Att10_090020_Drawings.pdf

PDF 1 MB Posted

Attached to
TINKER AFB MAC BOA WWYK090020; WWYK090032 AND WWYK240001 - ROOFS B1049 AND B7038; B414; B6601
Solicitation number
FA813726R0018
Issued by

About this file

This document is a set of construction drawings for a federal roofing project at Tinker Air Force Base in Oklahoma. The project, identified as WWYK090020, involves replacing multiple roofs on Buildings B1049 and B7038. The work is being managed by the Air Force Materiel Command's 72nd Air Base Wing Civil Engineer Directorate, with design completed by TEPA-SRM as of August 15, 2024.

For Building B1049, the scope includes complete roof replacement with new trapezoidal standing seam metal roof panels, removal of existing metal roof, gutters, downspouts, rake trim, and corner trim, followed by installation of new gutters, downspouts, rake trim, and corner trim. The work also requires installation of new pipe boots and includes provisions for pipe penetrations and exhaust fans. For Building B7038, the work involves cleaning and preparing the existing roof per manufacturer recommendations to receive new coating, applying new roof coating per the Statement of Work, removing existing gutters and trim, and installing new gutters, downspouts, rake trim, and corner trim. Both buildings require new metal wall panel closures and pipe boots. Construction details are provided for metal roof gutters, pipe penetration flashing using stainless steel drawband fasteners, vented ridge caps with continuous ridge ventilation, and curbs for roof-top equipment. The contractor is responsible for site protection, fencing, barricades, and repair of any damage to existing facilities caused by construction operations.

View the file

Other files

File Type Posted
ATT3_SOW_B1049 and B7038.pdf PDF
ATT1_EM Survey B6601.pdf PDF
ATT2_B414_Roof.pdf PDF
WWYK090020 090032 240001 RFIs_COR.pdf PDF
06601_RoofSections.pdf PDF
910243W.pdf PDF
840173.pdf PDF
20030059.pdf PDF
860072.pdf PDF
B414 As-Builts.pdf PDF
610107.pdf PDF
Solicitation - FA813726R0018.pdf PDF
Section L - Instructions to Offerors.pdf PDF
Section M - Evaluation Factors for Award.pdf PDF
Att8_090020_SOW.pdf PDF
Att11_240001_Submittal Register.pdf PDF
Att10_090032_Submittal Register_ROOF.pdf PDF
Att9_090020_Submittal Register.pdf PDF
EAL List - BLANK to Contractors.xlsx XLSX spreadsheet
Att9_090032_MAC BOA roof SOW.pdf PDF
Att10_240001_SOW.pdf PDF
Wage Determination 8APR2026.pdf PDF
Att11_090032_Drawings.pdf PDF
Att12_240001_Drawings.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVIEWED BY:

REVIEWED BY:

USING AGENCY:

ASBESTOS EVALUATION:

SAFETY:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

INDUSTRIAL HYGIENE:

DATE:

PROJECT DRAWING INDEX SIGNATURES

CORROSION ENGINEER: (CECE)

CE OPERATIONS: (CECO)

COMMUNICATIONS: (COMM)

CHIEF ENGINEER DIR: (CECE)

CHIEF DESIGN BRANCH: (CECE)

DESIGN MANAGER: (CECE)

ZONE MANAGER:

CONSTRUCTION MANAGEMENT: (CECE)

ENVIRONMENTAL:

BASE CIVIL ENGINEER: (CE)

FIRE DEPARTMENT: (CEFT)

GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES

OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING

MINIMUM QUALITY STANDARDS, IDENTIFICATION AND

GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF

OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED

THE SPECIFIED ITEMS IN TERMS OF PHYSICAL

PROPERTIES, INCLUDING, COLOR RANGE, FINISH,

DURABILITY, APPEARANCE, PERFORMANCE

CHARACTERISTICS, AND OTHER FACTORS. OTHER

PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE

SUBMITTED FOR EVALUATION AND

APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.

2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE

CONSIDERED AS A WHOLE IN THAT THE GENERAL

CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE

RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL

SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF

THE SPECIFICATIONS.

3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL

CONSTRUCTION FENCING AND BARRICADES AS REQUIRED

TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT

ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE

CONSTRUCTION SITE.

4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES

CAUSED BY CONSTRUCTION TRAFFIC OR ANY

CONSTRUCTION OPERATION SHALL BE REPAIRED OR

REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED

EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE

GOVERNMENT.

5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE

UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW

LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE

"EXISTING" OR "BY OTHERS".

WWYK090020

REPLACE MULTIPLE

ROOFS, B1049 & B7038

KEY PLAN:

GENERAL NOTES:

DISCIPLINE

PROJECT

LOCATION

1 G-101 GENERAL NOTES & VICINITY MAP

SHT.SEQ. SHEET TITLE

OF

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

R3M

W W

YK

RE

PL

AC

E

MU

LT

IP

LE

RO

OF

S, B

B

-1

5-

TE

PA

-S R

M

A

AL

AW

AD

I

G-101

S

ST

AR

R

J M

IT

C

H

EL

L

En gr

\D es ig n\ s\

\2

0\

0_ Su pp or t\0 _3

_D ra w in gs

GE

NE

RA

L N

OT

ES

AN

D

VI

CI

NI

TY

M

AP

01 05

R-101 AERIAL IMAGES B1049 AND B7038

RD-101 DEMOLITION AND NEW ROOF PLANS B1049

RD-102 DEMOLITION AND NEW ROOF PLANS B7038

DT-101 DETAILS5

PROJECT

LOCATION

Reserve Rd

O ld

A ir

De po t

Ai r D ep ot

R U

N W

AY

8/

RUNWAY 13/31

TA

XI

W

AY

G

TAXIW

AY H

TAXIWAY B

TAXIWAY C

TAXIWAY M

TA

XI

W

AY

K

TAXIWAY E

TAXIWAY A

TA

XIW

AY E

E

TAXIWAY F

TAXIWAY D

TAXIWAY E

TAXIWAY J

TA

XI

W

AY

G

TAXIWAY A

TAXIW

AY H

TAXIWAY C

TAXIWAY D

TAXIWAY EE

TAXIWAY F

Elm C reek

Cr ut ch o

Cr ee k

Kuhlman Creek

Soldier Creek

Kuhlman Creek

Elm C reek

East Crutcho Creek

Elm Creek

El m

C re ek

Elm Creek

Elm C reek

Elm CreekElm C reek

Ku hlm an C re ek

Ea st

C ru tc ho

C re ek

Elm C ree k

West Crutcho Creek

W es t C ru tc ho

C re ek

Elm Creek

Soldier Creek

Elm C reek

Soldier CreekSoldier Creek

Ea st

C ru tc ho

C re ek

Elm Creek

Ea st

C ru tc ho

C re ek

East C rutcho C reek

Soldier Creek

So ld ie r C re ek

East C rutch o Creek

Soldier C reek

Soldier C reek

So ld ie r C re ek

East Crutcho Creek

416506

21222121

59475946

11401128

62540

61089

838837

62509

62528

62523

62501X

43774

62512

62516

62525

3592135916

99999

62543

32101

71086

53902

50414

55300

56601

930G

948-E

911-E

948-W

61019

911-W

33001

35913

62501

65672

930S

45134

43609

42116

62517

62515

62526

62527

62503

62513

61289

62542

62501OK

11289

62501

15930

15908

15904

15904

15908

15908

15904

15904

15908

62502

41046

62501

62514

62501

61018

71089

45134

96022

43120

41157

44045

45815

40592

43610

62522

41163

15930

15930

11824

Arnold St.

Ea st

D r.

SE 74th St

SE 59th St.

Ai r D ep ot

Patrol Rd.

St af f D r.

Reserve Rd.

5th Ave

"A " A ve

M un iti on s R d.

W ar eh ou se R d.

"B " A ve

7th St.

"H " A ve

M cN ar ne y Av e.

Mitchell Ave

Al er t R d.

Co ok

A ve

W es t D r.

"E "A ve

Extender Dr.

Sentry Rd.

34th St.

Twining Dr.

5th Ave.

Jo ne s

Globemaster Dr.

To w er R d.

Vanaman Rd.

In du st ria l B lv d.

So ut h St

1st St.

Do ol itt le

A ve

Pi cn ic R d.

Ja m es D r.

W ol fe D r.

Ai r D ep ot

Ai r D ep ot

"D " A ve

Perimeter Rd.

Rapcon Rd.

Reserve Rd

"L " A ve

Mercury Rd.

1st St.

Br ow n Dr

Po nd

R d.

O ld

A ir

De po t

Airey Dr.

General Motors Dr

Bradley Dr.

Entrance Road "C"

Entrance Road "A"

"C " A ve

"C " A ve

Vandenberg Dr.

Hi llt op R d.

Do rm ito ry

R d.

Dormitory Rd.

"M " A ve

Chennault Dr.

M itc he ll A ve

Spaatz Dr.

Co m m od ity D r.

Doolittle Ave

W hi te D r.

3rd Ave.

"D " D riv e

Ba ll

Pa rk

R d.

Joint STARS Dr.

Ai r D ep ot

B lv d

Turbine Dr.

Turbine Dr.

Central Plant Dr.

6th St.6th St.

Falco n Dr.

Blackb ird

Dr.

W ey la nd

L oo p

Pegasus Dr.

Thunderbolt D r.

Munitions Rd. Ext.

Codding Rd.

Starlifter Dr.

Chidlaw Ct.

Co rs ai r D r.

Ra pt or Ct

N ig ht H aw k

Ct

Ph an to m

D r.

Fr an kl in

Po w er ho us e

Dr

Sk ym as te r D r.

Spaatz Ct.

La w re nc e

M un de ll

Nabors Dr.

In tr ud er

D r.

M cN ic kl e

M ill er D r.

Ta il

Fe at he r D r.

Holden Dr.

Ai re y C ir.

Smith Ct.

Ra ve n Ct

Air Dep ot Ai r D ep ot

Vanaman Rd.

1st St.

1st St.

TAXIWAY F

Ra w li ng s A ve

Mitc he ll Av e.

Mercury Rd.

Ra ily ar d

Rd

He rc ul es

R d.

"F " A ve

Pr op ul sio n Dr

Stratofortress Dr.

96021

Arnold St.

TINKER AFB, OK

VICINITY MAP

BASE

OPERATIONS

B240

CONTRACTING

B3

GOTT

GATE

TINKER GATE

PASS & ID B6611

HRUSKOCY

GATE

EAKER GATE

FIRE DEPARTMENT

B117

VANCE

GATE

LIBERATOR GATE

HOPE

GATE

LEGEND

CONTRACTOR

HAUL ROUTE

LANCER

GATE

TRUCK GATE

PIAZZA GATE

BASE CIVIL

ENGINEER

B400

PROJECT

LOCATION

OF

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

R3M

W W

YK

RE

PL

AC

E

MU

LT

IP

LE

RO

OF

S, B

B

-1

5-

TE

PA

-S R

M

A

AL

AW

AD

I

R-101

S

ST

AR

R

J M

IT

C

H

EL

L

En gr

\D es ig n\

\2

9\

\S

U

PP

O R

T\ D

R

AW

IN

G

S

AE

RI

AL

IM

AG

ES

B1

9 & B

02 05

GENERAL NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

R-101

AERIAL IMAGE B1049

NTS

R-101

AERIAL IMAGE B7038

NTS

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

R3M

W W

YK

RE

PL

AC

E

MU

LT

IP

LE

RO

OF

S, B

B

-1

5-

TE

PA

-S R

M

A

AL

AW

AD

I

RD-101

S

ST

AR

R

J M

IT

C

H

EL

L

En gr

\D es ig n\

\2

9\

\S

U

PP

O R

T\ D

R

AW

IN

G

S

DE

MO

LIT

IO

N

AN

D

NE

W R

OO

F

PL

AN

B

03 05

RD-101

DEMOLITION ROOF PLAN B1049

SCALE: 3/32" = 1'

RD-101

NEW ROOF PLAN B1049

SCALE: 3/32" = 1'

GENERAL NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

2. INSTALL NEW PIPE BOOTS.

KEYED NOTES

REMOVE THE EXISTING METAL ROOF.

REMOVE THE EXISTING GUTTERS AND DOWN SPOUTS.

REMOVE THE EXISTING RAKE TRIM.

REMOVE EXISTING CORNER TRIM.

INSTALL NEW TRAPEZOIDAL STANDING SEAM ROOF PANELS.

INSTALL NEW GUTTERS AND DOWN SPOUTS.

INSTALL NEW RAKE TRIM.

INSTALL NEW CORNER TRIM.

LEGEND

PP = PIPE PENETRATION

EF = EXHAUST FAN

DS = DOWN SPOUT

SLOPE

SLOPE

RIDGE CAP

PP

PP

PP PP

EF

EF

EF

EF

DS

DS

DS

DS

DS

DS

DS

DS

SLOPE

SLOPE

RIDGE CAP

PP

PP

PP PP

EF

EF

EF

EF

DS

DS

DS

DS

DS

DS

DS

DS

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

R3M

W W

YK

RE

PL

AC

E

MU

LT

IP

LE

RO

OF

S, B

B

-1

5-

TE

PA

-S R

M

A

AL

AW

AD

I

RD-102

S

ST

AR

R

J M

IT

C

H

EL

L

En gr

\D es ig n\

\2

9\

\S

U

PP

O R

T\ D

R

AW

IN

G

S

DE

MO

LIT

IO

N

AN

D

NE

W R

OO

F

PL

AN

B

04 05

GENERAL NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

2. CLEAN AND PREPARE ROOF PER MANUFACTURES RECOMMENDATIONS TO RECEIVE

NEW COATING.

3. THE VENTS AND EXHAUST FANS TO REMAIN.

4. INSTALL NEW METAL WALL PANEL CLOSURE.

5. INSTALL NEW PIPE BOOTS.

RD-102

DEMOLITION ROOF PLAN B7038

SCALE: 3/32" = 1'-0"

RD-102

NEW ROOF PLAN B7038

SCALE: 3/32" = 1'-0"

KEYED NOTES

REMOVE THE GUTTERS AND DOWN SPOUTS.

REMOVE RAKE TRIM.

REMOVE CORNER TRIM.

INSTALL NEW ROOF COATING PER SOW.

INSTALL NEW GUTTERS AND DOWN SPOUTS.

INSTALL NEW RAKE TRIM.

INSTALL NEW CORNER TRIM.

LEGEND

PP = PIPE PENETRATION

EF = EXHAUST FAN

DS = DOWN SPOUTS

SLOPE

SLOPE

RIDGE CAP

EF

PP

EF

PP

PP

EF

DS

DS DSDS

DS DS DS

12"

SLOPE

SLOPE

RIDGE CAP

EF

PP

EF

PP

PP

EF

5 66

DS

DS DSDS

DS DS DS

12"

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

R3M

W W

YK

RE

PL

AC

E

RO

OF

B1

9 &

B

-1

5-

TE

PA

-S R

M

A

AL

AW

AD

I

DT-101

S

ST

AR

R

J M

IT

C

H

EL

L

En gr

\D es ig n\ s\

\2

0\

0_ Su pp or t\0 _3

_D ra w in gs

DE

TA

ILS

05 05

ROOF PANEL

EXISTING WALL

WALL PANEL

1 3/4" THICKNESS

OVERHANG

24 GAUGE PVDF GUTTER

24 GAUGE BOX PANEL CAP TRIM

18 GAUGE GUTTER

STRAP @ 3'-0" O.C. MAX

TAPE SEALER

TOP & BOTTOM

OF CLOSURE

INSIDE

CLOSURE

FASTENER WITH

WASHER

FASTENER / WASHER

@ 12" O.C.

DT-101

METAL ROOF GUTTER

TYP B1049 & B7038

DT-101

PIPE PENETRATION FLASHING DETAIL

TYP B1049 & B7038

STAINLESS STEEL DRAWBAND

PREFORMED PENETRATION FLASHING

THRU GASKET FASTENERS SECURE

FLASHING COLLAR FLANGE TO NEW

ROOF PANEL AND NOT TO DECK SO AS

NOT TO FIX PANEL AT PENETRATION APPROPRIATE SEALANT TOOLED

TO FACILITATE WATER RUNOFF

PIPE PENETRATION

EXISTING SUBSTRUCTUREEXISTING SUBSTRUCTURE

EX

IS

TI

NG

S

UB

ST

RU

CT

UR

E

EXISTING SUBSTRUCTURE6" MIN. OVERLAP

NEW STANDING

SEAM ROOF PANEL

8" M

IN

NEW 18 GAUGE SHEET-

METAL CURB FLASHING

SEAL ENDS

OF SEAMS

OVERLAPPED JOINT WITH TWO ROWS

OF CONTINUOUS SEALANT TAPE

FLAT PAN/CURB ASSEMBLY

ONE-PIECE WELDED/SOLDERED

HEAVY-GAUGE METAL CURB

WELDED/SOLDERED TO METAL

FLANGE WITH CRICKET

EXISTING STRUCTURAL

EXISTING

ROOF PANEL

EXISTING

SUBSTRUCTURE

NEW HIP CLOSURE

NEW 24 GAUGE PVDF COATED

RIDGE FLASHING W/CONTINUOUS

RIDGE VENTILATIONNEW STANDING

SEAM ROOF PANEL

DT-101

CURB FOR ROOF TOP EQUIPMENT

TYP B1049

DT-101

VENTED RIDGE CAP DETAIL

TYP B1049

SET SECUREMENT RING IN

CONTINUOUS BEAD OF SEALANT

Sheets and Views
G101
05-090020-DT101-DT101.pdf
Sheets and Views
DT101
04-090020-RD102-RD-102.pdf
Sheets and Views
RD-102
03-090020-RD101-R-101.pdf
Sheets and Views
R-101
02-090020-R101-R-101.pdf
Sheets and Views
R-101
05-090020-DT101-DT101.pdf
Sheets and Views
DT101

File details come from the government source that posted it. Updated .