7-Questions_and_Answers-FA8501-14-R-0003 _9DEC2014.pdf

PDF 114 KB Posted

Attached to
VEHICLE MAINTENANCE AT ROBINS AFB, GA
Solicitation number
FA8501-14-R-0003
Issued by

About this file

Additional questions and answers regarding RFP FA8501-14-R-0003 9DEC2014

View the file

Other files

File Type Posted
8-Questions_and_Answers-FA8501-14-R-0003 _10DEC2014.pdf PDF
6-Questions_and_Answers-FA8501-14-R-0003 _8DEC2014.pdf PDF
SITE_VISIT-_VEHICLE_MAINTENANCE-Registered_Contractors-22_JAN_2014.pdf PDF
SITE_VISIT-Registered_Contractors_5_Dec_2014.pdf PDF
SITE_VISIT-Vendors_parking.pdf PDF
5-Questions_and_Answers_25_Nov_2014.pdf PDF
AMENDMENT_0001-_21_NOV_2014.pdf PDF
4-Questions_and_Answers_18_Nov_2014.pdf PDF
Attachment_6-VM_Pricing_Spreadsheet-Rev_1_18_Nov_2014FINAL.xlsx XLSX spreadsheet
AMENDMENT_0001-_21_NOV_2014.pdf PDF
Vehicle_Maint_PWS__21_Nov_2014_FINAL.pdf PDF
3-Questions_and_Answers-FA8501-14-R-0003 _17NOV2014.pdf PDF
Vehicle_Maint_PWS__19_Nov_2014.pdf PDF
2-Questions_and_Answers-FA8501-14-R-0003 _7NOV2014.pdf PDF
ATTACHMENT_1-FACTS_SHEET.docx DOCX document
ATTACHMENT_5-_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
1-Questions_and_Answers-FA8501-14-R-0003 _3NOV2014.pdf PDF
DOL_Wage_Determ_CBA-Vehicle_Maint.pdf PDF
Vehicles_CBA-_1_Aug_2014.pdf PDF
DD254_29Sep2014_FINAL.pdf PDF
Attachment_6-VM_Pricing_Spreadsheet_FINAL.xlsx XLSX spreadsheet
CDRLs__18_Sept_2014.pdf PDF
12-Vehicle_Maint_PWS__24_Sept_2014.pdf PDF
RFP_FA8501-14-R-0003_4_NOV_2014.pdf PDF
Vehicle_Maint_PWS_DRAFT_24_JAN_2014.docx DOCX document
Vehicle_Maint_QASP_DRAFT_24JAN2014.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8501‐14‐R‐0003‐ SUBMITTED QUESTIONS AND ANSWERS

9 Dec 2014

Reference: Section M, Evaluation Factors for Award, Para. 2.1.C, Past Performance Factor

Paragraph 1, sentence 6: For purposes of this evaluation, recency is defined as active or completed efforts performed within the past three (3) years from the issuance date of this solicitation.

Question: Given the presolicitation occurred in Jan 2014 and the incumbent was extended via

J&A to July 2015, would the government consider altering the definition of recency to “is defined as active or completed efforts performed within the past three (3) years from the issuance date of the presolicitation.”

Answer: As you’ve already noted, Section M says recency is defined as active or completed efforts performed within the past 3 years from the issuance of this solicitation, not the synopsis. I’m sorry, but we will not be changing the relevancy definition.

Reference: PWS 1.1.1.2.2. On‐site Maintenance.

PWS Sentence: The contractor shall provide on‐site scheduled maintenance on vehicles and equipment, which cannot economically be delivered to maintenance facility because of design or immobility.

Question/Statement: The term “on‐site” is confusing and has multiple meanings. Please clarify.

Answer: The term “on‐site” as used in this PWS refers to the location the asset is physically located, ie; inside building 319, taxiway, etc…

Reference: PWS 4.14.2 Chemical Site Manager.

PWS Sentence: Contractor shall appoint a chemical site manager and alternate for each assigned Chemical Site. The contractor shall provide site specific spill plans for each assigned chemical site. Contractor shall obtain applicable training and maintain certification for all assigned chemical site managers and alternates.

Question/Statement: What does the USAF intend by the term "Site"? How many “chemical sites” are there?

Answer: The term "Site" is defined as a location where chemicals are accumulated/stored.

Vehicle management has a total of 12 sites to include one 90 day accumulation site.

Reference: PWS 4.15.1. Compliance.

PWS Sentence: Contractor shall comply with AFI 32‐7042 and Facilities Response Plan (FRP) 19‐

2, AFI 32‐7080, AFI 32‐7086, RAFBI 32‐2001 and RAFB Hazardous Material Management Plan for the handling, storage and disposal of hazardous materials….

Question/Statement: Will the USAF provide the Robins AFB specific plans/instructions/documents?

Answer: Yes; The USAF will provide the most current reference material to include AFIs, FRP, RAFBI and RAFB. The contractor will be responsible in developing the site specific plan.

Reference: PWS 4.15.2. Alternative Fuels.

PWS Sentence: Refuel government owned, leased bi‐fuel and flex fuel/alternative fuel vehicles with alternative fuel to the maximum extent practicable.

Question/Statement: Are alternative fuels provided by the USG?

Answer: Yes; Alternative fuel is available and provided for USG owned/leased vehicles.

Reference: PWS 4.15.3. RAFB Municipal Solid Waste Management Plan.

PWS Sentence: Contractor shall comply with the "Municipal Solid Waste Management Plan" requirements; specifically the recycling and Chapter 4.4, Section II, Part B‐Vehicular Products.

Question/Statement: Will the USG provide a copy of this plan?

Answer: The plan is available at http://www.epa.gov/wastes/conserve/tools/cpg/pdf/rmanal3.pdf

File details come from the government source that posted it. Updated .