Att11_090032_Drawings.pdf

PDF 4 MB Posted

Attached to
TINKER AFB MAC BOA WWYK090020; WWYK090032 AND WWYK240001 - ROOFS B1049 AND B7038; B414; B6601
Solicitation number
FA813726R0018
Issued by

About this file

These are construction design documents for a roof replacement project at Tinker Air Force Base in Oklahoma. The project (WWYK090032) involves replacing the roof on Building 414 under the direction of the 72d Air Base Wing Civil Engineer Directorate. The documents include a general notes and vicinity map sheet, roof demolition plan, roof plan, and detailed construction drawings dated March 11, 2026.

The demolition plan specifies removal of existing gutters, downspouts, coping, counterflashing, built-up roofing, gravel ballast, insulation, associated flashings, gravel stops, and metal expansion joint covers down to the existing deck. The new roof installation calls for a white 90 mil EPDM membrane roof over R-24 rigid insulation on the existing roof deck, with metal expansion joint covers, prefinished metal coping, scuppers, gutters, and downspouts. Installation of walkpads around all vent hoods is required, and existing equipment curbs must be extended to provide a minimum 8-inch height above the new roof surface. The construction documents emphasize that contractors are responsible for understanding all information across all sheets and specifications, protecting construction materials and existing facilities, and repairing any damage caused during construction at no additional cost to the government. Reference to brand names in the specifications is for establishing minimum quality standards and does not preclude equal or superior alternative products subject to contracting officer approval.

View the file

Other files

File Type Posted
ATT3_SOW_B1049 and B7038.pdf PDF
ATT2_B414_Roof.pdf PDF
WWYK090020 090032 240001 RFIs_COR.pdf PDF
ATT1_EM Survey B6601.pdf PDF
910243W.pdf PDF
840173.pdf PDF
20030059.pdf PDF
860072.pdf PDF
B414 As-Builts.pdf PDF
610107.pdf PDF
06601_RoofSections.pdf PDF
Section L - Instructions to Offerors.pdf PDF
Section M - Evaluation Factors for Award.pdf PDF
Solicitation - FA813726R0018.pdf PDF
Att8_090020_SOW.pdf PDF
Att11_240001_Submittal Register.pdf PDF
Att10_090032_Submittal Register_ROOF.pdf PDF
Att9_090020_Submittal Register.pdf PDF
Att10_090020_Drawings.pdf PDF
EAL List - BLANK to Contractors.xlsx XLSX spreadsheet
Att12_240001_Drawings.pdf PDF
Att9_090032_MAC BOA roof SOW.pdf PDF
Att10_240001_SOW.pdf PDF
Wage Determination 8APR2026.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVIEWED BY:

REVIEWED BY:

USING AGENCY:

ASBESTOS EVALUATION:

SAFETY:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

INDUSTRIAL HYGIENE:

DATE:

PROJECT DRAWING INDEX SIGNATURES

CORROSION ENGINEER: (CECE)

CE OPERATIONS: (CECO)

COMMUNICATIONS: (COMM)

CHIEF ENGINEER DIR: (CECE)

CHIEF DESIGN BRANCH: (CECE)

DESIGN MANAGER: (CECE)

ZONE MANAGER:

CONSTRUCTION MANAGEMENT: (CECE)

ENVIRONMENTAL:

BASE CIVIL ENGINEER: (CE)

FIRE DEPARTMENT

GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES

OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING

MINIMUM QUALITY STANDARDS, IDENTIFICATION AND

GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF

OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED

THE SPECIFIED ITEMS IN TERMS OF PHYSICAL

PROPERTIES, INCLUDING, COLOR RANGE, FINISH,

DURABILITY, APPEARANCE, PERFORMANCE

CHARACTERISTICS, AND OTHER FACTORS. OTHER

PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE

SUBMITTED FOR EVALUATION AND

APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.

2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE

CONSIDERED AS A WHOLE IN THAT THE GENERAL

CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE

RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL

SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF

THE SPECIFICATIONS.

3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL

CONSTRUCTION FENCING AND BARRICADES AS REQUIRED

TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT

ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE

CONSTRUCTION SITE.

4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES

CAUSED BY CONSTRUCTION TRAFFIC OR ANY

CONSTRUCTION OPERATION SHALL BE REPAIRED OR

REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED

EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE

GOVERNMENT.

5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE

UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW

LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE

"EXISTING" OR "BY OTHERS".

WWYK090032

REPLACE ROOF B414

CE OPERATIONS

KEY PLAN:

GENERAL NOTES:

DISCIPLINE

PROJECT

LOCATION

1 G-101 GENERAL NOTES & VICINITY MAP

SHT.SEQ. SHEET TITLE

OF

TI

NK

ER

A

IR

F

OR

CE

B

AS

E, O

KL

AH

OM

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

W W

YK

RE

PL

AC

E

RO

OF

B

LD

G

CE

O

PE

RA

TI

ON

S

M

AR

T

EP

A-

SR

M

G-101

S

ST

AR

R

J U

H L

En gr

\D es ig n\ s\

\2

2\

0_ Su pp or t\0 _3

_D ra w in gs

GE

NE

RA

L N

OT

ES

AN

D

VI

CI

NI

TY

M

AP

01 04

RD-101 ROOF DEMOLITION PLAN- B414

RP-101 NEW WORK ROOF PLAN -B414

DT-501 DETAILS

50414

5th Ave

"E "A ve

"D " A ve

R U

N W

AY

8/

RUNWAY 13/31

TA

XI

W

AY

G

TAXIW

AY H

TAXIWAY B

TAXIWAY C

TAXIWAY M

TA

XI

W

AY

K

TAXIWAY E

TAXIWAY A

TA

XIW

AY E

E

TAXIWAY F

TAXIWAY D

TAXIWAY E

TAXIWAY J

TA

XI

W

AY

G

TAXIWAY A

TAXIW

AY H

TAXIWAY C

TAXIWAY D

TAXIWAY EE

TAXIWAY F

Elm C reek

Crutcho Creek

Kuhlman Creek

Soldier Creek

Kuhlman Creek

Elm C reek

East Crutcho Creek

Elm Creek

El m

C re ek

Elm Creek

Elm C reek

Elm CreekElm C reek

Ku hlm an C re ek

Ea st

C ru tc ho

C re ek

Elm C ree k

West Crutcho Creek

W es t C ru tc ho

C re ek

Elm Creek

Soldier Creek

Elm C reek

Soldier CreekSoldier Creek

Ea st

C ru tc ho

C re ek

Elm Creek

Ea st

C ru tc ho

C re ek

East C rutcho C reek

Soldier Creek

So ld ie r C re ek

East C rutch o Creek

Soldier C reek

Soldier C reek

So ld ie r C re ek

East Crutcho Creek

416506

21222121

59475946

11401128

62540

61089

838837

62509

62528

62523

62501X

43774

62512

62516

62525

3592135916

99999

62543

32101

71086

53902

50414

55300

56601

930G

948-E

911-E

948-W

61019

911-W

33001

35913

62501

65672

930S

45134

43609

42116

62517

62515

62526

62527

62503

62513

61289

62542

62501OK

11289

62501

15930

15908

15904

15904

15908

15908

15904

15904

15908

62502

41046

62501

62514

62501

61018

71089

45134

96022

43120

41157

44045

45815

40592

43610

62522

41163

15930

15930

11824

Arnold St.

Ea st

D r.

SE 74th St

SE 59th St.

Ai r D ep ot

Patrol Rd.

St af f D r.

Reserve Rd.

5th Ave

"A " A ve

M un iti on s R d.

W ar eh ou se R d.

"B " A ve

7th St.

"H " A ve

M cN ar ne y Av e.

Mitchell Ave

Al er t R d.

Co ok

A ve

W es t D r.

"E "A ve

Extender Dr.

Sentry Rd.

34th St.

Twining Dr.

5th Ave.

Jo ne s

Globemaster Dr.

To w er R d.

Vanaman Rd.

In du st ria l B lv d.

So ut h St

1st St.

Do ol itt le

A ve

Pi cn ic R d.

Ja m es D r.

W ol fe D r.

Ai r D ep ot

Ai r D ep ot

"D " A ve

Perimeter Rd.

Rapcon Rd.

Reserve Rd

"L " A ve

Mercury Rd.

1st St.

Br ow n Dr

Po nd

R d.

O ld

A ir

De po t

Airey Dr.

Bradley Dr.

Entrance Road "C"

Entrance Road "A"

"C " A ve

"C " A ve

Vandenberg Dr.

Hi llt op R d.

Do rm ito ry

R d.

Dormitory Rd.

"M " A ve

Chennault Dr.

M itc he ll A ve

Spaatz Dr.

Co m m od ity D r.

Doolittle Ave

W hi te D r.

3rd Ave.

"D " D riv e

Ba ll

Pa rk

R d.

Joint STARS Dr.

Ai r D ep ot

B lv d

Turbine Dr. Turbine Dr.

Central Plant Dr.

6th St.6th St.

Falco n Dr.

Blackb ird

Dr.

W ey la nd

L oo p

Pegasus Dr.

Thunderbolt D r.

Munitions Rd. Ext.

Codding Rd.

Starlifter Dr.

Chidlaw Ct.

Co rs ai r D r.

Ra pt or Ct

N ig ht H aw k

Ct

Ph an to m

D r.

Fr an kl in

Po w er ho us e

Dr

Sk ym as te r D r.

Spaatz Ct.

La w re nc e

M un de ll

Nabors Dr.

In tr ud er

D r.

M cN ic kl e

M ill er D r.

Ta il

Fe at he r D r.

Holden Dr.

Ai re y C ir.

Smith Ct.

Ra ve n Ct

Air Dep ot Ai r D ep ot

Vanaman Rd.

1st St.

1st St.

TAXIWAY F

Ra w li ng s A ve

Mitc he ll A ve

Mercury Rd.

Ra ily ar d

Rd

He rc ul es

R d.

"F " A ve

Pr op ul sio n Dr

Stratofortress Dr.

96021

Arnold St.

TINKER AFB, OK

VICINITY MAP

BASE

OPERATIONS

B240

CONTRACTING

B3

GOTT

GATE

TINKER GATE

PASS & ID B6611

HRUSKOCY

GATE

EAKER GATE

FIRE DEPARTMENT

B117

VANCE

GATE

LIBERATOR GATE

HOPE

GATE

LEGEND

CONTRACTOR

HAUL ROUTE

LANCER

GATE

TRUCK GATE

PIAZZA GATE

BASE CIVIL

ENGINEER

B400

(FUTURE

HAUL ROUTE)

(F

UT

UR

E

HA

UL

R

OU

TE

FUTURE

TRUCK GATE

FUTURE

HAUL ROUTE

PROJECT

LOCATION

TINKER AFB, OK

1 2 3 4 5

E

D

C

B

A

1 2 3 4 5

E

D

C

B

A

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A T:

\E ng r\D es ig n\ s\

\2

2\

0_ Su pp or t\0 _3

_D ra w in gs \M od el

M

AR

K D

AT

E

D

ES

C R

IP

TI

O N

IS

SU

E D

AT

E:

D

ES

IG

N

G R

O U

P:

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

SHEET

SHEET NUMBER

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N R

EV

IS

IO

N

S

PR

O

JE

C T

IN

FO

R M

AT

IO

N

OF

W W

YK

R

EP

LA

C

E R

O O

F

BL

D G

C E

O

PE

R

AT

IO

N

S R

O O

F D

EM

O

LI

TI

O N

PL

AN

- B

M

N O

LE

S

ST

AR

R

J U

H L

TE

PA

-S R

M

M

AR

RD-101

ROOF DEMOLITION PLAN - B414

SCALE: 1/16" = 1'-0"

RD-101

DEMOLITION KEYED NOTES

REMOVE EXISTING GUTTER AND

DOWNSPOUTS. APPROX. DOWNSPOUT

LOCATIONS SHOWN BY DS.

2 REMOVE EXISTING COPING AS INDICATED

BY DASHED LINES.

REMOVE EXISTING COUNTERFLASHING

ANCHORED TO CMU WALL BELOW.

2 3 2 3

REMOVE EXISTING BUILT-UP ROOFING,

GRAVEL BALLAST AND INSULATION DOWN

TO DECK. REMOVE ASSOCIATED FLASHINGS

AND GRAVEL STOPS.

1 1 1

5 5 5

REMOVE EXISTING METAL EXPANSION JOINT

COVER.

00 16' 32'4' 8'

#3

#1

#4

#2

RIDGE

3" VTR

EF

EFEF

EXISTING METAL ROOF TO REMAIN

EXISTING METAL ROOF TO REMAIN

EX

PA

N

SI

O N

J O

IN

T

EX

PA

N

SI

O N

J O

IN

T

'-7

457'-10"

'-0

178'-8"

'-9

18'-9"

'-2

10'-2"

15'-0"

RIDGERIDGE

EF

ANTENNA

MAST &

DISH

STEEL PIPE

FRAME

4" FLUE

8" FLUE W/

16" BASE

VENT HOOD

VENT HOOD

TYP.

LOWER

ROOF

VENT HOOD

1-1/2" VTR

6" FLUE VENT HOOD

VENT HOOD

VENT HOOD

SL

O

PE

SL

O

PE

SL

O

PE

LOWER

ROOF

D S

D S

D S

D S

D S

D S

D S

D S

D S

D S

D S

D S

D S

D S

D S

D S

D S

D S

DS

D

SD

S

D S

D S

D S

D S

D S

D S

DS

2" VTR

2" VTR

1-1/2" VTR

LOWER

ROOF

ANTENNA

MAST

SL

O

PE

SL

O

PE

SL

O

PE

1-1/2" VTR

2" VTR

AutoCAD SHX Text

X-FORMER

AutoCAD SHX Text

EMERGENCY

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

CHILLER

TINKER AFB, OK

1 2 3 4 5

E

D

C

B

A

1 2 3 4 5

E

D

C

B

A

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A T:

\E ng r\D es ig n\ s\

\2

2\

0_ Su pp or t\0 _3

_D ra w in gs \M od el

M

AR

K D

AT

E

D

ES

C R

IP

TI

O N

IS

SU

E D

AT

E:

D

ES

IG

N

G R

O U

P:

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

SHEET

SHEET NUMBER

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N R

EV

IS

IO

N

S

PR

O

JE

C T

IN

FO

R M

AT

IO

N

OF

W W

YK

R

EP

LA

C

E R

O O

F

BL

D G

C E

O

PE

R

AT

IO

N

S R

O O

F

PL

AN

B4

M

N O

LE

S

ST

AR

R

J U

H L

TE

PA

-S R

M

M

AR

RP-101

ROOF PLAN - B414

SCALE: 1/16" = 1'-0"

A-100

GENERAL NOTES

1. INSTALL WALKPADS AROUND ALL VENT

HOODS.

2. EXISTING CURBS FOR EQUIPMENT SUCH AS

HOODS, FANS AND SATELLITE DISH WILL

REQUIRE EXTENSION TO PROVIDE THE

REQUIRED 8" MINIMUM HEIGHT ABOVE THE

ROOF SURFACE.

ROOF PLAN KEYED NOTES

WHITE 90 MIL EPDM MEMBRANE ROOF

OVER R-24 RIGID INSULATION ON EXISTING

ROOF DECK.

2 METAL EXPANSION JOINT COVER.

PREFINISHED METAL COPING TYP.3

PROVIDE SCUPPER TYP.4

PREFINISHED METAL GUTTER &

DOWNSPOUTS TYP.

1 1 122

5 5 5

00 16' 32'4' 8'

RIDGE

3" VTR

EF

EFEF

EXISTING METAL ROOF TO BE COATED PER SOW

EXISTING METAL ROOF TO REMAIN

EX

PA

N

SI

O N

J O

IN

T

EX

PA

N

SI

O N

J O

IN

T

'-7

457'-10"

'-0

178'-8"

'-9

18'-9"

'-2

10'-2"

15'-0"

RIDGERIDGE

EF

ANTENNA

MAST &

DISH

STEEL PIPE

FRAME

4" FLUE8" FLUE W/

16" BASE

VENT HOOD

VENT HOOD

TYP.

LOWER

ROOF

VENT HOOD

1-1/2" VTR

6" FLUE VENT HOOD

VENT HOOD

VENT HOOD

SL

O

PE

SL

O

PE

SL

O

PE

SL

O

PE

SL

O

PE

SL

O

PE

LOWER

ROOF

LOWER

ROOF

ANTENNA

MAST

1-1/2" VTR

2" VTR

SCUPPER

EA. SIDE

D S

D S

D S

D S

D S

D S

D S

D S

D S

D S

D S

D S

D S

D S

D S

D S

D S

D S

D S

D

SD

S

D S

D S

D S

D S

D S

DS

2" VTR

2" VTR

1-1/2" VTR

SL

O

PE

SLOPE

AutoCAD SHX Text

X-FORMER

AutoCAD SHX Text

EMERGENCY

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

CHILLER

OF

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

A-501 04 04

D

ET

AI

LS

M

AR

TE

PE

-S R

M

J.

U

H L

S

ST

AR

R

M N

O

LE

En gr

/D es ig n/ s/

/0

_S up po rt/

0_ 3_

D ra w in gs

W W

YK

R

EP

LA

C

E R

O O

F, B

C E

O

PE

R

AT

IO

N

S

WOOD NAILER

PREFABRICATED METAL CURB

2 X 6 MIN. WOOD NAILER

ATTACHED TO SUBSTRATE

OVERALL THICKNESS TO

MATCH INSULATION

REINFORCED MEMBRANE

ATTACHMENT STRIP WITH

SEAM PLATES AND FASTENERS

ADHERED 90 MIL WHITE

EPDM MEMBRANE FLASHING

FL

A

S H

IN

G

H E

IG

H

T 8"

M

IN

IM

U

M

BONDING ADHESIVE

ROOFTOP EQUIPMENT FRAME

24 GAUGE REMOVABLE

SHEET-METALCOUNTERFLASHING

GASKETED FASTENER

MIN. TWO FASTENERS

PER SIDE

CORNER FLASHING PIECE

AT EACH CORNER

SEAL ALL EXPOSED EDGES

FASTENERS

APPROX. 8" O.C.

MIN. TWO PER SIDE

DT-501

GUTTER WITH PERMETER EDGE METAL

NTS

SHEET-METAL

SCUPPER SECURED

TO WALL AND DECK

TERMINATION OF

MEMBRANE FLASHING

WILL VARY

BONDING ADHESIVE SEALANT (IF REQUIRED

FOR SPECIFIC

SYSTEM)

BONDING ADHESIVE

SEALANT (IF REQUIRED

FOR SPECIFIC

SYSTEM)

SEALANT WATER

BLOCK

ADHERED MEMBRANE

FLASHING

WOOD BLOCKING

SEALANT WATER BLOCK

2 X 6 MIN. WOOD NAILER

ATTACHED TO SUBSTRATE

OVERALL THICKNESS TO

MATCH INSULATION

SHEET-METAL GUTTER

THE FRONT OF THE

GUTTER SHOULD BE A

MIN. 1'' LOWER THAN

THE BACK TO ALLOW

OVERFLOW

18 GAUGE GUTTER

BRACKET SUPPORT

ADHERED MEMBRANE FLASHING

PER THE MANUFACTURER'S

WARRANTY PER THE

MANUFACTURER'S

WARRANTY REQUIREMENTS

24 GAUGE PVDF

SHEET-METAL

EDGE FLASHING

18 GAUGE GUTTER

SPACERS INSTALLED

12" OC BETWEEN

GUTTER BRACKETS

FIELD SHEET OR SEPARATE

MEMBRANE SHEET EXTENDED

BELOW BLOCKING

24 GAUGE PVDF

COATED SHEET

METAL GUTTER

FL

A

S H

IN

G

H E

IG

H

T O

N 8'

' M

IN

IM

U

M

LO

W

S

ID

E

TOP OF CURB TO

DRAIN TO ONE SIDE

FASTENERS APPROX.

8'' O.C. BOTH SIDES

24 GAUGE PVDF COATED

SHEET-METAL EXPANSION JOINT

COVER WITH T-TYPE CLEAT

FLEXIBLE WEATHERPROOF

MEMBRANE CLOSURE

COMPRESSIBLE INSULATION

FLEXIBLE LINER

TO SERVE AS

INSULATION RETAINER

(ATTACHED TO TOP OF CURB)

2 X 6 MIN. WOOD NAILER

ATTACHED TO SUBSTRATE

OVERALL THICKNESS TO

MATCH INSULATION

CANT

MOP APPLIED MEMBRANE

FLASHING SHEET ADHERED

TO BACKER

EXTENDED FIELD PLIES

ABOVE TOP OF CANT

BACKER

SLOPE

APPROX. 4''

DT-501

BASE FLASHING AT EXPANSION JOINT WITH METAL COVER

NTS

PLUMBING VENT STACK

DRAWBAND

SEALANT

INSTALL SEALANT OR

SEALANT TAPE

BETWEEN PIPE AND

PRE-MANUFACTURED

MEMBRANE FLASHING

PRE-MANUFACTURED

MEMBRANE FLASHING

DT-501

PLUMBING VENT (PRE-MANUFACTURED BOOT)

NTS

DT-501

BASE FLASHING AT PREFABRICATED METAL CURB

NTS

DT-501

BASE FLASHING AT THROUGH-WALL SCUPPER

NTS

Sheets and Views
G101
04-090032-DT501-Layout1.pdf
Sheets and Views
Layout1
03-090032-RP101-RP101.pdf
Sheets and Views
RP101
02-090032-RD101-RD101.pdf
Sheets and Views
RD101

File details come from the government source that posted it. Updated .