DI-NDTI-80566.pdf

PDF 24 KB Posted

Attached to
T56 Component Improvement Program (CIP) Federal contract opportunity
Solicitation number
FA8124-14-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

DID

View the file

Other files for this federal contract opportunity

Other files attached to T56 Component Improvement Program (CIP), newest first.
File Type Posted
FA812414R0001_______0003.pdf PDF
CDRL.pdf PDF
RevisedIPPS.pdf PDF
IPPSAttach2.pdf PDF
IPPSAttach1.pdf PDF
IPPSAttach3.pdf PDF
FA812414R00010002.pdf PDF
PWS.doc DOC document
FA812414R0001_______0001.pdf PDF
Attachment1PWSRevised6March2014.pdf PDF
DI-MGMT-81861.pdf PDF
CY15_RFP_Letter.pdf PDF
IPPS_-_Atch_to_PTD_CDRL.PDF PDF
OT-2014-30009_DID_--_Propulsion_Characteristics_Summary - FINAL.pdf PDF
DI-IPSC-81427.pdf PDF
DI-MGMT-81468.pdf PDF
DI-IPSC-81438.pdf PDF
IPPS_Atch_2_-_PTD_FORMAT.PDF PDF
SERD_CDRL_Atch_A2_-_Handtools_LPD_Summary_Worksheet.pdf PDF
DI-SESS-81758A.pdf PDF
DI-MISC-80672.pdf PDF
Attachment_1_PWS.pdf PDF
DI-IPSC-81434.pdf PDF
SERD_CDRL_Atch_A1_-_SERD_LPD_Summary_Work_Worksheet.pdf PDF
DI-CMAN-80643.pdf PDF
DI-MCCR-80700.pdf PDF
DI-CMAN-81253.pdf PDF
DI-SESS-81766.pdf PDF
DI-MGMT-80004.pdf PDF
DD254.pdf PDF
IPPS_Atch_1_-_AFMC_718_(Prov_Perf_Sched).pdf PDF
FA812414R0001_(2).pdf PDF
SERD_CDRL_Atch_A3_-_SERD_Handtool_LPD_Selection_Worksheet.pdf PDF
DI-SAFT-81626.pdf PDF
DI-SESS-81759.pdf PDF
DI-ADMN-81250A.pdf PDF
DI-SESS-81874.pdf PDF
DI-IPSC-81440.pdf PDF
DI-QCIC-80278.pdf PDF
DI-IPSC-81439.pdf PDF
OT-2014-30010_DID--Engine_CIP_Engineering_Project_Description - FINAL.pdf PDF
Attachment_2_Air_Force_Proposal_Adequacy_Checklist.pdf PDF
DI-SESS-81768.pdf PDF
Attachment_3_FAR_15.408_Table_15-2.pdf PDF
DI-MISC-80508.pdf PDF
CDRL_TOC.pdf PDF
DI-IPSC-81433.pdf PDF
DI-CMAN-80639.pdf PDF
DI-NDTI-80809.pdf PDF
DI-NDTI-80603.pdf PDF
Show all 50

T56 Component Improvement Program (CIP) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Test Plan

Number: DI-NDTI-80566A Approval Date: 14 Nov 2006 AMSC Number: 7639 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A

Use/relationship: The Test Plan outlines the plans and performance objectives at every level of testing on systems or equipment. It provides the procuring activity with the test concept, objectives and requirements to be satisfied, test methods, elements, responsible activities associated with the testing, measures required and recording procedures to be used.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID is applicable to system and equipment tests that include design evaluation tests, engineering tests, preliminary qualification tests, formal qualification tests, human factors tests, operational tests and acceptance tests.

This DID supersede DI-NDTI-80566.

Requirements:

1. Reference documents. None.

2. General. The test plan shall document in detail the contractor’s plan for conducting tests and analyzing the test results to show how the system, when fielded, will satisfy the requirements of the applicable design specification.

3. Format: The plan shall be in contractor’s format.

4. Contents. The plan shall contain the following:

4.1 Title page. The title page shall include the following:

a. Title of the test to be conducted.

b. Identification of system being tested.

c. Contractor’s name.

d. Contractor number.

Provided by IHS Licensee=Tinker/5900025113, User=Tope, Scott

Not for Resale, 01/24/2014 13:03:18 MSTNo reproduction or networking permitted without license from IHS

DI-NDTI-80566A

e. Security classification.

f. Distribution statement.

4.2 Introduction. Consists of an overview of the objectives of the test plan, including flow diagrams, milestones, personnel participation, locations, schedules, and security measures to be observed. The plan shall include the following:

4.3 Flow diagrams. The flow diagrams will reflect a functional description of the test program using a block diagram portrayal of the functions that must be met to satisfy the total test program. Functions shall be numbered 1.0, 2.0, 3.0, etc.

4.4 Milestones. Identifies the start and expected completion dates of each test to be performed.

4.5 Participation. Identifies the government and contractor participation roles and responsibilties.

4.6 Location. Identifies the facilities where the testing will be performed.

4.7 Schedule. States when testing will be performed, whether testing is on schedule, and if not, what procedures will be taken to meet the schedule.

4.8 Security. Identify and state briefly any security measures of guidelines to be observed.

4.9 Master test list. Lists all tests to be accomplished in the order they are to be performed. A separate listing for each location shall be provided. Each listing shall include the following:

4.9.1 Test description. Name and brief description of test to be performed.

4.9.2 Applicable specification (s). The specifications shall be identified as follows:

a. Title and identification number.

b. Paragraph number associated with the tests.

c. Title of test.

d. Functional category of test.

4.9.3 Parameters. The number of cycles the test will be performed and selected parameters to be observed.

4.9.4 Special tests. Provides a list of special or unusual tests and examination necessary to verify satisfactory equipment performance to specifications.

Provided by IHS Licensee=Tinker/5900025113, User=Tope, Scott

Not for Resale, 01/24/2014 13:03:18 MSTNo reproduction or networking permitted without license from IHS

DI-NDTI-80566A

4.9.5 Test classification category. State the functional area of each test performed.

4.9.6 Test objectives. Describes the objectives of each test performed, including the criteria, baseline, duration, and number of times each test should be performed.

a. Success/failure criteria.

b. Baseline.

c. Duration.

d. Quantity of test.

4.9.7 Test equipment. List all equipment to be used in the test and identify as follows:

a. Description.

b. Nomenclature.

c. Serial number.

4.9.8 Support equipment. List all support equipment that will be used to perform the tests and identify as follows:

a. Description.

b. Nomenclature.

c. Serial number.

d. Calibration constants.

e. Calibration procedures.

f. Operating instructions.

4.9.9 Special test equipment. List all special test equipment required to be designed or fabricated for use on the program as follows:

a. Description.

b. Nomenclature.

c. Data required.

4.9.10 Approach. Describe the steps used to perform each test.

4.9.11 Instrumentation. Indicates the type and recording devices that will be used and the number and types of parameters to be recorded.

4.9.12 Data reduction and analysis. Describes data to be recorded and the data reduction and analysis techniques that will be used to interpret the data.

4.9.13 Government test facilities. Identifies applicable facility and includes a reference to the appropriate facility requirements documents.

Validation procedure. An overview of the procedures that the contractor will use to validate the test results.

5. END OF DI-NDTI-80566A

Provided by IHS Licensee=Tinker/5900025113, User=Tope, Scott

Not for Resale, 01/24/2014 13:03:18 MSTNo reproduction or networking permitted without license from IHS

DATA ITEM DESCRIPTION
Requirements:

File details come from the government source that posted it. Updated .