Dover Question SET 2 (REV 1) Engineering Answers
View the file
Other files for this federal contract opportunity
Show all 47
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Queries_USAF
| Tender Queries List | |||||
| Replacement of Elevating Transfer Vehicles (ETVs) at Dover Air Force Base, Delaware | |||||
| Solicitation Number: FA8604-19-R-8111 | |||||
| ID | Attach. | Page | RFP item | Query | Response to Query |
| Commercial Issues | |||||
| 1 | Attachment 7 | 1 | FAR 52.211-11 Liquidated Damages | Is it possible to agree on a cap of 7,5% of the contract price for LDs for delay? |
Is it possible to delete the LDs for termination and to limit the excess costs of repurchase?
Is it possible to agree on LDs for non-performance up to an amount of 7,5% of the contract price, if actually achieved performance values are beyond the mutually agreed minimum values but do not reach 100% of agreed value (in case minimum values are not reached, termination for cause is applicable), i.e. no unlimited make good?
Is it further possible to have an overall cap for the LDs for delay and non-performance of 12,5% of the contract price?
Is it possible to exclude any other kind of LDs?
2 Attachment 7 2 FAR 52-2125, 52.203-19 Confidentiality Is it possible to agree on a mutual confidentiality obligation with a duration of the confidentiality obligations of 10 years after signature?
3 SOLICITATION PROVISIONS 14 FAR 52.212-04 Excusable delays Is it possible to include embargo and governmental omissions into the excusable delays?
4 SOLICITATION PROVISIONS 15 FAR 52.214-02 Patent indemnity Is it possible to allow the Contractor in case of patent infringement to either obtain a license or to modify the equipment at Contractor's choice?
Is ist further possible that Contractor only indemnifies in case of actual infringement and not already in alleged infringement?
Is it possible to grant to USAF a license in any IP of Contractor only for operation, maintenance and repair?
5 SOLICITATION PROVISIONS 17 FAR 52.212-04 Termination Is is possible to limit the rights an remedies in case of termination for cause to a certain extent and not just to grant all rights and remedies provided by law?
6 SOLICITATION PROVISIONS 17, 40 FAR 52.212-04, FAR 246-17 Warranty The two FAR clauses seem to contradict each other with regard to fitness for purpose; which of the regulations is overruling the other one?
7 SOLICITATION PROVISIONS 17 FAR 52.212-04 Limitation of liability Is it possible to exclude all kinds of consequential damages, irrespective of the legal grounds?
Is it possible to limit Contactor's overall liability, irrespective of the legal grounds, to 100% of the contract price?
8 SOLICITATION PROVISIONS 17 FAR 52.212-04 Other compliances Is it possible to exclude the additional application of rights and remedies according to applicable law, i.e. to have the rights and remedies of the parties exclusively described in the contract (of course, with the exclusion of mandatory law)?
9 SOLICITATION PROVISIONS 39 FAR 52.246-17 Warranty Is it possible to agree on a latest date that leads to a deemed acceptance in case of delay that is attributable to USAF?
Is it possible to agree on exclusions to the warranty for e.g. wear and tear?
Is is possible to agree on a latest date for the warranty duration (including for replaced parts) in case of delay attributable to USAF?
10 Solicitation Provisions FAR 52.229-03 Federal, State and Local Taxes Will USAF provide a valid Sales and Use Tax exemption certificate for the project which releases the Contractor from registering for and invoicing to USAF plus Delaware Sales and Use Tax?
11 Solicitation Provisions FAR 52.229-03 Federal, State and Local Taxes If available, is such Sales and Use Tax exemption certificate applicable for local purchases subcontracted by the Contractor, i.e. can the Contractor pass over the certificate to its local suppliers in order to avoid their invoicing to the Contractor plus Sales and Use Tax?
12 Solicitation Provisions FAR 52.229-03 Federal, State and Local Taxes Under US Trade Terms "FOB Destination" the Contractor is responsible for the import of the Equipment. Did USAF receive a Sales tax exemption at import stage which enables a tax exempt import of the Equipment into the US by the Contractor?
13 Attachment 6 1 (2) that the required insurance policies shall contain an endorsement to the effect that any cancellation of material changes adversely affecting the Government's interest shall not be effective for such period as the laws of the State in which this contract is to be performed prescribe, or until thirty (30) calendar days after the insurer or contractor gives written notice to the Contracting Officer, whichever period is longer; Coverage is provided under ongoing annual insurance programs. The Insurer is not able to provide information to the Customers of the Contractor. Therefore this para should be read as follows:
(2) that the required insurance policies shall not be cancelled or materially changed, adversely affecting the Government's interest for such period as the laws of the State in which this contract is to be performed prescribe, or until thirty (30) calendar days after the contractor gives written notice to the Contracting Officer, whichever period is longer;
14 SOLICITATION PROVISIONS 32 FAR 52.228-05 INSURANCE -- WORK ON A GOVERNMENT INSTALLATION (Jan 1997) para b) second sentence should be revised according to the amendment to Attachment 6.
15 FAR SUBPART 28.3 - INSURANCE
28.302 Notice of cancellation or change.
| This para should be revised according to the amendment to Attachment 6. | ||||
| 16 | SOLICITATION PROVISIONS | 50 | QUALIFYING COUNTRY SOURCE AS SUBCONTRACTER | The origin of a component integrated into the goods might be unknown. Which tiers in the supply chain are relevant for the evaluation of the offers? |
What are the consequences of subcontracting 1st- or 2nd tier items in countries other than US or qualifying countries?
17 SOLICITATION PROVISIONS Some clauses are included in the Solicitation Provisions are included multiple times (e.g. 52.212-04) with different state of revision.
Which clause is applicable?
| Technical Issues | ||||||
| 18 | General | Solicitation Provisions | Confirm that prevailing wages are not applicable due to the supply contract status of the project. | |||
| 19 | Attachment 1 | 25 | 3.2.2.4 CONDUITS | |||
| …..flexible metallic Tubing….. | ACUNIS will use heavy duty PVC conduit for single cable installation. Wireway for multiple cable use will be steel cable trays as shown in the picture. | As pictured the wiring and cable tray is acceptable. | ||||
| 20 | Attachment 1 | 28 | 3.2.2.9 Motors | Motors will bear the UR mark. However, the mechanical dimensions will be according to IEC or for gearmotors, according to manufacturer's standard. | There is not enough information for me to determine if the motors proposed are acceptable, therefore the requirements listed in 3.2.2.9 stand. The proposed motors may or may not be found acceptable during the Shop Drawing submittal process. | |
| 21 | Attachment 1 | 35 | 3.2.3.11.3. PLC EEPROM | The newer Generations of PLC does not offer EPROM storage devices. ACUNS therefore transfers always the actual version of the PLC program on the local ICS Cluster server in a separate directory. Beneath this, the actual Status is always stored on our fail safe in-house file server. | This is acceptable. | |
| 22 | Attachment 1 | 40 | 3.3.1.14. SAFETY | |||
| Please specify in the RFP that all safety measures installed in the existing system are sufficient and shall be maintained for the new system. |
State that the ETV replacement is not a major change of the system.
Any new risk assessment arising out of the modification/retrofitting of the aforementioned plant & equipment do not form part of the scope of delivery and services.
| If it should later be found that such new risk assessment is necessary after all, the supplier shall be additionally paid for this and the time schedule be adjusted accordingly. | Per are conversation on 11 July 2019. The safety features for entering the Pallet Storage Enclosure (PSE) and the ETV aisle are sufficient. No additional safety features are required for entering the PSE, but the new ETV shall be designed to interface with the existing safety features. I.E. as we discussed if the PLC opens an overhead door the ETV shall operate normally, but if an overhead door is opened by some other means, other than the PLC, The ETV shall stop operation. The RFP does not require additional safety devices/enhancements for the PSE or conveyors. | |||||
| 23 | Attachment 1 | 44 | TEMPORARY AIRFIELD CONSTRUCTION WAIVER | Being this close to the flight line, what will require FAA Approval? | ||
| Who is responsible for the temporary airfield construction waiver? | Contractor is responsible for submitting information to Dover Civil Engineering. Dover Civil Engineering will then process the FAA waiver. Dover Civil Engineering requires the information to be submitted a minimum three months before start of installation. Information required is the dates of construction, type and heights of equipment to be used, exact location of work to be completed, and the nature of work being performed. | |||||
| 24 | Attachment 1 | 46 | 3.3.3. PROTECTIVE COATINGS | |||
| All metal system component surfaces shall be protected from corrosion by painting, plating, or galvanizing. Surface preparation and color shall be as specified in Table 2. | Please provide table 2. | Table added to specification. | ||||
| 25 | Attachment 1 | 52 | 3.3.11.11 LIGHTED BARRICADES | The SOW references lighted barricades. Should these be low profile barricade similar to what would be used on the flight line? | This will be part of the Construction Waiver (FAA Waiver). The Contractor shall submit the Construction with their recommendation for meeting the requirement. Dover CE/FAA will determine the acceptability of the proposed method for barricades. | |
| 26 | Attachment 2 | 26 | 3.2.8.5.1. DUAL VERTICAL LIFT MOTOR SYSTEM | |||
| ... If a vertical lift motor system fails, maintenance personnel shall be able to disconnect it from the system in less than 10 minutes. Maintenance personnel shall be able to reconnect a vertical lift motor system in less than 10 minutes. | For the horizontal drive this was changed to 60 minutes. | |||||
| Can we assume that the same time will be applicable for the vertical drive. | Yes, specification updated. | |||||
| 27 | Attachment 2 | 27 | 3.2.8.5.6. VERTICAL SAFETY GRABS | |||
| Safety grabs shall be integrally designed into the lift system such that any loss of vertical holding force shall lock the operator platform to the support structure preventing an uncontrolled fall of the operator platform with any load up to the maximum capacity. In case of a complete power loss, the lift device, under any loading condition, shall stop and remain in position. Safety devices shall prevent an over speed condition. The safety grabs shall be mechanically activated for safety in the event of power loss, but shall also be activated by the PLC under certain conditions. The safety grabs shall be capable of being used a minimum of 100 times without reducing their effectiveness, affecting ETV performance, or requiring components to be replaced. | There will be no actuation of the safety grap by PLC. |
The safety crap is deliberately a purely mechanical activated device.
It holds the lifting platform in case of:
- lifting cable breakage
- over speed The system is certified by German TÜV.
In case of power loss the break of the lifting drive will be activated mechanically.
The break of the lifting drive can only be released if power is on. If there is no power the break holds the platform.
| The safety grab is required to be activated by the PLC under certain safety conditions, i.e. slack rope condition, platform out of level, platform location different that PLC expected location. | ||
| 28 | Attachment 2 | 3.2.8.5.7. OPERATOR PLATFORM FALL PREVENTION |
... PLC activation of the safety grabs if the measured position or velocity is inconsistent with the expected position or velocity, etc….
| Please refer to item before "3.2.8.5.6. VERTICAL SAFETY GRABS" | Don't understand the question. The requirements in paragraph 3.2.8.5.7 are firm requirements. | |||||
| 29 | Attachment 2 | 28 | 3.2.8.5.9. EMERGENCY MANUAL LOWERING | We understood from our discussion in the prebid meeting dd. 19.06.2019 that manual lowering of the lifting platform is not requested anymore. | The relief from manual lowering as specification 3.2.5.5.3.1. was a miscommunication by the Government. Manual lowering is still required as specified in paragraph 3.2.8.5.9. | |
| 30 | Attachment 2 | 29 | 3.2.10. STOP PUSH RODS | In our standard design the function to operate the storage conveyor sprocket latch is incorporated in the extractor. Please confirm that this is also possible. | Operation of the storage conveyor sprocket latch through the extractor is acceptable as long as the functionally described in paragraphs 3.1, 3.2.5, 3.4.3.7.1, 3.4.6.2, 3.4.7.2, and 3.4.7.2.1 is met. | |
| 31 | Attachment 2 | 3.3.1 POWER | Are there any known electrical feed issues with the existing ETVs? | |||
| Are there any issues with backup generators for electrical feed? | No known issues. | |||||
| 32 | Attachment 2 | 47 | 3.4. CONTROLS / 3.4.2. ICS CONTROL CONSOLE | ETV cabin main operator panel. |
The picture below shows an application example of a n ETV cabin main control panel. Our statement refers only to the desk design, pushbuttons and joysticks, etc. will be in accordance to the PD!
| Beneath the push buttons, indicator lamps and Joysticks for operator’s intervention in manual and maintenance mode, a panel (19") with resistive touch function is also part of this control station. This panel PC acted as front end for the PLC level as well as a fully client PC for all ICS functions. The Standard configuration for the ICS functions however, will be the monitoring and order functions of the ETV. Could this be a acceptable solution instead of the edge panels and the partly fissured IT front ends in the current cabins. | The pictured control cabinet "desk design" is acceptable as long as it is ergonomically designed. | ||||
| 33 | Attachment 2 | 47 | 3.4. CONTROLS / 3.4.2. ICS CONTROL CONSOLE | ETV cabin auxiliary operator panel |
The picture below shows an application example of an ETV cabin auxiliary control panel. Our statement refers only to the desk design, pushbuttons and joysticks, etc. will be in accordance to the PD!
| All push buttons, indicator lamps and Joysticks to the related section for manual and maintenance mode are provided. The free space in the center section will be used to built in the front end screen and keyboard for the ULD volume scanning device. Could this be a acceptable solution ? | The pictured ETV cabin auxiliary control panel "desk design" is acceptable as long as it is ergonomically designed. | |||
| 34 | Attachment 4 | 1 | Office Space available? No | |
| Restrooms available? No | The RFP says there are no office spaces and restrooms available? |
Please confirm that we cannot use the existing facilities.
| In this case we have to provide office and restroom containers. | Office space will NOT be provided by the Government. Contractor shall have their on facilities office space and restrooms. Note that at all times one of the maintenance bays will be dedicated for Contractor use while on site. | |||||
| 35 | Attachment 4 | 1 | Staging Space | Please indicate the location and size of the staging space in the North on the layout drawing. We consider the staging space also to be used for preinstallation of the ETV main parts. | ||
| Will there be also staging space in the south for the dismantling of the ETV? | Under roof staging space shall be limited to the maintenance areas for installation of the ETVs, either the North or the South. In addition if both new ETVs are installed at the same time a minimum of 1/3 the ETV aisle will be made available to the Contractor. Outside staging space on the North end will only be limited to the size of the existing area. The Outside staging area on the South end will be limited to the width of the PSE and twice the long a crane. | |||||
| 36 | Attachment 4 | 1 | Staging Space | There is an truck entrance to the warehouse of B550 on the North End of the PSE where the SOW says we should construct the new ETVs. Does this entrance need to be maintained during this project? | The truck entrance will be shut down during installation of the ETVs. | |
| 37 | Attachment 4 | 1 | Office Space available? No | |||
| Restrooms available? No | The RFP says there are no office spaces and restrooms available? |
Please confirm that we cannot use the existing facilities.
| In this case we have to provide office and restroom containers. | Office space will NOT be provided by the Government. Contractor shall have their on facilities office space and restrooms. Note that at all times one of the maintenance bays will be dedicated for Contractor use while on site. | |||
| 38 | General | Is a quality control manager during erection/installation required for this contract? | A site manager is required on site during installation. A separate quality control manager is not required. | |
| 39 | General | What are the requirements for meetings during installation and commissioning on this project? Will there be a progress meeting every other week? | By-weekly progress meetings are not required. The minimum requirement of progress reporting is through the monthly progress report. |