridaySaturday

3rd Shift N/A to N/A N/A

Work on Saturdays, Sundays, Federal Holidays, and other than normal working hours may be arranged if requested in writing three working days in advance and if approved.

C. Nearest Sea Port

Location: Baltimore Maryland

D. Office space available? Yes X No

Location: N/A

E. Classroom space available?

(For number required to be trained)

X Yes No

(1) Location: Building 550

(2) Dry erase board? X Yes No

(3) DVD player? X Yes No

(4) Computer? X Yes No

F. Staging space available? X Yes No

(1) Under roof square feet: North ETV Maintenance Bay

(2) Outside square feet: 2,000 Sq Feet

Location: Installation site and pallet storage yard.

Secured area? Yes X No

G. Restrooms available? Yes X No

FA8604-19-R-8111 0003 Attachment 4 Page 1 of 2

H. Utilities available:

(1) Electrical outlets available in area? X Yes No

Voltage: 120 Hertz: 60 Phase: Single

The number of 60 Hz outlets is limited. Long extension cords may be required.

(2) Water available? X Yes No

Location: Building 550

2. SERVICES NOT AVAILABLE TO THE CONTRACTOR

A. Forklifts. Government forklifts are not available for the Contractor's use.

B. Tools. Government tools or equipment are not available for the Contractor's use.

C. Loading/unloading. Government personnel will not load or unload any Contractor equipment, tools, and system components shipped under this contract.

3. JOINT OCCUPANCY

The Contractor will be installing the equipment in close proximity to normal Government operations. The Contractor must minimize interference with base personnel.

Five Government caused delay days have been built into the scheduled time on site. For each Government caused delay day (greater than 6 continuous hours of delay per 14-hour period) over five delay days will add an allowable day to the onsite time. Each Government caused day shall be reported to the Contracting Officer within 72 hours from the conclusion of the Government caused delay. If the Government caused delay lasts longer than two continuous days the contracting Officer shall be notified immediately. The Contracting Officer will determine what is or is not a Government caused delay day.

4. SITE VISIT

To acquaint bidders/offerers with this project, arrangements may be made to visit the site by contacting:

Name: Mr. Bryan Mohr or Mike Williams

Phone: 302 677-4329, 302 677-2319

E-mail: bryan.mohr@us.af.mil, mike.williams.50@us.af.mil

Field Code Changed

Field Code Changed

FA8604-19-R-8111 0003 Attachment 4 Page 2 of 2 mailto:bryan.mohr@us.af.mil mailto:mike.williams.50@us.af.mil