23 08 01.00 20.pdf

PDF 121 KB Posted

Attached to
TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117
Solicitation number
FA813726R0030
Issued by

About this file

This is a technical specification document for testing industrial ventilation systems at Tinker Air Force Base, Oklahoma, issued in April 2019. The specification establishes comprehensive requirements for an independent test agency to conduct performance testing, evaluation, and certification of exhaust and replacement air systems in facilities with industrial processes.

The testing scope requires the independent test agency to measure and document smoke behavior, air flow patterns, static pressures, volume flow rates, velocity pressures, fan operating points, and system compliance with design specifications. The test agency must be qualified with a minimum of five years of industrial ventilation testing experience or current membership in AABC or NEBB, and the lead test engineer must hold a Professional Engineer license, Certified Industrial Hygienist registration, or Test and Balance Engineer certification with five years of documented experience. Testing must comply with ACGIH-2092S and AMCA 201 standards and be conducted under full-load conditions. Key deliverables include six copies of organized reports containing preliminary review findings, smoke test results, fan operating point analysis, static pressure data, volume and velocity flow rate measurements, and pitot traverse readings. The test agency must submit a preliminary review report 15 calendar days before testing, work plan and test instrument list submissions 120 and an unspecified number of days after contract award respectively, and complete testing reports within 15 to 30 days of test completion. The specification includes sample forms for test agency qualifications, pitot traverse data (rectangular and round ducts), exhaust air system test data, and replacement air system test data, with detailed instructions for field procedures, instrument calibration, pressure measurements, temperature readings, and system verification protocols.

View the file

Other files

File Type Posted
03 39 00.00 10.pdf PDF
03 62 16.pdf PDF
04 20 00.pdf PDF
05 21 00.pdf PDF
06 20 00.pdf PDF
06 61 16.pdf PDF
07 60 00.pdf PDF
07 61 14.00 20.pdf PDF
07 84 00.pdf PDF
07 92 00.pdf PDF
08 11 16.pdf PDF
08 36 13.pdf PDF
08 71 00.pdf PDF
09 68 00.pdf PDF
10 28 13.pdf PDF
13 48 00.pdf PDF
21 13 17.pdf PDF
22 00 00.pdf PDF
23 00 00.pdf PDF
23 08 00.pdf PDF
23 11 25.pdf PDF
23 35 00.pdf PDF
23 64 26.pdf PDF
23 82 16.00 40.pdf PDF
23 82 43.00 40.pdf PDF
26 56 00.pdf PDF
31 23 06.pdf PDF
32 01 14.pdf PDF
32 13 74.pdf PDF
02 41 00.pdf PDF
06 10 00.pdf PDF
07 12 00.pdf PDF
07 42 13.pdf PDF
07 42 63.pdf PDF
07 53 23.pdf PDF
07 54 19.pdf PDF
07 62 13.pdf PDF
08 41 13.pdf PDF
08 51 13.pdf PDF
08 51 23.pdf PDF
09 51 00.pdf PDF
00 71 00.pdf PDF
01 78 23.pdf PDF
00 72 00.pdf PDF
00 80 00.pdf PDF
Solicitation - FA813726R0030.pdf PDF
Att10_190023_SOW.pdf PDF
EAL List - BLANK to Contractors WWYK190023.xlsx XLSX spreadsheet
Att11_190023_Submittal Register_Final.pdf PDF
Wage Determination.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 23 08 01. 00 20

TESTI NG I NDUSTRI AL VENTI LATI ON SYSTEMS

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AI R MOVEMENT AND CONTROL ASSOCI ATI ON I NTERNATI ONAL ( AMCA)

AMCA 201 ( 2002; R 2011) Fans and Syst ems

AMERI CAN CONFERENCE OF GOVERNMENTAL I NDUSTRI AL HYGI ENI STS ( ACGI H)

ACGIH-2092S ( 2004) I ndust r i al Vent i l at i on: A Manual of Recommended Pr act i ce

1. 2 DEFINITIONS

a. Capt ur e vel oci t y: Ai r vel oci t y at any poi nt i n f r ont of t he hood or at t he hood openi ng necessar y t o over come opposi ng ai r cur r ent s and t o capt ur e cont ami nat ed ai r at t hat poi nt t o cause i t t o f l ow i nt o t he hood.

b. Capt ur e zone: Cont r ol l ed space ar ound an i ndust r i al pr ocess t hat pr ovi des a saf e and heal t hy wor kspace.

c. Equi l i br i um per f or mance poi nt : The oper at i ng condi t i on af t er suf f i c i ent st ar t - up t i me t hat an ai r pol l ut i on cont r ol devi ce r eaches opt i mum ef f i c i ency. The manuf act ur er r ecommends t he mi ni mum st ar t - up t i me f or each devi ce.

d. Faci l i t y : A bui l di ng or por t i on of a bui l di ng i n whi ch cont ami nat ed ai r i s cont r ol l ed by t he i ndust r i al vent i l at i on syst em. Thi s i ncl udes t he shop space, equi pment r oom, of f i ces, r est r ooms and l ocker r ooms af f ect ed by t he i ndust r i al pr ocess.

e. Ful l l oad condi t i on: Condi t i on i n t he f aci l i t y wher e exhaust and r epl acement ai r syst ems oper at e s i mul t aneousl y, as i nst al l ed by t he Cont r act or accor di ng t o t he desi gn pl ans and speci f i cat i ons.

f . Heat i ng and cool i ng equi pment : Equi pment used t o t emper ai r i n t he f aci l i t y . Equi pment i ncl udes, but i s not l i mi t ed t o: condenser s, chi l l er s, pumps, heat exchanger s, heat i ng and cool i ng coi l s, heat pumps, cool i ng t ower s, and duct heat er s.

g. Hood st at i c pr essur e: St at i c pr essur e, i n i nches of wat er gage ( wg) , t aken at 3 duct di amet er s f r om a f l anged or pl ai n hood or 1 duct di amet er f r om a t aper ed hood.

h. Manomet er : An i nst r ument f or measur i ng pr essur e. El ect r oni c or U- t ube manomet er s wi t h wat er or l i ght oi l ar e accept abl e.

Apr i l 2019 Page 1 SECTI ON 23 08 01. 00 20 i . Repl acement ai r syst em: The mechani cal syst em suppl y i ng ai r t o a f aci l i t y t o r epl ace exhaust ed ai r .

j . St andar d Temper at ur e and Pr essur e: Ai r at st andar d condi t i ons of 70 degr ees Fahr enhei t and 1 at mospher e.

k. St at i c Pr essur e: The pot ent i al pr essur e exer t ed i n al l di r ect i ons by a f l ui d at r est . For a f l ui d i n mot i on, i t i s measur ed i n a di r ect i on nor mal t o t he di r ect i on of f l ow. Usual l y expr essed i n i nches of wg.

l . Syst em Ef f ect : The est i mat ed l oss i n f an per f or mance f r om non- uni f or m ai r f l ow at t he f an' s i nl et or out l et .

m. Test agency: A f i r st t i er subcont r act or who i s i ndependent f r om t he Cont r act or and t he mechani cal Sub- cont r act or except by t he af f i l i at i on est abl i shed by t hi s cont r act .

n. Tr anspor t vel oci t y: Mi ni mum ai r vel oci t y, i n f eet per mi nut e ( f pm) , r equi r ed t o pr event cont ami nant s f r om set t l i ng, condensi ng, or pocket i ng i n t he duct wor k.

o. Vel oci t y pr essur e: The ki net i c pr essur e i n t he di r ect i on of f l ow necessar y t o cause a f l ui d at r est t o f l ow at a gi ven vel oci t y.

Usual l y expr essed i n i nches of wg.

1. 3 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y Not ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG.

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 06 Test Repor t s

Pr el i mi nar y r evi ew r epor t ; G

Smoke t est s r epor t ; G

Fan oper at i ng poi nt s r epor t ; G

St at i c pr essur e r epor t ; G

Vol ume and vel oci t y f l ow r at es r epor t ; G

Pi t ot t r aver se r epor t ; G

Submi t 6 copi es of an or gani zed r epor t bound i n a dur abl e, 3- r i ng wat er - r esi st ant bi nder . The r epor t shal l cont ai n a t abl e of cont ent s, an execut i ve summar y, an i nt r oduct i on, a r esul t s sect i on and a di scussi on of t he r esul t s. I ncl ude t he r epor t s speci f i ed i n par agr aphs ent i t l ed " Pr el i mi nar y Revi ew Repor t , " " Smoke Test Repor t s, " " Fan Oper at i ng Poi nt s Repor t s, " " St at i c Pr essur e Repor t , " " Vol ume and Vel oci t y Fl ow Rat es Repor t , " and" Pi t ot Tr aver se Repor t " as appendi ces.

Submi t f i el d dat a and r epor t f or ms i n appendi ces separ at ed by t he f an syst em t est ed. Use t he sampl e f or ms, " Repl acement Ai r

Apr i l 2019 Page 2 SECTI ON 23 08 01. 00 20

Syst em Test Dat a" and " Exhaust Ai r Syst em Test Dat a, " t o summar i ze t he t est s f or t he appr opr i at e f an. For ms ot her t han t hose l i s t ed may be used; however , i ncl ude al l i nf or mat i on r equi r ed by t hese forms.

Document def i c i enci es and unmet desi gn r equi r ement s i dent i f i ed dur i ng t est i ng. Not i f y t he Pr i me Cont r act or i n wr i t i ng, no l at er t han 5 cal endar days af t er encount er i ng def i c i ency, descr i be t he nat ur e of t he def i c i ency and a r ecommended cour se of act i on f or r esol ut i on. Repor t dai l y t emper at ur e, humi di t y and bar omet r i c pr essur e r eadi ngs. Not e ext r eme weat her and bar omet r i c pr essur e changes dur i ng t he day.

SD- 07 Cer t i f i cat es

Test agency Qual i f i cat i ons; G

Recor d of Document Submi t t al t o Test i ng Agency; G

Wor k pl an; G

Li st of t est i nst r ument s; G

1. 4 QUALI TY ASSURANCE

1. 4. 1 Modi f i cat i on of Ref er ences

Test t he i ndust r i al vent i l at i on syst em accor di ng t o t he r ef er enced publ i cat i ons l i s t ed i n par agr aph ent i t l ed " Ref er ences" and as modi f i ed by t hi s sect i on. Consi der t he advi sor y or r ecommended pr ovi s i ons, of t he r ef er r ed r ef er ences, as mandat or y.

1. 4. 2 Certification

1. 4. 2. 1 Test Agency Qual i f i cat i ons

Submi t , no l at er t han 15 cal endar days af t er cont r act awar d, i nf or mat i on cer t i f y i ng t hat t he t est agency i s not af f i l i at ed wi t h any ot her company par t i c i pat i ng i n wor k on t hi s cont r act . The wor k of t he t est agency shal l be l i mi t ed t o t est i ng and maki ng mi nor adj ust ment s t o t he i ndust r i al vent i l at i on syst em.

Use t he sampl e f or m, " Test Agency Qual i f i cat i ons Sheet , " t o submi t t he f ol l owi ng i nf or mat i on:

a. Ver i f i cat i on of 5] year s of exper i ence as an agency i n t est i ng i ndust r i al vent i l at i on syst ems or cur r ent member of ei t her AABC or

NEBB.

b. Ref er ences f r om f i ve f aci l i t y manager s of f aci l i t i es wi t h i ndust r i al vent i l at i on syst ems t hat t he agency has t est ed. A mi ni mum of one f aci l i t y shal l have pr ocesses and cont ami nant s s i mi l ar t o t hose gener at ed by t he f aci l i t y i n t hi s pr oj ect .

c. Regi st r at i on f or Pr of essi onal Engi neer ( PE) l i cense or Cer t i f i cat i on f or an I ndust r i al Hygi eni st ( CI H) or Test and Bal ance ( TAB) Engi neer f or t he l ead t est engi neer . Submi t PE l i cense, CI H r egi st r at i on number , or TAB cer t i f i cat i on number . I ncl ude t he di sci pl i ne, dat e of i ssue, and expi r at i on dat e. Engi neer s shal l i ncl ude t he st at e of

Apr i l 2019 Page 3 SECTI ON 23 08 01. 00 20 issue.

d. Conf i r mat i on of 5 year s of i ndust r i al vent i l at i on t est exper i ence f or t he l ead t est engi neer . Ref er ences f r om f i ve [ Cont r act i ng Of f i cer s] [ f aci l i t y manager s] f or f aci l i t i es wher e t he l ead engi neer has super vi sed i ndust r i al vent i l at i on syst ems t est s i n t he l ast 5 year s.

e. Ver i f i cat i on of l engt h of t i me l ead engi neer has been empl oyed by a t est and bal ance agency.

1. 4. 2. 2 Recor d of Document Submi t t al t o Test i ng Agency

Submi t not l at er t han 30 cal endar days pr i or t o t he wor k pl an submi t t al due dat e, a r ecor d of t r ansmi t t al of t he f ol l owi ng document s t o t he appr oved i ndependent t est i ng agency. I nf or mat i on i s r equi r ed t o devel op a t est i ng wor k pl an and pr epar e f or f i el d t est i ng.

a. Copy of wor ki ng as- bui l t pr oj ect dr awi ngs and speci f i cat i ons, i ncl udi ng mar ked desi gn changes. Changes cur r ent as of t he dat e of transmission.

b. Copi es of al l pr oj ect submi t t al s r el at i ng t o t he i ndust r i al vent i l at i on syst em. Tr ansmi t copi es of f i nal r ecor d submi t t al s i ncl udi ng appr oval sheet s.

1. 4. 2. 3 Wor k Pl an

Submi t not l at er t han 120 cal endar days af t er cont r act awar d, but bef or e st ar t of wor k, st eps t o be t aken by t he l ead engi neer t o accompl i sh t he r equi r ed t est i ng. Submi t t he f ol l owi ng:

a. Memor andum of t est pr ocedur e.

( 1) Pr oposed dat es f or t he pr el i mi nar y r evi ew and t est .

( 2) Pl an vi ew showi ng pr oposed t est l ocat i ons ( i . e. st at i c pr essur e locations).

( 3) Pr oposed pi t ot t r aver se r eadi ng l ocat i ons.

b. Test equi pment t o be used.

c. Scaf f ol di ng and ot her Cont r act or ' s suppor t equi pment r equi r ed t o per f or m t est .

d. Fact or y r epr esent at i ves and ot her Cont r act or ' s suppor t per sonnel who wi l l be on si t e f or t est i ng.

1. 4. 2. 4 Li st of Test I nst r ument s

Submi t a s i gned and dat ed l i s t of t est i nst r ument s, t hei r appl i cat i on, manuf act ur er , model , ser i al number , r ange of oper at i on, accur acy and dat e of cal i br at i on.

1. 4. 3 Test Requi r ement s

The Cont r act or shal l adj ust and bal ance t he i ndust r i al vent i l at i on syst em accor di ng t o Sect i on 23 05 93 TESTI NG, ADJUSTI NG AND BALANCI NG FOR HVAC.

An i ndependent t est agency shal l t est t he i ndust r i al vent i l at i on syst em

Apr i l 2019 Page 4 SECTI ON 23 08 01. 00 20 accor di ng t o ACGIH-2092S and t hi s sect i on under f ul l l oad condi t i ons. For t emper ed suppl y ai r r epeat t he i ndust r i al vent i l at i on syst ems t est f or t he f ol l owi ng condi t i ons: [ pl us or mi nus 20 per cent mi ni mum out door t emper at ur e desi gn condi t i on, ] [ pl us or mi nus 10 per cent maxi mum out door t emper at ur e desi gn condi t i on, ] [ [ _____] per cent l oads on a var i abl e ai r vol ume syst em, ] [ and] [ _____] .

1. 4. 4 Test Engi neer

1. 4. 4. 1 Fi el d Wor k

The l ead t est engi neer shal l be pr esent at t he pr oj ect s i t e whi l e t est i ng i s per f or med and shal l be r esponsi bl e f or conduct i ng, super vi s i ng, and managi ng of t est wor k. Management i ncl udes heal t h and saf et y of t est agency empl oyees.

1. 4. 4. 2 Repor t i ng Wor k

The l ead t est engi neer shal l pr epar e, s i gn, and dat e t he t est agenda, equi pment l i s t , and cer t i f i ed r epor t .

1. 4. 5 Test Repor t

1. 4. 5. 1 Pr el i mi nar y Revi ew Repor t

Submi t a pr el i mi nar y r evi ew r epor t , see par agr aph ent i t l ed " Pr el i mi nar y Revi ew" 15 cal endar days pr i or t o begi nni ng t he t est .

1. 4. 5. 2 Smoke Test s Repor t

Descr i be t ur bul ent ai r f l ow and dead ai r spaces i n and ar ound t he hood capt ur e zone. Descr i be ai r f l ow exi t i ng f r om t he r epl acement ai r di st r i but i on devi ce and t he ef f ect of r oom ai r cur r ent s on smoke capt ur e.

Repor t l eaks i n t he duct wor k, access door , and duct connect or s t o f an.

Repor t smoke behavi or as i t exi t s f r om t he exhaust st ack and descr i be ent r ai nment ar ound t he t est ed f aci l i t y , near by st r uct ur es and any geogr aphi cal f eat ur es.

1. 4. 5. 3 Fan Oper at i ng Poi nt s Repor t

Det er mi ne t he di f f er ence bet ween measur ed and desi gn vol ume f l ow r at e.

Compar e measur ed f an st at i c pr essur e t o manuf act ur er ' s per f or mance dat a.

Show t he desi gn and measur ed oper at i ng poi nt f or each f an on t he cor r espondi ng f an cur ve. Repor t f ans t hat cannot oper at e at speeds 25 per cent f ast er t han t he measur ed speed whi l e r emai ni ng wi t hi n t he boundar i es of t he f an cur ve and f an cl ass. I dent i f y f an mot or s t hat ar e oper at i ng at or near f ul l l oad amper age.

1. 4. 5. 4 St at i c Pr essur e Repor t

I ncl ude t he f ol l owi ng:

a. Hood st at i c pr essur es. Use t abl es t o summar i ze t est r esul t s by syst em.

b. Fan st at i c pr essur e, as def i ned by ACGIH-2092S , f or r epl acement and exhaust ai r syst ems.

c. Room st at i c pr essur e, as compar ed t o [ at mospher e] [ adj acent r ooms] , f or each r oom i n t he f aci l i t y .

Apr i l 2019 Page 5 SECTI ON 23 08 01. 00 20

d. St at i c pr essur es t hat ar e i nconsi st ent and t he pr obabl e r eason. For example:

( 1) I nconsi st ent st at i c pr essur e dr op or i ncr ease i n one or a ser i es of hoods on t he same br anch;

( 2) Di f f er ent st at i c pr essur es f or s i mi l ar syst ems i n t he f aci l i t y ;

and

( 3) Decr easi ng st at i c pr essur es as t he hoods get c l oser t o t he exhaust f an i nl et .

[ e. Di f f er ent i al pr essur e acr oss ai r pol l ut i on cont r ol devi ces. ]

1. 4. 5. 5 Vol ume and Vel oci t y Fl ow Rat es Repor t

Repor t vol ume f l ow r at es and vel oci t i es i n st andar d cubi c f eet per mi nut e ( cf m) and f eet per mi nut e ( f pm) , r espect i vel y, on t he " Exhaust Ai r Syst em Test Dat a" sampl e f or m or compar abl e f or m.

[ Conver t measur ed vol ume f l ow r at es t o st andar d vol ume f l ow r at es f or l ocat i ons wi t h oper at i ng condi t i ons ot her t han st andar d t emper at ur e and pr essur e. The conver si on may be i gnor ed i f t he vol ume f l ow r at e changes l ess t han pl us or mi nus one per cent . Show bot h t he act ual and st andar d val ue f or t est poi nt s. Show a sampl e conver si on equat i on. ]

Compar e measur ed ] vol ume f l ow r at es wi t h t he desi gn val ue f or each hood, t he t ot al exhaust ai r syst em, each r epl acement ai r di st r i but i on poi nt and t he t ot al r epl acement ai r syst em. Li st t he measur ed and desi gn val ues i n t abul ar f or m. Repor t t he t r anspor t vel oci t y f or each br anch [ submai n] and mai n duct i n t he exhaust ai r syst em.

I ndi cat e i f t he t est val ue i s adequat e or i nadequat e. Adequat e hood vol ume f l ow r at es and duct vel oci t i es ar e t hose wi t h [ measur ed] [ conver t ed] val ues wi t hi n pl us or mi nus 10 per cent of desi gn val ues.

Adequat e t ot al syst em vol ume f l ow r at es ar e t hose wi t h [ measur ed] [ conver t ed] val ues wi t hi n pl us or mi nus 10 per cent of t he desi gn val ues.

1. 4. 5. 6 Pi t ot Tr aver se Repor t

Use t he " Pi t ot Tr aver se Dat a" sampl e f or m or compar abl e f or m t o r ecor d pi t ot t r aver se r eadi ngs. Submi t t he f ol l owi ng dat a, as a mi ni mum, f or each t est l ocat i on:

a. Vel oci t y pr essur e and t hei r cor r espondi ng vel oci t i es;

b. Aver age vel oci t y;

c. Duct di mensi ons and ar ea;

d. Tot al measur ed vol ume f l ow r at e; and

e. St at i c pr essur e r eadi ng.

1. 4. 5. 7 Deadline

Pr ovi de a s i mpl i f i ed pass/ f ai l r epor t wi t hi n [ 3] [ _____] days af t er compl et i on of t est i ng. Pr ovi de a compl et e t est r epor t [ 15] [ 30] [ _____]

Apr i l 2019 Page 6 SECTI ON 23 08 01. 00 20 days af t er compl et i on of t est i ng. [ The onl y except i on i s f or t he l ast seasonal wor k sessi on whi ch shal l be compl et ed by [ _____] . ]

1. 5 SAMPLE FORMS

1. 5. 1 Test Agency Qual i f i cat i on Sheet

Apr i l 2019 Page 7 SECTI ON 23 08 01. 00 20

TEST AGENCY QUALI FI CATI ON SHEET

DATE: COMPLETED BY:

A. Agency Qual i f i cat i ons

Agency Name:

Address:

Tel ephone Number :

Year s of exper i ence t est i ng i ndust r i al vent i l at i on syst ems:

I ndust r i al f aci l i t i es t est ed ( 5 r equi r ed) . I ncl ude t he f ol l owi ng:

Faci l i t y Name, Addr ess, Poi nt of cont act wi t h t el ephone number ;

Dat es of t est ;

Type of oper at i on t est ed;

Li st of Cont ami nant s;

Number of f ans;

Type of exhaust hoods;

Ai r c l eani ng devi ces; and

Per sonnel per f or mi ng t he t est .

At t ach l et t er s of r ecommendat i on f or t est s per f or med at t hese f aci l i t i es. Thr ee f aci l i t i es shal l be of t he t ype of oper at i on t o be t est ed.

B. Lead Test Engi neer Qual i f i cat i ons

Apr i l 2019 Page 8 SECTI ON 23 08 01. 00 20

TEST AGENCY QUALI FI CATI ON SHEET

Name:

Lengt h of t i me l ead engi neer has wor ked wi t h Agency:

Year s of exper i ence t est i ng i ndust r i al vent i l at i on syst ems:

Pr of essi onal Engi neer i ng I nf or mat i on:

discipline:

l i cense number :

i ssue dat e:

r ecer t i f i cat i on dat e:

st at e of r egi st r at i on:

I ndust r i al f aci l i t i es t est ed ( 5 r equi r ed) . I ncl ude t he f ol l owi ng:

Faci l i t y Name, Addr ess, Poi nt of cont act wi t h t el ephone number ;

Dat es of Test ;

Type of Oper at i on;

Li st of Cont ami nant s;

Number of Fans;

Type of Exhaust Hoods; and

Ai r Cl eani ng Devi ces.

Apr i l 2019 Page 9 SECTI ON 23 08 01. 00 20

1. 5. 2 Pi t ot Tr aver se Dat a - Rect angul ar Duct

PI TOT TRAVERSE DATA - Rect angul ar Duct

Test Dat e:

Readi ngs By: Tr aver se By:

St at i c Pr essur e:

Room: Ai r Temper at ur e:

Tr aver se Locat i on: I nsi de/ Out si de Duct Wi dt h:

Di st ance t o Resi st ance Component:

Causi ng Component Distance:

I nsi de/ Out si de Duct Hei ght :

I nsi de Duct Ar ea:

before: before: Requi r ed Vel oci t y:

after: after: Requi r ed Act ual Vol ume Fl ow Rat e:

Vel oci t y Pr essur e Repor t ed as [ _____] Uni t s

Pi t ot Tr aver se Mat r i x

Vel oci t y | Pr essur e Readi ngs ( mi ni mum cent er di st ance i s 6 i nches

Point Position

1 2 3 4 5 6 7 8 9 10 Confirm

A [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

B [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

C [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

D [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

E [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

F [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

G [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

H [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

I [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

J [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

Apr i l 2019 Page 10 SECTI ON 23 08 01. 00 20

Pi t ot Tr aver se Mat r i x

Pr essur e Readi ngs Conver t ed t o Vel oci t y ( FPM)

Velocity Point Position

1 2 3 4 5 6 7 8 9 10

A [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

B [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

C [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

D [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

E [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

F [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

G [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

H [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

I [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

J [__] [__] [__] [__] [__] [__] [__] [__] [__] [__]

Subtotal:

Tot al Vel oci t y/ # Readi ngs = Avg. Vel oci t y x Duct Ar ea = Act ual Vol ume Fl ow Rat e:

______FPM / _______ = _______ FPM x ______ SQ. FEET = ________ ACFM

* ACFM - act ual cubi c f eet per mi nut e

REMARKS

Apr i l 2019 Page 11 SECTI ON 23 08 01. 00 20

1. 5. 3 Pi t ot Tr aver se Dat a - Round Duct

PI TOT TRAVERSE DATA - Round Duct

Test Dat e:

Readi ngs By: Tr aver se By:

St at i c Pr essur e:

Room Number : Ai r Temper at ur e:

System/Unit: Bar omet r i c Pr essur e:

Tr aver se Locat i on: I nsi de/ Out si de Duct DI A:

Di st ance t o Resi st ance Component:

Causi ng Component Distance:

I nsi de Duct Ar ea:

before: before: Requi r ed Vel oci t y:

after: after: Requi r ed Act ual Vol ume Fl ow Rat e:

Vel oci t y Pr essur e Repor t ed as [ _____] Uni t s

Pi t ot Tr aver se Mat r i x

Duct Di amet er 0- 6 i n. 6- 48 i n. >48 i n. or unst abl e velocity

Readings 12 ( 6/ t r aver se) 20 ( 10/ t r aver se) 40 ( 20/ t r aver se)

TEST POI NT Vel oci t y Pr essur e Velocity TEST POI NT Velocity Pressure

Velocity

1 [_____] [_____] 21 [_____] [_____]

2 [_____] [_____] 22 [_____] [_____]

2 [_____] [_____] 22 [_____] [_____]

3 [_____] [_____] 23 [_____] [_____]

4 [_____] [_____] 24 [_____] [_____]

5 [_____] [_____] 25 [_____] [_____]

6 [_____] [_____] 26 [_____] [_____]

7 [_____] [_____] 27 [_____] [_____]

8 [_____] [_____] 28 [_____] [_____]

9 [_____] [_____] 29 [_____] [_____]

10 [_____] [_____] 30 [_____] [_____]

Apr i l 2019 Page 12 SECTI ON 23 08 01. 00 20

Pi t ot Tr aver se Mat r i x

11 [_____] [_____] 31 [_____] [_____]

12 [_____] [_____] 32 [_____] [_____]

13 [_____] [_____] 33 [_____] [_____]

14 [_____] [_____] 34 [_____] [_____]

15 [_____] [_____] 35 [_____] [_____]

16 [_____] [_____] 36 [_____] [_____]

17 [_____] [_____] 37 [_____] [_____]

18 [_____] [_____] 38 [_____] [_____]

19 [_____] [_____] 39 [_____] [_____]

20 [_____] [_____] 40 [_____] [_____]

Conf i r m 1: Conf i r m 1:

Conf i r m 2: Conf i r m 2:

Vel oci t y Sum:

( Wi t hout Conf i r m Val ue)

Vel oci t y Sum/ # Readi ngs = Aver age Vel oci t y x Duct Ar ea = Act ual Vol ume Fl ow

Rat e [ _____] FPM / [ _____] = [ _____] FPM x [ _____] SQ. Feet = [ _____] ACFM

REMARKS

Apr i l 2019 Page 13 SECTI ON 23 08 01. 00 20

1. 5. 4 Exhaust Ai r Syst em Test Dat a

EXHAUST AI R SYSTEM TEST DATA

Test Dat es:

Readi ngs By:

Uni t Number : Pr essur es ( Pa)

Uni t Locat i on: Fan I nl et St at i c:

Make Model : Fan Out l et St at i c:

Model: Fan I nl et Vel oci t y:

Ser i al Number : Fan St at i c:

Fan Tot al :

Damper Posi t i ons

Hoods: Di f f er ent i al Pr essur e acr oss ai r c l eani ng device

Submains: Device Del t a P ( Pa)

Tot al Vol ume Test Locat i on [_____] [_____]

Duct di a. bef or e f an [_____] [_____] [_____]

Duct di a. af t er f an [_____]

Fan Speed ( RPM or RPS) [ _____]

Mot or Speed ( RPM or RPS) [ _____]

Resi st ance Causi ng El ement s

Type Rel at i onshi p t o Fan Pul l ey - Cent er t o Cent er Di st ance before/after # Duct di a.

elbow [_____] [_____] damper [_____] [_____] expansion [_____] [_____] Amper age - T1, T2, T3 [ _____] contraction [_____] [_____] Vol t age - T1- 2, T2- 3, T3- 1 [ _____] plenum [_____] [_____]

[_____] [_____] [_____] Temperature (W.B./D.B.)

Apr i l 2019 Page 14 SECTI ON 23 08 01. 00 20

EXHAUST AI R SYSTEM TEST DATA

[_____] [_____] [_____] Out si de Ai r [ _____]

[_____] [_____] [_____] Repl acement Ai r

* RPM - r evol ut i ons per mi nut e W. B. - wet bul b

RPS - r adi ans per second D. B. - dr y bul b

EXHAUST AI R SYSTEM TEST DATA

Test Dat es:

Readi ngs By:

Uni t Number : Pr essur es ( i nches of wg)

Uni t Locat i on: Fan I nl et St at i c:

Make Model : Fan Out l et St at i c:

Model: Fan I nl et Vel oci t y:

Ser i al Number : Fan St at i c:

Fan Tot al :

Damper Posi t i ons

Hoods: Di f f er ent i al Pr essur e acr oss ai r c l eani ng device

Submains: Device Del t a P ( i n. wg)

Tot al Vol ume Test Locat i on [_____] [_____]

Duct di a. bef or e f an [_____] [_____] [_____]

Duct di a. af t er f an [_____]

Fan Speed ( RPM or RPS) [ _____]

Mot or Speed ( RPM or RPS) [ _____]

Resi st ance Causi ng El ement s

Type Rel at i onshi p t o Fan Pul l ey - Cent er t o Cent er Di st ance before/after # Duct di a.

elbow [_____] [_____]

Apr i l 2019 Page 15 SECTI ON 23 08 01. 00 20

EXHAUST AI R SYSTEM TEST DATA

damper [_____] [_____] expansion [_____] [_____] Amper age - T1, T2, T3 [ _____] contraction [_____] [_____] Vol t age - T1- 2, T2- 3, T3- 1 [ _____] plenum [_____] [_____]

[_____] [_____] [_____] Temperature (W.B./D.B.)

[_____] [_____] [_____] Out si de Ai r [ _____]

[_____] [_____] [_____] Repl acement Ai r

* RPM - r evol ut i ons per mi nut e W. B. - wet bul b

RPS - r adi ans per second D. B. - dr y bul b

Apr i l 2019 Page 16 SECTI ON 23 08 01. 00 20

VOLUME FLOW RATES ( St andar d Cubi c Feet per Mi nut e)

SYSTEM ACTUAL DESIGN ADEQUATE INADEQUATE

Tot al Vol ume [_____] [_____] [_____] [_____]

SUBMAIN

Submai n name [_____] [_____] [_____] [_____]

Submai n name [_____] [_____] [_____] [_____]

Submai n name [_____] [_____] [_____] [_____]

HOODS

Hood name [_____] [_____] [_____] [_____]

Hood name [_____] [_____] [_____] [_____]

Hood name [_____] [_____] [_____] [_____]

Hood name [_____] [_____] [_____] [_____]

Hood name [_____] [_____] [_____] [_____]

Hood name [_____] [_____] [_____] [_____]

Hood name [_____] [_____] [_____] [_____]

Hood name [_____] [_____] [_____] [_____]

Hood name [_____] [_____] [_____] [_____]

Hood name [_____] [_____] [_____] [_____]

Apr i l 2019 Page 17 SECTI ON 23 08 01. 00 20

1. 5. 5 Repl acement Ai r Syst em Test Dat a

REPLACEMENT AI R SYSTEM TEST DATA

Test Dat es:

Readi ngs By:

Uni t Number : [ _____] Pr essur es ( i nches of wg)

Uni t Locat i on: Fan I nl et St at i c:

Make Model : Fan Out l et St at i c:

Model: Fan I nl et Vel oci t y:

Ser i al Number : Fan St at i c:

Fan Tot al :

Damper Posi t i ons

Di f f er ent i al Pr essur e

Terminals: acr oss Fi l t er s [ _____]

Submains: acr oss Reheat Coi l [ _____] acr oss Cool i ng Coi l [ _____] acr oss Pr eheat Coi l [ _____]

Tot al Vol ume Test Locat i on [_____]

Tot al Vol ume Test Locat i on

Duct di a. bef or e f an [_____] Fan Speed ( RPM or RPS) [ _____]

Duct di a. af t er f an [_____] Mot or Speed ( RPM or RPS) [ _____]

Resi st ance Causi ng El ement s

Type Rel at i onshi p t o Fan Pul l ey - Cent er t o Cent er Di st ance before/after # Duct di a.

elbow [_____] [_____] damper [_____] [_____] expansion [_____] [_____] Amper age - T1, T2, T3 [ _____]

Apr i l 2019 Page 18 SECTI ON 23 08 01. 00 20

REPLACEMENT AI R SYSTEM TEST DATA

contraction [_____] [_____] Vol t age - T1- 2, T2- 3, T3- 1 [ _____] plenum [_____] [_____]

[_____] [_____] [_____] Temperature (W.B./D.B.)

[_____] [_____] [_____] Out si de Ai r [ _____]

[_____] [_____] [_____] Repl acement Ai r

[_____] [_____] [_____] Mi xed Ai r [ _____]

* RPM - r evol ut i ons per mi nut e W. B. - wet bul b

RPS - r adi ans per second D. B. - dr y bul b

Apr i l 2019 Page 19 SECTI ON 23 08 01. 00 20

VOLUME FLOW RATES ( St andar d Cubi c Feet per Mi nut e)

SYSTEM ACTUAL DESIGN ADEQUATE INADEQUATE

Tot al Vol ume [_____] [_____] [_____] [_____]

Out si de Ai r Volume

Ret ur n Ai r [_____] [_____] [_____] [_____]

Rat i o:

Outside/Return

BRANCH

Br anch name [_____] [_____] [_____] [_____]

Br anch name [_____] [_____] [_____] [_____]

Br anch name [_____] [_____] [_____] [_____]

Br anch name [_____] [_____] [_____] [_____]

Br anch name [_____] [_____] [_____] [_____]

Br anch name [_____] [_____] [_____] [_____]

Br anch name [_____] [_____] [_____] [_____]

Apr i l 2019 Page 20 SECTI ON 23 08 01. 00 20

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

3. 1 TEST PROCEDURE

Det er mi ne t he st at i c pr essur e of t he wor k ar ea r el at i ve t o [ t he out door s and] t he f ol l owi ng r ooms: [ _____] . Repor t t he r esul t s.

3. 1. 1 Pr el i mi nar y Revi ew

Conduct a pr el i mi nar y r evi ew of t he f aci l i t y [ 45] [ _____] cal endar days pr i or t o begi nni ng t he t est . Per f or m t he f ol l owi ng t asks and r epor t t he r esul t s of each t ask i n t he Pr el i mi nar y Revi ew Repor t .

a. Locat e i ndust r i al vent i l at i on syst em component s i ncl udi ng hoods, hood t r ansi t i ons, duct wor k, br anch t o mai n duct ent r i es, el bows, expansi ons and cont r act i ons, f ans, ai r pol l ut i on cont r ol devi ces, exhaust st acks, weat her pr ot ect i on, r epl acement ai r pl enums, and di st r i but i on devi ces. Show component s on a s i ngl e l i ne dr awi ng f or each f an syst em.

b. Revi ew desi gn dr awi ngs, speci f i cat i ons, and shop dr awi ngs t o ver i f y t hat t est i ng can be per f or med on t he syst em. Recor d, on t he si ngl e l i ne dr awi ngs, l ocat i ons of pl anned pi t ot t r aver ses of mai ns and br anches and desi gn vel oci t i es. Repor t pot ent i al t est pr obl ems, such as i nadequat e space, t o t he Cont r act i ng Of f i cer .

c. I dent i f y on t he si ngl e l i ne dr awi ngs t he l ocat i on of syst em f i r e pr ot ect i on component s t hat may al t er ai r f l ow, such as f i r e damper s.

d. I dent i f y on t he si ngl e l i ne dr awi ngs t he l ocat i on of emer gency and spi l l sensor s.

e. I dent i f y on t he si ngl e l i ne dr awi ngs t he l ocat i on of [ pr essur e di f f er ent i al sensor s] [ st at i c pr essur e sensor s] .

f . Use AMCA 201 t o i dent i f y syst em ef f ect s t hat occur at t he i nl et and out l et of each r epl acement and exhaust ai r f an.

g. Ver i f y t hat duct wor k s i zes, el bows and f i t t i ngs, exhaust st acks and weat her pr ot ect i on meet t he desi gn pl ans and speci f i cat i ons f or bot h r epl acement and exhaust ai r syst ems.

h. Ver i f y t hat f ans ar e r ot at i ng i n t he pr oper di r ect i on.

i . I dent i f y equi pment such as f ans, ai r pol l ut i on devi ces, heat i ng coi l s, and cont r ol s, t hat do not meet t he desi gn pl ans and speci f i cat i ons.

j . Obt ai n f an per f or mance dat a.

k. Ver i f y t hat r epl acement ai r t er mi nal s i ncl udi ng [ di f f user s] [ l ouver s] [ gr i l l es] [ per f or at ed pl at e] [ per f or at ed duct wor k] ar e i nst al l ed accor di ng t o desi gn pl ans and speci f i cat i ons.

l . Obt ai n t he di f f er ent i al pr essur e dat a and maxi mum oper at i ng pr essur es f or ai r f i l t r at i on devi ces i ncl udi ng [ di r t y and cl ean r epl acement ai r f i l t er s] [ hi gh ef f i c i ency par t i cul at e ai r f i l t er s] [ dust col l ect or s]

Apr i l 2019 Page 21 SECTI ON 23 08 01. 00 20

[ mi st el i mi nat or s] [ wet scr ubber s] [ cycl one separ at or s] [ el ect r ost at i c pr eci pi t at or s] [ _____] .

m. Obt ai n t he t emper at ur e and pr essur e cont r ol di agr ams f or t he suppl y [ and exhaust ] i ndust r i al vent i l at i on syst em.

n. Recor d t he namepl at e dat a f r om each f an, mot or , [ ai r c l eani ng devi ce] [ vacuum syst em] and [ _____] .

o. Recor d mot or st ar t er s i zes and t he t ype of t her mal over l oad pr ot ect i on devices.

p. Ver i f y t he f ol l owi ng r equi r ement s unl ess ot her wi se speci f i ed i n t he i ndi v i dual sect i on:

( 1) Fan bear i ngs have a mi ni mum r at ed aver age l i f e of 200, 000 hour s.

( 2) Fan bases ar e l evel .

( 3) Fan wheel s ar e bal anced and cl ear t he housi ng.

( 4) Fan shaf t s ar e of uni f or m di amet er [ and t her e ar e no st ep down cut s at t he bear i ngs] .

( 5) Access t o f an gr ease f i t t i ngs and ot her r out i ne mai nt enance equipment.

( 6) Bear i ngs ar e gr eased and t he t ube i s f ul l upon i nst al l at i on.

( 7) Saf et y equi pment , such as f an bel t guar ds, ar e i n pl ace.

[ ( 8) Dr i ve al i gnment and bel t t ensi on ar e cor r ect f or each f an. ]

3. 2 FI ELD TESTS

3. 2. 1 Pr el i mi nar y Pr ocedur es

Pr ovi de i nst r ument s and consumabl e equi pment r equi r ed t o t est t he i ndust r i al vent i l at i on syst em.

Bef or e begi nni ng t he t est :

a. Cl ose al l wi ndows and door s i n t he f aci l i t y .

b. Ensur e t hat exhaust and r epl acement ai r duct wor k and ai r i nt ake sour ces ar e f r ee f r om debr i s and di r t , t hr ough a v i sual i nspect i on.

c. Load t he r epl acement ai r pr ef i l t er s t o t he manuf act ur er ' s r ecommended maxi mum l oad condi t i on.

d. Run t he exhaust ai r syst ems, cont ai ni ng ai r pol l ut i on cont r ol devi ces, f or a suf f i c i ent t i me t o obt ai n t he manuf act ur er ' s r ecommended equi l i br i um per f or mance poi nt .

[ e. Ensur e t hat a duct l eakage t est i s compl et e and accept ed by t he Cont r act i ng Of f i cer . ]

Apr i l 2019 Page 22 SECTI ON 23 08 01. 00 20

3. 2. 2 Test Met hod

Test t he vent i l at i on under f ul l l oad condi t i ons accor di ng t o ACGIH-2092S , Chapt er 9 and t hi s sect i on. Recor d quant i t at i ve r eadi ngs on sampl e f or ms, " Pi t ot Tr aver se Dat a, [ Rect angul ar Duct ] [ Round Duct ] , " " Exhaust Ai r Syst em Test Dat a, " and " Repl acement Ai r Syst em Test Dat a. "

The t est engi neer i s aut hor i zed t o r eadj ust and r ebal ance t he syst em i f mi nor adj ust ment s wi l l br i ng t he syst em i nt o compl i ance wi t h t he desi gn.

Mi nor adj ust ment s i ncl ude [ adj ust i ng t he f an sheave] [ cor r ect i ng f an r ot at i on] [ r eset t i ng damper s] [ adj ust i ng bl ast gat es] [ _____] .

3. 2. 2. 1 Smoke Test

Test each hood wi t h smoke gener at or s t o ver i f y cont ami nant cont r ol i n t he capt ur e zone, pr i or t o per f or mi ng quant i t at i ve t est s on t he i ndust r i al vent i l at i on syst em. Smoke si mul at es t he cont ami nant . [ Vi deot ape t he ai r movement pat t er n at t he wor ker ' s br eat hi ng zone f or t he [ hoods] [ boot hs] [ i ndoor f i r i ng r ange] [ _____] [ and ai r cur r ent s] . ] Compl y wi t h r est r i ct i ons on t he use of i ncendi ar y devi ces. I nf or m t he f i r e depar t ment or ot her r esponsi bl e par t i es when l ar ge quant i t i es of smoke ar e expect ed [ or t he vent i l at i on syst em has i nt er nal smoke al ar ms] .

3. 2. 2. 2 Ai r Quant i t y Readi ngs

Use a pi t ot t ube and manomet er t o measur e t he vel oci t y pr essur es f or t he exhaust and r epl acement ai r syst ems. Det er mi ne t he number and l ocat i on of vel oci t y pr essur e r eadi ngs r equi r ed f or r ound and r ect angul ar duct s accor di ng t o ACGIH-2092S . Dr i l l t r aver se access hol es. [ Round duct s r equi r e t wo t r aver se access hol es posi t i oned 90 degr ees apar t . ] [ Rect angul ar duct s may r equi r e sever al t r aver se access hol es. ]

Take pi t ot t r aver ses away f r om ai r di st ur bi ng devi ces ( i . e. el bows, br anch ent r i es, duct expansi ons, and hood t r ansi t i ons) . Mi ni mum di st ances ar e:

a. Fi ve ( 5) duct di amet er of st r ai ght duct af t er t he f an out l et ; and

b. Seven and one- hal f ( 7. 5) duct di amet er s of st r ai ght duct af t er an ai r di st ur bi ng devi ce.

When t hese di st ances of st r ai ght duct ar e not avai l abl e, use a schemat i c dr awi ng t o not e t he di st ur bance pr oduci ng devi ce, and di st ance bet ween t he pi t ot t r aver se and t he devi ce.

Conf i r m one vel oci t y pr essur e r eadi ng f or each access hol e af t er compl et i ng a t r aver se. Accept t r aver se dat a when t he di f f er ence bet ween t he or i gi nal and conf i r mat i on measur ement i s pl us or mi nus 10 per cent ;

ot her wi se r epeat t he t r aver se. Pl ug hol es wi t h cap pl ugs i mmedi at el y af t er each t r aver se.

Conver t vel oci t y pr essur e r eadi ngs t o vel oci t y bef or e aver agi ng t he duct vel oci t y. Cal cul at e aver age vel oci t y f r om vel oci t y pr essur e r eadi ngs and vol ume f l ow r at es f or t he f ol l owi ng l ocat i ons:

a. Repl acement ai r f an out l et ;

b. Repl acement ai r duct br anch;

c. Exhaust ai r duct br anch, i ncl udi ng hoods [ and submai ns] ;

Apr i l 2019 Page 23 SECTI ON 23 08 01. 00 20

d. Exhaust f an i nl et or out l et ;

[ e. Ai r pol l ut i on cont r ol devi ce i nl et ; and]

[ f . Out si de and r et ur n ai r duct s i n r eci r cul at i ng r epl acement ai r syst em. ]

3. 2. 2. 3 Ai r Vel oci t y Met er Readi ngs

A f l ow hood may be used f or measur i ng of f i ce and r est r oom r epl acement ai r quant i t i es. Do not subst i t ut e ai r vel oci t y met er r eadi ngs f or manomet er and pi t ot t ube r eadi ngs. Use ai r vel oci t y met er s t o est i mat e t he following:

a. Vel oci t y exi t i ng f r om r epl acement ai r syst ems wi t hout duct wor k;

b. Cr ossdr af t s i n a r oom;

c. Hood capt ur e vel oci t y;

d. Duct vel oci t i es l ess t han 600 f pm; and

[ e. Sl ot vel oci t i es. ]

3. 2. 2. 4 St at i c Pr essur e Readi ngs

Take st at i c pr essur e r eadi ngs usi ng a pi t ot t ube and manomet er . The f ol l owi ng r eadi ngs ar e r equi r ed:

a. Hood st at i c pr essur e. Take r eadi ngs at a di st ance of one duct di amet er f r om t aper ed hoods, and 3 di amet er s f r om pl ai n or f l anged hoods;

b. Repl acement and exhaust f an i nl et and out l et st at i c pr essur e;

c. Room st at i c pr essur e as compar ed t o [ out door s] [ out s i de t he ar ea cont r ol l ed by i ndust r i al vent i l at i on] ;

[ d. Ai r c l eani ng devi ce i nl et and out l et st at i c pr essur e; and]

[ e. Br anch st at i c pr essur e i n t he r epl acement and exhaust ai r syst em submai n duct wor k. ]

Ver i f y t est i nst r ument r eadi ngs cor r espond wi t h at t ached st at i c pr essur e gages

3. 2. 2. 5 Cont r ol Syst em Check- Out

Test war ni ng syst em cont r ol s f or t he i ndust r i al vent i l at i on syst em i ncl udi ng t he f ol l owi ng:

a. Above and bel ow r ange al ar ms f or r oom st at i c pr essur e.

b. Fan mot or oper at i ng l i ght s.

[ c. Damper s oper at ed by t he cont r ol mot or . ]

[ d. Hood st at i c pr essur e. ]

Apr i l 2019 Page 24 SECTI ON 23 08 01. 00 20

[ e. Di s l odged or r i pped f i l t r at i on equi pment . ]

[ f . Over l oaded ai r c l eani ng devi ce. ]

3. 2. 2. 6 Ot her Readi ngs

Take t he f ol l owi ng r eadi ngs on each day t est i ng i s per f or med:

a. Temper at ur e r eadi ngs af t er t he syst em has st abi l i zed and has been r unni ng f or at l east 4 hour s:

( 1) Wet bul b and dr y bul b t emper at ur e of anci l l ar y r ooms, wor kspaces, r epl acement ai r , out s i de ai r , [ r et ur n ai r , ] [ and] [ mi xed ai r ] .

( 2) Ext er nal t emper at ur e f or f an and mot or bear i ngs on vent i l at i on equipment.

b. Recor d bar omet r i c pr essur e and al t i t ude.

3. 2. 3 Syst em Mar ki ngs

Mar k t he set t i ngs and t est por t s t o r e- eval uat e t he i ndust r i al vent i l at i on syst em dur i ng f ol l ow- up t est s. Label t est poi nt s bef or e submi t t i ng t he r epor t . Use spr ay pai nt or anot her accept abl e pr act i ce, i . e. per manent mar ker , t o mar k t he ai r f l ow adj ust i ng devi ces [ such as val ves, spl i t t er s, damper s, and bl ast gat es] , so t he devi ces can be r et ur ned t o t hei r or i gi nal posi t i on i f an unaut hor i zed adj ust ment i s made.

3. 2. 4 Test Ver i f i cat i on

Not i f y Cont r act i ng Of f i cer [ 30] [ _____] cal endar days pr i or t o conduct i ng t he Test Ver i f i cat i on. I n t he pr esence of t he Cont r act i ng Of f i cer , t he t est engi neer shal l r epeat at l east [ 10] [ 20] [ _____] per cent of t he t est f or each r epl acement and exhaust ai r syst em t o ver i f y t he r esul t s. As a mi ni mum, r e- t est t he f ol l owi ng r eadi ngs:

a. Tot al vol ume f l ow f or each f an;

b. I nl et and out l et st at i c pr essur e f or each f an;

c. Vol ume f l ow and hood st at i c pr essur e f or t he hood wi t h t he l ongest duct r un f r om t he exhaust f an; [ and]

d. Hood vol ume f l ow r at es and t ot al syst em vol ume f l ow r at es whi ch di sagr ee wi t h t he desi gn val ue; [ and]

[ e. Di f f er ent i al pr essur e acr oss each ai r pol l ut i on cont r ol devi ce] .

3. 2. 4. 1 Test Resul t Di sagr eement s

St at i c and vel oci t y pr essur e t est r eadi ngs shal l be wi t hi n pl us or mi nus [ 10] [ _____] per cent of t he ver i f i cat i on r eadi ngs. When t he di f f er ence bet ween t est and ver i f i cat i on r eadi ngs ar e gr eat er t han t hese accept abl e val ues, t he t est engi neer shal l :

a. Recal cul at e t he t est and ver i f i cat i on r esul t s.

b. Recal i br at e t est equi pment .

Apr i l 2019 Page 25 SECTI ON 23 08 01. 00 20

c. Ret est t he ent i r e syst em.

d. Ver i f y t he r esul t s.

3. 2. 5 Test Engi neer s Out - Br i ef

Pr ovi de a ver bal summar y f or t he Cont r act i ng Of f i cer descr i bi ng t he condi t i on of t he i ndust r i al vent i l at i on syst em. Repor t t est dat a t hat does not meet t he desi gn cr i t er i a as def i ned i n par agr aph ent i t l ed " Fi el d Test Repor t s. "

- - End of Sect i on - -

Apr i l 2019 Page 26 SECTI ON 23 08 01. 00 20

File details come from the government source that posted it. Updated .