26 36 00.00 10.pdf

PDF 45 KB Posted

Attached to
TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117
Solicitation number
FA813726R0030
Issued by

About this file

This is a technical specification document for Automatic Transfer Switch (ATS) and By-Pass/Isolation Switch (BP/IS) equipment required for Tinker Air Force Base in Oklahoma, effective April 2019.

The specification establishes comprehensive requirements for electrically operated, mechanically held transfer switches suitable for emergency and standby power systems compliant with NFPA 70. Equipment must be UL listed and manufactured to standards including IEEE C37.90.1, IEEE C37.13, IEEE C62.41.1, IEEE C62.41.2, IEEE 602, NEMA ICS 1, NEMA ICS 2, NEMA ICS 10 Part 2, UL 1008, and UL 1066. The ATS must operate at 60 Hz with adjustable voltage sensing (85-100% of nominal, factory set at 90%), adjustable override time delay (0.5-6 seconds, factory set at 1 second), adjustable transfer time delay (0-5 minutes, factory set at 0 minutes), and adjustable return time delay (0-30 minutes, factory set at 30 minutes). Contacts must be silver alloy composition with neutral contacts rated equal to main contacts unless specified otherwise for non-linear loads. The BP/IS must permit load bypass and ATS isolation through a maximum of two handle operations within 5 seconds, with provisions for locking in isolation position. Equipment must be housed in NEMA ICS 6 Type 1, 3R, 4, or 12 enclosures with corrosion-resistant finishes and thermostatically controlled heaters for the specified site conditions: 390 meters altitude, 50% relative humidity maximum, -6 to +130°F operating temperature, and Seismic Zone 3. Comprehensive factory testing per UL 1008 and site testing demonstrating functional performance are required prior to equipment acceptance, with certified test reports submitted within specified timeframes.

View the file

Other files

File Type Posted
03 39 00.00 10.pdf PDF
03 62 16.pdf PDF
04 20 00.pdf PDF
05 21 00.pdf PDF
06 20 00.pdf PDF
06 61 16.pdf PDF
07 60 00.pdf PDF
07 61 14.00 20.pdf PDF
07 84 00.pdf PDF
07 92 00.pdf PDF
08 11 16.pdf PDF
08 36 13.pdf PDF
08 71 00.pdf PDF
09 68 00.pdf PDF
10 28 13.pdf PDF
13 48 00.pdf PDF
21 13 17.pdf PDF
22 00 00.pdf PDF
23 00 00.pdf PDF
23 08 00.pdf PDF
23 11 25.pdf PDF
23 35 00.pdf PDF
23 64 26.pdf PDF
23 82 16.00 40.pdf PDF
23 82 43.00 40.pdf PDF
26 56 00.pdf PDF
31 23 06.pdf PDF
32 01 14.pdf PDF
32 13 74.pdf PDF
02 41 00.pdf PDF
06 10 00.pdf PDF
07 12 00.pdf PDF
07 42 13.pdf PDF
07 42 63.pdf PDF
07 53 23.pdf PDF
07 54 19.pdf PDF
07 62 13.pdf PDF
08 41 13.pdf PDF
08 51 13.pdf PDF
08 51 23.pdf PDF
09 51 00.pdf PDF
00 71 00.pdf PDF
01 78 23.pdf PDF
00 72 00.pdf PDF
00 80 00.pdf PDF
Solicitation - FA813726R0030.pdf PDF
Att10_190023_SOW.pdf PDF
EAL List - BLANK to Contractors WWYK190023.xlsx XLSX spreadsheet
Att11_190023_Submittal Register_Final.pdf PDF
Wage Determination.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 26 36 00. 00 10

AUTOMATI C TRANSFER SWI TCH AND BY- PASS/ I SOLATI ON SWI TCH

04/17

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

ASTM I NTERNATI ONAL ( ASTM)

ASTM B117 ( 2016) St andar d Pr act i ce f or Oper at i ng Sal t Spr ay ( Fog) Appar at us

I NSTI TUTE OF ELECTRI CAL AND ELECTRONI CS ENGI NEERS ( I EEE)

I EEE 602 ( 2007) Recommended Pr act i ce f or El ect r i c Syst ems i n Heal t h Car e Faci l i t i es - Whi t e Book

I EEE C37. 13 ( 2015) St andar d f or Low- Vol t age AC Power Ci r cui t Br eaker s Used i n Encl osur es

I EEE C37. 90. 1 ( 2013) St andar d f or Sur ge Wi t hst and Capabi l i t y ( SWC) Test s f or Rel ays and Rel ay Syst ems Associ at ed wi t h El ect r i c Power Appar at us

I EEE C62. 41. 1 ( 2002; R 2008) Gui de on t he Sur ges Envi r onment i n Low- Vol t age ( 1000 V and Less) AC Power Ci r cui t s

I EEE C62. 41. 2 ( 2002) Recommended Pr act i ce on Char act er i zat i on of Sur ges i n Low- Vol t age ( 1000 V and Less) AC Power Ci r cui t s

NATI ONAL ELECTRI CAL MANUFACTURERS ASSOCI ATI ON ( NEMA)

NEMA I CS 1 ( 2000; R 2015) St andar d f or I ndust r i al Cont r ol and Syst ems: Gener al Requi r ement s

NEMA I CS 10 Par t 2 ( 2005) AC Tr ansf er Equi pment , Par t 2:

St at i c AC Tr ansf er Equi pment

NEMA I CS 2 ( 2000; R 2005; Er r at a 2008) St andar d f or Cont r ol l er s, Cont act or s, and Over l oad Rel ays Rat ed 600 V

NEMA I CS 4 ( 2015) Ter mi nal Bl ocks

NEMA I CS 6 ( 1993; R 2011) Encl osur es

Apr i l 2019 Page 1 SECTI ON 26 36 00. 00 10

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

NFPA 110 ( 2016) St andar d f or Emer gency and St andby Power Syst ems

NFPA 70 ( 2014; AMD 1 2013; Er r at a 1 2013; AMD 2 2013; Er r at a 2 2013; AMD 3 2014; Er r at a 3- 4 2014; AMD 4- 6 2014) Nat i onal El ect r i cal Code

U. S. DEPARTMENT OF DEFENSE ( DOD)

UFC 3- 310- 04 ( 2013) Sei smi c Desi gn f or Bui l di ngs

UNDERWRI TERS LABORATORI ES ( UL)

UL 1008 ( 2014) Tr ansf er Swi t ch Equi pment

UL 1066 ( 2012; Repr i nt Jul 2013) Low- Vol t age AC and DC Power Ci r cui t Br eaker s Used i n Enclosures

1. 2 SUBMITTALS

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 02 Shop Dr awi ngs

Det ai l Dr awi ngs

Equipment

Installation

SD- 03 Pr oduct Dat a

Equipment

SD- 06 Test Repor t s

Testing

SD- 07 Cer t i f i cat es

Equipment

Swi t chi ng Equi pment

SD- 10 Oper at i on and Mai nt enance Dat a

Swi t chi ng Equi pment

Instructions

Apr i l 2019 Page 2 SECTI ON 26 36 00. 00 10

1. 3 QUALI TY ASSURANCE

1. 3. 1 Det ai l Dr awi ngs

Submi t i nt er f ace equi pment connect i on di agr am showi ng condui t and wi r i ng bet ween ATS and r el at ed equi pment . Submi t schemat i c, ext er nal connect i on, one- l i ne schemat i c and wi r i ng di agr am of each ATS assembl y. Devi ce, namepl at e, and i t em number s shown i n l i s t of equi pment and mat er i al shal l appear on dr awi ngs wher ever t hat i t em appear s. Di agr ams shal l show i nt er l ocki ng pr ovi s i ons and caut i onar y not es, i f any. Oper at i ng i nst r uct i ons shal l be shown ei t her on one- l i ne di agr am or separ at el y.

Unl ess ot her wi se appr oved, one- l i ne and el ement ar y or schemat i c di agr ams shal l appear on same dr awi ng.

1. 3. 2 Swi t chi ng Equi pment

Upon r equest , manuf act ur er shal l pr ovi de not ar i zed l et t er cer t i f y i ng compl i ance wi t h r equi r ement s of t hi s speci f i cat i on, i ncl udi ng wi t hst and cur r ent r at i ng ( WCR) . Submi t evi dence t hat ATS wi t hst and cur r ent r at i ng ( WCR) has been coor di nat ed wi t h upst r eam pr ot ect i ve devi ces as r equi r ed by UL 1008. Submi t an oper at i ng manual out l i ni ng st ep- by- st ep pr ocedur es f or syst em st ar t up, oper at i on, and shut down. Manual shal l i ncl ude manuf act ur er ' s name, model number , ser vi ce manual , par t s l i s t , and br i ef descr i pt i on of equi pment and basi c oper at i ng f eat ur es. Manuf act ur er ' s spar e par t s dat a shal l be i ncl uded wi t h suppl y sour ce and cur r ent cost of r ecommended spar e par t s. Manual shal l i ncl ude si mpl i f i ed wi r i ng and cont r ol di agr ams f or syst em as i nst al l ed.

1. 4 SI TE CONDI TI ONS

Sei smi c r equi r ement s shal l be as speci f i ed i n UFC 3- 310- 04 and Sect i ons 13 48 00 SEI SMI C PROTECTI ON FOR MI SCELLANEOUS EQUI PMENT and 26 05 48. 00 10 SEI SMI C PROTECTI ON FOR ELECTRI CAL EQUI PMENT. ATS shal l be sui t abl e f or pr ol onged per f or mance under f ol l owi ng ser vi ce condi t i ons:

Altitude 390 met er s above mean sea l evel

Rel at i ve Humi di t y 50 per cent maxi mum, cont i nuous

Temperature Mi nus 6 t o Pl us 130 degr ees F degr ees F

Sei smi c Par amet er s Zone 3

PART 2 PRODUCTS

2. 1 STANDARD PRODUCTS

Pr ovi de mat er i al and equi pment whi ch ar e st andar d pr oduct s of a manuf act ur er r egul ar l y engaged i n manuf act ur i ng t he pr oduct s and t hat essent i al l y dupl i cat e i t ems t hat have been i n sat i sf act or y use f or at l east 2 year s pr i or t o bi d openi ng. Submi t l i s t of pr oposed equi pment and mat er i al , cont ai ni ng a descr i pt i on of each separ at e i t em, and cer t i f i cat es of compl i ance showi ng evi dence of UL l i s t i ng and conf or mance wi t h appl i cabl e NEMA st andar ds. Such cer t i f i cat es ar e not r equi r ed i f manuf act ur er ' s publ i shed dat a, submi t t ed and appr oved, r ef l ect UL l i s t i ng or conf or mance wi t h appl i cabl e NEMA st andar ds. The exper i ence use shal l i ncl ude appl i cat i ons i n s i mi l ar c i r cumst ances and of same desi gn and

Apr i l 2019 Page 3 SECTI ON 26 36 00. 00 10 r at i ng as speci f i ed ATS. Equi pment shal l be capabl e of bei ng ser vi ced by a manuf act ur er - aut hor i zed and t r ai ned or gani zat i on t hat i s, i n t he Cont r act i ng Of f i cer ' s opi ni on, r easonabl y conveni ent t o t he s i t e.

2. 2 NAMEPLATE

Namepl at e showi ng manuf act ur er ' s name and equi pment r at i ngs shal l be made of cor r osi on- r esi st ant mat er i al wi t h not l ess t han 1/ 8 i nch t al l char act er s. Namepl at e shal l be mount ed t o f r ont of encl osur e and shal l compl y wi t h namepl at e r equi r ement s of NEMA I CS 2.

2. 3 AUTOMATI C TRANSFER SWI TCH ( ATS)

ATS shal l be el ect r i cal l y oper at ed and mechani cal l y hel d i n bot h oper at i ng posi t i ons. ATS shal l be sui t abl e f or use i n emer gency syst ems and st andby syst ems descr i bed i n NFPA 70. ATS shal l be UL l i s t ed. ATS shal l be manuf act ur ed and t est ed i n accor dance wi t h appl i cabl e r equi r ement s of

I EEE C37. 90. 1, I EEE C37. 13, I EEE C62. 41. 1, I EEE C62. 41. 2, I EEE 602,

NEMA I CS 1, NEMA I CS 2, NEMA I CS 10 Par t 2, UL 1008 and UL 1066. ATS shal l conf or m t o NFPA 110. To f aci l i t at e mai nt enance, manuf act ur er ' s i nst r uct i on manual shal l pr ovi de t ypi cal maxi mum cont act vol t age dr op r eadi ngs under speci f i ed condi t i ons f or use dur i ng per i odi c mai nt enance.

Manuf act ur er shal l pr ovi de i nst r uct i ons f or det er mi nat i on of cont act i nt egr i t y. ATS shal l be r at ed f or cont i nuous dut y at speci f i ed cont i nuous cur r ent r at i ng. ATS shal l be f ul l y compat i bl e and appr oved f or use wi t h BP/ I S speci f i ed. BP/ I S shal l be consi der ed par t of ATS syst em. ATS shal l have f ol l owi ng char act er i st i cs:

Voltage As Speci f i ed

Number of Phases As Speci f i ed

Number of Wi r es As Speci f i ed

Frequency 60 Hz

Poles As Speci f i ed

ATS WCR Rat ed t o wi t hst and speci f i ed shor t - c i r cui t cur r ent ( amper es, RMS symmet r i cal ) .

Nonwel di ng Cont act s Rat ed f or nonwel di ng of cont act s when used wi t h upst r eam f eeder over cur r ent devi ces shown and wi t h avai l abl e f aul t cur r ent speci f i ed.

Mai n and Neut r al Contacts

Cont act s shal l have si l ver al l oy composi t i on. Neut r al cont act s shal l have same cont i nuous cur r ent r at i ng as mai n or phase cont act s unl ess speci f i ed ot her wi se t o accompodat e non- l i near l oads

Apr i l 2019 Page 4 SECTI ON 26 36 00. 00 10

2. 3. 1 Over r i de Ti me Del ay

Pr ovi de adj ust abl e t i me del ay t o over r i de moni t or ed sour ce devi at i on f r om

0. 5 t o 6seconds and f act or y set at 1 second. ATS shal l moni t or phase conduct or s t o det ect and r espond t o sust ai ned vol t age dr op of 15per cent of nomi nal bet ween any t wo nor mal or pr ef er r ed sour ce conduct or s and i ni t i at e t r ansf er act i on t o al t er nat e/ emer gency sour ce and st ar t engi ne dr i ven gener at or af t er set t i me per i od. Pi ckup vol t age shal l be adj ust abl e f r om 85t o 100 per cent of nomi nal and f act or y set at 90per cent . Dr opout vol t age shal l be adj ust abl e f r om 75t o 98 per cent of pi ckup val ue and f act or y set at 85 per cent of nomi nal .

2. 3. 2 Tr ansf er Ti me Del ay

Ti me del ay bef or e t r ansf er t o al t er nat e/ emer gency power sour ce shal l be adj ust abl e f r om 0t o 5mi nut es and f act or y set at 0 mi nut es. ATS shal l moni t or f r equency and vol t age of al t er nat e/ emer gency power sour ce and t r ansf er when f r equency and vol t age ar e st abi l i zed. Pi ckup vol t age shal l be adj ust abl e f r om 85t o 100 per cent of nomi nal and f act or y set at 90 per cent . Pi ckup f r equency shal l be adj ust abl e f r om 90 t o 100 per cent of nomi nal and f act or y set at 90 per cent .

2. 3. 3 Ret ur n Ti me Del ay

Ti me del ay bef or e r et ur n t r ansf er t o nor mal / pr ef er r ed power sour ce shal l be adj ust abl e f r om 0 t o 30 mi nut es and f act or y set at 30 mi nut es. Ti me del ay shal l be aut omat i cal l y def eat ed upon l oss or sust ai ned under vol t age of al t er nat e/ emer gency power sour ce, pr ovi ded t hat nor mal / pr ef er r ed suppl y has been r est or ed.

2. 3. 4 Engi ne Shut down Ti me Del ay

Ti me del ay shal l be adj ust abl e f r om 0 t o 30 mi nut es and shal l be f act or y set at 10 mi nut es, or as speci f i ed.

2. 3. 5 Exerciser

Pr ovi de a gener at or exer ci ser t i mer . Run t i mes shal l be user pr ogr ammabl e. The gener at or exer ci ser shal l be sel ect abl e bet ween l oad t r ansf er and engi ne r un onl y, and shal l have a f ai l - saf e f eat ur e t hat wi l l r et r ansf er t he ATS t o nor mal / pr ef er r ed dur i ng t he exer ci se per i od.

2. 3. 6 Auxi l i ar y Cont act s

Two nor mal l y open and t wo nor mal l y c l osed auxi l i ar y cont act s r at ed at 10 amper es at 120480vol t s shal l oper at e when ATS i s connect ed t o nor mal / pr ef er r ed power sour ce, and t wo nor mal l y open and t wo nor mal l y c l osed cont act s shal l oper at e when ATS i s connect ed t o al t er nat e/ emer gency sour ce.

2. 3. 7 Suppl ement al Feat ur es

ATS shal l be f ur ni shed wi t h t he f ol l owi ng:

a. Engi ne st ar t cont act .

b. Al t er nat eEmer gency sour ce moni t or .

c. Test swi t ch t o s i mul at e nor mal power out age.

Apr i l 2019 Page 5 SECTI ON 26 36 00. 00 10

d. Vol t age sensi ng. Pi ckup vol t age adj ust abl e f r om 85 t o 100 per cent of nomi nal ; dr opout adj ust abl e f r om 75 t o 98 per cent of pi ckup.

e. Ti me del ay bypass swi t ch t o over r i de r et ur n t i me del ay t o nor mal .

f . Manual r et ur n- t o- nor mal swi t ch.

g. Means shal l be pr ovi ded i n t he ATS t o i nsur e t hat mot or / t r ansf or mer l oad i nr ush cur r ent s do not exceed nor mal st ar t i ng cur r ent s. Thi s shal l be accompl i shed wi t h ei t her i n- phase moni t or i ng, t i me- del ay t r ansi t i on, or l oad vol t age decay sensi ng met hods. I f manuf act ur er suppl i es an i n- phase moni t or i ng syst em, t he manuf act ur er shal l i ndi cat e under what condi t i ons a t r ansf er cannot be accompl i shed. I f t he manuf act ur er suppl i es a t i me- del ay t r ansi t i on syst em, t he manuf act ur er shal l suppl y r ecommendat i ons f or est abl i shi ng t i me del ay. I f l oad vol t age decay sensi ng i s suppl i ed, t he l oad vol t age set t i ng shal l be user pr ogr ammabl e.

2. 3. 8 Operator

Manual oper at or conf or mi ng t o UL 1008 shal l be pr ovi ded, and shal l i ncor por at e f eat ur es t o pr event oper at i on by unaut hor i zed per sonnel . ATS shal l be desi gned f or saf e manual oper at i on under f ul l l oad condi t i ons.

I f manual oper at i on i s accompl i shed by openi ng t he door , t hen a dead- f r ont shal l be suppl i ed f or oper at or saf et y.

2. 3. 9 Over r i de Swi t ch

Over r i de swi t ch shal l bypass aut omat i c t r ansf er cont r ol s so ATS wi l l t r ansf er and r emai n connect ed t o al t er nat e/ emer gency power sour ce, r egar dl ess of condi t i on of nor mal / pr ef er r ed sour ce. I f al t er nat e/ emer gency sour ce f ai l s and nor mal / pr ef er r ed sour ce i s avai l abl e, ATS shal l aut omat i cal l y r et r ansf er t o nor mal / pr ef er r ed sour ce.

2. 3. 10 Gr een I ndi cat i ng Li ght

A gr een i ndi cat i ng l i ght shal l super vi se/ pr ovi de nor mal / pr ef er r ed power sour ce swi t ch posi t i on i ndi cat i on and shal l have a namepl at e engr aved NORMAL or PREFERRED.

2. 3. 11 Red I ndi cat i ng Li ght

A r ed i ndi cat i ng l i ght shal l super vi se/ pr ovi de al t er nat e/ emer gency power sour ce swi t ch posi t i on i ndi cat i on and shal l have a namepl at e engr aved ALTERNATE or EMERGENCY.

2. 4 BY- PASS/ I SOLATI ON SWI TCH ( BP/ I S)

2. 4. 1 Design

Bypass/ i sol at i on swi t ch ( BP/ I S) shal l per mi t l oad by- pass t o ei t her nor mal / pr ef er r ed or al t er nat e/ emer gency power sour ce and compl et e i sol at i on of associ at ed ATS, i ndependent of ATS oper at i ng posi t i on. BP/ I S and associ at ed ATS shal l be pr oduct s of same manuf act ur er and shal l be compl et el y i nt er connect ed and t est ed at f act or y and at pr oj ect s i t e as speci f i ed. BP/ I S shal l be manuf act ur ed, l i s t ed, and t est ed i n accor dance wi t h par agr aph AUTOMATI C TRANSFER SWI TCH ( ATS) and shal l have el ect r i cal r at i ngs t hat exceed or equal compar abl e r at i ngs speci f i ed f or ATS.

Oper at i ng handl es shal l be ext er nal l y oper at ed and ar r anged so t hat one

Apr i l 2019 Page 6 SECTI ON 26 36 00. 00 10 per son can per f or m t he bypass and i sol at i on f unct i ons t hr ough t he oper at i on of a maxi mum of t wo handl es wi t hi n 5 seconds. The ATS shal l have pr ovi s i ons f or l ocki ng i n t he i sol at i on posi t i on. Handl e f or manual oper at i on shal l be per manent l y at t ached t o oper at i ng mechani sm. BP/ I S oper at i on shal l be accompl i shed wi t hout di sconnect i ng swi t ch l oad t er mi nal conduct or s. I sol at i on handl e posi t i ons shal l be mar ked wi t h engr aved pl at es or ot her appr oved means t o i ndi cat e posi t i on or oper at i ng condi t i on of associ at ed ATS, as f ol l ows:

a. I ndi cat i on shal l be pr ovi ded t o show t hat ATS sect i on i s pr ovi di ng power t o t he l oad.

b. I ndi cat i on shal l be pr ovi ded of ATS i sol at i on. The ATS cont r ol s shal l r emai n f unct i onal wi t h t he ATS i sol at ed or i n bypass mode t o per mi t moni t or i ng of t he nor mal power sour ce and aut omat i c st ar t i ng of t he gener at or i n t he event of a l oss of t he nor mal power sour ce. I n t he i sol at ed mode, t he bypass sect i on shal l be capabl e of f unct i oni ng as a manual t r ansf er swi t ch t o t r ansf er t he l oad t o ei t her power sour ce.

The ATS shal l be capabl e of under goi ng f unct i onal oper at i on t est i ng wi t hout ser vi ce i nt er r upt i on. The ATS may al so be compl et el y r emoved f r om t he encl osur e, i f r equi r ed f or mai nt enance or r epai r , whi l e t he bypass sect i on cont i nues t o power t he l oad.

2. 4. 2 Swi t ch Const r uct i on

Bypass/ i sol at i on swi t ch shal l be const r uct ed f or conveni ent r emoval of par t s f r om f r ont of swi t ch encl osur e wi t hout r emoval of ot her par t s or di sconnect i on of ext er nal power conduct or s. Cont act s shal l be as speci f i ed f or associ at ed ATS, i ncl udi ng pr ovi s i ons f or i nspect i on of cont act s wi t hout di sassembl y of BP/ I S or r emoval of ent i r e cont act encl osur e. To f aci l i t at e mai nt enance, manuf act ur er shal l pr ovi de i nst r uct i ons f or det er mi nat i on of cont act i nt egr i t y. BP/ I S and associ at ed ATS shal l be i nt er connect ed wi t h sui t abl y s i zed copper bus bar s s i l ver - pl at ed at each connect i on poi nt , and br aced t o wi t hst and magnet i c and t her mal f or ces cr eat ed at WCR speci f i ed f or associ at ed ATS.

2. 5 ENCLOSURE

ATS and accessor i es shal l be i nst al l ed i n wal l - mount ed, f r ee- st andi ng, f l oor - mount ed, vent i l at ed, unvent i l at ed NEMA I CS 6, Type 1, 3R, 4, or 12, smoot h sheet met al encl osur e const r uct ed i n accor dance wi t h appl i cabl e r equi r ement s of UL 1066 and UL 1008. I nt ake vent shal l be scr eened and f i l t er ed. Exhaust vent shal l be scr eened. Door shal l have sui t abl e hi nges, l ocki ng handl e l at ch, and gasket ed j amb. Ther most at i cal l y cont r ol l ed heat er shal l be pr ovi ded wi t hi n encl osur e t o pr event condensat i on over t emper at ur e r ange st i pul at ed i n par agr aph SERVI CE CONDI TI ONS. Met al gauge shal l be not l ess t han No. 14. Encl osur e shal l be equi pped wi t h at l east t wo appr oved gr oundi ng l ugs f or gr oundi ng encl osur e t o f aci l i t y gr ound syst em usi ng No. 4 AWG copper conduct or s.

Fact or y wi r i ng wi t hi n encl osur e and f i el d wi r i ng t er mi nat i ng wi t hi n encl osur e shal l compl y wi t h NFPA 70. I f wi r i ng i s not col or coded, wi r e shal l be per manent l y t agged or mar ked near t er mi nal at each end wi t h wi r e number shown on appr oved det ai l dr awi ng. Ter mi nal bl ock shal l conf or m t o NEMA I CS 4. Ter mi nal s shal l be ar r anged f or ent r ance of ext er nal conduct or s f r om as shown. Mai n swi t ch t er mi nal s, i ncl udi ng neut r al t er mi nal i f used, shal l be pr essur e t ype sui t abl e f or t er mi nat i on of ext er nal copper conduct or s shown.

Apr i l 2019 Page 7 SECTI ON 26 36 00. 00 10

2. 5. 1 Construction

Encl osur e shal l be const r uct ed f or ease of r emoval and r epl acement of ATS component s and cont r ol devi ces f r om f r ont wi t hout di sconnect i on of ext er nal power conduct or s or r emoval or di sassembl y of maj or component s.

Encl osur e of ATS wi t h BP/ I S shal l be const r uct ed t o pr ot ect per sonnel f r om ener gi zed BP/ I S component s dur i ng ATS mai nt enance.

2. 5. 2 Cl eani ng and Pai nt i ng

Bot h t he i nsi de and out si de sur f aces of an encl osur e, i ncl udi ng means f or f ast eni ng, shal l be pr ot ect ed agai nst cor r osi on by enamel i ng, gal vani z i ng, pl at i ng, powder coat i ng, or ot her equi val ent means. Pr ot ect i on i s not r equi r ed f or met al par t s t hat ar e i nher ent l y r esi st ant t o cor r osi on, bear i ngs, s l i di ng sur f aces of hi nges, or ot her par t s wher e such pr ot ect i on i s i mpr act i cal . Fi ni sh shal l be manuf act ur er ' s st andar d mat er i al , pr ocess, and col or and shal l be f r ee f r om r uns, sags, peel i ng, or ot her defects.

2. 6 TESTING

Submi t a descr i pt i on of pr oposed f i el d t est pr ocedur es, i ncl udi ng pr oposed dat e and st eps descr i bi ng each t est , i t s dur at i on and expect ed r esul t s, not l ess t han 2 weeks pr i or t o t est dat e. Submi t cer t i f i ed f act or y and f i el d t est r epor t s, wi t hi n 14 days f ol l owi ng compl et i on of t est s. Repor t s shal l be cer t i f i ed and dat ed and shal l demonst r at e t hat t est s wer e successf ul l y compl et ed pr i or t o shi pment of equi pment .

2. 6. 1 Fact or y Test i ng

A pr ot ot ype of speci f i ed ATS shal l be f act or y t est ed i n accor dance wi t h UL 1008. I n addi t i on, f act or y t est s shal l be per f or med on each ATS as follows:

a. I nsul at i on r esi st ance t est t o ensur e i nt egr i t y and cont i nui t y of ent i r e syst em.

b. Mai n swi t ch cont act r esi st ance t est .

c. Vi sual i nspect i on t o ver i f y t hat each ATS i s as speci f i ed.

d. Mechani cal t est t o ver i f y t hat ATS sect i ons ar e f r ee of mechani cal hindrances.

e. El ect r i cal t est s t o ver i f y compl et e syst em el ect r i cal oper at i on and t o set up t i me del ays and vol t age sensi ng set t i ngs.

2. 6. 2 Fact or y Test Repor t s

Manuf act ur er shal l pr ovi de t hr ee cer t i f i ed copi es of f act or y t est r epor t s.

2. 7 FACTORY TESTI NG ( MEDI CAL FACI LI TI ES)

The f act or y t est s f or ATS and By- Pass/ I sol at i on swi t ches used i n medi cal f aci l i t i es shal l be conduct ed i n t he f ol l owi ng sequence:

a. Gener al

b. Nor mal

c. Over vol t age

Apr i l 2019 Page 8 SECTI ON 26 36 00. 00 10

d. Under vol t age

e. Over l oad f . Endur ance

g. Temper at ur e Ri se

h. Di el ect r i c Vol t age- Wi t hst and i . Cont act Openi ng j . Di el ect r i c Vol t age- Wi t hst and ( Repeat ed)

k. Wi t hst and l . I nst r ument at i on and Cal i br at i on of Hi gh Capaci t y

m. Cl osi ng

n. Di el ect r i c Vol t age- Wi t hst and ( Repeat ed)

o. St r engt h of I nsul at i ng Base and Suppor t

2. 7. 1 Vi ewi ng Por t s

ATS and BP/ I S swi t ches shal l be of dr aw- out const r uct i on. Vi ewi ng por t s t o i nspect t he cont act s wi t hout r equi r i ng di sassembl y shal l be pr ovi ded.

2. 7. 2 Oper at i ng Handl es

The oper at i ng handl es shal l be ext er nal l y oper at ed, and desi gned and const r uct ed not t o st op i n an i nt er medi at e or neut r al posi t i on dur i ng oper at i on, but shal l per mi t l oad by- pass and t r ansf er swi t ch i sol at i on i n no mor e t han t wo manual oper at i ons whi ch can be per f or med by one per son i n 5 seconds or l ess. The t r ansf er speed wi l l be i ndependent of t he oper at i onal speed of t he swi t ch handl e or handl es.

PART 3 EXECUTI ON

3. 1 INSTALLATION

ATS shal l be i nst al l ed as shown and i n accor dance wi t h appr oved manuf act ur er ' s i nst r uct i ons.

3. 2 INSTRUCTIONS

Manuf act ur er ' s appr oved oper at i ng i nst r uct i ons shal l be per manent l y secur ed t o cabi net wher e oper at or can see t hem. One- l i ne and el ement ar y or schemat i c di agr am shal l be per manent l y secur ed t o i nsi de of f r ont encl osur e door .

3. 3 SI TE TESTI NG

Fol l owi ng compl et i on of ATS i nst al l at i on and af t er maki ng pr oper adj ust ment s and set t i ngs, s i t e t est s shal l be per f or med i n accor dance wi t h manuf act ur er ' s wr i t t en i nst r uct i ons t o demonst r at e t hat each ATS f unct i ons sat i sf act or i l y and as speci f i ed. Advi se Cont r act i ng Of f i cer not l ess t han 5 wor ki ng days pr i or t o schedul ed dat e f or s i t e t est i ng, and pr ovi de cer t i f i ed f i el d t est r epor t s wi t hi n 2 cal endar weeks f ol l owi ng successf ul compl et i on of s i t e t est s. Test r epor t s shal l descr i be adj ust ment s and set t i ngs made and si t e t est s per f or med. Mi ni mum oper at i onal t est s shal l i ncl ude t he f ol l owi ng:

3. 3. 1 I nsul at i on Resi st ance

I nsul at i on r esi st ance shal l be t est ed, bot h phase- t o- phase and phase-to-ground.

Apr i l 2019 Page 9 SECTI ON 26 36 00. 00 10

3. 3. 2 Power Fai l ur e of Nor mal Sour ce

Power f ai l ur e of nor mal sour ce shal l be s i mul at ed by openi ng upst r eam pr ot ect i ve devi ce. Thi s t est shal l be per f or med a mi ni mum of f i ve t i mes.

3. 3. 3 Power Fai l ur e of Emer gency Sour ce

Power f ai l ur e of emer gency sour ce wi t h nor mal sour ce avai l abl e shal l be s i mul at ed by openi ng upst r eam pr ot ect i ve devi ce f or emer gency sour ce.

Thi s t est shal l be per f or med a mi ni mum of f i ve t i mes.

3. 3. 4 Low Phase- t o- Gr ound Vol t age

Si mul at e l ow phase- t o- gr ound vol t age f or each phase of nor mal sour ce.

3. 3. 5 Oper at i on and Set t i ngs

Ver i f y oper at i on and set t i ngs f or speci f i ed ATS f eat ur es, such as over r i de t i me del ay, t r ansf er t i me del ay, r et ur n t i me del ay, engi ne shut down t i me del ay, exer ci ser , auxi l i ar y cont act s, and suppl ement al f eat ur es.

3. 3. 6 ATS and BP/ I S Funct i ons

Ver i f y mannual and aut omat i c ATS and BP/ I S f unct i ons.

- - End of Sect i on - -

Apr i l 2019 Page 10 SECTI ON 26 36 00. 00 10

File details come from the government source that posted it. Updated .