ATT1_EM Survey B6601.pdf
PDF 2 MB Posted
- Attached to
- TINKER AFB MAC BOA WWYK090020; WWYK090032 AND WWYK240001 - ROOFS B1049 AND B7038; B414; B6601
- Solicitation number
- FA813726R0018
About this file
This is an Asbestos/Lead-Based Paint (LBP) Inspection Report prepared by 72 ABW/CEIE for Building 6601 at Tinker Air Force Base, dated June 10, 2024. The inspection was conducted for the "Replace Roof" project (WWYK240001) on a 1942-constructed facility. Civil Engineering Inspectors Laura Duck and Michael Green extracted ten samples from various roof sections for laboratory analysis.
The inspection identified asbestos-containing materials (ACM) in the original flat, gravel roof system, including all flashing, with confirmed asbestos presence in gray and black roofing materials exceeding one percent asbestos content. Conversely, the black tar does not contain asbestos, and the roofing shingles on the angled roof sections tested negative for asbestos. Polarized Light Microscopy (PLM) analysis revealed asbestos percentages ranging from 6% to 10% chrysotile in ACM samples. The report notes all sampled materials exhibited significant damage from weathering. XRF analysis detected no lead-based paint. The primary recommendation calls for Class II asbestos abatement work on the flat gravel roofing materials, with mandatory compliance to Asbestos NESHAP demolition notification, practices, and procedures under 29 CFR 1926.1101. The report directs project personnel to contact CEIE at 72abw.ce.asbestos-lbp@us.af.mil for questions or if additional suspect materials are discovered during roof replacement work.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
72 ABW/CEIE
ABSESTOS/LBP INSPECTION REPORT PAGE 1 OF 7
Project Information
Project Name Replace Roof Project ID WWYK240001
Project Building 6601 Year Constructed 1942
Room/Post Location Roof Historical Samplings No
Requestor Elisa Mercado Inspector(s) Laura Duck; Michael Green
Inspection Date 10 Jun 2024 Report Prepared By
Sampling Information:
Sample ID - Location Material/Dimensions Classification Condition Hazard Friable Analysis Results
RC66010001
Gravel Roof
Gray compound; black roofing w/tar MISC Significant Damage
ACM NF PLM Asbestos Present
RC66010002
Gravel Roof
Black roof compound MISC Some Damage ACM NF PLM Asbestos Present
RC66010003
Throughout Roof
Gray/Black flashing MISC Significant Damage
ACM NF PLM Asbestos Present
RM66010001
Throughout Roof
Black/Gray Flashing MISC Significant Damage
ACM NF PLM Asbestos Present
RM660110002
Roof throughout
Black roofing and white compound MISC Significant Damage
ACM NF PLM Not Present
PACM
RM66010003
Roof layers below gravel
Black roofing MISC Significant Damage
ACM NF PLM Asbestos Present
RM66010004
Angled roof
Gray/black shingles MISC Significant Damage
ACM NF PLM Asbestos Not Present
RM66010005
Second Layer Angled roof
Black shingle MISC Significant Damage
AMC NF PLM Asbestos Not Present
RM66010006
Second layer angled roof
Black shingle MISC Significant Damage
AMC NF PLM Asbestos Not Present
RC66010004
Roof throughout
Black roof compound MISC Significant Damage
AMC NF PLM Asbestos Present
Visual Observations/Photos (if available)
• CEIE conducted an inspection of the roof at B 6601. The roof appeared antiquated and contained varying degrees of weather damage.
• CEIE could not confirm the date of construction of the angled roof sections, but they appeared to be additions to the original structure.
• Roof materials on the center structure (gravel/decking) and angled roofing materials were not homogeneous.
Page | 2
General Inspection Procedures:
• CEIE conducted a visual and physical inspection of the roof systems and extracted suspect samples for analysis.
• CEIE was unable to sample below the second layer of shingles located on the angled roof.
Condition:
Surfacing/Misc. Materials:
• Good Condition: Material with no visible damage or deterioration or showing only very limited damage or deterioration.
• Some Damage: Material crumbling, blistered, water-stained, gouged, marred, or abraded covering less than one tenth of the surface if the damage is evenly distributed (one quarter if the damage is localized).
• Significant Damage: Material crumbling, blistered, hanging from surface, deteriorated, adhesive failure, water-stained, gouged, marred, or abraded covering more than one tenth if the damage is evenly distributed (one quarter if the damage is localized).
Hazard:
• ACM = Asbestos Containing Material; defined by the EPA as any material containing more than 1 percent asbestos.
Friable:
• Friable = Material, when dry, may be crumbled, pulverized, or reduced to powder by hand pressure, and includes previously nonfriable material that becomes damaged to the extent that it is now friable.
• NF = Nonfriable; Material, when dry may not be crumbled, pulverized, or reduced to powder by hand pressure.
Analysis/Results:
• PLM = Polarized Light Microscopy; Asbestos Present or Asbestos Not Present
• PACM = Presumed Asbestos Containing Material
Summary of ACMs:
• Gray and black roofing materials located on the flat roof of the bldg. contain greater than 1% asbestos. See PLM for specific percentages.
• The black roof tar does not contain asbestos.
• The gray and black shingles on the angled roof did not contain asbestos.
Summary of LBPs:
• XRF analysis did not detect LBP.
Page | 3
Conclusions:
• The original flat, gravel roof is asbestos containing. This includes all flashing.
• The black tar does not contain asbestos.
• The roofing shingles on the angled roofs did not contain asbestos and appeared to be different materials than what is installed on the flat roof.
Recommendations:
• Based on the information collected during this inspection, the following recommendations are offered. These recommendations are based on currently observed conditions of only asbestos containing materials and may have to be adjusted if emergency, or other factors alter the condition, use, or planned future.
• Class II asbestos abatement work of the flat gravel roofing materials.
• Follow all Demolition notification, practices, and procedures under Asbestos NESHAP, 29 CFR 1926.1101, as applicable.
• Contact CEIE at 72abw.ce.asbestos-lbp@us.af.mil for any questions and if additional suspect materials are discovered.
PLM Analysis and CoC: Pages 4 through 7 of this report.
Page | 4
Page | 5
Page | 6
Page | 7
END OF REPORT
| ABSESTOS/LBP inspection report Page 1 of 7 |
| Project Information |
| Sampling Information: |
| Visual Observations/Photos (if available) |
| General Inspection Procedures: |
| Condition: |
| Hazard: |
| Friable: |
| Analysis/Results: |
| Summary of ACMs: |
| Summary of LBPs: |
| Conclusions: |
| Recommendations: |
| PLM Analysis and CoC: Pages 4 through 7 of this report. |
| END OF REPORT |
| Project ID |
| Project Name |
| Year Constructed |
| Project Building |
| Historical Samplings |
| Room/Post Location |
| Inspector(s) |
| Requestor |
| Report Prepared By |
| Inspection Date |
| Results |
| Analysis |
| Friable |
| Condition |
| Classification |
| Material/Dimensions |
| Sample ID - Location |
| 2024-06-11T15:25:27-0500 | |
| DUCK.LAURA.MICHELLE.1260792225 |