Summary: TAFB Technical Specifications 2019 – Section 26 42 14.00 10 – Cathodic Protection System (Sacrificial Anode)

This document is a technical specification for the design, installation, testing, and commissioning of a complete sacrificial anode cathodic protection system at Tinker Air Force Base, Oklahoma. The system is intended to protect underground metallic water, fire protection, force main, and gas pipelines, including lines under concrete slabs and their associated components, from corrosion in compliance with NFPA 70, 49 CFR 192 (gas pipelines), 49 CFR 195 (hazardous liquid pipelines), and 40 CFR 280 (underground fuel storage tanks). The contractor must engage a NACE-accredited corrosion specialist or certified cathodic protection specialist to supervise installation and conduct a minimum of three site visits: an initial assessment including soil resistivity testing; a pre-installation review; and a final testing and training session. System design must achieve a minimum "instant off" potential of minus 850 millivolts (measured against a saturated copper-copper sulfate reference cell) over 95 percent of metallic surfaces without exceeding 1,150 millivolts, and the anode system must be designed for 25 years of continuous operation.

The specification requires installation of magnesium sacrificial anodes conforming to ASTM B843, with minimum unpackaged weights of 17 pounds per anode (or 917 pounds for certain change-of-direction devices). Anodes must be positioned 8 to 10 feet from protected pipelines and installed with water-permeable, gypsum/bentonite-based backfill packages. All metallic components—including pipes under concrete slabs, fire hydrants, valves, connectors, and change-of-direction devices—must have adequate anode coverage to maintain protection criteria. The contractor must submit detailed shop drawings, conduct electrical isolation testing at all insulating flanges and joints, perform close-interval potential surveys, holiday testing on all pipe coatings per NACE SP0188, interference testing with foreign pipes, and provide comprehensive operation and maintenance manuals with as-built drawings. Installation must comply with specified electrical standards, use exothermic welding or approved connectors for all bonds and lead wire connections, and include test stations at specified intervals (minimum 1,000-foot spacing) with GPS coordinates. Final acceptance requires demonstration that the system meets protection criteria over 95 percent of metallic surfaces, completion of staff training (48 hours minimum), and submission of all test reports in tabulated form documenting baseline potentials, isolation testing results, anode output measurements, and reference electrode potential measurements.

View the file

Other files

File Type Posted
03 39 00.00 10.pdf PDF
03 62 16.pdf PDF
04 20 00.pdf PDF
05 21 00.pdf PDF
06 20 00.pdf PDF
06 61 16.pdf PDF
07 60 00.pdf PDF
07 61 14.00 20.pdf PDF
07 84 00.pdf PDF
07 92 00.pdf PDF
08 11 16.pdf PDF
08 36 13.pdf PDF
08 71 00.pdf PDF
09 68 00.pdf PDF
10 28 13.pdf PDF
13 48 00.pdf PDF
21 13 17.pdf PDF
22 00 00.pdf PDF
23 00 00.pdf PDF
23 08 00.pdf PDF
23 11 25.pdf PDF
23 35 00.pdf PDF
23 64 26.pdf PDF
23 82 16.00 40.pdf PDF
23 82 43.00 40.pdf PDF
26 56 00.pdf PDF
31 23 06.pdf PDF
32 01 14.pdf PDF
32 13 74.pdf PDF
02 41 00.pdf PDF
06 10 00.pdf PDF
07 12 00.pdf PDF
07 42 13.pdf PDF
07 42 63.pdf PDF
07 53 23.pdf PDF
07 54 19.pdf PDF
07 62 13.pdf PDF
08 41 13.pdf PDF
08 51 13.pdf PDF
08 51 23.pdf PDF
09 51 00.pdf PDF
00 71 00.pdf PDF
01 78 23.pdf PDF
00 72 00.pdf PDF
00 80 00.pdf PDF
Solicitation - FA813726R0030.pdf PDF
Att10_190023_SOW.pdf PDF
EAL List - BLANK to Contractors WWYK190023.xlsx XLSX spreadsheet
Att11_190023_Submittal Register_Final.pdf PDF
Wage Determination.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 26 42 14. 00 10

CATHODI C PROTECTI ON SYSTEM ( SACRI FI CI AL ANODE)

04/17

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

ASTM I NTERNATI ONAL ( ASTM)

ASTM B418 ( 2012) St andar d Speci f i cat i on f or Cast and Wr ought Gal vani c Zi nc Anodes

ASTM B843 ( 2013) St andar d Speci f i cat i on f or Magnesi um Al l oy Anodes f or Cat hodi c Protection

ASTM D1248 ( 2012) St andar d Speci f i cat i on f or Pol yet hyl ene Pl ast i cs Ext r usi on Mat er i al s f or Wi r e and Cabl e

NACE I NTERNATI ONAL ( NACE)

NACE RP0193 ( 2001) Ext er nal Cat hodi c Pr ot ect i on of On- Gr ade Car bon St eel St or age Tank Bot t oms

NACE SP0169 ( 2015) Cont r ol of Ext er nal Cor r osi on on Under gr ound or Submer ged Met al l i c Pi pi ng Systems

NACE SP0177 ( 2014) Mi t i gat i on of Al t er nat i ng Cur r ent and Li ght ni ng Ef f ect s on Met al l i c St r uct ur es and Cor r osi on Cont r ol Syst ems

NACE SP0188 ( 1999; R 2006) Di scont i nui t y ( Hol i day) Test i ng of New Pr ot ect i ve Coat i ngs on Conduct i ve Subst r at es

NACE SP0285 ( 2011) Ext er nal Cor r osi on Cont r ol of Under gr ound St or age Tank Syst ems by Cat hodi c Pr ot ect i on

NATI ONAL ELECTRI CAL MANUFACTURERS ASSOCI ATI ON ( NEMA)

NEMA TC 2 ( 2013) St andar d f or El ect r i cal Pol yvi nyl Chl or i de ( PVC) Condui t

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

NFPA 70 ( 2014; AMD 1 2013; Er r at a 1 2013; AMD 2 2013; Er r at a 2 2013; AMD 3 2014; Er r at a 3- 4 2014; AMD 4- 6 2014) Nat i onal

Apr i l 2019 Page 1 SECTI ON 26 42 14. 00 10

El ect r i cal Code

U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)

40 CFR 280 Techni cal St andar ds and Cor r ect i ve Act i on Requi r ement s f or Owner s and Oper at or s of Under gr ound St or age Tanks ( UST)

49 CFR 192 Tr anspor t at i on of Nat ur al and Ot her Gas by Pi pel i ne: Mi ni mum Feder al Saf et y St andar ds

49 CFR 195 Tr anspor t at i on of Hazar dous Li qui ds by Pipeline

UNDERWRI TERS LABORATORI ES ( UL)

UL 510 ( 2005; Repr i nt Jul 2013) Pol yvi nyl Chl or i de, Pol yet hyl ene and Rubber I nsul at i ng Tape

UL 514A ( 2013) Met al l i c Out l et Boxes

UL 6 ( 2007; Repr i nt Nov 2014) El ect r i cal Ri gi d Met al Condui t - St eel

1. 2 SUBMITTALS

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 02 Shop Dr awi ngs

Drawings Cont r act or ' s Modi f i cat i ons

SD- 03 Pr oduct Dat a

Equipment Spar e Par t s

SD- 06 Test Repor t s

Test s and Measur ement s

SD- 07 Cer t i f i cat es

Cat hodi c Pr ot ect i on Syst em Ser vi ces of " Cor r osi on Exper t "

SD- 10 Oper at i on and Mai nt enance Dat a

Cat hodi c Pr ot ect i on Syst em Tr ai ni ng Cour se

Apr i l 2019 Page 2 SECTI ON 26 42 14. 00 10

1. 3 QUALI TY ASSURANCE

1. 3. 1 Ser vi ces of " Cor r osi on Exper t "

Obt ai n t he ser vi ces of a " cor r osi on exper t " t o super vi se, i nspect , and t est t he i nst al l at i on and per f or mance of t he cat hodi c pr ot ect i on syst em.

" Cor r osi on exper t " r ef er s t o a per son, who by t hor ough knowl edge of t he physi cal sci ences and t he pr i nci pl es of engi neer i ng and mat hemat i cs, acqui r ed by pr of essi onal educat i on and r el at ed pr act i cal exper i ence, i s qual i f i ed t o engage i n t he pr act i ce of cor r osi on cont r ol of bur i ed or submer ged met al l i c sur f aces.

a. Such a per son must be accr edi t ed or cer t i f i ed by t he Nat i onal Associ at i on of Cor r osi on Engi neer s ( NACE) as a NACE Accr edi t ed Cor r osi on Speci al i st or a NACE cer t i f i ed Cat hodi c Pr ot ect i on ( CP) Speci al i st or be a r egi st er ed pr of essi onal engi neer who has cer t i f i cat i on or l i censi ng t hat i ncl udes educat i on and exper i ence i n cor r osi on cont r ol of bur i ed or submer ged met al l i c pi pi ng and t ank syst ems, i f such cer t i f i cat i on or l i censi ng i ncl udes 5 year s exper i ence i n cor r osi on cont r ol on under gr ound met al l i c sur f aces of t he t ype under t hi s cont r act .

b. The " cor r osi on exper t " shal l make at l east 3 v i s i t s t o t he pr oj ect s i t e. The f i r st of t hese vi s i t s shal l i ncl ude obt ai ni ng soi l r esi st i v i t y dat a, acknowl edgi ng t he t ype of pi pel i ne coat i ngs t o be used and r epor t i ng t o t he Cont r act or t he t ype of cat hodi c pr ot ect i on r equi r ed. Once t he submi t t al s ar e appr oved and t he mat er i al s del i ver ed, t he " cor r osi on exper t " shal l r evi s i t t he s i t e t he ensur e t he Cont r act or under st ands i nst al l at i on pr act i ces and l ayi ng out t he component s. The t hi r d v i s i t shal l i nvol ve t est i ng t he i nst al l ed cat hodi c pr ot ect i on syst ems and t r ai ni ng appl i cabl e per sonnel on pr oper mai nt enance t echni ques. The " cor r osi on exper t " shal l super vi se i nst al l at i on and t est i ng of al l cat hodi c pr ot ect i on.

c. Submi t evi dence of qual i f i cat i ons of t he " cor r osi on exper t " i ncl udi ng i t s name and qual i f i cat i ons cer t i f i ed i n wr i t i ng t o t he Cont r act i ng Of f i cer pr i or t o t he st ar t of const r uct i on. Cer t i f i cat i on shal l be submi t t ed gi v i ng t he name of t he f i r m, t he number of year s of exper i ence, and a l i s t of not l ess t han f i ve ( 5) of t he f i r m' s i nst al l at i ons, t hr ee ( 3) or mor e year s ol d, t hat have been t est ed and f ound sat i sf act or y.

1. 3. 2 Isolators

I sol at or s ar e r equi r ed t o i nsul at e t he i ndi cat ed pi pes f r om any ot her st r uct ur e. I sol at or s shal l be pr ovi ded wi t h l i ght ni ng pr ot ect i on and a t est st at i on as shown.

1. 3. 3 Anode and Bond Wi r es

A mi ni mum of speci f i ed magnesi um anodes wi t h an unpackaged wei ght of speci f i ed pounds shal l be pr ovi ded uni f or m di st ances al ong t he met al l i c pi pe l i nes. A mi ni mum of speci f i ed t est st at i ons shal l be used f or t hese anodes. These anodes shal l be i n addi t i on t o anodes f or t he pi pe under concr et e s l ab and casi ng r equi r ement s. For each cat hodi c syst em, t he met al l i c component s and st r uct ur es t o be pr ot ect ed shal l be made el ect r i cal l y cont i nuous. Thi s shal l be accompl i shed by i nst al l i ng bond wi r es bet ween t he var i ous st r uct ur es. Bondi ng of exi st i ng bur i ed st r uct ur es may al so be r equi r ed t o pr ecl ude det r i ment al st r ay cur r ent

Apr i l 2019 Page 3 SECTI ON 26 42 14. 00 10 ef f ect s and saf et y hazar ds. Pr ovi s i ons shal l be i ncl uded t o r et ur n st r ay cur r ent t o i t s sour ce wi t hout damagi ng st r uct ur es i nt er cept i ng t he st r ay cur r ent . The el ect r i cal i sol at i on of under gr ound f aci l i t i es i n accor dance wi t h accept abl e i ndust r y pr act i ce shal l be i ncl uded under t hi s sect i on.

Al l t est s shal l be wi t nessed by t he Cont r act i ng Of f i cer .

1. 3. 4 Sur ge Pr ot ect i on

Appr oved zi nc gr oundi ng cel l s or seal ed weat her pr oof l i ght ni ng ar r est or devi ces shal l be i nst al l ed acr oss i nsul at ed f l anges or f i t t i ngs i nst al l ed i n under gr ound pi pi ng as i ndi cat ed on t he dr awi ngs. The ar r est or shal l be gapl ess, sel f - heal i ng, sol i d st at e t ype. Zi nc anode composi t i on shal l conf or m t o ASTM B418, Type I I . Lead wi r es shal l be number 6 AWG copper wi t h hi gh mol ecul ar wei ght pol yet hyl ene ( HMWPE) i nsul at i on. The zi nc gr oundi ng cel l s shal l not be pr epackaged i n backf i l l but shal l be i nst al l ed as det ai l ed on t he dr awi ngs. Li ght ni ng ar r est or s or z i nc gr oundi ng cel l s ar e not r equi r ed f or i nsul at ed f l anges on met al l i c component s used on nonmet al l i c pi pi ng syst ems.

1. 3. 5 Nonmet al l i c Pi pe Syst em

I n t he event pi pe ot her t han met al l i c pi pe i s appr oved and used i n l i eu of met al l i c pi pe, al l met al l i c component s of t hi s pi pe syst em shal l be pr ot ect ed wi t h cat hodi c pr ot ect i on. Det ai l ed dr awi ngs of cat hodi c pr ot ect i on f or each component shal l be submi t t ed t o t he Cont r act i ng Of f i cer f or appr oval wi t hi n 45 days af t er dat e of r ecei pt of not i ce t o pr oceed, and bef or e commencement of any wor k.

1. 3. 5. 1 Coatings

Coat i ngs f or met al l i c component s shal l be as r equi r ed f or met al l i c f i t t i ngs. Pr ot ect i ve cover i ng ( coat i ng and t api ng) shal l be compl et ed and t est ed on each met al l i c component ( such as val ves, hydr ant s and f i l l i ngs) . Thi s cover i ng shal l be as r equi r ed f or under gr ound met al l i c pi pe. Each t est shal l be wi t nessed by t he Cont r act i ng Of f i cer . Coat i ngs shal l be sel ect ed, appl i ed, and i nspect ed as speci f i ed i n t hese speci f i cat i ons. The use of nonmet al l i c pi pe does not change ot her r equi r ement s of t he speci f i cat i ons. Any devi at i ons due t o t he use of nonmet al l i c pi pe shal l be submi t t ed f or appr oval .

1. 3. 5. 2 Tr acer Wi r e

When a nonmet al l i c pi pe l i ne i s used t o ext end or add t o an exi st i ng met al l i c l i ne, an i nsul at ed No. 8 AWG copper wi r e shal l be t her mi t - wel ded t o t he exi st i ng met al l i c l i ne and r un t he l engt h of t he new nonmet al l i c l i ne. Thi s wi r e shal l be used as a l ocat or t r acer wi r e and t o mai nt ai n cont i nui t y t o any f ut ur e ext ensi ons of t he pi pe l i ne.

1. 3. 6 Drawings

Submi t det ai l ed dr awi ngs consi st i ng of a compl et e l i s t of equi pment and mat er i al i ncl udi ng manuf act ur er ' s descr i pt i ve and t echni cal l i t er at ur e, cat al og cut s, r esul t s of syst em desi gn cal cul at i ons i ncl udi ng soi l - r esi st i v i t y, i nst al l at i on i nst r uct i ons and cer t i f i ed t est dat a showi ng l ocat i on of anodes and st at i ng t he maxi mum r ecommended anode cur r ent out put densi t y. I ncl ude i n t he det ai l dr awi ngs compl et e wi r i ng and schemat i c di agr ams, i nsul at ed f i t t i ngs, t est st at i ons, per manent r ef er ence cel l s, and bondi ng. and any ot her det ai l s r equi r ed t o demonst r at e t hat t he syst em has been coor di nat ed and wi l l f unct i on pr oper l y as a

Apr i l 2019 Page 4 SECTI ON 26 42 14. 00 10 uni t . Locat i ons shal l be r ef er enced t o t wo ( 2) per manent f aci l i t i es or mar k poi nt s.

1. 4 DELI VERY, STORAGE, AND HANDLI NG

St or age ar ea f or magnesi um anodes wi l l be desi gnat ed by t he Cont r act i ng Of f i cer . I f anodes ar e not st or ed i n a bui l di ng, t ar ps or s i mi l ar pr ot ect i on shoul d be used t o pr ot ect anodes f r om i ncl ement weat her .

Packaged anodes, damaged as a r esul t of i mpr oper handl i ng or bei ng exposed t o r ai n, shal l be r esacked and t he r equi r ed backf i l l added.

1. 5 EXTRA MATERI ALS

Af t er appr oval of shop dr awi ngs, and not l at er t han t hr ee ( 3) mont hs pr i or t o t he dat e of benef i c i al occupancy, f ur ni sh spar e par t s dat a f or each di f f er ent i t em of mat er i al and equi pment speci f i ed, af t er appr oval of det ai l dr awi ngs and not l at er t han si x ( 6) mont hs pr i or t o t he dat e of benef i c i al occupancy. The dat a shal l i ncl ude a compl et e l i s t of par t s, speci al t ool s, and suppl i es, wi t h cur r ent uni t pr i ces and sour ce of suppl y. One ( 1) spar e anode of each t ype shal l be f ur ni shed. I n addi t i on, suppl y i nf or mat i on f or mat er i al and equi pment r epl acement f or al l ot her component s of t he compl et e syst em, i ncl udi ng anodes, cabl es, spl i ce k i t s and connect or s, cor r osi on t est st at i ons, and any ot her component s not l i s t ed above.

PART 2 PRODUCTS

2. 1 SYSTEM DESCRI PTI ON

Pr ovi de a compl et e, oper at i ng, sacr i f i c i al anode cat hodi c pr ot ect i on syst em i n compl et e compl i ance wi t h NFPA 70, wi t h al l appl i cabl e Feder al , St at e, and l ocal r egul at i ons and wi t h t he mi ni mum r equi r ement s of t hi s cont r act .

a. I n addi t i on t o t he mi ni mum r equi r ement s of t hese speci f i cat i ons, const r uct i on of gas pi pel i nes and associ at ed cat hodi c pr ot ect i on syst ems shal l be i n compl i ance wi t h 49 CFR 192 and const r uct i on of hazar dous l i qui d pi pel i nes, i ncl udi ng f uel pi pel i nes, and associ at ed cat hodi c pr ot ect i on syst ems shal l be i n compl i ance wi t h 49 CFR 195 and const r uct i on and i nst al l at i on of under gr ound f uel st or age t anks and associ at ed cat hodi c pr ot ect i on syst em shal l be i n compl i ance wi t h

40 CFR 280.

b. The ser vi ces r equi r ed i ncl ude pl anni ng, i nst al l at i on, adj ust i ng and t est i ng of a cat hodi c pr ot ect i on syst em, usi ng sacr i f i c i al anodes f or cat hodi c pr ot ect i on of t he Wat er , Fi r e Pr ot ect i on, For ce Mai n, Gas, l i nes, as speci f i ed, t hei r connect or s and l i nes under t he s l ab or f l oor f oundat i on. The cat hodi c pr ot ect i on syst em shal l i ncl ude anodes, cabl es, connect or s, cor r osi on pr ot ect i on t est st at i ons, and any ot her equi pment r equi r ed f or a compl et e oper at i ng syst em pr ovi di ng t he NACE cr i t er i a of pr ot ect i on as speci f i ed.

c. I nsul at or s ar e r equi r ed whenever needed t o i nsul at e t he pi pes f r om any ot her st r uct ur e. Any pi pe cr ossi ng t he speci f i ed pi pe shal l have a t est st at i on. The cat hodi c pr ot ect i on shal l be pr ovi ded on Wat er , Fi r e Pr ot ect i on, For ce Mai n, and Gas pi pes as speci f i ed.

d. Submi t pr oof t hat t he mat er i al s and equi pment f ur ni shed under t hi s sect i on conf or m t o t he speci f i ed r equi r ement s cont ai ned i n t he r ef er enced st andar ds or publ i cat i ons. The l abel or l i s t i ng by t he

Apr i l 2019 Page 5 SECTI ON 26 42 14. 00 10 speci f i ed agency wi l l be accept abl e evi dence of such compl i ance.

e. Bef or e f i nal accept ance of t he cat hodi c pr ot ect i on syst em, submi t 4 copi es of oper at i ng manual s out l i ni ng t he st ep- by- st ep pr ocedur es r equi r ed f or syst em st ar t up, oper at i on, adj ust ment of cur r ent f l ow, and shut down. The manual s shal l i ncl ude t he manuf act ur er ' s name, model number , ser vi ce manual , par t s l i s t , and br i ef descr i pt i on of al l equi pment and t hei r basi c oper at i ng f eat ur es.

f . Submi t 4 copi es of mai nt enance manual s, l i s t i ng r out i ne mai nt enance pr ocedur es, r ecommendat i on f or mai nt enance t est i ng, possi bl e br eakdowns and r epai r s, and t r oubl eshoot i ng gui des. The manual s shal l i ncl ude si ngl e- l i ne di agr ams f or t he syst em as i nst al l ed; i nst r uct i ons i n maki ng pi pe- t o- r ef er ence cel l and t ank- t o- r ef er ence cel l pot ent i al measur ement s and f r equency of moni t or i ng; i nst r uct i ons f or di el ect r i c connect i ons, i nt er f er ence and sacr i f i c i al anode bonds; i nst r uct i ons shal l i ncl ude pr ecaut i ons t o ensur e saf e condi t i ons dur i ng r epai r of pi pe or ot her met al l i c syst ems. The i nst r uct i ons shal l be neat l y bound bet ween per manent cover s and t i t l ed " Oper at i ng and Mai nt enance I nst r uct i ons. " These i nst r uct i ons shal l be submi t t ed f or t he Cont r act i ng Of f i cer ' s appr oval . The i nst r uct i ons shal l i ncl ude t he following:

( 1) As- bui l t dr awi ngs, t o scal e, of t he ent i r e syst em, showi ng t he l ocat i ons of t he pi pi ng, l ocat i on of al l anodes and t est st at i ons, l ocat i ons of al l i nsul at i ng j oi nt s, and st r uct ur e- t o- soi l pot ent i al t est poi nt s as measur ed dur i ng t he t est s r equi r ed by par agr aph TESTS AND MEASUREMENTS. Each t est poi nt shal l be gi ven a uni que al phanumer i c i dent i f i cat i on t hat i s cr oss r ef er enced t o t he dat a sheet s.

( 2) Recommendat i ons f or mai nt enance t est i ng, i ncl udi ng i nst r uct i ons i n maki ng pi pe- t o- r ef er ence cel l pot ent i al measur ement s and f r equency of t est i ng.

( 3) Al l mai nt enance and oper at i ng i nst r uct i ons and namepl at e dat a shal l be i n Engl i sh.

( 4) I nst r uct i ons shal l i ncl ude pr ecaut i ons t o i nsur e saf e condi t i ons dur i ng r epai r of pi pe syst em.

2. 1. 1 Cont r act or ' s Modi f i cat i ons

The speci f i ed syst em i s based on a compl et e syst em wi t h magnesi um sacr i f i c i al anodes. The Cont r act or may modi f y t he cat hodi c pr ot ect i on syst em af t er r evi ew of t he pr oj ect , s i t e ver i f i cat i on, and anal ysi s, i f t he pr oposed modi f i cat i ons i ncl ude t he anodes speci f i ed and wi l l pr ovi de bet t er over al l syst em per f or mance.

a. Submi t 4 copi es of det ai l dr awi ngs showi ng pr oposed changes i n l ocat i on, scope of per f or mance i ndi cat i ng any var i at i ons f r om, addi t i ons t o, or c l ar i f i cat i ons of cont r act dr awi ngs. Show pr oposed changes i n anode ar r angement , anode si ze and number , anode mat er i al s and l ayout det ai l s, condui t s i ze, wi r e s i ze, mount i ng det ai l s, wi r i ng di agr am, met hod f or el ect r i cal l y- i sol at i ng each pi pe, and any ot her per t i nent i nf or mat i on t o pr oper i nst al l at i on and per f or mance of t he syst em. The modi f i cat i ons shal l be f ul l y descr i bed, shal l be appr oved by t he Cont r act i ng Of f i cer , and shal l meet t he f ol l owi ng cr i t er i a.

Apr i l 2019 Page 6 SECTI ON 26 42 14. 00 10

b. The pr oposed syst em shal l achi eve a mi ni mum pi pe- t o- soi l " i nst ant of f " pot ent i al of mi nus 850 mi l l i vol t s wi t h r ef er ence t o a sat ur at ed copper - copper sul f at e r ef er ence cel l on t he under gr ound component s of t he pi pi ng or ot her met al l i c sur f ace. Take r esi st i v i t y measur ement s of t he soi l i n t he v i c i ni t y of t he pi pes and gr ound bed si t es. Based upon t he measur ement s t aken, t he cur r ent and vol t age shal l be r equi r ed t o pr oduce a mi ni mum of mi nus 850 mi l l i vol t s " i nst ant of f " pot ent i al bet ween t he st r uct ur e bei ng t est ed and t he r ef er ence cel l . Thi s pot ent i al shal l be obt ai ned over 95 per cent of t he met al l i c ar ea. The anode syst em shal l be desi gned f or a l i f e of t went y- f i ve ( 25) year s of cont i nuous oper at i on.

c. Submi t f i nal r epor t r egar di ng Cont r act or ' s modi f i cat i ons. The r epor t shal l i ncl ude pi pe- t o- soi l measur ement s t hr oughout t he af f ect ed ar ea, i ndi cat i ng t hat t he modi f i cat i ons i mpr oved t he over al l condi t i ons, and cur r ent measur ement s f or anodes. The f ol l owi ng speci al mat er i al s and i nf or mat i on ar e r equi r ed: t api ng mat er i al s and conduct or s; z i nc gr oundi ng cel l , i nst al l at i on and t est i ng pr ocedur es, and equi pment ;

coat i ng mat er i al ; syst em desi gn cal cul at i ons f or anode number , l i f e, and par amet er s t o achi eve pr ot ect i ve pot ent i al ; backf i l l shi el d mat er i al and i nst al l at i on det ai l s showi ng wat er pr oof i ng; bondi ng and wat er pr oof i ng det ai l s; i nsul at ed r esi st ance wi r e; exot her mi c wel d equi pment and mat er i al .

2. 1. 2 Summar y of Ser vi ces Requi r ed

The scope of ser vi ces shal l i ncl ude, but shal l not be l i mi t ed t o, t he following:

a. Cl ose- i nt er val pot ent i al sur veys.

b. Cat hodi c Pr ot ect i on Syst ems.

c. Syst em t est i ng.

d. Casi ng cor r osi on cont r ol .

e. I nt er f er ence t est i ng.

f . Tr ai ni ng.

g. Oper at i ng and mai nt enance manual .

h. I nsul at or t est i ng and bondi ng t est i ng.

i . Coat i ng and hol i day t est i ng t o be submi t t ed wi t hi n 45 days of not i ce t o pr oceed.

2. 1. 3 Test s of Component s

Per f or m a mi ni mum of f our ( 4) t est s at each met al l i c component i n t he pi pi ng syst em. Two ( 2) measur ement s shal l be made di r ect l y over t he anodes and t he ot her t wo ( 2) t est s shal l be over t he out er edge of t he component , but at t he f ar t hest poi nt f r om t he anodes. St r uct ur e and pi pes shal l be shown wi t h t he cat hodi c pr ot ect i on equi pment . Al l component s of t he cat hodi c pr ot ect i on syst em shal l be shown on dr awi ngs, showi ng t hei r r el at i onshi p t o t he pr ot ect ed st r uct ur e or component . A nar r at i ve shal l descr i be how t he cat hodi c pr ot ect i on syst em wi l l wor k and pr ovi de t est i ng at each component . Component s r equi r i ng cat hodi c pr ot ect i on shal l i ncl ude

Apr i l 2019 Page 7 SECTI ON 26 42 14. 00 10 but not be l i mi t ed t o t he f ol l owi ng:

a. Pi pes under t he f l oor s l ab or f oundat i ons.

b. PI V.

c. Shut of f val ves.

d. Met al l i c pi pe ext ended f r om abovegr ound l ocat i ons.

e. Each connect or or change- of - di r ect i on devi ce.

f . Any met al l i c pi pe component or sect i on.

g. Backf l ow pr event er .

h. Cul ver t .

2. 1. 4 El ect r i cal Pot ent i al Measur ement s

Al l pot ent i al t est s shal l be made at a mi ni mum of 10 f oot i nt er val s wi t nessed by t he Cont r act i ng Of f i cer . Submi t t al s shal l i dent i f y t est l ocat i ons on separ at e dr awi ng, showi ng al l met al t o be pr ot ect ed and al l cat hodi c pr ot ect i on equi pment . Test poi nt s equi pment and pr ot ect ed met al shal l be easi l y di st i ngui shed and i dent i f i ed.

2. 1. 5 Achi evement of Cr i t er i a f or Pr ot ect i on

Al l conduct or s, unl ess ot her wi se shown, shal l be r out ed t o or t hr ough t he t est st at i ons. Each syst em pr ovi ded shal l achi eve a mi ni mum pi pe- t o- soi l " i nst ant of f " pot ent i al of mi nus 850 mi l l i vol t pot ent i al s wi t h r ef er ence t o a sat ur at ed copper - copper - sul f at e r ef er ence cel l on al l under gr ound component s of t he pi pi ng. Based upon t he measur ement s t aken, t he cur r ent and vol t age of t he anodes shoul d be adj ust ed as r equi r ed t o pr oduce a mi ni mum of mi nus 850 mi l l i vol t s " i nst ant of f " pot ent i al bet ween t he st r uct ur e bei ng t est ed and t he r ef er ence cel l . Thi s pot ent i al shoul d be obt ai ned over 95 per cent of t he met al l i c ar ea. Thi s must be achi eved wi t hout t he " i nst ant of f " pot ent i al exceedi ng 1150 mi l l i vol t s. Test i ng wi l l be wi t nessed by t he Cont r act i ng Of f i cer . Pr ovi de addi t i onal anodes i f r equi r ed t o achi eve t he mi nus 850 mi l l i vol t s " i nst ant of f " . Al t hough accept ance cr i t er i a of t he cat hodi c pr ot ect i on syst ems ar e def i ned i n NACE SP0169, f or t hi s pr oj ect t he " i nst ant of f " pot ent i al of mi nus 850 mi l l i vol t s i s t he onl y accept abl e cr i t er i a.

2. 1. 6 Met al l i c Component s on Nonmet al l i c Syst ems and Typi cal s

2. 1. 6. 1 Met al l i c Component s

As a mi ni mum, pr ot ect each met al l i c component wi t h t wo ( 2) magnesi um anodes. Thi s number of anodes i s r equi r ed t o achi eve mi nus 850 mi l l i vol t s " i nst ant of f " pot ent i al on t he met al l i c ar ea and at t he same t i me not pr ovi de over vol t age above 1150 mi l l i vol t s " i nst ant of f . " As a mi ni mum, t he magnesi um anode unpackaged wei ght shal l be 17 pounds. The magnesi um anodes shal l be l ocat ed on each si de of t he met al l i c component and r out ed t hr ough a t est st at i on.

2. 1. 6. 2 Fi r e Hydr ant s

Fi r e hydr ant pi pe component s shal l have a mi ni mum of t wo ( 2) anodes.

Apr i l 2019 Page 8 SECTI ON 26 42 14. 00 10

These magnesi um anodes shal l have an unpackaged wei ght of 17 pounds.

2. 1. 6. 3 Pi pe Under Concr et e Sl ab

Pi pe under concr et e s l ab shal l have a mi ni mum of 2 magnesi um anodes.

These magnesi um anodes shal l have an unpackaged wei ght of 17 pounds. Pi pe under concr et e s l ab shal l have 1 2 per manent r ef er ence el ect r odes l ocat ed under t he s l ab. One ( 1) per manent r ef er ence el ect r ode shal l be l ocat ed wher e t he pi pe ent er s t he concr et e s l ab. Al l conduct or s shal l be r out ed t o a t est st at i on.

2. 1. 6. 4 Valves

Each val ve shal l be pr ot ect ed wi t h 1 magnesi um anode. The magnesi um anode shal l have an unpackaged wei ght of 17 pounds.

2. 1. 6. 5 Met al l i c Pi pe Component or Sect i on

Each sect i on of met al l i c pi pe shal l be pr ot ect ed wi t h 2 magnesi um anodes.

The magnesi um anodes shal l have an unpackaged wei ght of 17 pounds.

2. 1. 6. 6 Connect or s or Change- of - Di r ect i on Devi ces

Each change- of - di r ect i on devi ce shal l be pr ot ect ed wi t h 2 magnesi um anodes. The magnesi um anode shal l have an unpackaged wei ght of 917 pounds.

2. 1. 7 Met al l i c Component Coat i ng

Coat i ngs f or met al l i c component s shal l be as r equi r ed f or met al l i c f i t t i ngs as i ndi cat ed. Thi s wi l l i ncl ude f i r e hydr ant s, T' s, el bows, val ves, et c. Coat i ngs shal l be sel ect ed, appl i ed, and i nspect ed as speci f i ed i n t hese speci f i cat i ons. Al l abovegr ound pi pel i ne shal l be coat ed as i ndi cat ed or as appr oved. The coat i ng shal l have a mi ni mum t hi ckness of 7 mi l . The pi pel i ne coat i ng shal l be i n accor dance wi t h al l appl i cabl e Feder al , St at e, and l ocal r egul at i ons.

2. 2 MAGNESI UM ANODES

I nst al l a mi ni mum of speci f i ed anodes on t he Pi pe or Tank syst em. See Par agr aph METALLI C COMPONENTS ON NONMETALLI C SYSTEMS AND TYPI CALS f or addi t i onal anodes under s l ab.

2. 2. 1 Anode Composi t i on

Anodes shal l be of hi gh- pot ent i al magnesi um al l oy, made of pr i mar y magnesi um obt ai ned f r om sea wat er or br i ne, and not made f r om scr ap met al . Magnesi um anodes shal l conf or m t o ASTM B843 and t o t he f ol l owi ng anal ysi s ( i n per cent s) ot her wi se i ndi cat ed:

Al umi num, max. 0.010

Manganese, max. 0. 50 t o 1. 30

Zinc 0.05

Si l i con, max. 0.05

Apr i l 2019 Page 9 SECTI ON 26 42 14. 00 10

Copper , max. 0.02

Ni ckel , max. 0.001

I r on, Max. 0. 03

Ot her i mpur i t i es, max. 0. 05 each or 0. 3 max. t ot al

Magnesium Remainder

Fur ni sh spect r ogr aphi c anal ysi s on sampl es f r om each heat or bat ch of anodes used on t hi s pr oj ect .

2. 2. 2 Di mensi ons and Wei ght s

Di mensi ons and wei ght s of anodes shal l be appr oxi mat el y as f ol l ows:

TYPI CAL MAGNESI UM ANODE SI ZE

( Cr oss sect i ons may be r ound, squar e, or D shaped)

Nominal Wei ght ( l bs)

Appr ox. Si ze ( i nch) Nomi nal Gr oss Wei ght ( l bs) Packaged i n

Backfill

Nomi nal Package Di mensi ons ( i nch)

3 3 X 3 X 5 8 5- 1/ 4 X 5- 1/ 4 X 8

5 3 X 3 X 8 13 5- 1/ 4 X 5- 1/ 4 X 11- 1/ 4

9 3 X 3 X 14 27 5- 1/ 4 X 20

12 4 X 4 X 12 32 7- 1/ 2 X 18

17 4 X 4 X 17 45 7- 1/ 2 X 24

32 5 X 5 X 20- 1/ 2 68 8- 1/ 2 X 28

50 7 X 7 X 16 100 10 X 24

2. 2. 3 Packaged Anodes

Pr ovi de anodes i n packaged f or m wi t h t he anode sur r ounded by speci al l y- pr epar ed qui ck- wet t i ng backf i l l and cont ai ned i n a wat er per meabl e c l ot h or paper sack. Anodes shal l be cent er ed by means of spacer s i n t he backf i l l mat er i al . The backf i l l mat er i al shal l have t he f ol l owi ng composi t i on, unl ess ot her wi se i ndi cat ed:

Material Appr oxi mat e Per cent by Wei ght

Gypsum 75

Bentonite 20

Apr i l 2019 Page 10 SECTI ON 26 42 14. 00 10

Material Appr oxi mat e Per cent by Wei ght

Sodi um Sul phat e 5

Total 100

2. 2. 4 Zi nc Anodes

Zi nc anodes shal l conf or m t o ASTM B418, Type I I .

2. 2. 5 Connect i ng Wi r e

2. 2. 5. 1 Wi r e Requi r ement s

Wi r e shal l be t he speci f i ed AWG sol i d copper wi r e, not l ess t han 10 f eet l ong, unspl i ced, compl yi ng wi t h NFPA 70, Type TW or RHW- USE i nsul at i on, as speci f i ed. Connect i ng wi r es f or magnesi um anodes shal l be f act or y i nst al l ed wi t h t he pl ace or emer gence f r om t he anode i n a cavi t y seal ed f l ush wi t h a di el ect r i c seal i ng compound. Connect i ng wi r es f or z i nc anodes shal l be f act or y i nst al l ed wi t h t he pl ace of connect i on t o t he pr ot r udi ng st eel cor e compl et el y seal ed wi t h a di el ect r i c mat er i al .

2. 2. 5. 2 Anode Header Cabl e

Cabl e f or anode header and di st r i but i on shal l be t he speci f i ed AWG st r anded copper wi r e wi t h t ype CP hi gh mol ecul ar wei ght pol yet hyl ene, 7/ 64 i nch t hi ck i nsul at i on, 600- vol t r at i ng.

2. 3 MI SCELLANEOUS MATERI ALS

2. 3. 1 El ect r i cal Wi r e

Wi r e shal l be No. 10 AWG st r anded copper wi r e wi t h NFPA 70, Type TW, RHW- USE wi t h out er cover i ng RHW- USE Pol yet hyl ene i nsul at i on. Pol yet hyl ene i nsul at i on shal l compl y wi t h t he r equi r ement s of ASTM D1248 and shal l be of t he f ol l owi ng t ypes, c l asses, and gr ades:

Hi gh- mol ecul ar wei ght pol yet hyl ene shal l be Type I , Cl ass C, Gr ade E5.

Hi gh- densi t y pol yet hyl ene shal l be Type I I I , Cl ass C, Gr ade E3.

2. 3. 1. 1 Wi r e Spl i c i ng

Connect i ng wi r e spl i c i ng shal l be made wi t h copper compr essi on connect or s or exot her mi c wel ds, f ol l owi ng i nst r uct i ons of t he manuf act ur er . Si ngl e spl i t - bol t connect i ons shal l not be used. Sheat hs f or encapsul at i ng el ect r i cal wi r e spl i ces t o be bur i ed under gr ound shal l f i t t he i nsul at ed wi r es ent er i ng t he spl i ced j oi nt s and epoxy pot t i ng compound shal l be as speci f i ed bel ow.

2. 3. 1. 2 Test Wi r es

Test wi r es shal l be AWG No. 12 st r anded copper wi r e wi t h NFPA 70, Type TW or RHW- USE wi t h out er cover i ng or pol yet hyl ene i nsul at i on.

Apr i l 2019 Page 11 SECTI ON 26 42 14. 00 10

2. 3. 1. 3 Resi st ance Wi r e

Resi st ance wi r e shal l be AWG No. 16 or No. 22 ni ckel - chr omi um wi r e.

2. 3. 2 Conduit

Ri gi d gal vani zed st eel condui t and accessor i es shal l conf or m t o UL 6. Non met al l i c condui t shal l conf or m t o NEMA TC 2.

2. 3. 3 Test Boxes and Junct i ons Boxes

Boxes shal l be out door t ype conf or mi ng t o UL 514A.

2. 3. 4 Joi nt , Pat ch, Seal , and Repai r Coat i ng

Seal i ng and di el ect r i c compound shal l be a bl ack, r ubber based compound t hat i s sof t , per manent l y pl i abl e, t acky, mol dabl e, and unbacked.

Compound shal l be appl i ed as r ecommended by t he manuf act ur er , but not l ess t han 1/ 2- i nch t hi ck. Coat i ng compound shal l be col d- appl i ed coal - t ar base mast i c or hot - appl i ed coal - t ar enamel , as speci f i ed.

Pr essur e- sensi t i ve v i nyl pl ast i c el ect r i cal t ape shal l conf or m t o UL 510.

2. 3. 5 Backf i l l Shi el ds

Shi el ds shal l consi st of appr oved pi pel i ne wr appi ng or f i ber gl ass- r ei nf or ced, coal - t ar i mpr egnat ed t ape, or pl ast i c wel d caps, speci f i cal l y made f or t he pur pose and i nst al l ed i n accor dance wi t h t he manuf act ur er ' s r ecommendat i ons. When j oi nt bonds ar e r equi r ed, due t o t he use of mechani cal j oi nt s, t he ent i r e j oi nt shal l be pr ot ect ed by t he use of a kr af t paper j oi nt cover . The j oi nt cover shal l be f i l l ed wi t h pour ed- i n, hot coat - t ar enamel .

2. 3. 6 Epoxy Pot t i ng Compound

Compound f or encapsul at i ng el ect r i cal wi r e spl i ces t o be bur i ed under gr ound shal l be a t wo package syst em made f or t he pur pose.

2. 3. 7 Test St at i ons

St at i ons shal l be of t he f l ush- cur b- box t ype and shal l be t he st andar d pr oduct of a r ecogni zed manuf act ur er . Test st at i ons shal l be compl et e wi t h an i nsul at ed t er mi nal bl ock havi ng t he r equi r ed number of t er mi nal s.

The t est st at i on shal l be pr ovi ded wi t h a l ockabl e over and shal l have an embossed l egend, " C. P. Test . " A mi ni mum of one ( 1) t est st at i on shal l be pr ovi ded each component of t he pi pe or t ankas speci f i ed. A mi ni mum of s i x ( 6) t er mi nal s shal l be pr ovi ded i n each t est st at i on. A mi ni mum of t wo ( 2) l eads ar e r equi r ed t o t he met al l i c pi pe f r om each t est st at i on. Ot her conduct or s shal l be pr ovi ded f or each anode, ot her f or ei gn pi pe, and r ef er ence cel l s as r equi r ed. Uni t s shal l be i nsl l ed f l ush wi t h gr ade and gr out ed i n pl ace.

2. 3. 8 Joi nt and Cont i nui t y Bonds

Bonds shal l be pr ovi ded acr oss al l j oi nt s i n t he met al l i c wat er , or gas l i nes as speci f i ed, acr oss any el ect r i cal l y di scont i nuous connect i ons and al l ot her pi pes and st r uct ur es wi t h ot her t han wel ded or t hr eaded j oi nt s t hat ar e i ncl uded i n t hi s cat hodi c pr ot ect i on syst em. Unl ess ot her wi se speci f i ed i n t he speci f i cat i ons, bonds bet ween st r uct ur es and acr oss j oi nt s i n pi pe wi t h ot her t han wel ded or t hr eaded j oi nt s shal l be No. 8

Apr i l 2019 Page 12 SECTI ON 26 42 14. 00 10

AWG st r anded copper cabl e wi t h pol yet hyl ene i nsul at i on. Bonds bet ween st r uct ur es shal l cont ai n suf f i c i ent s l ack f or any ant i c i pat ed movement bet ween st r uct ur es. Bonds acr oss pi pe j oi nt s shal l cont ai n a mi ni mum of 4 i nch of s l ack t o al l ow f or pi pe movement and soi l st r ess. Bonds shal l be at t ached by exot her mi c wel di ng. Exot her mi c wel d ar eas shal l be i nsul at ed wi t h coat i ng compound and appr oved, and wi t nessed by t he Cont r act i ng Of f i cer . Cont i nui t y bonds shal l be i nst al l ed as necessar y t o r educe st r ay cur r ent i nt er f er ence. Addi t i onal j oi nt bondi ngs shal l be accompl i shed wher e t he necessi t y i s di scover ed dur i ng const r uct i on or t est i ng or wher e t he Cont r act i ng Of f i cer ' s r epr esent at i ve di r ect s t hat such bondi ng be done. Joi nt bondi ng shal l i ncl ude al l associ at ed excavat i on and backf i l l i ng. Ther e shal l be a mi ni mum of t wo ( 2) cont i nui t y bonds bet ween each st r uct ur e and ot her t han wel ded or t hr eaded j oi nt s. Test f or el ect r i cal cont i nui t y acr oss al l j oi nt s wi t h ot her t han wel ded or t hr eaded j oi nt s and acr oss al l met al l i c por t i ons or component s. Pr ovi de bondi ng as r equi r ed and as speci f i ed above unt i l el ect r i cal cont i nui t y i s achi eved.

Submi t bondi ng t est dat a f or appr oval .

2. 3. 9 Resi st ance Bonds

Resi st ance bonds shoul d be adj ust ed as out l i ned i n t hi s speci f i cat i on.

Al t er nat e met hods may be used i f t hey ar e appr oved by t he Cont r act i ng Officer.

2. 3. 10 St r ay Cur r ent Measur ement s

St r ay cur r ent measur ement s shoul d be per f or med at each t est st at i on.

St r ay cur r ent s r esul t i ng f r om l i ght ni ng or over head al t er nat i ng cur r ent ( AC) power t r ansmi ssi on syst ems shal l be mi t i gat ed i n accor dance wi t h

NACE SP0177.

2. 3. 11 El ect r i cal I sol at i on of St r uct ur es

As a mi ni mum, i sol at i ng f l anges or uni ons shal l be pr ovi ded as speci f i ed:

a. Connect i on of new met al l i c pi pi ng or component s t o exi st i ng pi pi ng.

b. Pr essur e pi pi ng under f l oor s l ab t o a bui l di ng.

I sol at i on shal l be pr ovi ded at met al l i c connect i on of al l l i nes t o exi st i ng syst em and wher e connect i ng t o a bui l di ng. Addi t i onal l y, i sol at i on shal l be pr ovi ded bet ween wat er , and/ or gas and f or ced mai n l i ne, as speci f i ed, and f or ei gn pi pes t hat cr oss t he new l i nes wi t hi n 10 f eet .

I sol at i on f i t t i ngs, i ncl udi ng i sol at i ng f l anges and coupl i ngs, shal l be i nst al l ed abovegr ound or i n a concr et e pi t .

2. 3. 11. 1 El ect r i cal l y I sol at i ng Pi pe Joi nt s

El ect r i cal l y i sol at i ng pi pe j oi nt s shal l be of a t ype t hat i s i n r egul ar f act or y pr oduct i on.

2. 3. 11. 2 El ect r i cal l y Conduct i ve Coupl i ngs

El ect r i cal l y conduct i ve coupl i ngs shal l be of a t ype t hat has a publ i shed maxi mum el ect r i cal r esi st ance r at i ng gi ven i n t he manuf act ur er ' s l i t er at ur e. Cr adl es and seal s shal l be of a t ype t hat i s i n r egul ar f act or y pr oduct i on made f or t he pur pose of el ect r i cal l y i nsul at i ng t he car r i er pi pe f r om t he casi ng and pr event i ng t he i ncur si on of wat er i nt o t he annul ar space.

Apr i l 2019 Page 13 SECTI ON 26 42 14. 00 10

2. 3. 11. 3 I nsul at i ng Joi nt Test i ng

A Model 601 I nsul at i on Checker , as manuf act ur ed by " Gas El ect r oni cs" , , or an appr oved equal , shal l be used f or i nsul at i ng j oi nt ( f l ange) el ect r i cal testing.

2. 3. 12 Under gr ound St r uct ur e Coat i ng

Thi s coat i ng speci f i cat i on shal l t ake pr ecedence over any ot her pr oj ect speci f i cat i on and dr awi ng not es, whet her st at ed or i mpl i ed, and shal l al so appl y t o t he pi pel i ne or t ank suppl i er . No var i ance i n coat i ng qual i t y shal l be al l owed by t he Cont r act or or Base Const r uct i on Repr esent at i ve wi t hout t he wr i t t en consent of t he desi gner . Al l under gr ound met al l i c pi pel i nes and t anks t o be cat hodi cal l y pr ot ect ed shal l be af f or ded a good qual i t y f act or y- appl i ed coat i ng. Thi s i ncl udes al l car bon st eel , cast - i r on and duct i l e- i r on pi pel i nes or vessel s. Coat i ngs shal l be sel ect ed, appl i ed, and i nspect ed as speci f i ed. I f non- met al l i c pi pel i nes ar e i nst al l ed, al l met al l i c f i t t i ngs on pi pe sect i ons shal l be coat ed i n accor dance wi t h t hi s speci f i cat i on sect i on.

a. The nomi nal t hi ckness of t he met al l i c pi pe j oi nt or ot her component coat i ng shal l be as speci f i ed, pl us or mi nus 5 per cent .

b. Pi pe and j oi nt coat i ng f or f act or y appl i ed or f i el d r epai r mat er i al shal l be appl i ed as r ecommended by t he manuf act ur er and shal l be one of t he f ol l owi ng:

( 1) Cont i nuousl y ext r uded pol yet hyl ene and adhesi ve coat i ng syst em.

( 2) Pol yvi nyl chl or i de pr essur e- sensi t i ve adhesi ve t ape.

( 3) Hi gh densi t y pol yet hyl ene/ bi t umi nous r ubber compound t ape.

( 4) But yl r ubber t ape.

( 5) Coal t ar epoxy.

2. 3. 12. 1 Fi el d Joi nt s

Al l f i el d j oi nt s shal l be coat ed wi t h mat er i al s compat i bl e wi t h t he pi pel i ne coat i ng compound. The j oi nt coat i ng mat er i al shal l be appl i ed t o an equal t hi ckness as t he pi pel i ne coat i ng. Unbonded coat i ngs shal l not be used on t hese bur i ed met al l i c component s. Thi s i ncl udes t he el i mi nat i on of al l unbonded pol ymer wr aps or t ubes. Once t he pi pel i ne or vessel i s set i n t he t r ench, an i nspect i on of t he coat i ng shal l be conduct ed. Thi s i nspect i on shal l i ncl ude el ect r i cal hol i day det ect i on.

Any damaged ar eas of t he coat i ng shal l be pr oper l y r epai r ed. The Cont r act i ng Of f i cer shal l be asked t o wi t ness i nspect i on of t he coat i ng and t est i ng usi ng a hol i day det ect or .

2. 3. 12. 2 I nspect i on of Pi pe Coat i ngs

Any damage t o t he pr ot ect i ve cover i ng dur i ng t r ansi t and handl i ng shal l be r epai r ed bef or e i nst al l at i on. Af t er f i el d coat i ng and wr appi ng has been appl i ed, t he ent i r e pi pe shal l be i nspect ed by an el ect r i c hol i day det ect or wi t h i mpr essed cur r ent i n accor dance wi t h NACE SP0188 usi ng a f ul l - r i ng, spr i ng- t ype coi l el ect r ode. The hol i day det ect or shal l be equi pped wi t h a bel l , buzzer , or ot her t ype of audi bl e s i gnal whi ch sounds when a hol i day i s det ect ed. Al l hol i days i n t he pr ot ect i ve cover i ng shal l be r epai r ed i mmedi at el y upon det ect i on. Occasi onal checks of hol i day det ect or pot ent i al wi l l be made by t he Cont r act i ng Of f i cer ' s r epr esent at i ve t o det er mi ne sui t abi l i t y of t he det ect or . Al l l abor , Apr i l 2019 Page 14 SECTI ON 26 42 14. 00 10 mat er i al s, and equi pment necessar y f or conduct i ng t he i nspect i on shal l be f ur ni shed by t he Cont r act or .

2. 3. 12. 2. 1 Pr ot ect i ve Cover i ng f or Abovegr ound Pi pi ng Syst em

Fi ni sh pai nt i ng shal l conf or m t o t he appl i cabl e par agr aph of SECTI ON:

09 90 00 PAI NTS AND COATI NGS and as f ol l ows:

2. 3. 12. 2. 2 Fer r ous Sur f aces

Shop- pr i med sur f aces shal l be t ouched- up wi t h f er r ous met al pr i mer .

Sur f aces t hat have not been shop- pr i med shal l be sol vent - c l eaned.

Sur f aces t hat cont ai n l oose r ust , l oose mi l scal e, and ot her f or ei gn subst ances shal l be mechani cal l y- c l eaned by power wi r e- br ushi ng and pr i med wi t h f er r ous met al pr i mer . Pr i med sur f ace shal l be f i ni shed wi t h t wo ( 2) coat s of ext er i or oi l pai nt and vi nyl pai nt . Coat i ng f or each ent i r e pi pi ng ser vi ce shal l be an appr oved pi pe l i ne wr appi ng havi ng a mi ni mum coat i ng r esi st ance of 50, 000 Ohms per squar e f oot .

2. 3. 13 Resi st ance Wi r e

Wi r e shal l be No. 16 or No. 22 ni ckel - chr omi um wi r e wi t h TW i nsul at i on.

2. 3. 14 El ect r i cal Connect i ons

El ect r i cal connect i ons shal l be done as f ol l ows:

a. Exot her mi c wel ds shal l be " Cadwel d" , " Bundy" , " Ther mowel d" , or an appr oved equal . Use of t hi s mat er i al shal l be i n st r i ct accor dance wi t h t he manuf act ur er ' s r ecommendat i ons.

b. El ect r i cal - shi el ded ar c wel ds shal l be appr oved f or use on st eel pi pe by shop dr awi ng submi t t al act i on.

c. Br azi ng shal l be as speci f i ed i n Par agr aph: Lead Wi r e Connect i ons.

2. 3. 15 El ect r i cal Tape

Pr essur e- sensi t i ve v i nyl pl ast i c el ect r i cal t ape shal l conf or m t o UL 510.

2. 3. 16 Per manent Ref er ence El ect r odes

Per manent r ef er ence el ect r odes shal l be Cu- CuS04 el ect r odes sui t abl e f or di r ect bur i al . El ect r odes shal l be guar ant eed by t he suppl i er f or 15 year s ' ser vi ce i n t he envi r onment i n whi ch t hey shal l be pl aced.

El ect r odes shal l be i nst al l ed di r ect l y beneat h pi pe, or met al l i c component .

2. 3. 17 Casing

Wher e a pi pel i ne i s i nst al l ed i n a casi ng under a r oadway or r ai l way, t he pi pel i ne shal l be el ect r i cal l y i nsul at ed f r om t he casi ng, and t he annul ar space seal ed and f i l l ed wi t h an appr oved cor r osi on i nhi bi t i ng pr oduct agai nst i ncur si on of wat er .

PART 3 EXECUTI ON

3. 1 CRI TERI A OF PROTECTI ON

Accept ance cr i t er i a f or det er mi ni ng t he adequacy of pr ot ect i on on a bur i ed

Apr i l 2019 Page 15 SECTI ON 26 42 14. 00 10 under gr ound pi pe, t ank or met al l i c component shal l be i n accor dance wi t h NACE SP0169, NACE RP0193, NACE SP0285 and as speci f i ed bel ow.

3. 1. 1 I r on and St eel

The f ol l owi ng met hod a. shal l be used f or t est i ng cat hodi c pr ot ect i on vol t ages. I f mor e t han one met hod i s r equi r ed, met hod b. shal l be used.

a. A negat i ve vol t age of at l east mi nus 850 mi l l i vol t s as measur ed bet ween t he under gr ound component and a sat ur at ed copper - copper sul phat e r ef er ence el ect r ode connect i ng t he ear t h ( el ect r ol yt e) di r ect l y over t he under gr ound component . Det er mi nat i on of t hi s vol t age shal l be made wi t h t he cat hodi c pr ot ect i on syst em i n oper at i on. Vol t age dr ops shal l be consi der ed f or val i d i nt er pr et at i on of t hi s vol t age measur ement . A mi ni mum of mi nus 850 mi l l i vol t s " i nst ant of f " pot ent i al bet ween t he under gr ound component bei ng t est ed and t he r ef er ence cel l shal l be achi eved over 95 per cent of t he ar ea of t he st r uct ur e. Adequat e number of measur ement s shal l be obt ai ned over t he ent i r e st r uct ur e, pi pe, t ank, or ot her met al l i c component t o ver i f y and r ecor d achi evement of mi nus 850 mi l l i vol t s " i nst ant of f . " Thi s pot ent i al shal l be obt ai ned over 95 per cent of t he t ot al met al l i c ar ea wi t hout t he " i nst ant of f " pot ent i al exceedi ng 1200 mi l l i vol t s.

b. A mi ni mum pol ar i zat i on vol t age shi f t of 100 mi l l i vol t s as measur ed bet ween t he under gr ound component and a sat ur at ed copper - copper sul phat e r ef er ence el ect r ode cont act i ng t he ear t h di r ect l y over t he under gr ound component . Thi s pol ar i zat i on vol t age shi f t shal l be det er mi ned by i nt er r upt i ng t he pr ot ect i ve cur r ent and measur i ng t he pol ar i zat i on decay. When t he pr ot ect i ve cur r ent i s i nt er r upt ed, an i mmedi at e vol t age shi f t wi l l occur . The vol t age r eadi ng, af t er t he i mmedi at e shi f t , shal l be used as t he base r eadi ng f r om whi ch t o measur e pol ar i zat i on decay. Measur ement s achi evi ng 100 mi l l i vol t s decay shal l be made over 95 per cent of t he met al l i c sur f ace bei ng protected.

c. For any met al l i c component , a mi ni mum of f our ( 4) measur ement s shal l be made usi ng subpar agr aph a. , above, and achi evi ng t he " i nst ant of f " pot ent i al of mi nus 850 mi l l i vol t s. Two ( 2) measur ement s shal l be made over t he anodes and t wo ( 2) measur ement s shal l be made at di f f er ent l ocat i ons near t he component and f ar t hest away f r om t he anode.

3. 1. 2 Aluminum

Al umi num under gr ound component shal l not be pr ot ect ed t o a pot ent i al mor e negat i ve t han mi nus 1200 mi l l i vol t s, measur ed bet ween t he under gr ound component and a sat ur at ed copper - copper sul phat e r ef er ence el ect r ode cont act i ng t he ear t h, di r ect l y over t he met al l i c component . Resi st ance, i f r equi r ed, shal l be i nser t ed i n t he anode ci r cui t wi t hi n t he t est st at i on t o r educe t he pot ent i al of t he al umi num t o a val ue whi ch wi l l not exceed a pot ent i al mor e negat i ve t han mi nus 1200 mi l l i vol t s. Vol t age shi f t cr i t er i on shal l be a mi ni mum negat i ve pol ar i zat i on shi f t of 100 mi l l i vol t s measur ed bet ween t he met al l i c component and a sat ur at ed copper - copper sul phat e r ef er ence el ect r ode cont act i ng t he ear t h, di r ect l y over t he met al l i c component . The pol ar i zat i on vol t age shi f t shal l be det er mi ned as out l i ned f or i r on and st eel .

3. 1. 3 Copper Pi pi ng

For copper pi pi ng, t he f ol l owi ng cr i t er i a shal l appl y: A mi ni mum of 100

Apr i l 2019 Page 16 SECTI ON 26 42 14. 00 10 mi l l i vol t s of cat hodi c pol ar i zat i on bet ween t he st r uct ur e sur f ace and a st abl e r ef er ence el ect r ode cont act i ng t he el ect r ol yt e. The pol ar i zat i on vol t age shi f t shal l be det er mi ned as out l i ned f or i r on and st eel .

3. 2 TRENCHI NG AND BACKFI LLI NG

Per f or m t r enchi ng and backf i l l i ng i n accor dance wi t h Sect i on 31 00 00 EARTHWORK. I n t he ar eas of t he anode beds, al l t r ees and under br ush shal l be c l ear ed and gr ubbed t o t he l i mi t s shown or i ndi cat ed. I n t he event r ock i s encount er ed i n pr ovi di ng t he r equi r ed dept h f or anodes, det er mi ne an al t er nat e appr oved l ocat i on and, i f t he dept h i s st i l l not pr ovi ded, submi t an al t er nat e pl an t o t he Cont r act i ng Of f i cer . Al t er nat e t echni ques and dept hs must be appr oved pr i or t o i mpl ement at i on.

3. 3 INSTALLATION

3. 3. 1 Anode I nst al l at i on

Unl ess ot her wi se aut hor i zed, i nst al l at i on shal l not pr oceed wi t hout t he pr esence of t he Cont r act i ng Of f i cer . Anodes of t he s i ze speci f i ed shal l be i nst al l ed t o t he dept h i ndi cat ed and at t he l ocat i ons shown. Locat i ons may be changed t o c l ear obst r uct i ons wi t h t he appr oval of t he Cont r act i ng Of f i cer . Anodes shal l be i nst al l ed i n suf f i c i ent number and of t he r equi r ed t ype, s i ze, and spaci ng t o obt ai n a uni f or m cur r ent di st r i but i on over t he sur f ace of t he st r uct ur e. The anode syst em shal l e desi gned f or a l i f e of 25 year s of cont i nuous oper at i on. Anodes shal l be i nst al l ed as i ndi cat ed i n a dr y condi t i on af t er any pl ast i c or wat er pr oof pr ot ect i ve cover i ng has been compl et el y r emoved f r om t he wat er per meabl e, per manent cont ai ner housi ng t he anode met al . The anode connect i ng wi r e shal l not be used f or l ower i ng t he anode i nt o t he hol e. The annul ar space ar ound t he anode shal l be backf i l l ed wi t h f i ne ear t h i n 6 i nch l ayer s and each l ayer shal l be hand t amped. Car e must be exer ci sed not t o st r i ke t he anode or connect i ng wi r e wi t h t he t amper . Appr oxi mat el y 5 gal l ons of wat er shal l be appl i ed t o each f i l l ed hol e af t er anode backf i l l i ng and t ampi ng has been compl et ed t o a poi nt about 6 i nch above t he anode. Af t er t he wat er has been absor bed by t he ear t h, backf i l l i ng shal l be compl et ed t o t he gr ound sur f ace l evel .

3. 3. 1. 1 Si ngl e Anodes

Si ngl e anodes, spaced as shown, shal l be connect ed as speci f i ed t o t he pi pel i ne, al l owi ng adequat e s l ack i n t he connect i ng wi r e t o compensat e f or movement dur i ng backf i l l oper at i on.

3. 3. 1. 2 Gr oups of Anodes

Gr oups of anodes, i n quant i t y and l ocat i on shown, shal l be connect ed t o an anode header cabl e. The anode header cabl e shal l make cont act wi t h t he st r uct ur e t o be pr ot ect ed onl y t hr ough a t est st at i on.

This is the start of the file's text. The full file is on GovTribe.