ETV_Replacement_Pre-Proposal_Conf_charts.pdf

PDF 84 KB Posted

Attached to
Replacement Elevating Transfer Vehicle Federal contract opportunity
Solicitation number
FA8604-19-R-8111
Issued by
Department of the Air Force Materiel Command

About this file

ETV Pre-Proposal Conference Charts

View the file

Other files for this federal contract opportunity

Other files attached to Replacement Elevating Transfer Vehicle, newest first.
File Type Posted
Mod_0007_without_Attachment.pdf PDF
Mod_0007--Cover_PD-2019-07-31_-_No_Markups.pdf PDF
MOD_0006--Dover_(App._A_REV_4).pdf PDF
Mark-Ups_Appendix_A_-_ETVs-2019-07-24.pdf PDF
Amendment_0003.pdf PDF
FA8604-19-R-8111__0005.pdf PDF
Dover_Question_Set_2_(REV1)_Engr_Answers.xlsx XLSX spreadsheet
Amend_0004_FA8604-19-R-8111.pdf PDF
Mod_03_Rev_1_-_Contractor_Information_-_2019-07-15.pdf PDF
Dover_Proj._OCF_041_ICS_pg_097-185.pdf PDF
Dover_Rail_Epoxy_Anchor_Stud_Adhesive_Submittal.pdf PDF
Dover_Rail_Steel_Sole_Plate_Submittal.pdf PDF
Dover_Rail_-_Top_Guide_Rail.pdf PDF
8111-Mod_0002.pdf PDF
Dover_Rail_Description.pdf PDF
Dover_Proj._OCF_041_ICS_pg_014-64.pdf PDF
Dover_Proj._OCF_041_ICS__pg_001-14.pdf PDF
Dover_Rail_Epoxy_Grout_submittal.pdf PDF
Dover_Proj._OCF_041_ICS_pg_186-206.pdf PDF
Dover_Rail_DP_Epoxy_2719432234.pdf PDF
Dover_Proj._OCF_041_ICS_pg_065-96.pdf PDF
PS-015.dwg DWG drawing
PS-017.dwg DWG drawing
PS-004.dwg DWG drawing
PS-006.dwg DWG drawing
PS-012.dwg DWG drawing
PS-001.dwg DWG drawing
PS-009_PS-010_and_PS-011.dwg DWG drawing
PS-003.dwg DWG drawing
PS-014.dwg DWG drawing
PS-002.dwg DWG drawing
PS-005.dwg DWG drawing
PS-016.dwg DWG drawing
PS-018.dwg DWG drawing
PS-013.dwg DWG drawing
PS-007_and_PS-008.dwg DWG drawing
DOVER_ETV_Questions_addressed_at_Pre-Proposal_Conference_6.19.19.xlsx XLSX spreadsheet
Dover--C5M_Pull_Sheet_-_Load_Plan.xlsx XLSX spreadsheet
Dover_PIc_Deck-03.jpg JPG image
Dover_Pic_Deck-04.jpg JPG image
DOVER_PLATFORM_STABLIZATION_CABLES.pdf PDF
NIST.SP.800-171.pdf PDF
Dover_Pic_Deck-01.jpg JPG image
DOVER_Mod-0001.pdf PDF
Dover_Pic_Deck-02.jpg JPG image
BDV806-01.dwg DWG drawing
5-31_Dover_RFP.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Elevating Transfer Vehicle Replacement

Dover Air Force Base Pre-Proposal Conference

June 19, 2019

Administrative Information

• Restroom location

• Shelter-in-Place, Evacuation for fire, etc.

• Ground rules for photos at site location

• Requirements for escorts

Ground rules and Assumptions

• All questions in response to the solicitation and this pre-proposal conference must be submitted in writing to the Contracting Officer

• All questions received will be answered through publication on FEDBIZOPs

• All communications concerning this Request For Proposal should be routed through the Contracting Officer. No further communications should be directed to the Project Engineer or Base Project Officer until after contract award.

ETV Government Team

• Contracting Team Members

• Chris Shirk, Branch Chief, Specialized Contracting Branch

• Phil Anders, Section Chief, Specialized Contracting Section B

• Diane Chong, PCO

• Julia Kemp, Contract Specialist

• Engineering Team Members (Wright Patterson AFB)

• Larry Nugent, Chief Mechanized Material Handling Systems

• Ron Parsons, Project Engineer

• Megan Blackwell, Project Engineer

• Base Project Officer (Dover AFB) and other related personnel

• Bryan Mohr, Primary BPO

• Mike Williams, Secondary BPO

Highlights of the RFP

• Uniform Contract Format

• Section A – Cover Page of the RFP

• Section B – Covers the basic requirements and CLIN structure of the intended contract

• Section F – Covers the delivery schedule of all CLINs contained in the contract

• Section G – Covers accounting data

• Section I – Basic terms and conditions of the contract (NOTE: There are issues with some of the “fill-in” information contained in the clauses – these are corrected with attachments in Section J)

Highlights of the RFP (cont’d)

• Section J (Table of Contents listing attachments)

• Section K – Representations and Certifications (NOTE: If not registered in SAM, you must be prior to award. Complete Reps & Certs and Submit along with your proposal.

• Section L – outlines all proposal requirements (See FAR 52.212-01 and addendum to this Clause)

• Section M – outlines how your proposal will be evaluated in consideration for award (See FAR 52.212-02 and addendum)

Noteworthy Items

• This RFP contains the requirement to submit a Subcontracting Plan

• Details of what to include are in the RFP

• Information on how your plan will be evaluated is contained in the Checklist in Section J

• This RFP contains the requirement to submit relevant experience as a qualifying factor to be considered eligible for award – please read this information carefully and respond with the requisite information

• Please be sure to complete the Proposal Checklist and Pricing Summary Sheets and submit along with your proposal.

• Note the incorporation of a Liquidated Damages Clause and other construction related clauses.

Working on Base – What to Expect

• Restrictions while working in and around an active airfield

• Special clearances or identification required to obtain access to facility

• Obtaining Airfield Waivers

• Movement restrictions around airfield

• FOD Prevention

• Restrictions on taking photos

Elevating Transfer Vehicle Replacement
Administrative Information
Ground rules and Assumptions
ETV Government Team
Highlights of the RFP
Highlights of the RFP (cont’d)
Noteworthy Items
Working on Base – What to Expect