23 82 43.00 40.pdf

PDF 15 KB Posted

Attached to
TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117
Solicitation number
FA813726R0030
Issued by

About this file

This is a technical specification document for electric duct heaters required at Tinker Air Force Base, Oklahoma.

The specification, Section 23 82 43.00 40, establishes requirements for factory-prewired duct heaters with capacity tolerance of plus or minus 5 percent and conformance to UL 1996 (2009; Reprint Jul 2016) safety standards. Heating elements must consist of helix-wound nickel-chromium alloy (80 percent nickel, 20 percent chromium) with wattage density not exceeding 50 watts per linear inch, installed in mill-aluminized or galvanized carbon steel junction boxes. All gasketing must be 1/16-inch thick non-asbestos woven-cloth tape. Units require integral overheat cutouts for primary and secondary protection, with automatic-reset primary cutouts and manual-reset secondary cutouts suitable for 277-volt, 60-hertz service. Control systems must include indicating lights showing heater on/off and circuit status, pilot switches, UL-approved magnetic contactors, step controllers for load sequencing with individual fusing, stage-type wall-mounted thermostats (55–105 degrees F range with 1.5 degrees F differential maximum, 24-volt, 60-hertz operation), and solid-state silicon-controlled rectifier (SCR) systems providing continuous voltage variation from zero to 105 percent of rated voltage.

Pre-installation meetings are required within 30 days of contract award. Contractor submittals requiring government approval ("G" designation) include fabrication drawings, installation drawings, equipment and performance data, and manufacturer's instructions. Field quality control requires demonstration of satisfactory operation in the presence of the Contracting Officer, with a minimum 6-hour operational test and five complete heating cycles to verify construction adequacy, system controls, and component performance. Installation must follow manufacturer's instructions with accessible heater locations and temperature probe routing to building controllers.

View the file

Other files

File Type Posted
03 39 00.00 10.pdf PDF
03 62 16.pdf PDF
04 20 00.pdf PDF
05 21 00.pdf PDF
06 20 00.pdf PDF
06 61 16.pdf PDF
07 60 00.pdf PDF
07 61 14.00 20.pdf PDF
07 84 00.pdf PDF
07 92 00.pdf PDF
08 11 16.pdf PDF
08 36 13.pdf PDF
08 71 00.pdf PDF
09 68 00.pdf PDF
10 28 13.pdf PDF
13 48 00.pdf PDF
21 13 17.pdf PDF
22 00 00.pdf PDF
23 00 00.pdf PDF
23 08 00.pdf PDF
23 11 25.pdf PDF
23 35 00.pdf PDF
23 64 26.pdf PDF
23 82 16.00 40.pdf PDF
26 56 00.pdf PDF
31 23 06.pdf PDF
32 01 14.pdf PDF
32 13 74.pdf PDF
02 41 00.pdf PDF
06 10 00.pdf PDF
07 12 00.pdf PDF
07 42 13.pdf PDF
07 42 63.pdf PDF
07 53 23.pdf PDF
07 54 19.pdf PDF
07 62 13.pdf PDF
08 41 13.pdf PDF
08 51 13.pdf PDF
08 51 23.pdf PDF
09 51 00.pdf PDF
09 65 00.pdf PDF
00 71 00.pdf PDF
01 78 23.pdf PDF
00 72 00.pdf PDF
00 80 00.pdf PDF
Solicitation - FA813726R0030.pdf PDF
Att10_190023_SOW.pdf PDF
EAL List - BLANK to Contractors WWYK190023.xlsx XLSX spreadsheet
Att11_190023_Submittal Register_Final.pdf PDF
Wage Determination.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 23 82 43. 00 40

ELECTRI C DUCT HEATERS

04/17

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

UNDERWRI TERS LABORATORI ES ( UL)

UL 1996 ( 2009; Repr i nt Jul 2016) UL St andar d f or Saf et y El ect r i c Duct Heat er s

1. 2 ADMI NI STRATI VE REQUI REMENTS

Sect i on 26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS appl i es t o wor k speci f i ed i n t hi s sect i on.

1. 2. 1 Pr e- I nst al l at i on Meet i ngs

The Cont r act i ng Of f i cer wi l l schedul e a pr e- i nst al l at i on meet i ng wi t hi n 30 days of Cont r act Awar d. Pr ovi de t he f ol l owi ng f or r evi ew and appr oval :

a. Submi t f abr i cat i on dr awi ngs f or duct heat er s consi st i ng of f abr i cat i on and assembl y det ai l s t o be per f or med i n t he f act or y.

b. Submi t equi pment and per f or mance dat a f or duct heat er s i ncl udi ng use l i f e, syst em f unct i onal f l ows, saf et y f eat ur es, and mechani cal aut omat ed det ai l s.

c. Submi t manuf act ur er ' s i nst r uct i ons f or duct heat er s i ncl udi ng i nst al l at i on dr awi ngs showi ng any speci al pr ovi s i ons r equi r ed t o i nst al l equi pment component s and syst em packages. Cl ear l y not e i mpedances, hazar ds and saf et y pr ecaut i ons.

1. 3 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval and i nf or mat i on onl y. Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y Not ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on

01 33 00 SUBMI TTAL PROCEDURES:

SD- 02 Shop Dr awi ngs

Fabr i cat i on Dr awi ngs; G

I nst al l at i on Dr awi ngs; G

SD- 03 Pr oduct Dat a

Equi pment and Per f or mance Dat a; G

Apr i l 2019 Page 1 SECTI ON 23 82 43. 00 40

Duct Heat er s; G

Heat i ng El ement s; G

Encl osur es; G

Cont r ol s; G

SD- 08 Manuf act ur er ' s I nst r uct i ons

Manuf act ur er ' s I nst r uct i ons; G

PART 2 PRODUCTS

2. 1 SYSTEM DESCRI PTI ON

Pr ovi de duct heat er s wi t h t he capaci t y i ndi cat ed, pl us or mi nus 5 per cent . Ensur e duct heat er s ar e f act or y pr ewi r ed, r eady f or f i el d t er mi nal connect i ons.

2. 1. 1 Per f or mance Requi r ement s

Pr ovi de duct heat er s conf or mi ng t o t he r equi r ement s of UL 1996.

2. 2 COMPONENTS

2. 2. 1 Heat i ng El ement s And Encl osur es

I nst al l heat i ng el ement s wi t h a f r amewor k compl et e wi t h t er mi nal , and const r uct j unct i on boxes of mi l l - al umi ni zed or gal vani zed car bon st eel .

Pr ovi de wi t h a magnet i c cont act or i n a separ at e encl osur e i nsul at ed f r om t he duct at duct heat er l ocat i on or at a separ at e, r emot e l ocat i on.

Ensur e al l gasket i ng i s 1/ 16- i nch t hi ck non- asbest os woven- cl ot h t ape, wi t h f l ange dept h sui t abl e f or duct i nsul at i on pr ovi ded. I nsul at e t er mi nal j unct i on box t o pr event el evat ed t emper at ur es.

Pr ovi de open heat i ng- el ement consi st i ng of a hel i x- wound r esi st ance wi r e al l oy appr oxi mat el y 80 per cent ni ckel and 20 per cent chr omi um. Wat t age densi t y i s not t o exceed 50 wat t s per l i near i nch of heat ed el ement .

Ensur e el ement suppor t mi ni mi zes abr asi on and saggi ng. Pr ovi de saf et y scr eens on bot h upst r eam and downst r eam si des of heat er el ement s.

Pr ovi de dummy el ement s or i ncl ude ot her pr ovi s i ons s i mi l ar t o open ar ea per f or at ed scr eens i f r equi r ed t o uni f or ml y di st r i but e ai r f l ow acr oss heat er f ace.

2. 2. 2 Controls

Pr ovi de uni t s wi t h i nt egr al over heat cut out s f or pr i mar y and secondar y pr ot ect i on, wi t h aut omat i c- r eset pr i mar y cut out of t he di sk t ype and sui t abl e f or 277- vol t , 60- her t z ser vi ce.

Pr ovi de di sk t ype manual - r eset secondar y cut out s wi r ed i n ser i es wi t h each circuit.

Pr ovi de i ndi cat i ng l i ght ( s) t o show:

Apr i l 2019 Page 2 SECTI ON 23 82 43. 00 40

a. Heat er on

b. Each ci r cui t on

Local l y pr ovi de pi l ot swi t ch t o cut of f heat er t hr ough i nt egr al magnet i c contactors.

For heat er assembl i es r at ed at 45 amper es and l ar ger , pr ovi de t he heat er assembl y subdi v i ded and f used. Fuse each subdi v i ded 45- amper e heat er l oad sect i on. I n c i r cui t s of l ess t han 45 amper es, f use appr opr i at e sect i ons.

Pr ovi de UL- appr oved magnet i c cont act or s, ( ot her t han i nt egr al over heat - cut out associ at ed uni t s) , r emot el y l ocat ed as i ndi cat ed.

Pr ovi de st ep cont r ol l er s f or sequenci ng heat er l oads of UL- appr oved component s and i ncl ude t he f ol l owi ng:

a. Del ay t o pr event l i ne sur ge when ener gi z i ng l oads

b. I ndi v i dual f usi ng of each st ep

c. I nt er component wi r i ng t o t er mi nal s f or f i el d connect i on cabi net

Pr ovi de st age t ype wal l mount ed t her most at s.

Pr ovi de t her most at s compl et e wi t h t her momet er , mechani cal hi gh- l i mi t st op, cal i br at ed oper at or , and an adj ust abl e heat er t o ef f ect ant i c i pat i on and t o pr event over r i de of space t emper at ur e. Ensur e r ange i s bet ween 55 and 105 degr ees F, wi t h di f f er ent i al not t o exceed 1. 5 degr ees F, r at ed f or oper at i on at 24 vol t s, 60 her t z. Pr ovi de any necessar y t r ansf or mer s, wi r i ng, and devi ces t o meet t hi s r equi r ement . Fi ni sh cases i n br ushed or sat i n chr ome.

Pr ovi de cont r ol of power t o uni t by a UL- l i s t ed sol i d- st at e s i l i con- cont r ol l ed r ect i f i er ( SCR) syst em such t hat vol t age i s cont i nuousl y i mpr essed and var i ed i n mi nut e i ncr ement s over a r ange of zer o t o r at ed vol t age or t o 105 per cent of r at ed vol t age maxi mum.

PART 3 EXECUTI ON

3. 1 INSTALLATION

I nst al l duct heat er s i n accor dance wi t h t he manuf act ur er ' s i nst r uct i ons and l ocat e duct heat er s t o per mi t access t o t he heat er af t er i nst al l at i on.

I nst al l t emper at ur e pr obe r out ed t o t he bui l di ng cont r ol l er i ndi cat i ng when t he uni t i s i n heat i ng mode.

For duct heat er s i nsi de a VAV, di spl ay f an st at us at t he bui l di ng controller.

3. 2 FI ELD QUALI TY CONTROL

Demonst r at e t hat duct heat er s oper at e sat i sf act or i l y i n t he pr esence of t he Cont r act i ng Of f i cer .

Conduct an oper at i onal t est f or a mi ni mum of 6 hour s.

Apr i l 2019 Page 3 SECTI ON 23 82 43. 00 40

Cycl e duct heat er s f i ve t i mes, f r om st ar t t o oper at i ng t her mal condi t i ons t o of f , t o ver i f y adequacy of const r uct i on, syst em cont r ol s, and component performance.

- - End of Sect i on - -

Apr i l 2019 Page 4 SECTI ON 23 82 43. 00 40

File details come from the government source that posted it. Updated .