Solicitation - FA813726R0018.pdf
PDF 725 KB Posted
- Attached to
- TINKER AFB MAC BOA WWYK090020; WWYK090032 AND WWYK240001 - ROOFS B1049 AND B7038; B414; B6601
- Solicitation number
- FA813726R0018
About this file
This is a Solicitation, Offer, and Award form for construction services at Tinker Air Force Base, Oklahoma. The solicitation number is FA813726R0018, issued as a sealed bid (IFB) with a firm fixed-price contract type. The solicitation covers three concurrent roofing projects with an estimated magnitude between $1,000,000 and $5,000,000. WWYK090020 involves replacement of a trapezoidal metal roof system on Building 1049 and installation of a two-component silicone coating system on Building 7038 (NAICS 238160, PSC Z2JZ, 215 days after Notice to Proceed). WWYK090032 addresses repair/replacement of the roof on Building 414 (NAICS 236220, PSC Z1AA, 200 days after NTP). WWYK240001 covers roof replacement on Building 6601 (NAICS 238160, PSC Z2AZ, 150 days after NTP). All work must begin within 10 calendar days of award and performance bonds equal to 100 percent of the contract price are required within 10 days of award.
Sealed offers in original plus one copy are due by 2:00 PM local time on May 29, 2026, at FA8137 AFSC PZIOC, 7799 Arnold Avenue, Building 3, First Floor, Tinker AFB, Oklahoma 73145-9125. Offers must provide a minimum of 120 calendar days for Government acceptance after the due date. An offer guarantee is not required. The solicitation is restricted to current BOA holders only. Key contact for inquiries is Eric Owens at 312-884-4627 or eric.owens.8@us.af.mil. Construction wage rate requirements, performance and payment bonds, Buy American requirements for construction materials, and standard FAR and DFARS clauses apply. The contract will be administered with progress payments, liquidated damages of $227.75 per day for delay, and inspection/acceptance at the service performance site under FAR 52.246-12.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION
NUMBER
FA813726R0018
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE 1 OF 40
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER
F3Y0AB6086AW01
6. PROJECT NUMBER
WWYK090020 - Replace Multiple Roofs - B1049 & B7038, WWYK090032 - REPAIR ROOF BLDG 414, WWYK240001
- REPLACE ROOF, B6601
7. ISSUED BY CODE: FA8137
FA8137 AFSC PZIOC
CP 405 739 4040, 7858 5TH ST STE 1
TINKER AFB, OK 73145-9125
UNITED STATES
Eric Owens, Email: eric.owens.8@us.af.mil Telephone: 312-884-4627 Stephen Palmer, Email: stephen.palmer@us.af.mil Telephone: 4057394182
8. ADDRESS OFFER TO
FA8137 AFSC PZIOC
CP 405 739 4040, 7799 ARNOLD AVE BLDG 3 FIRST FLOOR
TINKER AFB, OK 73145-9125
UNITED STATES
9. FOR
INFORMATION
CALL:
a. NAME Eric Owens
b. TELEPHONE NUMBER (include area code) (NO COLLECT CALLS) 312-884-4627
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10.THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
Project Title: WWYK090020 Replace Multiple Roofs, B1049, B7038 WWYK090032 REPAIR ROOF BLDG 414 WWYK240001REPLACE ROOF, B6601 Project Location: Tinker AFB
THIS ORDER PROPOSAL REQUEST IS ONLY AVAILABLE TO CURRENT BOA HOLDERS
THE FOLLOWING THREE PROJECTS ARE BEING AWARDED UNDER ONE CONTRACT AND WILL BE WORKED CONCURRENTLY
IAW FAR 36.204(f) THE ESTIMATED MAGNITUDE OF THIS PROJECT IS BETWEEN $1,000,000 - $5,000,000
WWYK090020 The work to be performed under the terms of this Order consists of furnishing limited design services, materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the replacement of the trapezoidal metal roof system on Building 1049 and install two component silicone coating system on Building 7038 at Tinker Air Force Base (AFB), Oklahoma (reference the project drawings for additional location information).
WWYK090020 NAICS Code: 238160, PSC Code: Z2JZ, PoP: 215 days after NTP
WWYK090032 and WWYK240001 The work to be performed under the terms of this Order consists of furnishing limited design services, materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair/replacement of the roof on B414 and B6601 at Tinker Air Force Base (AFB), Oklahoma (reference the project drawings for additional location information).
WWYK090032 NAICS Code: 236220, PSC Code: Z1AA, PoP: 200 days after NTP WWYK240001 NAICS Code: 238160, PSC Code: Z2AZ, PoP: 150 days after NTP
IAW FAR 52.232-18 Funds are not presently available for this contract. The Governments obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer
11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving 10 215 award, notice to proceed. This performance period is mandatory negotiable. (See ). FAR 52.211-10
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
YES NO
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) 1 02:00 PM local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes 29 May 2026 containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. 120
Computer generated. STANDARD FORM 1442 (REV. 12/2022) Prescribed by GSA-FAR (48CFR) 53.236-1(d)
Created On:
17 Apr 2026, 12:56 PM Central Daylight Time
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED
STATES CODE AT
10 U.S.C 3204(a) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document
Contractor agrees to furnish and return copies to issuing office.)
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
Computer generated. STANDARD FORM 1442 (REV. 12/2022) BACK
Section A - Solicitation/Contract Form WWYK090020 Replace Multiple Roofs B1049 B7038, WWYK090032 Replace Roof B414 Operations, WWYK240001 Replace Roof B6601
NAICS: 238160
Size Standard: USD 19,000,000.00 Annual receipts
Product Service Code: Z2JZ
FA813726R0018
Section B - Supplies or Services & Prices or Costs Additional Information/Notes
Item Supplies / Services Quantity Unit Unit Price Amount
WWYK090020 Replace Multiple Roofs PSC/FSC: Z2AA, Repair Costs, (EEIC:
52400)
Product Type Code: Z2AA Product Service Code: Z2AA Claimant Program Code: C2 Pricing Arrangement: Firm Fixed Price
1 Project
0002 WWYK090032, Repair Roof, Bldg.
0002AA
WWYK090032, Repair Roof, Bldg. 414, PSC/FSC: Z1AA, Design Costs (EEIC 53200)
Product Service Code: Z1AA Claimant Program Code: C2 Pricing Arrangement: Firm Fixed Price
1 Project
0002AB
WWYK090032, Repair Roof, Bldg. 414 PSC/FSC: Z1AA, Repair Costs, (EEIC 52200)
Product Service Code: Z1AA Claimant Program Code: C2 Pricing Arrangement: Firm Fixed Price
1 Project
WWYK240001 Replace Roof B6601
0003AA
WWYK240001 Replace Roof B6601 PSC/FSC: Z2AZ, Design Costs, (EEIC:
53200)
Product Service Code: Z2AZ Claimant Program Code: C2 Pricing Arrangement: Firm Fixed Price
1 Project
0003AB
WWYK240001 Replace Roof B6601 PSC/FSC: Z2AZ, Repair Costs, (EEIC:
52200)
Product Service Code: Z2AZ Claimant Program Code: C2 Pricing Arrangement: Firm Fixed Price
1 Project
Section C - Description/Specifications/Statement of Work
Requirements
FY26 F18JJ 374421 CE PLANNING FM9 WWYK090020 REPLACE MULTIPLE ROOFS B1049 B7038
FY26 F18JJ 374449 CE PLANNING FM9 WWYK090032, REPAIR ROOF B414
FY26 F18JJ 374449 CE PLANNING FM9 WWYK240001 REPLACE ROOF B6601
Section D - Packaging and Marking
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
52.246-12 Inspection of Construction. Aug 1996 Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: FA8137 CountryCode: USA
FA8137 AFSC PZIOC
CP 405 739 4040, 7799 ARNOLD AVE BLDG 3 FIRST FLOOR
TINKER AFB, OK 73145-9125
UNITED STATES
Frank Smith Email: franklin.smith.4@us.af.mil Telephone: 4055824071
0002AA
Inspection and Acceptance Location
Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: FA8137 CountryCode: USA
FA8137 AFSC PZIOC
CP 405 739 4040, 7799 ARNOLD AVE BLDG 3 FIRST FLOOR
TINKER AFB, OK 73145-9125
UNITED STATES
Frank Smith Email: franklin.smith.4@us.af.mil Telephone: 4055824071
0002AB
Inspection and Acceptance Location
Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: FA8137 CountryCode: USA
FA8137 AFSC PZIOC
CP 405 739 4040, 7799 ARNOLD AVE BLDG 3 FIRST FLOOR
TINKER AFB, OK 73145-9125
UNITED STATES
Frank Smith Email: franklin.smith.4@us.af.mil Telephone: 4055824071
0003AA
Inspection and Acceptance Location
Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: FA8137 CountryCode: USA
FA8137 AFSC PZIOC
CP 405 739 4040, 7799 ARNOLD AVE BLDG 3 FIRST FLOOR
TINKER AFB, OK 73145-9125
UNITED STATES
Frank Smith Email: franklin.smith.4@us.af.mil Telephone: 4055824071
0003AB
Inspection and Acceptance Location
Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: FA8137 CountryCode: USA
FA8137 AFSC PZIOC
CP 405 739 4040, 7799 ARNOLD AVE BLDG 3 FIRST FLOOR
TINKER AFB, OK 73145-9125
UNITED STATES
Frank Smith Email: franklin.smith.4@us.af.mil Telephone: 4055824071
Section F - Deliveries or Performance Overall Contract Delivery Period
Line Item Delivery Schedule Quantity Address and POC
Delivery Schedule From date of lead time event to completion of performance 215 Calendar Days Date of Notice to Proceed Receipt
1 Project Service Performance Site DoDAAC: FA8137 CountryCode: USA
FA8137 AFSC PZIOC
CP 405 739 4040, 7799 ARNOLD AVE BLDG 3 FIRST FLOOR
TINKER AFB, OK 73145-9125
UNITED STATES
Frank Smith Email: franklin.smith.4@us.af.mil Telephone: 4055824071
0002AA
Delivery Schedule From date of lead time event to completion of performance 200 Calendar Days Date of Notice to Proceed Receipt
1 Project Service Performance Site DoDAAC: FA8137 CountryCode: USA
FA8137 AFSC PZIOC
CP 405 739 4040, 7799 ARNOLD AVE BLDG 3 FIRST FLOOR
TINKER AFB, OK 73145-9125
UNITED STATES
Frank Smith Email: franklin.smith.4@us.af.mil Telephone: 4055824071
0002AB
Delivery Schedule From date of lead time event to completion of performance 200 Calendar Days Date of Notice to Proceed Receipt
1 Project Service Performance Site DoDAAC: FA8137 CountryCode: USA
FA8137 AFSC PZIOC
CP 405 739 4040, 7799 ARNOLD AVE BLDG 3 FIRST FLOOR
TINKER AFB, OK 73145-9125
UNITED STATES
Frank Smith Email: franklin.smith.4@us.af.mil Telephone: 4055824071
0003AA
Delivery Schedule From date of lead time event to completion of performance 150 Calendar Days Date of Notice to Proceed Receipt
1 Project Service Performance Site DoDAAC: FA8137 CountryCode: USA
FA8137 AFSC PZIOC
CP 405 739 4040, 7799 ARNOLD AVE BLDG 3 FIRST FLOOR
TINKER AFB, OK 73145-9125
UNITED STATES
Frank Smith Email: franklin.smith.4@us.af.mil Telephone: 4055824071
0003AB
Delivery Schedule From date of lead time event to completion of performance 150 Calendar Days Date of Notice to Proceed Receipt
1 Project Service Performance Site DoDAAC: FA8137 CountryCode: USA
FA8137 AFSC PZIOC
CP 405 739 4040, 7799 ARNOLD AVE BLDG 3 FIRST FLOOR
TINKER AFB, OK 73145-9125
UNITED STATES
Frank Smith Email: franklin.smith.4@us.af.mil Telephone: 4055824071
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
252.201-7000 Contracting Officer's Representative. Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause-
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
N/A
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Construction Invoice
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F87700 Issue By DoDAAC FA8137 Admin DoDAAC FA8137 Inspect By DoDAAC FA8137 Ship To Code ____ Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) FA8137 Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____ (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
72CPTS FMASSYSTEMS@US.AF.MIL
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
52.202-1 Definitions. Jun 2020 52.203-3 Gratuities. Apr 1984 52.203-5 Covenant Against Contingent Fees. May 2014 52.203-6 Restrictions on Subcontractor Sales to the Government. Jun 2020 52.203-7 Anti-Kickback Procedures. Jun 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. May 2014 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. May 2014 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. Jun 2020 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (Deviation 2026-O0038) Feb 2026 52.204-13 System for Award Management-Maintenance. (Deviation 2026-O0038) Feb 2026 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026-O0038) Feb 2026
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. (Deviation 2026-O0038) Feb 2026 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation 2026-O0038) Feb 2026 52.219-8 Utilization of Small Business Concerns. (Deviation 2026-O0038) Feb 2026 52.219-9 Small Business Subcontracting Plan. (Deviation 2026-O0038) Feb 2026 52.219-16 Liquidated Damages-Subcontracting Plan. (Deviation 2026-O0038) Feb 2026 52.222-3 Convict Labor. (Deviation 2026-O0038) Feb 2026 52.222-6 Construction Wage Rate Requirements. (Deviation 2026-O0038) Feb 2026 52.222-7 Withholding of Funds. (Deviation 2026-O0038) Feb 2026 52.222-8 Payrolls and Basic Records. (Deviation 2026-O0038) Feb 2026 52.222-9 Apprentices and Trainees. (Deviation 2026-O0038) Feb 2026 52.222-10 Compliance with Copeland Act Requirements. (Deviation 2026-O0038) Feb 2026 52.222-11 Subcontracts (Labor Standards). (Deviation 2026-O0038) Feb 2026 52.222-12 Contract Termination-Debarment. May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. May 2014 52.222-14 Disputes Concerning Labor Standards. (Deviation 2026-O0038) Feb 2026 52.222-15 Certification of Eligibility. May 2014 52.222-35 Equal Opportunity for Veterans. (Deviation 2026-O0038) Feb 2026 52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026-O0038) Feb 2026 52.222-37 Employment Reports on Veterans. (Deviation 2026-O0038) Feb 2026 52.222-40 Notification of Employee Rights Under the National Labor Relations Act. (Deviation 2026-O0038) Feb 2026 52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038) Feb 2026 52.222-54 Employment Eligibility Verification. (Deviation 2026-O0038) Feb 2026 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. (Deviation 2026-O0038) Feb 2026 52.222-62 Paid Sick Leave Under Executive Order 13706. (Deviation 2026-O0038) Feb 2026 52.223-23 Sustainable Products. (Deviation 2026-O0038) Feb 2026 52.226-7 Drug-Free Workplace. May 2024 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.228-2 Additional Bond Security. Oct 1997 52.228-11 Individual Surety-Pledge of Assets. Feb 2021 52.228-12 Prospective Subcontractor Requests for Bonds. Dec 2022 52.228-14 Irrevocable Letter of Credit. Nov 2014 52.229-3 Federal, State, and Local Taxes. Feb 2013 52.229-12 Tax on Certain Foreign Procurements. Feb 2021 52.232-8 Discounts for Prompt Payment. Feb 2002 52.232-17 Interest. May 2014 52.232-23 Assignment of Claims. May 2014 52.232-27 Prompt Payment for Construction Contracts. Jan 2017 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-39 Unenforceability of Unauthorized Obligations. Jun 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023 52.233-1 Disputes. (Deviation 2026-O0038) (Alternate I) Feb 2026 Alternate I Feb 2026 52.233-3 Protest after Award. (Deviation 2026-O0038) Feb 2026 52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026-O0038) Feb 2026 52.236-2 Differing Site Conditions. (Deviation 2026-O0038) Feb 2026 52.236-3 Site Investigation and Conditions Affecting the Work. (Deviation 2026-O0038) Feb 2026 52.236-5 Material and Workmanship. (Deviation 2026-O0038) Feb 2026 52.236-6 Superintendence by the Contractor. (Deviation 2026-O0038) Feb 2026 52.236-7 Permits and Responsibilities. (Deviation 2026-O0038) Feb 2026 52.236-8 Other Contracts. (Deviation 2026-O0038) Feb 2026 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (Deviation 2026-
O0038) Feb 2026
52.236-10 Operations and Storage Areas. (Deviation 2026-O0038) Feb 2026 52.236-11 Use and Possession Prior to Completion. (Deviation 2026-O0038) Feb 2026 52.236-12 Cleaning Up. (Deviation 2026-O0038) Feb 2026 52.236-13 Accident Prevention. (Deviation 2026-O0038) Feb 2026 52.236-15 Schedules for Construction Contracts. (Deviation 2026-O0038) Feb 2026
52.236-21 Specifications and Drawings for Construction. (Deviation 2026-O0038) Feb 2026 52.240-91 Security Prohibitions and Exclusions. (Deviation 2026-O0038) Feb 2026 52.240-93 Basic Safeguarding of Covered Contractor Information Systems. (Deviation 2026-O0038) Feb 2026 52.242-5 Payments to Small Business Subcontractors. Jan 2017 52.242-13 Bankruptcy. Jul 1995 52.242-14 Suspension of Work. Apr 1984 52.243-4 Changes. (Deviation 2026-O0038) Feb 2026 52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026-O0038) Feb 2026 52.249-2 Termination for Convenience of the Government (Fixed-Price). (Alternate I) Apr 2012 Alternate I Sep 1996 52.249-10 Default (Fixed-Price Construction). Apr 1984
DFARS Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7001 Prohibition on Persons Convicted of Fraud or Other Defense-Contract-Related Felonies. Jan 2023 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7003 Control of Government Personnel Work Product. Apr 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. (DEVIATION 2024-
O0013 REVISION 1)
May 2024 Deviation 2024-O0013 May 2024
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services. Jan 2023 252.205-7000 Provision of Information to Cooperative Agreement Holders. Oct 2024 252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a
State Sponsor of Terrorism.
May 2019
252.219-7996 Small Business Subcontracting Plan (DoD Contracts). (DEVIATION 2026-O0037) Feb 2026 Deviation 2026-O0037 Feb 2026 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements. Jan 2023 252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7012 Preference for Certain Domestic Commodities. Apr 2022 252.225-7048 Export-Controlled Items. Jun 2013 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region. Jun 2023 252.226-7001 Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian
Small Business Concerns.
Jan 2023
252.226-7003 Drug-Free Work Force. Aug 2024 252.232-7010 Levies on Contract Payments. Dec 2006 252.240-7997 NIST SP 800-171 DoD Assessment Requirements. (DEVIATION 2026-O0025) Feb 2026 Deviation 2026-O0025 Feb 2026 252.243-7001 Pricing of Contract Modifications. Dec 1991 252.243-7002 Requests for Equitable Adjustment. Dec 2022 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for Military Operations. Oct 2010 252.247-7023 Transportation of Supplies by Sea. Oct 2024
FAR Clauses Incorporated by Full Text
52.211-12 Liquidated Damages-Construction. (Sep 2000)
Liquidated Damages-Construction (Sept 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of 227.75[Contracting Officer insert amount] for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.219-28 Postaward Small Business Program Rerepresentation. (Deviation 2026-O0038) (Alternate I) (Feb 2026) Alternate I (Feb 2026)
Alternate I (Feb 2026) (Deviation 2026-O0038). As prescribed in 19.101(a)(2)(iii)(B), substitute the following paragraph (g)(1) for paragraph (g)(1) of the basic clause:
(g)(1) The Contractor represents its small business size status for each one of the NAICS codes assigned to this contract.
NAICS Code Small business concern (yes/no) 238160 ____ 236220 ____ [Contracting Officer to insert NAICS codes.]
52.225-9 Buy American-Construction Materials. (Deviation 2026-O0038) (Feb 2026)
Buy American-Construction Materials (Feb 2026) (Deviation 2026-O0038)
(a) Definitions. As used in this clause-
Commercially available off-the-shelf (COTS) item-
(1) Means any item of supply (including construction material) that is-
(i) A commercial product (as defined in paragraph (1) of the definition of "commercial product" at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work.
The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph
(1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.
Domestic construction material means-
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if-
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
____________[Contracting Officer to list applicable excepted materials or indicate "none"]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable.
(A) For domestic construction material that is not a critical item or does not contain critical components.
(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.
(3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.
(B) For domestic construction material that is a critical item or contains critical components.
(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.
(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B)(1) of this clause.
(3) The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute or Balance of Payments Program.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of measure Quantity Price (dollars)* Item 1:
Foreign construction material. ____ ____ ____ Domestic construction material. ____ ____ ____
Item 2:
Foreign construction material. ____ ____ Domestic construction material. ____ ____ ____ [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.][Include other applicable supporting information.] (End of clause)
52.228-15 Performance and Payment Bonds-Construction (Deviation 2020-O0016) (Jun 2020) Deviation 2020-O0016 (Apr 2020)
PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION (APR 2020) (DEVIATION 2020-O0016)
(a) Definitions. As used in this clause-
Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is $150,000 or less, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance bonds (Standard Form 25, except that no seal is required). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment bonds (Standard Form 25A, except that no seal is required). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3) Additional bond protection.
(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the U.S. Department of the Treasury, Financial Management Service, Surety Bond Branch, 3700 East West Highway, Room 6F01, Hyattsville, MD 20782. Or via the internet at http://www.fms.treas.gov/c570/.
(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
(End of clause)
52.232-5 Payments under Fixed-Price Construction Contracts. (May 2014)
Payments under Fixed-Price Construction Contracts (May 2014)
(a) Payment of price. The Government shall pay the Contractor the contract price as provided in this contract.
(b) Progress payments. The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.
(1) The Contractor's request for progress payments shall include the following substantiation:
(i) An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment requested.
(ii) A listing of the amount included for work performed by each subcontractor under the contract.
(iii) A listing of the total amount of each subcontract under the contract.
(iv) A listing of the amounts previously paid to each such subcontractor under the contract.
(v) Additional supporting data in a form and detail required by the Contracting Officer.
(2) In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be taken into consideration. Material delivered to the Contractor at locations other than the site also may be taken into consideration if-
(i) Consideration is specifically authorized by this contract; and
(ii) The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform this contract.
(c) Contractor certification. Along with each request for progress payments, the Contractor shall furnish the following certification, or payment shall not be made: (However, if the Contractor elects to delete paragraph (c)(4) from the certification, the certification is still acceptable.)
I hereby certify, to the best of my knowledge and belief, that-
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor's performance.
____ (Name)
____ (Title)
____ (Date)
(d) Refund of unearned amounts. If the Contractor, after making a certified request for progress payments, discovers that a portion or all of such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the "unearned amount"), the Contractor shall-
(1) Notify the Contracting Officer of such performance deficiency; and
(2) Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph (j) of this clause) equal to interest on the unearned amount from the 8th day after the date of receipt of the unearned amount until-
(i) The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or
(ii) The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the unearned amount.
(e) Retainage. If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future progress payments that amount the Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage.
(f) Title, liability, and reservation of rights. All material and work covered by progress payments made shall, at the time of payment, become the sole property of the Government, but this shall not be construed as-
(1) Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work; or
(2) Waiving the right of the Government to require the fulfillment of all of the terms of the contract.
(g) Reimbursement for bond premiums. In making these progress payments, the Government shall, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (e) of this clause shall not apply to that portion of progress payments attributable to bond premiums.
(h) Final payment. The Government shall pay the amount due the Contractor under this contract after-
(1) Completion and acceptance of all work;
(2) Presentation of a properly executed voucher; and
(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of1940 ( 31 U.S.C.3727 and 41 U.S.C. 6305).
(i) Limitation because of undefinitized work. Notwithstanding any provision of this contract, progress payments shall not exceed 80 percent on work accomplished on undefinitized contract actions.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .