ATTACHMENT_1-FACTS_SHEET.docx

DOCX document 32 KB Posted

Attached to
VEHICLE MAINTENANCE AT ROBINS AFB, GA Federal contract opportunity
Solicitation number
FA8501-14-R-0003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

ATTACHMENT 1- FACTS SHEET IN WORD

View the file

Other files for this federal contract opportunity

Other files attached to VEHICLE MAINTENANCE AT ROBINS AFB, GA, newest first.
File Type Posted
8-Questions_and_Answers-FA8501-14-R-0003 _10DEC2014.pdf PDF
7-Questions_and_Answers-FA8501-14-R-0003 _9DEC2014.pdf PDF
6-Questions_and_Answers-FA8501-14-R-0003 _8DEC2014.pdf PDF
SITE_VISIT-Registered_Contractors_5_Dec_2014.pdf PDF
SITE_VISIT-_VEHICLE_MAINTENANCE-Registered_Contractors-22_JAN_2014.pdf PDF
SITE_VISIT-Vendors_parking.pdf PDF
5-Questions_and_Answers_25_Nov_2014.pdf PDF
AMENDMENT_0001-_21_NOV_2014.pdf PDF
4-Questions_and_Answers_18_Nov_2014.pdf PDF
Vehicle_Maint_PWS__21_Nov_2014_FINAL.pdf PDF
Attachment_6-VM_Pricing_Spreadsheet-Rev_1_18_Nov_2014FINAL.xlsx XLSX spreadsheet
AMENDMENT_0001-_21_NOV_2014.pdf PDF
3-Questions_and_Answers-FA8501-14-R-0003 _17NOV2014.pdf PDF
Vehicle_Maint_PWS__19_Nov_2014.pdf PDF
2-Questions_and_Answers-FA8501-14-R-0003 _7NOV2014.pdf PDF
1-Questions_and_Answers-FA8501-14-R-0003 _3NOV2014.pdf PDF
ATTACHMENT_5-_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
DOL_Wage_Determ_CBA-Vehicle_Maint.pdf PDF
Vehicles_CBA-_1_Aug_2014.pdf PDF
DD254_29Sep2014_FINAL.pdf PDF
Attachment_6-VM_Pricing_Spreadsheet_FINAL.xlsx XLSX spreadsheet
CDRLs__18_Sept_2014.pdf PDF
12-Vehicle_Maint_PWS__24_Sept_2014.pdf PDF
RFP_FA8501-14-R-0003_4_NOV_2014.pdf PDF
Vehicle_Maint_QASP_DRAFT_24JAN2014.docx DOCX document
Vehicle_Maint_PWS_DRAFT_24_JAN_2014.docx DOCX document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP # FA8501-14-R-0003

ATTACHMENT #1

FACTS Sheet

SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

Present/Past Performance “FACTS Sheet” (TO BE COMPLETED BY OFFEROR, JOINT VENTURE MEMBER, AND IF APPLICABLE, CRITICAL SUBCONTRACTOR)

Request the offeror/joint venture member/critical subcontractor, if applicable, complete a separate FACTS Sheet for each relevant contract. See Section L of this RFP for detailed instructions and limits on number and recency of contracts. Offeror/joint venture member/ critical subcontractor is requested to provide frank, concise comments regarding present/past performance on the program identified in B. below.

A. OFFEROR:

(1) Name (Company/Division)

(2) Address

(3) CAGE Code

B. PROGRAM/PROJECT TITLE and CONTRACT NUMBER*:

(* If contract listed is a Dept of Defense contract, then attach electronic copy of Performance Work Statement to FACTS Sheet).

C. Role of the Offeror In Effort: __________ Prime Contractor __________ Subcontractor

Note that the information provided in the FACTS Sheet shall reflect the role that the offeror/joint venture member/critical subcontractor performed in the effort, i.e. an offeror who performed as a subcontractor shall identify the contract type, dollar value, description, etc. of its subcontract with the prime contractor.

D. NAME OF CONTRACTING ACTIVITY OR CUSTOMER:

E. CONTRACT TYPE(S) – CHECK ALL THAT APPLY

a. Firm Fixed Price _____

b. Time and Materials _____

c. Cost _____

d. Other (Explain)

F. CONTRACT $ VALUE: (If you performed work as a subcontractor, identify your contract $ value and the PRIME’s contract $ value, if known. Describe any changes in dollar value that may have occurred from time of contract award to the conclusion of the effort or the present, whichever is applicable.)

1. Original Contract Dollar Value:

2. Current Dollar Value:

3. If Award Fee Contract, what percentages of the fee have been awarded in each of last 3 years?

G. PERIOD OF PERFORMANCE: (includes start and end dates, i.e. Jan 2004 – Dec 2007)

1. Original Schedule:

2. Current Schedule (if changed):

3. Estimated percentage of completion:

4. How many times changed and primary causes of changes:

H. BRIEF DESCRIPTION OF EFFORT:

1. As a part of this narrative description, highlight portions considered most relevant to the current acquisition; addressing how and to what extent the proposed effort relates to the program identified in B. above. To supplement the data provided in response to this paragraph, complete the following regarding relevancy of the effort identified in paragraph B to the proposed effort. This is limited to two pages beyond the page limitation of the FACTS sheet information.

2. This paragraph shall also include details to support the offeror’s record for on-time delivery, technical quantity and cost control for this effort identified in paragraoh B. above.

I. RELEVANCY TABLE:

The Relevancy Table on the following page will assist the PCO in evaluating the relevancy of the proposed effort to the Vehicle Maintenance service requirement at Robins AFB, GA. Offeror/joint venture member/critical subcontractor, if applicable, shall only complete column three. Offeror’s/joint venture member’s/critical subcontractor’s answers are applicable only to the effort identified in paragraph B. above, not the offeror’s/joint venture member’s/critical subcontractor’s proposed solutions to the instant effort. If additional space is needed, please attach a separate sheet to your response (limited to two pages).

RELEVANCY TABLE

Complete with each effort submitted for evaluation. Please follow guidance in paragraph H above.)

Category
The Proposed Effort

Requires:

(DO NOT CHANGE)

Fill-in for the Effort Identified in paragraph B above (Offeror completes) The effort in paragraph B required:

1. Nature of Business Area(s) Involved
Services
Circle all that apply
Service
Manufacture
Production

2. Required Level of Technology

Noncommercial
Circle one
Commercial
Noncommercial

3. Requiring activity of contract

Air Force
Circle all that apply
Air Force
Branch of DoD
other

4. Contract Requirements

4a. Vehicle Maintenance
850 vehicles
Number of vehicles_________
3b. In-commission rate
90%
________%
4c. Fleet Management
1,000 vehicles
Number of vehicles_________
3d. Scheduled maintenance-Turn around rate
0-24 vehicle turn around rate of 60%
4e. Scheduled maintenance performed on different types of vehicles
Emergency response, material handling, construction & general purpose
Circle all types of vehicles that apply
Emergency response
Material Handling
Construction
General purpose
4f. Unscheduled maintenance performed on different types of vehicles
Emergency response, material handling, construction & general purpose
Circle all types of vehicles that apply
Emergency response
Material Handling
Construction
General purpose
4g. Corrosion Control/Allied Trade services*
PWS
Circle one
Yes
No

4h. HAZMAT Pharmacy*

PWS

Circle one

Yes
No

5. Material Control Functions

5a. Material Functions

Order/Inventory/Track Parts
Circle all that apply
Order
Inventory
Track

5b. Estimated Monthly Costs of Parts

~$40K/Month
$____________/Month
6. Contract Type(s)
FFP
Circle One
Firm Fixed Type
Cost Type

*As described in the Performance Work Statement

3. If you are small business, or, if you are a large business and a Small Business Subcontracting Plan per FAR 52.219-9 was NOT required by this effort, indicate your compliance with FAR 52.219-8, Utilization of Small Business Concerns, by completing the following. That is, when subcontracting possibilities existed on this effort, did you award subcontracts to small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns to the fullest extent consistent with efficient contract performance? If FAR 52.219-8 was NOT included in this effort, whenever subcontracting possibilities existed in the performance of this effort, address whether or not it was your policy to utilize small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns to the fullest extent consistent with efficient contract performance.

Utilization of Small Business Concerns
Small Business
Large Business

No subcontracting possibilities

In compliance

Not in compliance (address why)

4. If you are a large business, identify whether a subcontracting plan in accordance with FAR 52.219-9, Small Business Subcontracting Plan, was required by this effort. If one was required, complete the following regarding subcontracting goals and status-to-date. If goals were not met, please explain. This is applicable to large businesses only.

_____ Required

_____ Not Required

Category
Goals
Achieved-to-Date

Small Business

Small Disadvantaged Business

Women-Owned Small Business

HUBZone Small Business

Veteran-Owned Small Business

Service-Disabled Veteran Owned Small Business

HBCU/MI

K. PRIMARY POINTS OF CONTACT: (The offeror/joint venture member/critical subcontractor is responsible for exerting its best efforts to ensure that current information is provided for all individuals.)

Name and Office Symbol
Phone Number
FAX Number
1. Procuring Contracting Officer
DSN & Comm
DSN & Comm
2. Program Manager
DSN & Comm
DSN & Comm
3. Administrative Contracting Officer
DSN & Comm
DSN & Comm
4. Other (Please Specify)
DSN & Comm
DSN & Comm

L. If the offeror, joint venture member or critical subcontractor (if applicable) is a newly formed (in existence less than (3) years from the issuance date of this solicitation) entity who either has no prior contracts or does not possess relevant corporate past performance, but does have key personnel with relevant past performance while employed by another company, specify by name, such key individual(s) who will participate in the proposed effort under this acquisition who also participated in the program identified in B. above, and indicate their contract role. Describe how participation of these key personnel contributed to the success of the previous effort and how this indicates probability of success on the proposed effort.

M. Use this space to address any aspect about this program considered unique. Describe quality awards or certifications that indicate the offeror possesses a high-quality process for developing and producing the product/service required.

N. Summarize contract issues relative to the number and severity of quality deficiencies recorded/contract discrepancy reports issued, cure notices, show cause letters, termination for default or cause, disputes, claims, latent defects; and, corrective actions taken for the contract listed in paragraph B. above.

P. Additionally, for those efforts where you are cognizant of unfavorable and/or marginal past performance ratings/reports previously assessed by customers or clients, but feel that significant progress has been made but not yet credited or formally documented, provide the program name, contract number, customer location and a narrative explaining "fixes" made to date, or any other information regarding the unfavorable/marginal assessment. This narrative portion is limited to one (1) additional page beyond the FACTS sheet required page limitation. It is not presumed that performance has been perfect. Rather, the proposal should contain evidence of the offeror's/joint venture member’s/critical subcontractor’s ability to isolate the root causes of problems and should describe programs or actions taken to resolve those causes. Demonstrated corrective actions (not just planned or promised), and the overall work record will be considered. Problems not addressed, but found by the Government during the evaluation of the information in this volume, will be assumed to still exist. Note: In the case of Contractor Performance Assessment Report System (CPARS), if your input has already been provided and the rationale/ circumstances have not changed, DO NOT repeat them here.

Q. Was this contract effort (as identified in paragraph B. above) submitted as a past performance source of data for a previous WR-ALC procurement. Yes _ No _ . If yes, identify the buyer and/or contracting officer, their phone number and office symbol and solicitation number of the procurement for which this effort was submitted.

PLEASE NOTE: The Government is not bound by the offeror's opinion of relevancy. The Government will perform an independent assessment of relevancy of the data provided or obtained.

SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .